BLA Power Pvt. Ltd
2
DEFINATION
• A switchyard is a part of an electrical Generation, Transmission,
and Distribution system. Substations transform voltage from high to
low, or the reverse, or perform any of several other important
functions.
• Switchyards generally have Breakers, Isolators , CTs ,PTs , Bus bars,
protection and control equipments, transformers ,grounding wires
and switches, disconnects and metering devices, etc.
3
132 KV Switchyard
• Constructional Overview
• Testing
• Operation & Maintenance
• Protection
• Conclusion
4
Constructional Overview
• Two main Bus-1& 2 bars – ACSR TWIN MOOSE Conductor.
Both are used to energize any abnormality with Bus-coupler for un
interruption Operation.
• Current rating 2000A,Fault Level 40KA for 3 Sec.
• Bay Equipment to Equipment Connection-ACSR Moose
Conductor.
• CTs are connected in Series , PTs are connected across supply.
• STG Generator Transformer Bay -01 No.
• Start-up S.A.T. Bay -01 No.
• 132 KV overhead line circuit Bay -02 No.s
• 132 KV Transfer Bus coupler Bay - 01 No.s
• Fully Equipped Bus PT Bay -02 No.s
5
6
GEN. TRFO. BAY
TRNSFER BUS
COUPLER BAY
BUS PT
O/G OHL #1 BAY
STN. TRFO. BAY
O/G OHL # 2 BAY
• Total no. of Towers- 28 (A/B/C/D/E)
• Total no. of SF6 CB- 5
• Total no. of PT-12
• Total no. of CT-12
• Total no. of LA-12
• Total no. of Wave Trap -2
• Total no. of Isolators- 22
• Total no. of CVT- 6
• Total no. of BPI- 18
• Total no. of EMPT -6 7
Constructional Overview
8
GEN BAY SAT BAY
9
B/C BAY
Line# 1 & 2
BAY
10
Bus Bar
Protection Scheme
• Rated Voltage 145 KV
• Rated Current 1250 A Frequency 50 Hz
• Breaking Capacity 40 KA
• Making Capacity 100 KVP
• Short Time Rating 40 KA for 3 sec
• Operating sequence
O-0.3 sec - CO- 3 MIN- CO
• Trip and Closing Coil Voltage 110V DC
• Motor Supply 240 V
11
These are used to operate on the fault on line or X-mer depending upon where it is
connected. This isolates the faulty line or equipments from the live portion of the sub
station by opening automatically through protective relays; control cables etc. in
definite time.
Testing for SF6:-
Applied Volt 5KV DC
•IR Value
> 20 GΩ CB ON
[R(Y+B+E),Y(R+B+E),B(R+Y+E)]
> 50 GΩ CB OFF
[R-R’,Y-Y’,B-B’]
•Applied current 100 A DC
Contact Resistance test: R-ø ,Y-ø B-ø < 34 μΩ
•SF6 Gas pressure setting 5.4 bar.
•Breaker , Closing Time 72 ms
Opening Time -29 ms Each Phase
12
Make CGL
Type Outdoor
No of Core 2 Core
Ratio 400-800/1-1A
Class 0.25/0.25
Burden 30 VA
ISF <= 5
Make CGL
No of Core 2
Ratio 132KV/√3/110V/√3/110V/√3
Class 0.2/3P
Burden 100 VA/100 VA
a) Measurement of voltage
b) Provide secondary voltage for
protection.
a) Measurement of current
b) Protection current circuits when currents
passed through protective relays like
Distance protection, Backup protection.
Common Testing's Required for CT & PT:-
•IR Test :
Applied Volt 5KV DC
> 10 GΩ [Prim – Earth, Prim – Core]
Applied Volt 1KV DC
> 500 MΩ [Core-Earth]
•Winding Resistance Test:
< 5-6 Ω [Ex: R-ø ,1s1-1s2,1s1-1s3]
•Ratio Test :
[Prim current 400-800]/ [Sec. current 1-1A]
[Ex: R-ø ,1s1-1s2,2s1-2s2]
•Polarity Test :
[Ex: R-ø ,1s1-1s2,2s1-2s2]
•Knee voltage Test:
[Only For Protection Class CT ]
is significance of saturation level of a current
transformer core mainly used for protection
purposes. The sinusoidal voltage of rated
frequency is applied to the secondary
terminals of CT, with other winding being
open circuited which increased by10%, cause
the exiting current to increase by 50%. NEXT
Press
14
P1 P2
S1 S2
Battery 9V
Press Back
•Polarity Test :
Make
OBLUM ELECTRICAL
Type METAL OXIDE
LD DISCHARGE CLASS Class-3
Rated Voltage 60 KV
Rated Frequency 48-62 HZ
Maximum continuous Operating
Voltage
102 KV
Nominal Discharge Current 10 KA
MFD 2010
Make
OBLUM ELECTRICAL
 Wave trap is an instrument of Low pass
filter, when power frequency currents are
passed to switchyard & high freq. signals are
blocked. Line trap also is known as Wave trap.
 Shapes like a DRUM.
Use for Carrier Communication (PLCC)
systems for communication among various
substations without dependence on the telecom
company network located in substation control
room (through coupling capacitor and LMU).
