In this paper, a techno-commercial analysis method based on comparing 3 coal exporting countries in
Asia–Pacific region has been done for a 6 x 660 MW imported coal based ultra mega power plant
employing supercritical technology from Shanghai Electric Corp., China located in Krishnapatnam (A.P,
India) to show “How much economic is importing coal for Krishnapatnam UMPP ”. Annual coal
requirement is 15.33 MTPA @ 4290 Kcal/Kg (GCV) on GAR basis from Indonesia. FOB for Indonesian is
$ 50 /T & landed cost is $ 70.4 /T on CIF basis at plant site. Coal is imported in CAPESIZE vessels of
1, 75,000 DWT (87,500 GRT) @ 15 Knots in 7.5 days from Indonesia. KUMMP was awarded to
RELIANCE POWER LTD, & PPA of levelised tariff of Rs. 2.33/Kwhr has been signed between the
beneficiary state (T.N, A.P, Maharashtra & Karnataka) for 25 years. Analysis for cost formation of the
landed cost of imported coal at power plant site as well as the effects of coal consumption , cycle time
of vessels, different routes, duration & delivery time and characteristics of Indonesian coal has been
discussed. Indonesian coal is most economical because of short distance and huge availability to meet
plant requirement. Thus coal consumption is reduced by employing supercritical technology in KUMPP
as heat energy produced by imported coal is more efficiently utilised for generating electricity.
Ultr a Mega Power Plant 6 x 660 MW
umpp is located near krishnapatnam village in muttukur mandal of Nellore distt of coastal Andhra Pradesh.
LATITUDE 140 – 18’ – 26” N & LONGITUDE 800 – 07’ – 11.81” E. It has 6 units of 660 MW each which is to be
commissioned by 1st April 2013. The has installed capacity of 3960 MW. Contracted capacity is of 3465
MW to 3762 MW, employing supercritical technology from Shanghai Electric Grp,China. .
Some parameters to be considered for each unit :-
• Pressure: 247 kg/sq.cm (abs)
• Main steam temp :535 ° C
• Reheat temp : 565 ° C
• Station heat rate : 2250 Kcal / Kwhr
• Availability :90 %
• PLF : 85%
Project Dynamics
• The most suitable location for importing coal are south Africa, Australia & Indonesia in Asia- Pacific
region.
• 15.33 MPTA is annual coal requirement , 2076 tph ,49824 tpd @ 4290 Kcal/Kg (gcv) on GAR basis.
• Coal is imported on AR & DB basis .
a. AR (as received)- includes total moisture
b. DB (dry basis) - excludes all moisture
• Sharing of power- 40 % to A.P & 20 % to Maharashtra, T.N, Karnataka each.
• The nearest port to plant site is Krishnapatnam port.
a. One of the India’s largest and fastest growing seaports, Krishnapatnam Port.
b. It is fast becoming a port of choice for all international cargo originating from and destined to the
Southern and Central India.
c. Can store 0.63 MT (15 days) of coal at port and 1.26 MT at plant site for (30 days)
d. Maximum handling loss of 0.2 % at port.
ABSTRACT
Techno-Commercial Analysis of Importing Indonesian Coal for Krishnapatnam Ultra Mega Power Plant 6 X 660 MW
K
Mr. Manoj Vyas - MBA Power Management
Shri. Anil Kumar – Project Guide, Senior Analyst.
NPTI Faridabad (Under Ministry of Power, Govt. Of India)
manojvyas.ee@gmail.com
Coal Linkages & Coal Markets
AUSTRALIA
INDEX
Price(fob) US$
(4 Aug-2008)
GCV(Kcal/Kg)
Time In Delivery(Days)
Indonesia
• Indonesia is world’s no .1 thermal coal producer
of coal resources and 18.5 bn tons of
reserves are present in the South Sumatra
• RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico
Pendragon Energy in the
hectares.
• The coal from the mines would be supplied to Reliance Power’s 4,000
Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project
in Maharashtra
• Reliance has acquired mines with reserves of 2 billion to
linked model
