SOFTWARE PROJECT
MANAGEMENT
How Bad are Our Projects?
   Only 34 percent of all projects succeed.
   The average project has a 43 percent cost
    overrun.
Why Projects FAIL
   Overlooked one or more of the crucial
    elements of project management.
     Risk engineering and management
     Human resource management

     Effort and cost estimation

     Project monitoring

     Tracking and control

     Time and financial management

     Proper use of project management tools
What is Project Management?
   Did you say:
     People skills
     Software
What is Software Project
Management?
   Encompasses a set of activities that are
    performed during the phases of a typical
    software development project.
Software Project Manager




      Manage Software
         Projects
Software Project Manager
         Continuously ensure that the
          software product is developed
          according to:
           The client’s business requirements
           Within allocated time

           Within allocated budget
Elements of Software Project
Management
   The project itself
   The people working on the project
   The process used to produce the project
    deliverables
   The final product delivered to the client
Common Mistakes why Projects
FAIL
   Project managers begin without knowing what
    the project is.
   Project managers do not have a plan.
   Project managers do not break the project
    down to manageable pieces.
Project Plan
   Is an important deliverable that must be
    developed carefully.
   Once written, the plan must be executed by
    the project manager.
   People involved should be well-versed
   Progress must be closely monitored by the
    manager
People
   Engaging the proper people to perform the
    prescribed tasks according to the project plan
    is important.
   Training people on the proper use of tools and
    techniques is essential.
   Communication and reporting must be well-
    defined to ensure frictionless environment.
   Transparent and continuous monitoring of
    people involved is critical for the early
    detection of problem symptoms.
Process and Phases
   Must be understood and defined because they
    determine deliverable and the efforts involved
    in their execution.
   An appropriate software life cycle model must
    be adapted for the project
   The development team needs to be
    knowledgeable regarding that model.
Project Management Activities
                                  Project management activities
During project   Estimation                          Developing the work plan:
start-up         Staffing                            activities, schedule,
                 Resource acquisition                resources, and budget
                 Training                            allocation
During project   Quality assurance control           Budget control
execution        Reporting and tracking              Schedule control
                 Metrics collection                  Requirements control
                 Risk monitoring and mitigation      Verification and validation
                 Configuration management            Documentation
                 Process Improvement                 Problem resolution
                                                     Subcontractor management
During project   Product acceptance                  Archiving
closeout         Staff reassignment                  Post-mortem evaluation and
                 User training                       assessment
                 Product installation                Integration and conversion
ESTIMATION
TECHNIQUES AND
SOFTWARE
METRICS
Good day.. (^_^)
Estimation
   One of the most critical activity during project
    startup
   Estimate the effort needed to complete the
    project
   Affects many resource aspects (financial and
    human)
   Must be realistic and accurate
Common Problems
   Underestimation
     Project milestones cannot be met
     What to do?

     Leads to low employee morale, decline in
      reputation, and a stressful work environment


   Overestimation
     Lead   to losing the bid
ESTIMATION TECHNIQUE #1:
   Informal approaches
     One or more expert opinions
     Experiences from peers

     Opinions of hired consultants
ESTIMATION TECHNIQUE #2:
   Decomposition Process
     Break down the project into functional
      components
     Ask potential developers of these components to
      provide their own estimates based on prior
      experiences
MACRO-LEVEL ESTIMATION
   Consider the software product as a whole
MICRO-LEVEL ESTIMATION
   Decompose the product into smallest possible
    components
   Estimate for those components
   Requires more time to produce, but accurate
    estimates are produced
CATEGORIES
   Black box-based / Requirements-based ET
     Estimations are obtained once the software
      project scope is clearly defined in terms of the
      required functionalities
     Function points and use case points estimation
      techniques

