1.5 Mtpa Longwall faces in
Shanthikhani and KK-7.




             G.Rajendar Reddy GM, Proj.Plng
               MD. Suresh Kumar Add.Mgr,
             Proj.Plng
MMR shaft block                               KK-7 LW Project




                                                           D
                          B                  C
                                                                 E

  A

                                          Geo-Reserves         101.57 MT
Mine Take Area:           857.91 Ha
                                          Rated Capacity       1.5MT
Forest                    60.51
                                          Grade                F, E, C
No-Forest         797.4
BH Density                13/sq.km
Seams                     7
Seams workable            3 (IA, I,III)
Gradient                  1 in 3.5 to 5
Depth                     92 to 606 m
Shanthikhani shaft block                  SK LW Project




Mine Take Area    1184.3 Ha            Geo-Reserves                     45.496 MT
Forest Land       648.11 Ha            Ext. Reserves                    26.22
Non-Forest Land   536.18 Ha            Rated Capacity                   1.5MT
BH Density        13.5 /sq.km          Depth                            244-662m
Seams avble       7 seams
Seams workable    1 (SJ Top&Bot)
Rated Capacity    1.5MT
Grade             D Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                  Roof                  underground Strata Control- Planning issues
Working under Sst roof                                    Past Experience
LW failures under hard roof in India
• LW collapsed at Balrampur, Kumda, Churcha, Kottadi and Gdk9inc, 11A.
• Major roof collapse in VK-7 during salvage under Sst roof.
• P-21 worked under Sst roof in PVK.

Preparedness for working under Sst in PVK

• Supports Refurbishment: Around new 200 legs (50% of
  total legs), all control valve blocks, all bleed valves, all
  line distribution blocks, all connectors, hoses, filters,
  advancing rams, rams of extension canopies were
  replaced with indigenous and imported spares.
• New 3rd power pack pump.
• Ring-main circuit.
• Multi Point Borehole Extensometers (MPBEx) - 2 Nos.
• The additional boreholes at 30 and 60m were logged too.                               21
                                                                                      P-
• The physic-mechanical properties of older/newer
  boreholes compared and studied in-detail.
• Calculation of layer wise cavability index.
• Numerical modeling were done with the help of CIMFR.
• Around 500 blast holes were drilled & blasted.

                                 Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                          underground Strata Control- Planning issues
Working under Sst roof                                                                          Past Experience
  Actual Situation…                                                         0   10           20   30   40
                                                                                                            Support #
                                                                                                              50        60   70   80   90   100
                                                                      120                                                                         0

• Excessive abutment pressure &
  loading on Power supports.                                          100
                                                                                                                                                  -5
• Floor heaving-AFC got lifted up,




                                       Hydraulic run of Legs (cm s)
  Supports dislodged in gates                                         80




                                                                                                                                                        Hanging Goaf (m )
                                                                                                                                                  -10
• Change of roof RL within the face:
                                                                      60
  Frequent change of section- AFC
                                                                                                                                                  -15
  damage.                                                             40        Front 24/9

• Stone intrusion: had to cut by                                                Rear 24/9
                                                                                Front 25/9
  shearer--Damage to picks, drums,                                    20        Rear 25/9
                                                                                                                                                  -20


  gear box, abrasion of AFC                                                     Hanging 24/9
                                                                                Hanging25/9
  fleights, chains.                                                    0                                                                          -25




                                 Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                          underground Strata Control- Planning issues
Working under Sst roof                               Past Experience
Coal roof Vs Stone roof




                          Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                   underground Strata Control- Planning issues
Selection of seam and sequence of Operation
 Seams of MMR shaft Block                        Seams of SK shaft Block




                      4.5m




                                                            2.5m                  3.7m
                            1.7m




                            2.0m

                      Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                               underground Strata Control- Planning issues
Selection of seams and Sequence of Oprn.
  LW workability options