• Since the mines are located in the South Sumatra region which is closer to India's east coast,
shipping time will be cut down by two days
• Reliance plans to build infrastruc
• The three mines acquired by Reliance Power in Indonesia have coal reserves valued at
about Rs 20,000 crore
• There are 2 coal markets in world Atlantic & Pacific.
• The coal can be purchased on contract basis & spot market
basis.
• Types of coal are hard & soft on the availability basis.
• Hard & soft coal be further bifurcated into coking (for iron &
steel manufacturing) & non-coking
generation).
AUSTRALIA SOUTH AFRICA INDONESIA
NEWC RB
160 155.13
6300 6000 4200
17.42 13.35 7.50
no .1 thermal coal producer. Indonesia has an estimated amount of 90 bn
of coal resources and 18.5 bn tons of coal reserves. More than 64% More than 64% of country’s coal
reserves are present in the South Sumatra.
RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico
Pendragon Energy in the South Sumatra area of Indonesia spread over an area of 40,000
The coal from the mines would be supplied to Reliance Power’s 4,000-
Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project
mines with reserves of 2 billion tonnes on a risk
Since the mines are located in the South Sumatra region which is closer to India's east coast,
shipping time will be cut down by two days
Reliance plans to build infrastructure, including a 100-kilometre railway line
The three mines acquired by Reliance Power in Indonesia have coal reserves valued at
Atlantic
South Africa
Columbia
There are 2 coal markets in world Atlantic & Pacific.
The coal can be purchased on contract basis & spot market
& soft on the availability basis.
Hard & soft coal be further bifurcated into coking (for iron &
coking coal (for power
1%
South sumatra
east kalimantan
riau
south kalimantan
others
INDONESIA
ICI
50
4200
7.50
imated amount of 90 bn tons
More than 64% of country’s coal
RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico
spread over an area of 40,000
-MW Ultra Mega
Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project
nnes on a risk-free production-
Since the mines are located in the South Sumatra region which is closer to India's east coast,
railway line
The three mines acquired by Reliance Power in Indonesia have coal reserves valued at
Atlantic
Africa
Columbia
Pacific
Indonesia
Australia
China
sumatra
kalimantan
kalimantan
Coal Analysis
There are 3 types of coal analysis:
a. Qualitative : proximate analysis & ultimate analysis
b. Quantitative: coal consumption on hourly, daily, monthly & annual basis.
c. Cost: among Australia, South Africa & Indonesia as per there coal indices .
Ship scheduling
Cycle time 1+5.50+1+1+5.50=14days
No.of available days 320
No.of voyages 320/14=23
Qty per vessel(175 DWT) CAPESIZE 87500 GRT approx
Annual capacity 87500 X 23=2 MT
Annual capacity of 8 vessels 16 MTPA
The requirement of 15.33 MTPA of the KUMPP can be met with ease by above method.
GCV of Coal (designed) 4290 Kcal/Kg
Specific coal consumption 0.5244 kg/kwhr
Hourly consumption of coal(6X 660MW) 1750 Te
Daily coal consumption @85% PLF 4200 Te
Annual coal requirement @85 % PLF 15.33 MTPA
Description
quality
GCV(GAR)
Kcal/kg
Price(US$) as
on
06-june-08
TM(GAR)% Ash(GAR)% Sulphur%
ICI-1 6500 120.36 12 12 1
ICI-2 5800 95.17 18 10 0.8
ICI-3 5000 75.58 30 8 0.6
Reliance coal
ICI-4
4290 50 33.30 2.60 .24
Port name
Distance
(Km)
Speed (Kts)
Seatime
(days)
Port time
(days)
Total
delivery
time
Departure
(including 1
day at
loading port)
Arrival
Tarah coal
terminal,
Indonesia
3667 15 5.50 2 7.50
15-8-2008
7 hrs
20-8-2008
23:32hrs
Richardsbay
port, SA
7569 15 11.35 2 13.35
15-8-2008
7 hrs
27-8-2008
15:27 hrs
New castle
port,
Australia
10281 15 15.42 2 17.42