   Based on projected size of the final SW
    product in terms of lines of code (LOC)
     COCOMO     technique
How to solve a problem?
   When we have a problem that consists of two
    particular aspects, we should consider taking
    care about each aspect separately. Once the
    first of problems is solved, we can turn to
    another. After that, everything left is to check
    whether the particular solutions work well
    together with greater problem.
Back to measuring application
complexity …
   The analysis based on function points can be
    compared to slicing the problem into smaller
    parts.
Function Points (to simplify)
   FP is a standard method for quantifying the
    software deliverable based upon the user
    view, where:
     User  is any person or thing that communicates or
      interacts with the software at any time
     User View is the Functional User Requirements
      as seen by the user
     Functional user requirements describe what the
      software shall do, in terms of tasks and services.
Five Functional Components
   INTERNAL LOGIC FILES (ILF)
      Files created and maintained within the application

   EXTERNAL INTERFACE FILES (EIF)
     Files that are owned and are exchanged by other
      systems
   EXTERNAL INPUTS (EI)
     Inputs that affect the control flow and internal logic of the
      application leading to the creation and maintenance of
      data
   EXTERNAL OUTPUTS (EO)
     Data leaving the application to different devices, files or
      external systems
   EXTERNAL INQUIRIES (EQ)
How to perform Function Points
Analysis?
   Basically people solve problems by dividing
    them into smaller parts.
   Instead of trying to evaluate the application as
    a whole, we need to rate each of the selected
    groups.

       How exactly to do it?

   We need to classify the complexity of each
    category.
Function Points Analysis (FPA)
   We have three possibilities.
                                        COMPLEXITY
         COMPONENT
                               SIMPLE    AVERAGE     COMPLEX
     External Input              3          4           6
     External Output             4          5           7
     User Inquiry                3          4           6
     External Interface File     7          10         15
     Internal Logic File         5          7          10

   Then, the whole “problem” is to sum the values.
   A total of them represents the number of
    application’s function points.
Function Point Metrics
                               SIMPLE                          AVERAGE                          COMPLEX




                                   How many?




                                                                     How many?




                                                                                                    How many?
                                                  Product




                                                                                 Product




                                                                                                                Product
                          Weight




                                                            Weight




                                                                                           Weight
                          Factor




                                                            Factor




                                                                                           Factor
External Input             3       1              3          4       2           8          6       1           6
External Output            4       3             12          5       0           0          7       1           7
User Inquiry               3       1              3          4       1           4          6       0           0
External Interface File    7       0              0          10      0           0          15      3           45
Internal Logic File        5       0              0          7       0           0          10      1           10
TOTAL                              18                                12                             68
NO. of FPs                                     18 + 12 + 68 = 98 function points
CASE STUDY
   STOCK CONTROL SYSTEM – estimating the
    time needed to develop this application

Let's imagine a company which sells goods on the
phone - if agents call the customers, customers call
the agents, and so on - business operates
successfully, but there comes a time for putting the
whole in order. There occurs a need for developing
a system able to control the whole stock, from
orders to payments. Our thing is to estimate how
complex such system can be and - after that - try
to predict how long it would take to develop it.
HELP??.. :’(
   At first, we should pay attention to the
    functionality – what exactly the system should
    be able to do.
   Then, let us group functions into five
    categories.
   Let math do the last thing. (^_^)
Let’s predict every function’s complexity is
simple …

       Category             Multiplier        Weight Factor
External Inputs                 4                  3
External Outputs                4                  4
External InQuiries              3                  3
Internal Logic Files            4                  5


   4 * 3 + 4 * 4 + 3 * 3 + 4 * 5 = 57 [Function
HowPoints]takes to produce 57 function points?
   long it
                       57 * 8 = 456 [hours]
The answer?
     - The estimate for developing the application would
take
       about 456 hours of work.
Technical factors affecting
complexity of software projects

   Reliable backup and recovery needed
   Data communications needed
   Distributed functions required
   Performance required
   Heavily used configuration
   Real-time data entry needed
   Ease of use
Technical factors affecting
complexity of software projects

   Real-time update needed
   Complexity of the interfaces
   Complexity of the processing
   Reusability
   Ease of installation
   Multiple sites
   Easy to change
USE CASE
 POINTS
  AND
COCOMO
Use Case Points
Use Case Points
   introduced by Gustav Kamer in 1993
   Extension of the FP method based on the use
    cases existing in the use case model of a
    software system
Categories of actors:


      Simple – are other systems that
       communicate with your software via a pre-
       defined API. Complex – has more than 10
       transactions
Categories of actors:

