1. Golden Gate University
SF Remodel Project - Phase 7: Master Planning & Programming
Objective 4 - Library Planning
11.12.12
2. November 12th Meeting
Steering Committee
I. Emerging Themes and Opportunities (review)
II. Objective 4 Space Planning
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 2
3. Conceptual Organizational Model: Proposed
Instruction
Seminar/ Seminar/
Instruction Study Instruction Study
Lawyering
Mini- Mini- Skills
break break Program Seminar/
Study
Mini-
break
Law Quiet/ Law
Scheduled Library
Relaxation Wellness Study Staff
Learning Law Book
Support SBA Browsing
Staff Learning SGA Book
Support Lounge store Lounge
LEARNING Services Book Storage
Casual Study LAW & BUSINESS
COMMONS (loud, informal) LIBRARIES
Interaction
Quiet/ Business Dining (Café)
Scheduled Library Business Business
Study Research HUB Library Book
Staff Technical Browsing
Staff
University
Concierge
PLUS
Law
Student
Study Services
Business LAW
U.G. Study Student Informal SCHOOL
PRGMS
Services “Drop-In” Faculty
Faculty Meeting Support
Support AGENO
SCHOOL Study
OF BUS. Study
Faculty BRADEN Law
Faculty SCHOOL Formal Faculty
Support SCHOOL “Scheduled”
OF TAX. Meetings
OF ACCT.
Faculty
AdjunctSupport Faculty
Faculty Faculty Staff Lounge
Support
Lounge
Faculty
University
Administration
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 3
4. Physical Planning
One-block Radius
BART
1s
tS
tre
et
e t
re
St
k et
ar
M
Ec
ker Transbay
40 Pl Terminal
Jessie ac
e
Golden Gate
University
BART
536
Mission
En ain
try
M
t
e
re
St
on
2n
si
d
is
St
M
re
et
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 4
5. Physical Planning
Ecker Place Orientation
1s
tS
tre
et
Ec
ke
rP
la
ce
Pe
des
40 tr
Jessie ia
n
W
al
kw
ay
Golden
Gate
University
te
re
St
n
sio
is
M
536 Mission
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 5
6. Physical Planning
Urban Design employs social spaces to connect campus
Café
Study Space
Service
Point
HUB
Learning
Support
Services
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 6
7. Physical Planning
Buildings in section show planned organization; highlight focuses attention on Libraries
6 Administration Interaction Administration
5 Classrooms Schools of Business
4 Schools of Business
3 Law School
2 Law School
M Study / Group Study
1 HUB CAFÉ
Interactive Collaboration
P Staff
Book Storage
B
West Wing 536 Mission East Wing 40 Jessie
Quiet / No Food Louder / Food Permitted
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 7
8. Physical Planning: Seat Counts
Existing Planned
Basement
Group Study Seats: 16 Group Study Seats: 8
Rooms: 4 Rooms: 2
Individual Seats: 126 Individual Seats: 56
Group tables: 76 Group tables: 28
Carrels: 51 Carrels: 28
_____________________________ ____________________________
Total Basement Seats: 142 Total Basement Seats: 64
Plaza
Law Library
Group Study Seats: 12 (excl. ELJ) Group Study Seats: 12 (excl. ELJ)
Rooms: 3 Rooms: 3
Individual Seats: 228 Individual Seats: 228
Group tables: 116 Group tables: 116
Carrels:102 Carrels:102
_____________________________ _____________________________
Total Plaza Seats: 240 Total Plaza Seats: 240
Unused Shelving: 388 LF Unused Shelving: 388 LF
497 Law Library seats 419 Law Library seats
University Library 169 University Library seats 300 University Library seats
40 Group Study room seats floors 2 - 5
GGU Total 666 total seats 759 total seats
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 8
9. Physical Planning: Objective 4, Library
Basement
Summary:
• Add 1,200 SF of
compact shelving
• Add open shelving
• Remove 78 seats; retain
64 seats
• Retain Microfiche Room,
Computer Lab, and Law
Review spaces
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 9
10. Physical Planning: Objective 4, Library
Plaza
Summary:
• Retain majority of floor
and spaces as they are
• Possible re-allocation of
484 SF of space from
Law Library offices (2)
and shelving to
Business Library Tech
Services offices (2) and
open offices (3)
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 10
11. Physical Planning: Objective 4, Library
1st Floor
Summary:
• Law Library side
remains as-is
• Wall behind current
lobby opens up into new
Hub + Event Space
• New Library entry onto
Ecker place enables
Urban Planning / Design
strategy to be realized
• Learning Support
Services, collaborative
interaction space, group
study rooms, circulation
and reference service
point, and quiet study
form the foundation of
the new Learning
Commons
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 11
12. Physical Planning: Objective 4, Library
Mezzanine
Summary:
• Additional Group Study
rooms, quiet study
space, and collaborative
interaction space
enliven the Mezzanine
• Student-serving
(reference) Library staff
plus the Director, a staff
break room, storage
space, and a shared
work area fill the
remainder of the floor
proprietary and confidential
Golden Gate University SF Remodel Project - Phase 7: Master Planning & Programming
MKTHINK 12