To discharge the switching & lighting
voltage surges to earth to protect instrument
in the station. These are high pass filters (50
KHZ to 500 KHZ) pass carrier.
15
16
Make CGL
No of Core 3
Ratio 132KV/√3/110V/√3/110V/√3/110V
Class 0.2/3P/3P
Burden 100 VA/100 VA/100VA
> CVT is a transformer used to step down extra
high volt. Signals & provide low volt. Signals
either for measurement or to operate protective
relays. CVTs are typically 1-ø devices where
stack of capacitors are connected in series
result voltage drop.
Make S & S POWER SWITCHGEAR
EQUIPMENT LTD.
Type Drive Motor/Manual,415 v,3ø
Rated Voltage 145 kv
Rated Current 1250 A
Frequency 50 Hz
Short Time Rating 100 KA for 3 sec
Lightning Impulse with stand
Across voltage
650 kv
> Isolators are used to isolate the high Volt.
from flow through the line into the Bus. It
allows only needed voltage and rest is earthed
by itself if required.
Bushing
17
•Bus: is a line in which the incoming feeder
come into & get into the instruments for
further step up or step down.
•Double line in the bus so that if any fault
occurs in one the other can still have the
current and the supply will not stop.
•Two lines are separated by a little distance by
a conductor [spacer] having a connector
between them .
Spacer
Clamp
Tension
Suspension
OPERATIONAL MODES
• Normal Operation :
Synchronization
Start Up / Import
• Inter -Transfer Mode Operation:
Inter Transfer Mode
By Pass change over Scheme:
18
Press
Press
Move Next
Press
Press
G
19
DS-1 DS-2
CB
CB
DS-4
DS-3 DS-2
CB
DS-4
DS-3DS-1
DS-2
CB
DS-3
DS-4
DS-1 DS-2
CB
DS-4
DS-1
DS-3
OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY
BUS COUPLER CUM
TRNSFER BREAKER
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY 
GENERATOR
G. TRFO
STN. TRFO
DS-5 DS-5
U.A.TRFO
DS-1 DS-2
Gen CB
LOAD
G
20
DS-1 DS-2
CB
CB
DS-4
DS-3 DS-2
CB
DS-4
DS-3DS-1
DS-2
CB
DS-3
DS-4
DS-1 DS-2
CB
DS-4
DS-1
DS-3
OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY
BUS COUPLER CUM
TRNSFER BREAKER
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY 
GENERATOR
G. TRFO
STN. TRFO
DS-5 DS-5
U.A.TRFO
DS-1 DS-2
LOADLOAD
Press Back
G
21
DS-1 DS-2
CB
CB
DS-4
DS-3 DS-2
CB
DS-4
DS-3DS-1
DS-2
CB
DS-3
DS-4
DS-1 DS-2
CB
DS-4
DS-1
DS-3
OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY
BUS COUPLER CUM
TRNSFER BREAKER
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY 
GENERATOR
G. TRFO
STN. TRFO
DS-5 DS-5
U.A.TRFO
DS-1 DS-2
LOADLOAD
Press Back
22
CB
DS-2
CB
DS-4
DS-3DS-1
BUS COUPLER CUM
TRNSFER BREAKERS
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS
DS-1 DS-2
Tripping Prt.
OUTGOING OHL #1 BAY
1. Close DS-3
2. Open DS-3 & DS4
Close DS-3
Tripping Prt.
23
CB
DS-2
CB
DS-4
DS-3
DS-1
BUS COUPLER CUM
TRNSFER BREAKER
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS
DS-1 DS-2
Press Back
Tripping Prt.
OUTGOING OHL #1 BAY
24
CB
DS-2
CB
DS-4
DS-3DS-1
BUS COUPLER CUM
TRNSFER BREAKERS
MAIN -1 BUS
MAIN -2 CUM TRANSFER BUS
DS-1 DS-2
Tripping Prt.
OUTGOING OHL #1 BAY
1. Open DS-1
2. Close DS-1
Tripping Prt.
Protection
Tripping fuse Out
Press Back
Maintenance
• CTs, PTs ,all auxiliaries terminal tightness.
• SF6 Breaker Gas pressure monitoring &
maintain.
• Stone,metnal layer maintain across the area.
• Monitoring & diagnosis using Hotspot detector
or temperature scanner .
• Isolator & contact cleaning on scheduled.
25
Thermal Sensor / Hot Spot Detector
26
27
Protection
28
29
30
Protection System
• A series of devices whose main purpose is to
protect persons and primary electric power
equipment from the effects of faults.
Why A System Needs Protection?
• There is no ‘fault free’ system.
• It is neither practical nor economical to build a ‘fault free’
system.
• Electrical system shall tolerate certain degree of faults.
• Usually faults are caused by breakdown of insulation due to
various reasons: Short Circuit, High Voltage, system aging,
lighting, etc.
Protection System Elements
• Protective relays
• Circuit breakers
• Current and voltage transducers
• Communications channels
• DC supply system
• Control cables
Three-Phase Diagram of the Protection scheme
CTs
VTs
Relay
CB
Control
Protected
Equipment
How Do Relays Detect Faults?
• When a fault takes place, the