                        KK-7                                                SK
•Projected Reserves in IA : 33.9 MT (upto750m).   •Projected Reserves in SJ Bot: 34.3MT (Upto750m).
•No of Cycles =34000                              •No of cycles = 34000



 LW Unit-1 with 30000 cycles                       LW Unit-2 with 30000 cycles
                                          Thin seams (2.5m)
 •Projected Reserves in III seam of KK-7   : 8.5 MT (Upto 750m).         No of Cycles = 14775
 •Projected Reserves in I seam of KK-7     : 6.8 MT (Upto 750m)          No of Cycles = 16144
 •Projected Reserves in SJ (Top)seam of SK : 9.7 MT (Upto 750m).         No of Cycles = 9760


              LW Unit-3 with 30000 cycles (1.7 to 2.5 Ht Control- Planning issues
                                        Workshop on Strata
                                                           of Extn)
Selection of Working section                 Development
Trunks




Gate Roads




                 Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                          underground Strata Control- Planning issues
Selection of Working section                 Extraction




                Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                         underground Strata Control- Planning issues
Panel Layouts                              Dip-Rise Panels
Why Dip-Rise panel in KK-7 ??




                          Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                   underground Strata Control- Planning issues
Panel Layouts                                        Dip-Rise Panels
Advantages
1. Face gradient is 1 in 6. Gate roads gradient is 1 in 6.
2. The position of abutment load and tensile load gets shifted from
   supports towards goaf.
3. The intensity of abutment load reduced drastically and the caving is
   very smooth.
4. No abnormal roof convergence and floor heaving are experienced
   & expected.
5. Gate road supports are intact.
6. No water problem along bottom gate road ways.
     a. Min 10 persons/ day/ km gate belt-be avoided.
     b. Min 4 weak joints/week-avoided
     c. Reduction in Belt life.
     d. Advancing of gate end supports, BSL, Gate belt tail end unit becomes
        easier.
     e. BSL and gate belt is free of water.
     f. No rusting & pitting problems of BSL bottom plates, fleights and chain.
     g. Quality of coal is maintained.
Limitations
1. Men transport upto face and Advancing of switch train.
2. Shear failure of face results in falling of boulders onto
   AFC and injuring persons working at face.
3. Reduction of shearer thrust for cutting the coal in
   raising direction.            Roof Bolting Practice in underground mines-needs ‘ Review & Policy’
Panel Layouts                                  Strike panels
    Problems to be focused..
•    Face gradient is 1 in 3.8 to 1 in 4.5. Gate road gradient is 1 in 50.
•    Power requirement of Shearer:
         • For cutting the face At 1 in 3.8 gradient is around 900KW for 3.6m/4m Ht of Extrn.
         • For haulage of shearer at 1 in 3.8 gradient is around 70 KW.
•    Contours swing for about 500m in few panels towards North.
         • Straight gate: Gates dipping at 1 in 50, RL difference 10m, Water should be
             pumped out.
         • Deviation in Gate (90) : Face has to negotiate deviation with strata problems, time
             loss.
•    Possible Roof damage to bottom Gate of Twin gates due to LW retreat.
•    Maintaining such gates for 1-1.5 years including Pumping, Ventilation, inspection etc.,




                                  Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                           underground Strata Control- Planning issues
Selection of Equipment                            Power Roof Supports
Support resistance
1. Convergence method




2. Bending stress/Moment/
   Beam method


 •   Ht of caving is 10T.
 •   Weighted avg of Ts is considered.
 •   Cavability index calculated layer-wise.
 •   Caving beds are assumed as cantilever beams.
 •   Bending stress/moment of Beams calculated
     and equated.