15-8-2008 7
hrs
30-8-2008
17 hrs
Landed Cost of Indonesian coal
Landed cost consist = FOB ($ 50) + freight rates + inland handling charges at Krishnapatnam port.
= CIF + inland handling charges at Krishnapatnam
Data for calculating landed cost :
a) Cost of coal at Indonesian coal = Rs. 2000 @$ 50 /T ($ 1= Rs. 40)
b) quantity of coal imported form Indonesia through 175000 DWT vessel
c) rail distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port
d) transportation cost of coal/tonne/km
e) coal handling charges /tonne at Indonesian Port
f) Sea - route Distance (in Km.)
g) transportation cost of coal/tonne/km
h) coal handling charges /tonne at Krishnapatnam Port
Options for sourcing coal
There are 3 options for sourcing coal:
a. Port > conveyer> project site
b. Mid sea Anchorage >
c. Mid sea anchorage >
Landed Cost of Indonesian coal
+ freight rates + inland handling charges at Krishnapatnam port.
handling charges at Krishnapatnam port = $ 70.4
Cost of coal at Indonesian coal = Rs. 2000 @$ 50 /T ($ 1= Rs. 40)
quantity of coal imported form Indonesia through 175000 DWT vessel = 87,500 T
distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port
portation cost of coal/tonne/km= Rs.1 /Km
coal handling charges /tonne at Indonesian Port = Rs. 320
route Distance (in Km.) = 3667 Km
rtation cost of coal/tonne/km (through sea)= Rs. .30
coal handling charges /tonne at Krishnapatnam Port = Rs. 259
There are 3 options for sourcing coal:
conveyer> project site
id sea Anchorage > canal system > project site
Mid sea anchorage > captive port > conveyer > project site
+ freight rates + inland handling charges at Krishnapatnam port.
= 87,500 T
distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port =100 Km
PDCA Cycle
• Plan : To procure best quality coal at cheaper rates
• Do : search various locations , supply chain, logistics & risk analysis
• Act : efficient power at cost - effective rates
• Check: Bottlenecks, cycle time, escalations, requirement
Questions
1. What is supercritical technology and what is the significance of it in case of UMPP & coal
consumption?
2. What is coal linkage and how it is different from captive coal mines?
3. How many coal linkages have been notified so far?
4. How ship scheduling has been carried out in this case?
5. What would be the landed cost in this case and how it is calculated?
6. Which is best option for sourcing coal & why?
7. What are INCO-TERMS? Differentiate between those which have been used here.
8. How many types of vessels are there in world for transporting coal? Name few with their
capacities.
9. What will be the landed cost if reliance would have purchased its mine in Kalimantan, the
place where TATA has acquired mines?
10. Calculate the price escalation as per CERC guidelines for importing coal for 25 yrs for
KUMPP.
11. Why china has stopped exporting coal?
12. What are the main reasons for increase in freight rates & coal demand?
13. What are various factors affecting global FOB coal prices?
14. Is there any risk in Indonesian mines? Discuss.
15. Name Indonesian coal price index. Name some international coal price indices .Why
Indonesia has formed its own coal price indices?
16. Why Indonesian mines for Krishnapatnam UMPP?
17. Is there any potential for sequestration of carbon-dioxide at Krishnapatnam UMMP?
18. COAL is providing enhanced security for power plants. Why?
Bibliography
1. www.mjunction.com
2. www.coal.nic.in
3. www.infraline.com
4. www.ausraliancoal.com
5. www.argus.com
6. www.globalcoal.com
7. www.plats.com
8. www.mccloskey.com
9. www.barleyjonker.com
10. www.coalindoenergy.com
Manoj Vyas- MBA (Power Management)
Shri. Anil Kumar- Project Guide (Senior Analyst)
NPTI – Faridabad