current, voltage, frequency, and other electrical variables
behave in a peculiar way. For example:
– Current suddenly increases
– Voltage suddenly decreases
• Relays can measure the currents and the voltages and
detect that there is an overcurrent, or an undervoltage, or
a combination of both
• Many other detection principles determine the design of
protective relays
Main Protection Requirements
• Reliability
• Selectivity
• Speed
• Sensitivity
Typical Short-Circuit Type Distribution
Single-Phase-Ground: 70–80%
Phase-Phase-Ground: 17–10%
Phase-Phase: 10–08%
Three-Phase: 03–02%
Following type of Protection Curve
used in our plant
1. INSTANTANEOUS/High Speed
2. DMT: (Definite Mean Time-I>>/high set)
3. IDMT: (Inverse Definite Minimum Time)
a. SI - Standard Inverse (I>)
b. VI - Very Inverse
c. EI - Extreme Inverse
d. LTI - Long Time Inverse
Formula for Relay Operating Time
calculation
Operating Time:
= A X TMS
Ir C - 1
o A=0.14 & C=0.02 for SI
o A=0.13.5 & C=1.0 for VI
o A= 80 & C= 2.0 for EI
o A=120 & C=1.0 for LTI
o Ir= I(multiple of fault current) / Iset
Example:
• If FLC=100A, % setting =105,
• Operate time = 10sec Then TMS=?
If CTR =150/1A, In=150, Isec=1A
As per CTR % set= 0.7*In.
Relay Iset= 700mA, Ir=1.05/1.0=1.05
=>TMS will be 0.136
IDMT:SI
IDMT:
Basic Requirement for Relay Setting
• Equipment Full Rating(V, Amp, Z)
• CT/PT Ratio installed on that feeder
• Identification of CT/PT for Particular
protection.
• Breaker opening & tripping time.
• Equipments Factory Test report/Curve
Relay Setting Adopted for our system:
1. OC: 105% to 120% - SI,
2. EF: 10% to 30%. - SI
3. OV: 110%, U/V: 80% - DMT
4. SEF: more than EF and time >0.8to1.0sc.
5. REF/Diff : 08 to12% -Inst.
6. DPR (Z1-inst. Z2-300ms, Z-800ms)
Protection used for different System
• For Transmission Line :
a. Distance Protection
b. Backup Direction OC/EF
c. Lightning Protection
• For Transformer:
a. Differential Protection
b. Overfluxing
c. O/C & E/F
d. Restricted E/F
e.Sensitive or standby E/F
f. Buchholz
g. Pressure Release Valve
h. Winding/ oil Temperature & LA
• For LT Motor (up to 35KW)
a. Thermal Overload
b. Fuse
• For LT Motor (Above 35KW)
a. Thermal Over Laod
b. O/C & E/F
• For HT Motors:
a. Thermal Over Load
b. O/C & E/F
c. Locked Rotor
d. Negative Phase Sequence
e. Start supervision
f. Restart Inhabit
• For Generator :
a. Differential Protection
b. Stator Earth Fault (100% & 90 %)
c. Rotor E/F
d. NPS
e. Backup Impedance
f. Backup O/C & E/F
g. Loss of field
h. Reverse Power (Short Time /Long time)
i. Thermal Overload Alarm
j. Dead Machine
k. Winding temperature
l. O/V & U/V
.
SUMMARY
• The Operative Direction for Directional OC Relays are as follows:
– GT bay relay is having operative direction towards GT.
– Line bay relay is having operative direction towards Line.
– Station Transformer. Relay is having operative direction towards Station Transformer.
• Grading margin of 0.3 seconds has been considered between different levels of
protective devices.
• In case of a fault on Line, Distance relay will operate instantaneously. If it fails to
Operate than Directional OC relay will operate as backup.
• If the fault is still found persisting than GT bay and other line bay relay will give
further backup and will trip their respective breakers to clear the fault.
• In case of a fault on Bus, Bus differential relay will operate instantaneously. If this
relay fails to clear the fault , all other feeders including two line bays and GT bay
relays will trip their respective breakers to clear the fault .
• In case of a fault in Generator Transformer (GT),Differential protection for GT will
operate instantaneously. And Directional relay looking towards GT will give backup to
it. If the fault is still found persisting than all other feeders including two line bays will
trip their respective breaker to clear the fault.
Forward Path
• For Trouble Free Operation.
• Longevity of System.
• 2 No.s Upcoming Bays for Unit-II
51
Special Thanks
• for Guidance
Mr. U.P. Sharma
Sr. Manager [ Dept. Of Electrical ]
• for Co-ordination
Mr. Nilesh Malviya
Mr. Dhanajya Ray
Engineer [ Dept. Of Electrical ]
52
Switch yard & Protection