      •   Main Fall is expected at     : 65m
      •   Periodic Fall span           : 15.85m
      •   Required Support Density     : 129.7 t/m2 (Main weight) 64.7 t/m2 (Periodic Weighting)
      •   Load on Support              : 915.4 T (Main weighting) 641.4 (Periodic Weighting)
      •   The recommended Support Capacity is 1000-1100T with support Resistance of 110-120T/m2

                                     Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                              underground Strata Control- Planning issues
Selection of Equipment                         Power Roof Supports
Structural Features




  • 2 Legged Shield
  • Base width : 1.7 or 1.8m
  • Advancing Ram : atleast 60T capacity.
  • Face frogs
  • Anti skid + Anti topple
  • Base lifting rams.
  • Support Resistance         : 110-120T/m2
  • Support capacity           : 1000-1100T




                                  Base

                               Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                                        underground Strata Control- Planning issues
Coal Evacuation system             Belts Vs Skip




              Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                       underground Strata Control- Planning issues
Coal Evacuation system             Belts Vs Skip




              Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                       underground Strata Control- Planning issues
Men & material Transport              Haulers Vs Monorail




              Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                       underground Strata Control- Planning issues
Men & material Transport              Haulers Vs Monorail




              Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’
                                       underground Strata Control- Planning issues
Conclusion
Thank You Sir..

Mais conteúdo relacionado

Mais procurados

Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for LongwallVR M
 
Dragline Planning
Dragline PlanningDragline Planning
Dragline PlanningVR M
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practiceWeb2Present
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breakerSATYANARAYANA I
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1patrickhudd
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
Brochure - Slim Boring 2016
Brochure - Slim Boring 2016Brochure - Slim Boring 2016
Brochure - Slim Boring 2016Master Drilling
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidenceVR M
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
Raise boring ventajas sobre otros métodos
Raise boring ventajas sobre otros métodosRaise boring ventajas sobre otros métodos
Raise boring ventajas sobre otros métodosjoshua50101
 
Ground Engineering Datasheets
Ground Engineering DatasheetsGround Engineering Datasheets
Ground Engineering Datasheetskavdavid
 
Piling Datasheets
Piling DatasheetsPiling Datasheets
Piling Datasheetskavdavid
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Abdul Basith C
 
Drillship Specifications Explained
Drillship Specifications ExplainedDrillship Specifications Explained
Drillship Specifications ExplainedGiridhar Gopu
 
Open cut mining brief _hot mining
Open cut mining brief _hot miningOpen cut mining brief _hot mining
Open cut mining brief _hot miningLolita Liao
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerSafdar Ali
 

Mais procurados (20)

Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for Longwall
 
Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breaker
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Brochure - Slim Boring 2016
Brochure - Slim Boring 2016Brochure - Slim Boring 2016
Brochure - Slim Boring 2016
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidence
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Raise boring ventajas sobre otros métodos
Raise boring ventajas sobre otros métodosRaise boring ventajas sobre otros métodos
Raise boring ventajas sobre otros métodos
 
Ground Engineering Datasheets
Ground Engineering DatasheetsGround Engineering Datasheets
Ground Engineering Datasheets
 
Piling Datasheets
Piling DatasheetsPiling Datasheets
Piling Datasheets
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
 
Drillship Specifications Explained
Drillship Specifications ExplainedDrillship Specifications Explained
Drillship Specifications Explained
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
Offshore packages
Offshore packagesOffshore packages
Offshore packages
 
Open cut mining brief _hot mining
Open cut mining brief _hot miningOpen cut mining brief _hot mining
Open cut mining brief _hot mining
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous miner
 

Destaque

Effect of Environmental conditions in Production, Productivity, Health and Sa...
Effect of Environmental conditions in Production, Productivity, Health and Sa...Effect of Environmental conditions in Production, Productivity, Health and Sa...
Effect of Environmental conditions in Production, Productivity, Health and Sa...MD.Suresh Kumar
 
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMAR
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMARPreventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMAR
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMARMD.Suresh Kumar
 
Experience of working p8
Experience of working p8Experience of working p8
Experience of working p8MD.Suresh Kumar
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesMD.Suresh Kumar
 
Making use of online resourse for research
Making use of online resourse for researchMaking use of online resourse for research
Making use of online resourse for researchNila Shah
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevasvalearellano
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevasvalearellano
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevasvalearellano
 