Mais conteúdo relacionado

Mais procurados

Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plant
David Grenier
 
LNG Penetration (1)
LNG Penetration (1)LNG Penetration (1)
LNG Penetration (1)
Paul Joy
 
Society automotive engineering
Society automotive engineeringSociety automotive engineering
Society automotive engineering
Air Fuel Synthesis
 
Studies of performance and emission characteristics of compressed natural gas...
Studies of performance and emission characteristics of compressed natural gas...Studies of performance and emission characteristics of compressed natural gas...
Studies of performance and emission characteristics of compressed natural gas...
IOSR Journals
 

Mais procurados (18)

Fuel and energy final
Fuel and energy finalFuel and energy final
Fuel and energy final
 
Amc strategies for green mining at mcl
Amc strategies for green mining at mclAmc strategies for green mining at mcl
Amc strategies for green mining at mcl
 
ME 499 CSP Project Presentation
ME 499 CSP Project PresentationME 499 CSP Project Presentation
ME 499 CSP Project Presentation
 
Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plant
 
Summer training report on
Summer training report onSummer training report on
Summer training report on
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHAR
 
Nuclear test and air pollution in pakistan
Nuclear test and air pollution in pakistanNuclear test and air pollution in pakistan
Nuclear test and air pollution in pakistan
 
Diesel Adaptation for the Toyota Prius Hybrid System
Diesel Adaptation for the Toyota Prius Hybrid SystemDiesel Adaptation for the Toyota Prius Hybrid System
Diesel Adaptation for the Toyota Prius Hybrid System
 
Spectroscopic Properties of Ho3+ Doped Zinc Lithium Bismuth Borate Glasses
Spectroscopic Properties of Ho3+ Doped Zinc Lithium Bismuth Borate GlassesSpectroscopic Properties of Ho3+ Doped Zinc Lithium Bismuth Borate Glasses
Spectroscopic Properties of Ho3+ Doped Zinc Lithium Bismuth Borate Glasses
 
Ee opportunities
Ee opportunities Ee opportunities
Ee opportunities
 
LNG Penetration (1)
LNG Penetration (1)LNG Penetration (1)
LNG Penetration (1)
 
Society automotive engineering
Society automotive engineeringSociety automotive engineering
Society automotive engineering
 
02.20-21.2014, PRESENTATION, Introduction of CTL Plant Project, T. Munkhturl
02.20-21.2014, PRESENTATION, Introduction of CTL Plant Project, T. Munkhturl02.20-21.2014, PRESENTATION, Introduction of CTL Plant Project, T. Munkhturl
02.20-21.2014, PRESENTATION, Introduction of CTL Plant Project, T. Munkhturl
 
Uranium Enrichment techniques
Uranium Enrichment techniquesUranium Enrichment techniques
Uranium Enrichment techniques
 
Studies of performance and emission characteristics of compressed natural gas...
Studies of performance and emission characteristics of compressed natural gas...Studies of performance and emission characteristics of compressed natural gas...
Studies of performance and emission characteristics of compressed natural gas...
 
Vikas
VikasVikas
Vikas
 
F O S S I L F U E L S
F O S S I L  F U E L SF O S S I L  F U E L S
F O S S I L F U E L S
 

Semelhante a Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ultra Mega Power Plant - 6 x 660 MW

report on adani UPCL
report on adani UPCLreport on adani UPCL
report on adani UPCL
Aquib Nadaf
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
VR M
 
Presentation fot Coal Loading Operation
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
Adi Sumanto
 

Semelhante a Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ultra Mega Power Plant - 6 x 660 MW (20)

report on adani UPCL
report on adani UPCLreport on adani UPCL
report on adani UPCL
 
Surathgarh thermal powerplant
Surathgarh thermal powerplantSurathgarh thermal powerplant
Surathgarh thermal powerplant
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Cng marine for gas distribution in indonesia 2012 s
Cng marine for gas distribution in indonesia 2012 sCng marine for gas distribution in indonesia 2012 s
Cng marine for gas distribution in indonesia 2012 s
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
 
Underground Coal Gasification - India & Global
Underground Coal Gasification -  India & GlobalUnderground Coal Gasification -  India & Global
Underground Coal Gasification - India & Global
 
Training chp
Training chpTraining chp
Training chp
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Presentation fot Coal Loading Operation
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
 
presentation vsv.ppt
presentation vsv.pptpresentation vsv.ppt
presentation vsv.ppt
 
Introduction to power plants
Introduction to power plantsIntroduction to power plants
Introduction to power plants
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Gujarat Ambuja Cements Limited Cast Study
Gujarat Ambuja Cements Limited Cast StudyGujarat Ambuja Cements Limited Cast Study
Gujarat Ambuja Cements Limited Cast Study
 
Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
Indonesia power plant on gas supply to lombok gas fired power plant using cng...
Indonesia power plant on gas supply to lombok gas fired power plant using cng...Indonesia power plant on gas supply to lombok gas fired power plant using cng...
Indonesia power plant on gas supply to lombok gas fired power plant using cng...
 