More Related Content

What's hot

Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protectionNischal Popat
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introductionH. Kheir
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 

What's hot (20)

Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Electric substation
Electric substation Electric substation
Electric substation
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
220kv substation
220kv substation220kv substation
220kv substation
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 

Viewers also liked

220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overviewThien Huynh
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protectionJayashree Behera
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overviewMilind Punj
 
ECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionChandrabhan Sharma
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardI.E.T. lucknow
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-StationTowfiqur Rahman
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARFACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARashwini kumar
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substationsbhanu lucky
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurR-One Power
 
Loss of excitation
Loss of excitationLoss of excitation
Loss of excitationNTPC
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 

Viewers also liked (20)

220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overview
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
 
5. Switchyard & Substation
5. Switchyard & Substation5. Switchyard & Substation
5. Switchyard & Substation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
ECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent Protection
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Bus Bar Protection
Bus Bar ProtectionBus Bar Protection
Bus Bar Protection
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARFACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
 
Protection basic
Protection basicProtection basic
Protection basic
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
Loss of excitation
Loss of excitationLoss of excitation
Loss of excitation
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 

Similar to Switch yard & Protection

C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................hiiarindam
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewAUTHELECTRONIC
 
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUSSaikat Bhandari
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptxssuser1b3e431
 