Managing Existing mineral resources in Indian coal mines-Technological option...
Managing Existing mineral resources in Indian coal mines-Technological option...Managing Existing mineral resources in Indian coal mines-Technological option...
Managing Existing mineral resources in Indian coal mines-Technological option...MD.Suresh Kumar
 
Aprendamos Project Proposal
Aprendamos Project ProposalAprendamos Project Proposal
Aprendamos Project ProposalJLipshin
 
Project memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water useProject memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water useDuPontEC
 
Actividad nº4 secuencia normalizada
Actividad nº4 secuencia normalizadaActividad nº4 secuencia normalizada
Actividad nº4 secuencia normalizadaSailaMJ
 
Ground control continues to be a crucial issue in Indian coal mines ..What we...
Ground control continues to be a crucial issue in Indian coal mines ..What we...Ground control continues to be a crucial issue in Indian coal mines ..What we...
Ground control continues to be a crucial issue in Indian coal mines ..What we...MD.Suresh Kumar
 
Chapter 2 Sales Final
Chapter 2 Sales FinalChapter 2 Sales Final
Chapter 2 Sales FinalLucyndaGrider
 
Total social success
Total social successTotal social success
Total social successJill White
 
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLAn experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLMD.Suresh Kumar
 
Million pound drop
Million pound dropMillion pound drop
Million pound dropJill White
 

Destaque (20)

Effect of Environmental conditions in Production, Productivity, Health and Sa...
Effect of Environmental conditions in Production, Productivity, Health and Sa...Effect of Environmental conditions in Production, Productivity, Health and Sa...
Effect of Environmental conditions in Production, Productivity, Health and Sa...
 
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMAR
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMARPreventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMAR
Preventing spantaneous combustion in Blasting Gallery panels by MD.SURESH KUMAR
 
Experience of working p8
Experience of working p8Experience of working p8
Experience of working p8
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground mines
 
Making use of online resourse for research
Making use of online resourse for researchMaking use of online resourse for research
Making use of online resourse for research
 
Sul tepec
Sul tepecSul tepec
Sul tepec
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevas
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevas
 
Diapositivas nuevas
Diapositivas nuevasDiapositivas nuevas
Diapositivas nuevas
 
Managing Existing mineral resources in Indian coal mines-Technological option...
Managing Existing mineral resources in Indian coal mines-Technological option...Managing Existing mineral resources in Indian coal mines-Technological option...
Managing Existing mineral resources in Indian coal mines-Technological option...
 
Producto
ProductoProducto
Producto
 
Aprendamos Project Proposal
Aprendamos Project ProposalAprendamos Project Proposal
Aprendamos Project Proposal
 
Project memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water useProject memorandum 91 1313-06 lone star plant water use
Project memorandum 91 1313-06 lone star plant water use
 
Actividad nº4 secuencia normalizada
Actividad nº4 secuencia normalizadaActividad nº4 secuencia normalizada
Actividad nº4 secuencia normalizada
 
Ground control continues to be a crucial issue in Indian coal mines ..What we...
Ground control continues to be a crucial issue in Indian coal mines ..What we...Ground control continues to be a crucial issue in Indian coal mines ..What we...
Ground control continues to be a crucial issue in Indian coal mines ..What we...
 
Chapter 2 Sales Final
Chapter 2 Sales FinalChapter 2 Sales Final
Chapter 2 Sales Final
 
Total social success
Total social successTotal social success
Total social success
 
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLAn experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
 
capibara
capibaracapibara
capibara
 
Million pound drop
Million pound dropMillion pound drop
Million pound drop
 

Semelhante a 1.5MT Longwall faces in SCCL-Few planning issues

crushing C-S-Basic-Terminology-ppt.pdf
crushing C-S-Basic-Terminology-ppt.pdfcrushing C-S-Basic-Terminology-ppt.pdf
crushing C-S-Basic-Terminology-ppt.pdfJeanClaudeEid1
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design conceptKumar VEL
 