Pln cng
Pln cngPln cng
Pln cng
 

Último

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Techno Commercial Analysis of Importing Indonesian Coal For Krishnapatnam Ultra Mega Power Plant - 6 x 660 MW

  • 1. In this paper, a techno-commercial analysis method based on comparing 3 coal exporting countries in Asia–Pacific region has been done for a 6 x 660 MW imported coal based ultra mega power plant employing supercritical technology from Shanghai Electric Corp., China located in Krishnapatnam (A.P, India) to show “How much economic is importing coal for Krishnapatnam UMPP ”. Annual coal requirement is 15.33 MTPA @ 4290 Kcal/Kg (GCV) on GAR basis from Indonesia. FOB for Indonesian is $ 50 /T & landed cost is $ 70.4 /T on CIF basis at plant site. Coal is imported in CAPESIZE vessels of 1, 75,000 DWT (87,500 GRT) @ 15 Knots in 7.5 days from Indonesia. KUMMP was awarded to RELIANCE POWER LTD, & PPA of levelised tariff of Rs. 2.33/Kwhr has been signed between the beneficiary state (T.N, A.P, Maharashtra & Karnataka) for 25 years. Analysis for cost formation of the landed cost of imported coal at power plant site as well as the effects of coal consumption , cycle time of vessels, different routes, duration & delivery time and characteristics of Indonesian coal has been discussed. Indonesian coal is most economical because of short distance and huge availability to meet plant requirement. Thus coal consumption is reduced by employing supercritical technology in KUMPP as heat energy produced by imported coal is more efficiently utilised for generating electricity. Ultr a Mega Power Plant 6 x 660 MW umpp is located near krishnapatnam village in muttukur mandal of Nellore distt of coastal Andhra Pradesh. LATITUDE 140 – 18’ – 26” N & LONGITUDE 800 – 07’ – 11.81” E. It has 6 units of 660 MW each which is to be commissioned by 1st April 2013. The has installed capacity of 3960 MW. Contracted capacity is of 3465 MW to 3762 MW, employing supercritical technology from Shanghai Electric Grp,China. . Some parameters to be considered for each unit :- • Pressure: 247 kg/sq.cm (abs) • Main steam temp :535 ° C • Reheat temp : 565 ° C • Station heat rate : 2250 Kcal / Kwhr • Availability :90 % • PLF : 85% Project Dynamics • The most suitable location for importing coal are south Africa, Australia & Indonesia in Asia- Pacific region. • 15.33 MPTA is annual coal requirement , 2076 tph ,49824 tpd @ 4290 Kcal/Kg (gcv) on GAR basis. • Coal is imported on AR & DB basis . a. AR (as received)- includes total moisture b. DB (dry basis) - excludes all moisture • Sharing of power- 40 % to A.P & 20 % to Maharashtra, T.N, Karnataka each. • The nearest port to plant site is Krishnapatnam port. a. One of the India’s largest and fastest growing seaports, Krishnapatnam Port. b. It is fast becoming a port of choice for all international cargo originating from and destined to the Southern and Central India. c. Can store 0.63 MT (15 days) of coal at port and 1.26 MT at plant site for (30 days) d. Maximum handling loss of 0.2 % at port. ABSTRACT Techno-Commercial Analysis of Importing Indonesian Coal for Krishnapatnam Ultra Mega Power Plant 6 X 660 MW K Mr. Manoj Vyas - MBA Power Management Shri. Anil Kumar – Project Guide, Senior Analyst. NPTI Faridabad (Under Ministry of Power, Govt. Of India) manojvyas.ee@gmail.com