Thyristors,Commutayion of Thyristor, Power Electronics
Thyristors,Commutayion of Thyristor, Power ElectronicsThyristors,Commutayion of Thyristor, Power Electronics
Thyristors,Commutayion of Thyristor, Power ElectronicsDurgesh Singh
 
SCR_Firing_commutation
SCR_Firing_commutationSCR_Firing_commutation
SCR_Firing_commutationjayantmane
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewAUTHELECTRONIC
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 

Similar to Switch yard & Protection (20)

C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
 
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
Thyristors,Commutayion of Thyristor, Power Electronics
Thyristors,Commutayion of Thyristor, Power ElectronicsThyristors,Commutayion of Thyristor, Power Electronics
Thyristors,Commutayion of Thyristor, Power Electronics
 
SCR_Firing_commutation
SCR_Firing_commutationSCR_Firing_commutation
SCR_Firing_commutation
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
L2 thyristors
L2 thyristorsL2 thyristors
L2 thyristors
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 

More from MANOJ KUMAR MAHARANA

More from MANOJ KUMAR MAHARANA (6)

eres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppteres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppt
 
CMAA.pdf
CMAA.pdfCMAA.pdf
CMAA.pdf
 
Facility
FacilityFacility
Facility
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
 
ISO Clause No 7 Production Realization
ISO Clause No 7 Production RealizationISO Clause No 7 Production Realization
ISO Clause No 7 Production Realization
 