    Average - can either be human beings interacting in a
     well defined protocol, or they could be systems that
     interact through a more complex or flexible API.
Categories of actors:


      Complex - users who interact with the
                   software through a graphical
                   user interface are complex
                   actors
                 - users who interact with the
                 system in unpredictable ways
Categories of use cases:


    Simple – at most 3 transactions
    Average – has 4 to 7 transactions

    Complex – has more than 7 transactions
Unadjusted Actor Weight
(UAW)

   sum of complexity values assigned to
       each actor
   sum of all actor weights
e.g.
Unadjusted Use Case Weight
(UUCW)

   sum of complexity values assigned to each
    use case
e.g.
Unadjusted Use Case Point
(UUCP)

   the unadjusted size of the overall system

             UUCP= UAW + UUCW
e.g.
       UUCP = 560 + 40
          =600
Adjusted Use Case Points
(AUCP)

   total effort to develop a system in respect to
    the different factors impacting Technical
    Complexity Factor and Environmental Factor

        AUCP = (UAW + UCCW * TCF * EF)
   Technical Complexity Factor
        - Sum of all the weighted values     computed
    for each of the 13 technical factors which are
    mainly related to the product and its complexity in
    terms of functional and non-functional
        requirements.


               TCF = 0.6 + (0.01 * TF)
e.g.
       TCF = 0.6 + (0.01 * 42)
           = 1.02
   Environmental Factor
       - related to the people, process and project
    aspects of the software


                EF = 1.4 - (-0.03 * EF)
e.g.
       EF = 1.4 + (-0.03 * 17.5)
         = 1.4 + (-0.03 * 17.5)
         = 0.89
COCOMO
Constructed Cost Model
(COCOMO)
   introduced by Barry Boehm in 1981
   provides an estimate of the effort in person-
    months needed to develop a software product
   Based on the estimation of the size of the
    software in terms of the number of lines of
    codes
Types of Software
1. Organic Products
    -are relatively small and simple
2. Semi-detached
    -are average in size and simplicity
3. Embedded
     - complex in the sense that they must meet the
   constraints of their embedding environment and
   interfaces, including software and hardware
3 Versions of COCOMO
   Basic
        - provides an estimate of the effort as a function
    of an estimate of the program size.
        -the development effort and the development
    duration are calculated on the basis of the
    estimated DSI.

                        E = a * Sizeb
                         D = c * Ed
                          P = E/D
   Intermediate
         -The same basic equation for the model is
    used, but fifteen cost drivers are rated on a
    scale of 'very low' to 'very high' to calculate
    the specific effort multiplier and each of them
    returns an adjustment factor which multiplied
    yields in the total EAF (Effort Adjustment
    Factor).


                 E = a * Size * EAF
   Detailed
        -computes effort as a function of program size and a
      set of cost drivers weighted according to each phase
      of the software lifecycle.
4 phases of Detailed COCOMO
     1. Requirements Planning and Product
           design
     2. Detailed Design
     3. Code and Unit Test
     4. Integration and Test
Thank you.. :P


                 By : wa lng.. :D

Mais conteúdo relacionado

Mais procurados

Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9koolkampus
 
Chain of responsibility
Chain of responsibilityChain of responsibility
Chain of responsibilityShakil Ahmed
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5Mohammad Faizan
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation TechniquesMohamedIbrahim1408
 
Characterizing the Software Process: A Maturity Framework
Characterizing the Software Process:  A Maturity FrameworkCharacterizing the Software Process:  A Maturity Framework
Characterizing the Software Process: A Maturity FrameworkSachin Hiriyanna
 
Lect4 software economics
Lect4 software economicsLect4 software economics
Lect4 software economicsmeena466141
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation TechniquesSanthi thi
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality planKittitouch Suteeca
 
Software estimation
Software estimationSoftware estimation
Software estimationMd Shakir
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniqueskamal
 
WORKFLOW OF THE PROCESS IN SPM
 WORKFLOW OF THE PROCESS IN SPM WORKFLOW OF THE PROCESS IN SPM
WORKFLOW OF THE PROCESS IN SPMgarishma bhatia
 