Progress presentation
Progress presentationProgress presentation
Progress presentationBen Reyngoud
 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Minotaur Exploration
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
Apbu Casing Drilling Review Dec2010
Apbu  Casing Drilling Review Dec2010Apbu  Casing Drilling Review Dec2010
Apbu Casing Drilling Review Dec2010CalHolt
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement opsamrhaggag
 
ABB Power Curcuit Braker
ABB Power Curcuit BrakerABB Power Curcuit Braker
ABB Power Curcuit BrakerOleg Volkov
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Nandan Shandilya
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentationbtpguitar723
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit miningSATYANARAYANA I
 
Advances in GeoMechanics
Advances in GeoMechanicsAdvances in GeoMechanics
Advances in GeoMechanicsduggatj
 

Semelhante a 1.5MT Longwall faces in SCCL-Few planning issues (20)

Pillar design
Pillar designPillar design
Pillar design
 
Pillar design
Pillar designPillar design
Pillar design
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
crushing C-S-Basic-Terminology-ppt.pdf
crushing C-S-Basic-Terminology-ppt.pdfcrushing C-S-Basic-Terminology-ppt.pdf
crushing C-S-Basic-Terminology-ppt.pdf
 
Steel Jacketed Rc Column
Steel Jacketed Rc ColumnSteel Jacketed Rc Column
Steel Jacketed Rc Column
 
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAMMANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
Progress presentation
Progress presentationProgress presentation
Progress presentation
 
Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012Mutooroo Magnetite Project Update October 2012
Mutooroo Magnetite Project Update October 2012
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
The Pipe Ramming Method
The Pipe Ramming MethodThe Pipe Ramming Method
The Pipe Ramming Method
 
Apbu Casing Drilling Review Dec2010
Apbu  Casing Drilling Review Dec2010Apbu  Casing Drilling Review Dec2010
Apbu Casing Drilling Review Dec2010
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement ops
 
ABB Power Curcuit Braker
ABB Power Curcuit BrakerABB Power Curcuit Braker
ABB Power Curcuit Braker
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentation
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Advances in GeoMechanics
Advances in GeoMechanicsAdvances in GeoMechanics
Advances in GeoMechanics
 

Mais de MD.Suresh Kumar

Underground coal mining in india
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in indiaMD.Suresh Kumar
 
Experience of working Longwall at shallow depth-Strats mangement issues by MD...
Experience of working Longwall at shallow depth-Strats mangement issues by MD...Experience of working Longwall at shallow depth-Strats mangement issues by MD...
Experience of working Longwall at shallow depth-Strats mangement issues by MD...MD.Suresh Kumar
 
Impact of coal mining on environment and ecology with a special note on Envir...
Impact of coal mining on environment and ecology with a special note on Envir...Impact of coal mining on environment and ecology with a special note on Envir...
Impact of coal mining on environment and ecology with a special note on Envir...MD.Suresh Kumar
 
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...MD.Suresh Kumar
 
Underground mine Ventilation improvement by re organisation
Underground mine Ventilation improvement by re organisationUnderground mine Ventilation improvement by re organisation
Underground mine Ventilation improvement by re organisationMD.Suresh Kumar
 
Dynamic loading in the longwall face
Dynamic loading in the longwall faceDynamic loading in the longwall face
Dynamic loading in the longwall faceMD.Suresh Kumar
 

Mais de MD.Suresh Kumar (6)

Underground coal mining in india
Underground coal mining in indiaUnderground coal mining in india
Underground coal mining in india
 
Experience of working Longwall at shallow depth-Strats mangement issues by MD...
Experience of working Longwall at shallow depth-Strats mangement issues by MD...Experience of working Longwall at shallow depth-Strats mangement issues by MD...
Experience of working Longwall at shallow depth-Strats mangement issues by MD...
 
Impact of coal mining on environment and ecology with a special note on Envir...
Impact of coal mining on environment and ecology with a special note on Envir...Impact of coal mining on environment and ecology with a special note on Envir...
Impact of coal mining on environment and ecology with a special note on Envir...
 