Recently uploaded

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

Switch yard & Protection

  • 2. 2
  • 3. DEFINATION • A switchyard is a part of an electrical Generation, Transmission, and Distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. • Switchyards generally have Breakers, Isolators , CTs ,PTs , Bus bars, protection and control equipments, transformers ,grounding wires and switches, disconnects and metering devices, etc. 3
  • 4. 132 KV Switchyard • Constructional Overview • Testing • Operation & Maintenance • Protection • Conclusion 4
  • 5. Constructional Overview • Two main Bus-1& 2 bars – ACSR TWIN MOOSE Conductor. Both are used to energize any abnormality with Bus-coupler for un interruption Operation. • Current rating 2000A,Fault Level 40KA for 3 Sec. • Bay Equipment to Equipment Connection-ACSR Moose Conductor. • CTs are connected in Series , PTs are connected across supply. • STG Generator Transformer Bay -01 No. • Start-up S.A.T. Bay -01 No. • 132 KV overhead line circuit Bay -02 No.s • 132 KV Transfer Bus coupler Bay - 01 No.s • Fully Equipped Bus PT Bay -02 No.s 5
  • 6. 6 GEN. TRFO. BAY TRNSFER BUS COUPLER BAY BUS PT O/G OHL #1 BAY STN. TRFO. BAY O/G OHL # 2 BAY
  • 7. • Total no. of Towers- 28 (A/B/C/D/E) • Total no. of SF6 CB- 5 • Total no. of PT-12 • Total no. of CT-12 • Total no. of LA-12 • Total no. of Wave Trap -2 • Total no. of Isolators- 22 • Total no. of CVT- 6 • Total no. of BPI- 18 • Total no. of EMPT -6 7 Constructional Overview
  • 11. • Rated Voltage 145 KV • Rated Current 1250 A Frequency 50 Hz • Breaking Capacity 40 KA • Making Capacity 100 KVP • Short Time Rating 40 KA for 3 sec • Operating sequence O-0.3 sec - CO- 3 MIN- CO • Trip and Closing Coil Voltage 110V DC • Motor Supply 240 V 11 These are used to operate on the fault on line or X-mer depending upon where it is connected. This isolates the faulty line or equipments from the live portion of the sub station by opening automatically through protective relays; control cables etc. in definite time. Testing for SF6:- Applied Volt 5KV DC •IR Value > 20 GΩ CB ON [R(Y+B+E),Y(R+B+E),B(R+Y+E)] > 50 GΩ CB OFF [R-R’,Y-Y’,B-B’] •Applied current 100 A DC Contact Resistance test: R-ø ,Y-ø B-ø < 34 μΩ •SF6 Gas pressure setting 5.4 bar. •Breaker , Closing Time 72 ms Opening Time -29 ms Each Phase
  • 12. 12 Make CGL Type Outdoor No of Core 2 Core Ratio 400-800/1-1A Class 0.25/0.25 Burden 30 VA ISF <= 5 Make CGL No of Core 2 Ratio 132KV/√3/110V/√3/110V/√3 Class 0.2/3P Burden 100 VA/100 VA a) Measurement of voltage b) Provide secondary voltage for protection. a) Measurement of current b) Protection current circuits when currents passed through protective relays like Distance protection, Backup protection.
  • 13. Common Testing's Required for CT & PT:- •IR Test : Applied Volt 5KV DC > 10 GΩ [Prim – Earth, Prim – Core] Applied Volt 1KV DC > 500 MΩ [Core-Earth] •Winding Resistance Test: < 5-6 Ω [Ex: R-ø ,1s1-1s2,1s1-1s3] •Ratio Test : [Prim current 400-800]/ [Sec. current 1-1A] [Ex: R-ø ,1s1-1s2,2s1-2s2] •Polarity Test : [Ex: R-ø ,1s1-1s2,2s1-2s2] •Knee voltage Test: [Only For Protection Class CT ] is significance of saturation level of a current transformer core mainly used for protection purposes. The sinusoidal voltage of rated frequency is applied to the secondary terminals of CT, with other winding being open circuited which increased by10%, cause the exiting current to increase by 50%. NEXT Press
  • 14. 14 P1 P2 S1 S2 Battery 9V Press Back •Polarity Test :
  • 15. Make OBLUM ELECTRICAL Type METAL OXIDE LD DISCHARGE CLASS Class-3 Rated Voltage 60 KV Rated Frequency 48-62 HZ Maximum continuous Operating Voltage 102 KV Nominal Discharge Current 10 KA MFD 2010 Make OBLUM ELECTRICAL  Wave trap is an instrument of Low pass filter, when power frequency currents are passed to switchyard & high freq. signals are blocked. Line trap also is known as Wave trap.  Shapes like a DRUM. Use for Carrier Communication (PLCC) systems for communication among various substations without dependence on the telecom company network located in substation control room (through coupling capacitor and LMU). To discharge the switching & lighting voltage surges to earth to protect instrument in the station. These are high pass filters (50 KHZ to 500 KHZ) pass carrier. 15