Software effort estimation
Software effort estimationSoftware effort estimation
Software effort estimationtumetr1
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimationumair khan
 
Uml diagrams
Uml diagramsUml diagrams
Uml diagramsbarney92
 
Interaction Modeling
Interaction ModelingInteraction Modeling
Interaction ModelingHemant Sharma
 
3 Tier Architecture
3  Tier Architecture3  Tier Architecture
3 Tier ArchitectureWebx
 

Mais procurados (20)

Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9
 
Chain of responsibility
Chain of responsibilityChain of responsibility
Chain of responsibility
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
Characterizing the Software Process: A Maturity Framework
Characterizing the Software Process:  A Maturity FrameworkCharacterizing the Software Process:  A Maturity Framework
Characterizing the Software Process: A Maturity Framework
 
Lect4 software economics
Lect4 software economicsLect4 software economics
Lect4 software economics
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Unit testing
Unit testing Unit testing
Unit testing
 
WORKFLOW OF THE PROCESS IN SPM
 WORKFLOW OF THE PROCESS IN SPM WORKFLOW OF THE PROCESS IN SPM
WORKFLOW OF THE PROCESS IN SPM
 
Software effort estimation
Software effort estimationSoftware effort estimation
Software effort estimation
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimation
 
Uml diagrams
Uml diagramsUml diagrams
Uml diagrams
 
Interaction Modeling
Interaction ModelingInteraction Modeling
Interaction Modeling
 
3 Tier Architecture
3  Tier Architecture3  Tier Architecture
3 Tier Architecture
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 

Destaque (7)

Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
Chapter 6 software metrics
Chapter 6 software metricsChapter 6 software metrics
Chapter 6 software metrics
 
Software process and project metrics
Software process and project metricsSoftware process and project metrics
Software process and project metrics
 
Software Metrics
Software MetricsSoftware Metrics
Software Metrics
 
13 software metrics
13 software metrics13 software metrics
13 software metrics
 
Software Metrics
Software MetricsSoftware Metrics
Software Metrics
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 

Semelhante a Estimation techniques and software metrics

Module 1_software engineering.pptx
Module 1_software engineering.pptxModule 1_software engineering.pptx
Module 1_software engineering.pptxadityab33
 
Importance of software quality metrics
Importance of software quality metricsImportance of software quality metrics
Importance of software quality metricsPiyush Sohaney
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-pptatish90
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdfShivareddyGangam
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manualVivek Kumar Sinha
 
Spm project planning
Spm project planning Spm project planning
Spm project planning Kanchana Devi
 
Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Raj vardhan
 
Project report software major project
Project report software major projectProject report software major project
Project report software major projectAnnurajsingh
 
Software Size Estimation
Software Size EstimationSoftware Size Estimation
Software Size EstimationMuhammad Asim
 
Managing Software Project
Managing Software ProjectManaging Software Project
Managing Software ProjectAnas Bilal
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxssusere4c6aa
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNANDINI SHARMA
 
Agile driven development main principles
Agile driven development main principlesAgile driven development main principles
Agile driven development main principlesTanya Epstein
 
Different Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application TestingDifferent Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application TestingRachel Davis
 
Soft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxSoft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxKalpna Saharan
 
Lecture 2 introduction to Software Engineering 1
Lecture 2   introduction to Software Engineering 1Lecture 2   introduction to Software Engineering 1
Lecture 2 introduction to Software Engineering 1IIUI
 

Semelhante a Estimation techniques and software metrics (20)

Module 1_software engineering.pptx
Module 1_software engineering.pptxModule 1_software engineering.pptx
Module 1_software engineering.pptx
 
Importance of software quality metrics
Importance of software quality metricsImportance of software quality metrics
Importance of software quality metrics
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-ppt
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdf
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
 
SE-Lecture-5.pptx
SE-Lecture-5.pptxSE-Lecture-5.pptx
SE-Lecture-5.pptx
 
Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2
 
Project report software major project
Project report software major projectProject report software major project
Project report software major project
 
Software Size Estimation
Software Size EstimationSoftware Size Estimation
Software Size Estimation
 
Managing Software Project
Managing Software ProjectManaging Software Project
Managing Software Project
 