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...
Opencast Mining below HFL of Godavari river bed-An experience of Medipally OC...
 
Underground mine Ventilation improvement by re organisation
Underground mine Ventilation improvement by re organisationUnderground mine Ventilation improvement by re organisation
Underground mine Ventilation improvement by re organisation
 
Dynamic loading in the longwall face
Dynamic loading in the longwall faceDynamic loading in the longwall face
Dynamic loading in the longwall face
 

Último

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 

Último (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 

1.5MT Longwall faces in SCCL-Few planning issues

  • 1. 1.5 Mtpa Longwall faces in Shanthikhani and KK-7. G.Rajendar Reddy GM, Proj.Plng MD. Suresh Kumar Add.Mgr, Proj.Plng
  • 2. MMR shaft block KK-7 LW Project D B C E A Geo-Reserves 101.57 MT Mine Take Area: 857.91 Ha Rated Capacity 1.5MT Forest 60.51 Grade F, E, C No-Forest 797.4 BH Density 13/sq.km Seams 7 Seams workable 3 (IA, I,III) Gradient 1 in 3.5 to 5 Depth 92 to 606 m
  • 3. Shanthikhani shaft block SK LW Project Mine Take Area 1184.3 Ha Geo-Reserves 45.496 MT Forest Land 648.11 Ha Ext. Reserves 26.22 Non-Forest Land 536.18 Ha Rated Capacity 1.5MT BH Density 13.5 /sq.km Depth 244-662m Seams avble 7 seams Seams workable 1 (SJ Top&Bot) Rated Capacity 1.5MT Grade D Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ Roof underground Strata Control- Planning issues
  • 4. Working under Sst roof Past Experience LW failures under hard roof in India • LW collapsed at Balrampur, Kumda, Churcha, Kottadi and Gdk9inc, 11A. • Major roof collapse in VK-7 during salvage under Sst roof. • P-21 worked under Sst roof in PVK. Preparedness for working under Sst in PVK • Supports Refurbishment: Around new 200 legs (50% of total legs), all control valve blocks, all bleed valves, all line distribution blocks, all connectors, hoses, filters, advancing rams, rams of extension canopies were replaced with indigenous and imported spares. • New 3rd power pack pump. • Ring-main circuit. • Multi Point Borehole Extensometers (MPBEx) - 2 Nos. • The additional boreholes at 30 and 60m were logged too. 21 P- • The physic-mechanical properties of older/newer boreholes compared and studied in-detail. • Calculation of layer wise cavability index. • Numerical modeling were done with the help of CIMFR. • Around 500 blast holes were drilled & blasted. Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 5. Working under Sst roof Past Experience Actual Situation… 0 10 20 30 40 Support # 50 60 70 80 90 100 120 0 • Excessive abutment pressure & loading on Power supports. 100 -5 • Floor heaving-AFC got lifted up, Hydraulic run of Legs (cm s) Supports dislodged in gates 80 Hanging Goaf (m ) -10 • Change of roof RL within the face: 60 Frequent change of section- AFC -15 damage. 40 Front 24/9 • Stone intrusion: had to cut by Rear 24/9 Front 25/9 shearer--Damage to picks, drums, 20 Rear 25/9 -20 gear box, abrasion of AFC Hanging 24/9 Hanging25/9 fleights, chains. 0 -25 Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 6. Working under Sst roof Past Experience Coal roof Vs Stone roof Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 7. Selection of seam and sequence of Operation Seams of MMR shaft Block Seams of SK shaft Block 4.5m 2.5m 3.7m 1.7m 2.0m Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 8. Selection of seams and Sequence of Oprn. LW workability options KK-7 SK •Projected Reserves in IA : 33.9 MT (upto750m). •Projected Reserves in SJ Bot: 34.3MT (Upto750m). •No of Cycles =34000 •No of cycles = 34000 LW Unit-1 with 30000 cycles LW Unit-2 with 30000 cycles Thin seams (2.5m) •Projected Reserves in III seam of KK-7 : 8.5 MT (Upto 750m). No of Cycles = 14775 •Projected Reserves in I seam of KK-7 : 6.8 MT (Upto 750m) No of Cycles = 16144 •Projected Reserves in SJ (Top)seam of SK : 9.7 MT (Upto 750m). No of Cycles = 9760 LW Unit-3 with 30000 cycles (1.7 to 2.5 Ht Control- Planning issues Workshop on Strata of Extn)