  • 16. 16 Make CGL No of Core 3 Ratio 132KV/√3/110V/√3/110V/√3/110V Class 0.2/3P/3P Burden 100 VA/100 VA/100VA > CVT is a transformer used to step down extra high volt. Signals & provide low volt. Signals either for measurement or to operate protective relays. CVTs are typically 1-ø devices where stack of capacitors are connected in series result voltage drop. Make S & S POWER SWITCHGEAR EQUIPMENT LTD. Type Drive Motor/Manual,415 v,3ø Rated Voltage 145 kv Rated Current 1250 A Frequency 50 Hz Short Time Rating 100 KA for 3 sec Lightning Impulse with stand Across voltage 650 kv > Isolators are used to isolate the high Volt. from flow through the line into the Bus. It allows only needed voltage and rest is earthed by itself if required. Bushing
  • 17. 17 •Bus: is a line in which the incoming feeder come into & get into the instruments for further step up or step down. •Double line in the bus so that if any fault occurs in one the other can still have the current and the supply will not stop. •Two lines are separated by a little distance by a conductor [spacer] having a connector between them . Spacer Clamp Tension Suspension
  • 18. OPERATIONAL MODES • Normal Operation : Synchronization Start Up / Import • Inter -Transfer Mode Operation: Inter Transfer Mode By Pass change over Scheme: 18 Press Press Move Next Press Press
  • 19. G 19 DS-1 DS-2 CB CB DS-4 DS-3 DS-2 CB DS-4 DS-3DS-1 DS-2 CB DS-3 DS-4 DS-1 DS-2 CB DS-4 DS-1 DS-3 OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY BUS COUPLER CUM TRNSFER BREAKER MAIN -1 BUS MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY  GENERATOR G. TRFO STN. TRFO DS-5 DS-5 U.A.TRFO DS-1 DS-2 Gen CB LOAD
  • 20. G 20 DS-1 DS-2 CB CB DS-4 DS-3 DS-2 CB DS-4 DS-3DS-1 DS-2 CB DS-3 DS-4 DS-1 DS-2 CB DS-4 DS-1 DS-3 OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY BUS COUPLER CUM TRNSFER BREAKER MAIN -1 BUS MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY  GENERATOR G. TRFO STN. TRFO DS-5 DS-5 U.A.TRFO DS-1 DS-2 LOADLOAD Press Back
  • 21. G 21 DS-1 DS-2 CB CB DS-4 DS-3 DS-2 CB DS-4 DS-3DS-1 DS-2 CB DS-3 DS-4 DS-1 DS-2 CB DS-4 DS-1 DS-3 OUTGOING OHL #2 BAYOUTGOING OHL #1 BAY BUS COUPLER CUM TRNSFER BREAKER MAIN -1 BUS MAIN -2 CUM TRANSFER BUS <--- GT BAY  <--- STN. TRFO BAY  GENERATOR G. TRFO STN. TRFO DS-5 DS-5 U.A.TRFO DS-1 DS-2 LOADLOAD Press Back
  • 22. 22 CB DS-2 CB DS-4 DS-3DS-1 BUS COUPLER CUM TRNSFER BREAKERS MAIN -1 BUS MAIN -2 CUM TRANSFER BUS DS-1 DS-2 Tripping Prt. OUTGOING OHL #1 BAY 1. Close DS-3 2. Open DS-3 & DS4 Close DS-3 Tripping Prt.
  • 23. 23 CB DS-2 CB DS-4 DS-3 DS-1 BUS COUPLER CUM TRNSFER BREAKER MAIN -1 BUS MAIN -2 CUM TRANSFER BUS DS-1 DS-2 Press Back Tripping Prt. OUTGOING OHL #1 BAY
  • 24. 24 CB DS-2 CB DS-4 DS-3DS-1 BUS COUPLER CUM TRNSFER BREAKERS MAIN -1 BUS MAIN -2 CUM TRANSFER BUS DS-1 DS-2 Tripping Prt. OUTGOING OHL #1 BAY 1. Open DS-1 2. Close DS-1 Tripping Prt. Protection Tripping fuse Out Press Back
  • 25. Maintenance • CTs, PTs ,all auxiliaries terminal tightness. • SF6 Breaker Gas pressure monitoring & maintain. • Stone,metnal layer maintain across the area. • Monitoring & diagnosis using Hotspot detector or temperature scanner . • Isolator & contact cleaning on scheduled. 25
  • 26. Thermal Sensor / Hot Spot Detector 26
  • 27. 27
  • 29. 29
  • 30. 30
  • 31. Protection System • A series of devices whose main purpose is to protect persons and primary electric power equipment from the effects of faults.
  • 32. Why A System Needs Protection? • There is no ‘fault free’ system. • It is neither practical nor economical to build a ‘fault free’ system. • Electrical system shall tolerate certain degree of faults. • Usually faults are caused by breakdown of insulation due to various reasons: Short Circuit, High Voltage, system aging, lighting, etc.
  • 33. Protection System Elements • Protective relays • Circuit breakers • Current and voltage transducers • Communications channels • DC supply system • Control cables
  • 34. Three-Phase Diagram of the Protection scheme CTs VTs Relay CB Control Protected Equipment