Software testing ppt
Software testing pptSoftware testing ppt
Software testing ppt
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
 
prod-dev-management.pptx
prod-dev-management.pptxprod-dev-management.pptx
prod-dev-management.pptx
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project Management
 
Agile driven development main principles
Agile driven development main principlesAgile driven development main principles
Agile driven development main principles
 
Different Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application TestingDifferent Methodologies For Testing Web Application Testing
Different Methodologies For Testing Web Application Testing
 
Soft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxSoft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptx
 
Lecture 2 introduction to Software Engineering 1
Lecture 2   introduction to Software Engineering 1Lecture 2   introduction to Software Engineering 1
Lecture 2 introduction to Software Engineering 1
 

Último

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 

Último (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 

Estimation techniques and software metrics

  • 2.
  • 3.
  • 4. How Bad are Our Projects?  Only 34 percent of all projects succeed.  The average project has a 43 percent cost overrun.
  • 5. Why Projects FAIL  Overlooked one or more of the crucial elements of project management.  Risk engineering and management  Human resource management  Effort and cost estimation  Project monitoring  Tracking and control  Time and financial management  Proper use of project management tools
  • 6. What is Project Management?  Did you say:  People skills  Software
  • 7. What is Software Project Management?  Encompasses a set of activities that are performed during the phases of a typical software development project.
  • 8. Software Project Manager Manage Software Projects
  • 9. Software Project Manager  Continuously ensure that the software product is developed according to:  The client’s business requirements  Within allocated time  Within allocated budget
  • 10. Elements of Software Project Management  The project itself  The people working on the project  The process used to produce the project deliverables  The final product delivered to the client
  • 11. Common Mistakes why Projects FAIL  Project managers begin without knowing what the project is.  Project managers do not have a plan.  Project managers do not break the project down to manageable pieces.
  • 12. Project Plan  Is an important deliverable that must be developed carefully.  Once written, the plan must be executed by the project manager.  People involved should be well-versed  Progress must be closely monitored by the manager
  • 13. People  Engaging the proper people to perform the prescribed tasks according to the project plan is important.  Training people on the proper use of tools and techniques is essential.  Communication and reporting must be well- defined to ensure frictionless environment.  Transparent and continuous monitoring of people involved is critical for the early detection of problem symptoms.
  • 14. Process and Phases  Must be understood and defined because they determine deliverable and the efforts involved in their execution.  An appropriate software life cycle model must be adapted for the project  The development team needs to be knowledgeable regarding that model.
  • 15. Project Management Activities Project management activities During project Estimation Developing the work plan: start-up Staffing activities, schedule, Resource acquisition resources, and budget Training allocation During project Quality assurance control Budget control execution Reporting and tracking Schedule control Metrics collection Requirements control Risk monitoring and mitigation Verification and validation Configuration management Documentation Process Improvement Problem resolution Subcontractor management During project Product acceptance Archiving closeout Staff reassignment Post-mortem evaluation and User training assessment Product installation Integration and conversion
  • 17. Estimation  One of the most critical activity during project startup  Estimate the effort needed to complete the project  Affects many resource aspects (financial and human)  Must be realistic and accurate
  • 18. Common Problems  Underestimation  Project milestones cannot be met  What to do?  Leads to low employee morale, decline in reputation, and a stressful work environment  Overestimation  Lead to losing the bid
  • 19. ESTIMATION TECHNIQUE #1:  Informal approaches  One or more expert opinions  Experiences from peers  Opinions of hired consultants
  • 20. ESTIMATION TECHNIQUE #2:  Decomposition Process  Break down the project into functional components  Ask potential developers of these components to provide their own estimates based on prior experiences