  • 9. Selection of Working section Development Trunks Gate Roads Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 10. Selection of Working section Extraction Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 11. Panel Layouts Dip-Rise Panels Why Dip-Rise panel in KK-7 ?? Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 12. Panel Layouts Dip-Rise Panels Advantages 1. Face gradient is 1 in 6. Gate roads gradient is 1 in 6. 2. The position of abutment load and tensile load gets shifted from supports towards goaf. 3. The intensity of abutment load reduced drastically and the caving is very smooth. 4. No abnormal roof convergence and floor heaving are experienced & expected. 5. Gate road supports are intact. 6. No water problem along bottom gate road ways. a. Min 10 persons/ day/ km gate belt-be avoided. b. Min 4 weak joints/week-avoided c. Reduction in Belt life. d. Advancing of gate end supports, BSL, Gate belt tail end unit becomes easier. e. BSL and gate belt is free of water. f. No rusting & pitting problems of BSL bottom plates, fleights and chain. g. Quality of coal is maintained. Limitations 1. Men transport upto face and Advancing of switch train. 2. Shear failure of face results in falling of boulders onto AFC and injuring persons working at face. 3. Reduction of shearer thrust for cutting the coal in raising direction. Roof Bolting Practice in underground mines-needs ‘ Review & Policy’
  • 13. Panel Layouts Strike panels Problems to be focused.. • Face gradient is 1 in 3.8 to 1 in 4.5. Gate road gradient is 1 in 50. • Power requirement of Shearer: • For cutting the face At 1 in 3.8 gradient is around 900KW for 3.6m/4m Ht of Extrn. • For haulage of shearer at 1 in 3.8 gradient is around 70 KW. • Contours swing for about 500m in few panels towards North. • Straight gate: Gates dipping at 1 in 50, RL difference 10m, Water should be pumped out. • Deviation in Gate (90) : Face has to negotiate deviation with strata problems, time loss. • Possible Roof damage to bottom Gate of Twin gates due to LW retreat. • Maintaining such gates for 1-1.5 years including Pumping, Ventilation, inspection etc., Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 14. Selection of Equipment Power Roof Supports Support resistance 1. Convergence method 2. Bending stress/Moment/ Beam method • Ht of caving is 10T. • Weighted avg of Ts is considered. • Cavability index calculated layer-wise. • Caving beds are assumed as cantilever beams. • Bending stress/moment of Beams calculated and equated. • Main Fall is expected at : 65m • Periodic Fall span : 15.85m • Required Support Density : 129.7 t/m2 (Main weight) 64.7 t/m2 (Periodic Weighting) • Load on Support : 915.4 T (Main weighting) 641.4 (Periodic Weighting) • The recommended Support Capacity is 1000-1100T with support Resistance of 110-120T/m2 Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 15. Selection of Equipment Power Roof Supports Structural Features • 2 Legged Shield • Base width : 1.7 or 1.8m • Advancing Ram : atleast 60T capacity. • Face frogs • Anti skid + Anti topple • Base lifting rams. • Support Resistance : 110-120T/m2 • Support capacity : 1000-1100T Base Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 16. Coal Evacuation system Belts Vs Skip Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 17. Coal Evacuation system Belts Vs Skip Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 18. Men & material Transport Haulers Vs Monorail Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues
  • 19. Men & material Transport Haulers Vs Monorail Roof Bolting Practice in Workshop on mines-needs ‘ Review & Policy’ underground Strata Control- Planning issues