  • 35. How Do Relays Detect Faults? • When a fault takes place, the current, voltage, frequency, and other electrical variables behave in a peculiar way. For example: – Current suddenly increases – Voltage suddenly decreases • Relays can measure the currents and the voltages and detect that there is an overcurrent, or an undervoltage, or a combination of both • Many other detection principles determine the design of protective relays
  • 36. Main Protection Requirements • Reliability • Selectivity • Speed • Sensitivity
  • 37. Typical Short-Circuit Type Distribution Single-Phase-Ground: 70–80% Phase-Phase-Ground: 17–10% Phase-Phase: 10–08% Three-Phase: 03–02%
  • 38. Following type of Protection Curve used in our plant 1. INSTANTANEOUS/High Speed 2. DMT: (Definite Mean Time-I>>/high set) 3. IDMT: (Inverse Definite Minimum Time) a. SI - Standard Inverse (I>) b. VI - Very Inverse c. EI - Extreme Inverse d. LTI - Long Time Inverse
  • 39. Formula for Relay Operating Time calculation Operating Time: = A X TMS Ir C - 1 o A=0.14 & C=0.02 for SI o A=0.13.5 & C=1.0 for VI o A= 80 & C= 2.0 for EI o A=120 & C=1.0 for LTI o Ir= I(multiple of fault current) / Iset
  • 40. Example: • If FLC=100A, % setting =105, • Operate time = 10sec Then TMS=? If CTR =150/1A, In=150, Isec=1A As per CTR % set= 0.7*In. Relay Iset= 700mA, Ir=1.05/1.0=1.05 =>TMS will be 0.136
  • 42. IDMT:
  • 43. Basic Requirement for Relay Setting • Equipment Full Rating(V, Amp, Z) • CT/PT Ratio installed on that feeder • Identification of CT/PT for Particular protection. • Breaker opening & tripping time. • Equipments Factory Test report/Curve
  • 44. Relay Setting Adopted for our system: 1. OC: 105% to 120% - SI, 2. EF: 10% to 30%. - SI 3. OV: 110%, U/V: 80% - DMT 4. SEF: more than EF and time >0.8to1.0sc. 5. REF/Diff : 08 to12% -Inst. 6. DPR (Z1-inst. Z2-300ms, Z-800ms)
  • 45. Protection used for different System • For Transmission Line : a. Distance Protection b. Backup Direction OC/EF c. Lightning Protection • For Transformer: a. Differential Protection b. Overfluxing c. O/C & E/F d. Restricted E/F
  • 46. e.Sensitive or standby E/F f. Buchholz g. Pressure Release Valve h. Winding/ oil Temperature & LA • For LT Motor (up to 35KW) a. Thermal Overload b. Fuse • For LT Motor (Above 35KW) a. Thermal Over Laod b. O/C & E/F
  • 47. • For HT Motors: a. Thermal Over Load b. O/C & E/F c. Locked Rotor d. Negative Phase Sequence e. Start supervision f. Restart Inhabit • For Generator : a. Differential Protection b. Stator Earth Fault (100% & 90 %)
  • 48. c. Rotor E/F d. NPS e. Backup Impedance f. Backup O/C & E/F g. Loss of field h. Reverse Power (Short Time /Long time) i. Thermal Overload Alarm j. Dead Machine k. Winding temperature l. O/V & U/V
  • 49. .
  • 50. SUMMARY • The Operative Direction for Directional OC Relays are as follows: – GT bay relay is having operative direction towards GT. – Line bay relay is having operative direction towards Line. – Station Transformer. Relay is having operative direction towards Station Transformer. • Grading margin of 0.3 seconds has been considered between different levels of protective devices. • In case of a fault on Line, Distance relay will operate instantaneously. If it fails to Operate than Directional OC relay will operate as backup. • If the fault is still found persisting than GT bay and other line bay relay will give further backup and will trip their respective breakers to clear the fault. • In case of a fault on Bus, Bus differential relay will operate instantaneously. If this relay fails to clear the fault , all other feeders including two line bays and GT bay relays will trip their respective breakers to clear the fault . • In case of a fault in Generator Transformer (GT),Differential protection for GT will operate instantaneously. And Directional relay looking towards GT will give backup to it. If the fault is still found persisting than all other feeders including two line bays will trip their respective breaker to clear the fault.
  • 51. Forward Path • For Trouble Free Operation. • Longevity of System. • 2 No.s Upcoming Bays for Unit-II 51
  • 52. Special Thanks • for Guidance Mr. U.P. Sharma Sr. Manager [ Dept. Of Electrical ] • for Co-ordination Mr. Nilesh Malviya Mr. Dhanajya Ray Engineer [ Dept. Of Electrical ] 52