  • 21. MACRO-LEVEL ESTIMATION  Consider the software product as a whole
  • 22. MICRO-LEVEL ESTIMATION  Decompose the product into smallest possible components  Estimate for those components  Requires more time to produce, but accurate estimates are produced
  • 23. CATEGORIES  Black box-based / Requirements-based ET  Estimations are obtained once the software project scope is clearly defined in terms of the required functionalities  Function points and use case points estimation techniques  Based on projected size of the final SW product in terms of lines of code (LOC)  COCOMO technique
  • 24. How to solve a problem?  When we have a problem that consists of two particular aspects, we should consider taking care about each aspect separately. Once the first of problems is solved, we can turn to another. After that, everything left is to check whether the particular solutions work well together with greater problem.
  • 25. Back to measuring application complexity …  The analysis based on function points can be compared to slicing the problem into smaller parts.
  • 26. Function Points (to simplify)  FP is a standard method for quantifying the software deliverable based upon the user view, where:  User is any person or thing that communicates or interacts with the software at any time  User View is the Functional User Requirements as seen by the user  Functional user requirements describe what the software shall do, in terms of tasks and services.
  • 27. Five Functional Components  INTERNAL LOGIC FILES (ILF)  Files created and maintained within the application  EXTERNAL INTERFACE FILES (EIF)  Files that are owned and are exchanged by other systems  EXTERNAL INPUTS (EI)  Inputs that affect the control flow and internal logic of the application leading to the creation and maintenance of data  EXTERNAL OUTPUTS (EO)  Data leaving the application to different devices, files or external systems  EXTERNAL INQUIRIES (EQ)
  • 28. How to perform Function Points Analysis?  Basically people solve problems by dividing them into smaller parts.  Instead of trying to evaluate the application as a whole, we need to rate each of the selected groups. How exactly to do it?  We need to classify the complexity of each category.
  • 29. Function Points Analysis (FPA)  We have three possibilities. COMPLEXITY COMPONENT SIMPLE AVERAGE COMPLEX External Input 3 4 6 External Output 4 5 7 User Inquiry 3 4 6 External Interface File 7 10 15 Internal Logic File 5 7 10  Then, the whole “problem” is to sum the values.  A total of them represents the number of application’s function points.
  • 30. Function Point Metrics SIMPLE AVERAGE COMPLEX How many? How many? How many? Product Product Product Weight Weight Weight Factor Factor Factor External Input 3 1 3 4 2 8 6 1 6 External Output 4 3 12 5 0 0 7 1 7 User Inquiry 3 1 3 4 1 4 6 0 0 External Interface File 7 0 0 10 0 0 15 3 45 Internal Logic File 5 0 0 7 0 0 10 1 10 TOTAL 18 12 68 NO. of FPs 18 + 12 + 68 = 98 function points
  • 31. CASE STUDY  STOCK CONTROL SYSTEM – estimating the time needed to develop this application Let's imagine a company which sells goods on the phone - if agents call the customers, customers call the agents, and so on - business operates successfully, but there comes a time for putting the whole in order. There occurs a need for developing a system able to control the whole stock, from orders to payments. Our thing is to estimate how complex such system can be and - after that - try to predict how long it would take to develop it.
  • 32. HELP??.. :’(  At first, we should pay attention to the functionality – what exactly the system should be able to do.  Then, let us group functions into five categories.  Let math do the last thing. (^_^)
  • 33. Let’s predict every function’s complexity is simple … Category Multiplier Weight Factor External Inputs 4 3 External Outputs 4 4 External InQuiries 3 3 Internal Logic Files 4 5 4 * 3 + 4 * 4 + 3 * 3 + 4 * 5 = 57 [Function HowPoints]takes to produce 57 function points? long it 57 * 8 = 456 [hours] The answer? - The estimate for developing the application would take about 456 hours of work.
  • 34. Technical factors affecting complexity of software projects  Reliable backup and recovery needed  Data communications needed  Distributed functions required  Performance required  Heavily used configuration  Real-time data entry needed  Ease of use
  • 35. Technical factors affecting complexity of software projects  Real-time update needed  Complexity of the interfaces  Complexity of the processing  Reusability  Ease of installation  Multiple sites  Easy to change
  • 36. USE CASE POINTS AND COCOMO
  • 38. Use Case Points  introduced by Gustav Kamer in 1993  Extension of the FP method based on the use cases existing in the use case model of a software system