  • 2. Coal Linkages & Coal Markets AUSTRALIA INDEX Price(fob) US$ (4 Aug-2008) GCV(Kcal/Kg) Time In Delivery(Days) Indonesia • Indonesia is world’s no .1 thermal coal producer of coal resources and 18.5 bn tons of reserves are present in the South Sumatra • RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico Pendragon Energy in the hectares. • The coal from the mines would be supplied to Reliance Power’s 4,000 Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project in Maharashtra • Reliance has acquired mines with reserves of 2 billion to linked model • Since the mines are located in the South Sumatra region which is closer to India's east coast, shipping time will be cut down by two days • Reliance plans to build infrastruc • The three mines acquired by Reliance Power in Indonesia have coal reserves valued at about Rs 20,000 crore • There are 2 coal markets in world Atlantic & Pacific. • The coal can be purchased on contract basis & spot market basis. • Types of coal are hard & soft on the availability basis. • Hard & soft coal be further bifurcated into coking (for iron & steel manufacturing) & non-coking generation). AUSTRALIA SOUTH AFRICA INDONESIA NEWC RB 160 155.13 6300 6000 4200 17.42 13.35 7.50 no .1 thermal coal producer. Indonesia has an estimated amount of 90 bn of coal resources and 18.5 bn tons of coal reserves. More than 64% More than 64% of country’s coal reserves are present in the South Sumatra. RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico Pendragon Energy in the South Sumatra area of Indonesia spread over an area of 40,000 The coal from the mines would be supplied to Reliance Power’s 4,000- Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project mines with reserves of 2 billion tonnes on a risk Since the mines are located in the South Sumatra region which is closer to India's east coast, shipping time will be cut down by two days Reliance plans to build infrastructure, including a 100-kilometre railway line The three mines acquired by Reliance Power in Indonesia have coal reserves valued at Atlantic South Africa Columbia There are 2 coal markets in world Atlantic & Pacific. The coal can be purchased on contract basis & spot market & soft on the availability basis. Hard & soft coal be further bifurcated into coking (for iron & coking coal (for power 1% South sumatra east kalimantan riau south kalimantan others INDONESIA ICI 50 4200 7.50 imated amount of 90 bn tons More than 64% of country’s coal RCRPL has acquired Srivijaya Bintangtiga Energy, Bryayan Bintangtiga Energy and Sugico spread over an area of 40,000 -MW Ultra Mega Power Project at Krishnapatnam in Andhra Pradesh and also to the Shahapur power project nnes on a risk-free production- Since the mines are located in the South Sumatra region which is closer to India's east coast, railway line The three mines acquired by Reliance Power in Indonesia have coal reserves valued at Atlantic Africa Columbia Pacific Indonesia Australia China sumatra kalimantan kalimantan
  • 3. Coal Analysis There are 3 types of coal analysis: a. Qualitative : proximate analysis & ultimate analysis b. Quantitative: coal consumption on hourly, daily, monthly & annual basis. c. Cost: among Australia, South Africa & Indonesia as per there coal indices . Ship scheduling Cycle time 1+5.50+1+1+5.50=14days No.of available days 320 No.of voyages 320/14=23 Qty per vessel(175 DWT) CAPESIZE 87500 GRT approx Annual capacity 87500 X 23=2 MT Annual capacity of 8 vessels 16 MTPA The requirement of 15.33 MTPA of the KUMPP can be met with ease by above method. GCV of Coal (designed) 4290 Kcal/Kg Specific coal consumption 0.5244 kg/kwhr Hourly consumption of coal(6X 660MW) 1750 Te Daily coal consumption @85% PLF 4200 Te Annual coal requirement @85 % PLF 15.33 MTPA Description quality GCV(GAR) Kcal/kg Price(US$) as on 06-june-08 TM(GAR)% Ash(GAR)% Sulphur% ICI-1 6500 120.36 12 12 1 ICI-2 5800 95.17 18 10 0.8 ICI-3 5000 75.58 30 8 0.6 Reliance coal ICI-4 4290 50 33.30 2.60 .24 Port name Distance (Km) Speed (Kts) Seatime (days) Port time (days) Total delivery time Departure (including 1 day at loading port) Arrival Tarah coal terminal, Indonesia 3667 15 5.50 2 7.50 15-8-2008 7 hrs 20-8-2008 23:32hrs Richardsbay port, SA 7569 15 11.35 2 13.35 15-8-2008 7 hrs 27-8-2008 15:27 hrs New castle port, Australia 10281 15 15.42 2 17.42 15-8-2008 7 hrs 30-8-2008 17 hrs