  • 39. Categories of actors:  Simple – are other systems that communicate with your software via a pre- defined API. Complex – has more than 10 transactions
  • 40. Categories of actors:  Average - can either be human beings interacting in a well defined protocol, or they could be systems that interact through a more complex or flexible API.
  • 41. Categories of actors:  Complex - users who interact with the software through a graphical user interface are complex actors - users who interact with the system in unpredictable ways
  • 42.
  • 43. Categories of use cases:  Simple – at most 3 transactions  Average – has 4 to 7 transactions  Complex – has more than 7 transactions
  • 44.
  • 45. Unadjusted Actor Weight (UAW)  sum of complexity values assigned to each actor  sum of all actor weights
  • 46. e.g.
  • 47. Unadjusted Use Case Weight (UUCW)  sum of complexity values assigned to each use case
  • 48. e.g.
  • 49. Unadjusted Use Case Point (UUCP)  the unadjusted size of the overall system UUCP= UAW + UUCW e.g. UUCP = 560 + 40 =600
  • 50. Adjusted Use Case Points (AUCP)  total effort to develop a system in respect to the different factors impacting Technical Complexity Factor and Environmental Factor AUCP = (UAW + UCCW * TCF * EF)
  • 51. Technical Complexity Factor - Sum of all the weighted values computed for each of the 13 technical factors which are mainly related to the product and its complexity in terms of functional and non-functional requirements. TCF = 0.6 + (0.01 * TF)
  • 52.
  • 53. e.g. TCF = 0.6 + (0.01 * 42) = 1.02
  • 54. Environmental Factor - related to the people, process and project aspects of the software EF = 1.4 - (-0.03 * EF)
  • 55.
  • 56. e.g. EF = 1.4 + (-0.03 * 17.5) = 1.4 + (-0.03 * 17.5) = 0.89
  • 58. Constructed Cost Model (COCOMO)  introduced by Barry Boehm in 1981  provides an estimate of the effort in person- months needed to develop a software product  Based on the estimation of the size of the software in terms of the number of lines of codes
  • 59. Types of Software 1. Organic Products -are relatively small and simple 2. Semi-detached -are average in size and simplicity
  • 60. 3. Embedded - complex in the sense that they must meet the constraints of their embedding environment and interfaces, including software and hardware
  • 61.
  • 62. 3 Versions of COCOMO  Basic - provides an estimate of the effort as a function of an estimate of the program size. -the development effort and the development duration are calculated on the basis of the estimated DSI. E = a * Sizeb D = c * Ed P = E/D
  • 63. Intermediate -The same basic equation for the model is used, but fifteen cost drivers are rated on a scale of 'very low' to 'very high' to calculate the specific effort multiplier and each of them returns an adjustment factor which multiplied yields in the total EAF (Effort Adjustment Factor). E = a * Size * EAF
  • 64.
  • 65. Detailed -computes effort as a function of program size and a set of cost drivers weighted according to each phase of the software lifecycle.
  • 66. 4 phases of Detailed COCOMO 1. Requirements Planning and Product design 2. Detailed Design 3. Code and Unit Test 4. Integration and Test
  • 67. Thank you.. :P By : wa lng.. :D

Notas do Editor

  1. We need to make a choice right now.TO LEARN or NOT TO LEARN Project ManagementProject management has a lot that can offer us.One thing we want you to realize is that PROJECTS ARE REALLY BAD
  2. How about extra time?Do you really want to be working on your project more time than you need to?
  3. The manager must develop a management plan to follow closely during the execution of the project. This plan must be monitored and necessary modifications made by the manager to ensure the timely delivery of a quality software product.
  4. If I would ask you..Neither of these are correct.Sure you need people skills. But we need people’s skills are for lots of things.Yes! There are good softwares out there, but it only HELPS you to manage projects, its NOT going to TELL you how to manage projects.
  5. The project plan is a multipage document describing the schedule, costs, resources, risks, communication, and quality for the product AND how they will be managed.Any delays in the execution of the plan and any foreseen or unforeseen risks that arise during the project progress must be detected. Proper project progress monitoring tools must be used to ensure the timely delivery of the product. A review of the project plan and its timeline can be needed as a result of a corrective action.
  6. Most important resources for the execution of a project.
  7. COCOMO – Constructive Cost Model
  8. + The idea of function points - slicing the system into smaller parts - seems simple, but the problem was how to distinguish each part. + The first two are data-based components and the last three are transaction-based components