  • 4. Landed Cost of Indonesian coal Landed cost consist = FOB ($ 50) + freight rates + inland handling charges at Krishnapatnam port. = CIF + inland handling charges at Krishnapatnam Data for calculating landed cost : a) Cost of coal at Indonesian coal = Rs. 2000 @$ 50 /T ($ 1= Rs. 40) b) quantity of coal imported form Indonesia through 175000 DWT vessel c) rail distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port d) transportation cost of coal/tonne/km e) coal handling charges /tonne at Indonesian Port f) Sea - route Distance (in Km.) g) transportation cost of coal/tonne/km h) coal handling charges /tonne at Krishnapatnam Port Options for sourcing coal There are 3 options for sourcing coal: a. Port > conveyer> project site b. Mid sea Anchorage > c. Mid sea anchorage > Landed Cost of Indonesian coal + freight rates + inland handling charges at Krishnapatnam port. handling charges at Krishnapatnam port = $ 70.4 Cost of coal at Indonesian coal = Rs. 2000 @$ 50 /T ($ 1= Rs. 40) quantity of coal imported form Indonesia through 175000 DWT vessel = 87,500 T distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port portation cost of coal/tonne/km= Rs.1 /Km coal handling charges /tonne at Indonesian Port = Rs. 320 route Distance (in Km.) = 3667 Km rtation cost of coal/tonne/km (through sea)= Rs. .30 coal handling charges /tonne at Krishnapatnam Port = Rs. 259 There are 3 options for sourcing coal: conveyer> project site id sea Anchorage > canal system > project site Mid sea anchorage > captive port > conveyer > project site + freight rates + inland handling charges at Krishnapatnam port. = 87,500 T distance (in km) for carrying coal from Indonesian Mine end to Indonesian Port =100 Km
  • 5. PDCA Cycle • Plan : To procure best quality coal at cheaper rates • Do : search various locations , supply chain, logistics & risk analysis • Act : efficient power at cost - effective rates • Check: Bottlenecks, cycle time, escalations, requirement Questions 1. What is supercritical technology and what is the significance of it in case of UMPP & coal consumption? 2. What is coal linkage and how it is different from captive coal mines? 3. How many coal linkages have been notified so far? 4. How ship scheduling has been carried out in this case? 5. What would be the landed cost in this case and how it is calculated? 6. Which is best option for sourcing coal & why? 7. What are INCO-TERMS? Differentiate between those which have been used here. 8. How many types of vessels are there in world for transporting coal? Name few with their capacities. 9. What will be the landed cost if reliance would have purchased its mine in Kalimantan, the place where TATA has acquired mines? 10. Calculate the price escalation as per CERC guidelines for importing coal for 25 yrs for KUMPP. 11. Why china has stopped exporting coal? 12. What are the main reasons for increase in freight rates & coal demand? 13. What are various factors affecting global FOB coal prices? 14. Is there any risk in Indonesian mines? Discuss. 15. Name Indonesian coal price index. Name some international coal price indices .Why Indonesia has formed its own coal price indices? 16. Why Indonesian mines for Krishnapatnam UMPP? 17. Is there any potential for sequestration of carbon-dioxide at Krishnapatnam UMMP? 18. COAL is providing enhanced security for power plants. Why? Bibliography 1. www.mjunction.com 2. www.coal.nic.in 3. www.infraline.com 4. www.ausraliancoal.com 5. www.argus.com 6. www.globalcoal.com 7. www.plats.com 8. www.mccloskey.com 9. www.barleyjonker.com 10. www.coalindoenergy.com Manoj Vyas- MBA (Power Management) Shri. Anil Kumar- Project Guide (Senior Analyst) NPTI – Faridabad