              Stakeholders of the SCRMP Project

                   Loren Karl Schwappach

                Colorado Technical University

PM600-1103A-02: Project Management Processes in Organizations

             Prepared for: Professor David Bowers
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                                  2

                                           Abstract

This paper is a detailed analysis of HLR Inc.’s SCRMP Project and the project stakeholders that

need to be informed and involved with the project.
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                                     3



                               Stakeholders of the SCRMP Project



Introduction to the SCRMP Project

       The Standard Customer Relationship Management Processes (SCRMP) project was is a

major incentive by HLR Inc. as solution to create an accurate, shared, standardized customer

information system and customer management process database and business process

reengineering for consolidating management and market research data into a globally sharable

and secure system shared by HLR Inc. divisions. SCRMP is the largest project ever undertaken

by HLR Inc. and is imperative for the continual growth in sales development that is expected at

HLR Inc. next year.


       The SCRMP project will be lead by HLR Inc’s Information Technology (IT) Department

and will focus on updating the software and information systems of several departments to

include IT, sales, product fulfillment, customer service, billing, and marketing. The project will

also involve cooperative work between IT, current business unit managers, sales, product

fulfillment, customer service, billing, marketing, and a software vender contracted for

developing and installing the new information system required for the project.


       The software vender will play a large role in the SCRMP project and has been contracted

to provide essential personnel with the skill and experience needed to develop and install the

SCRMP software at all HLR Inc’s locations to include foreign locations and will be assigned to

work with business unit managers and low level staff towards the project’s completion.
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                                 4

       Before the project can be undertaken identification of the project stakeholders and project

sponsor is necessary.




Stakeholders

       The project stakeholders are the organizations (public, performing organizations,

sponsors, or customers) or persons whose interests may be negatively or positively modified by

the completion and performance of a project. Stakeholders are typically vigorously involved in a

project and can exercise influence over the project’s success to include its’ project team

members, and deliverables. (A guide to, 2008, p. 23)


       The first thing a project team should do before ever starting a new project is to determine

both external and internal stakeholders. This will allow the project team to create a complete and

accurate analysis of the expectations and project requirements matched to the stakeholder’s

expectations for the project. The project manager must also maintain a healthy relationship with

project stakeholders through consistent and effective communication and leadership.

Stakeholders play a tremendous role on the life and death of most projects and so their

significance can and should not be undervalued. (A guide to, 2008)


       Stakeholder’s roles may change from sporadic contributions in focus groups and surveys

to complete project sponsorship. (A guide to, 2008) Since the most valuable thing to a project

are the projects resources (time, personnel, money, equipment), negative stakeholder support can

cause a project to be over with before it ever begins.
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                                      5

        Some of the stakeholders of the SCRMP project include HLR Inc., the customers of HLR

Inc. (as they will either be frustrated or pleased by the new system), the employees which utilize

the SCRMP tools (sales, marketing, billing, customer service, product fulfillment), the software

developer, SCRMP shareholders, SCRMP leadership and management, the IT department

(whom are not only involved in the project but will have to deal with the consequences of the

projects success), the sponsor, the program managers, the division chiefs and directors, the

software designers, testers, project team, and the project manager.




Identifying Project Stakeholders

        Stakeholder identification can be extremely difficult and is a never ending process. It

might be argued that the most basic assembly line worker can be a stakeholder since his / her

future service at a corporation is directly tied to the failure or success of a project. Failure to

identify stakeholders can have devastating impacts on a projects timeline and budget. (A guide

to, 2008) If they gain to lose or benefit from the project in any way they are most likely a project

stakeholder.


        The following are some examples of stakeholders: customers/users, sponsors, portfolio

managers, program managers, the project management office, project managers, project teams,

functional managers, operations management, and seller/business partners. (A guide to, 2008)




Project Sponsor
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                                    6

       The project sponsor is the group or individual that assists the project by providing

financial resources for a project. The project sponsor is also the champion of the project when it

is first conceived and serves a spokesman leading the project forward until it is formally

authorized.


       The project sponsor also provides guidance on objective setting, priority setting, project

organizational structure, project policies and procedures, project master planning, up-front

planning, key staffing, monitoring execution, and conflict resolution. (Kerzner, 2003)


       In the initial stages of a projects development the project sponsor is actively engaged in

the project and is involved in such activities as: helping the project manager establish objectives,

providing the project manager with political / environmental factors which could influence the

project, establishing a projects priority, and functioning as the executive-client contact.


       I believe the SCRMP Project Sponsor is the Chief Information Officer (CIO) of HLR Inc.

for all of the reasons just mentioned. I believe he is the executive-client contact that first

initiated the project (although there is not enough information to validate this argument). The

CIO openly supports the project while it seems others don’t see a need for it, and he has the

authority and power to make the project happen.


       It could also be argued the division head of marketing or even the marketing department

first conceived the project as a necessary requirement and thus sold senior management on the

details. If that is the case then he / she / or the department itself maybe the project sponsor

according to definition alone. However, I’ll stick to my guns and say I think it’s the CIO.
STAKEHOLDERS OF THE SCRMP PROJECT

                                                                                         7

References


Kerzner, H. (2003) Project management: A systems approach to planning, scheduling, and

       controlling (8th ed.). Hoboken, New Jersey: John Wiley & Sons, Inc.


A Guide to the Project Management Body of Knowledge (4th ed.). (2008). Newtown Square, PA:

       Project Management Institute, Inc.

Mais conteúdo relacionado

Mais procurados

Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
PMI_IREP_TP
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva sen
PMI_IREP_TP
 
Sample project-charter-template
Sample project-charter-templateSample project-charter-template
Sample project-charter-template
webtech46
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubey
PMI_IREP_TP
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
Kelvin Crenshaw
 
The gigaprogram challenge
The gigaprogram challengeThe gigaprogram challenge
The gigaprogram challenge
Bob Prieto
 
Article-How to Write a Project Charter
Article-How to Write a Project CharterArticle-How to Write a Project Charter
Article-How to Write a Project Charter
jaydeep chaurasia
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
Kelvin Crenshaw
 
Project Manual
Project ManualProject Manual
Project Manual
Joe Lynn
 
Pm600 1103 a-02-schwappach-loren-p1-t2
Pm600 1103 a-02-schwappach-loren-p1-t2Pm600 1103 a-02-schwappach-loren-p1-t2
Pm600 1103 a-02-schwappach-loren-p1-t2
Loren Schwappach
 
Project_Brief_Lotus_Notes_to_Outlook_Conversion
Project_Brief_Lotus_Notes_to_Outlook_ConversionProject_Brief_Lotus_Notes_to_Outlook_Conversion
Project_Brief_Lotus_Notes_to_Outlook_Conversion
janet mccoll
 

Mais procurados (20)

Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva sen
 
Sample project-charter-template
Sample project-charter-templateSample project-charter-template
Sample project-charter-template
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
Project management Course in Mumbai
Project management Course in MumbaiProject management Course in Mumbai
Project management Course in Mumbai
 
Project management
Project management Project management
Project management
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubey
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
 
The gigaprogram challenge
The gigaprogram challengeThe gigaprogram challenge
The gigaprogram challenge
 
Article-How to Write a Project Charter
Article-How to Write a Project CharterArticle-How to Write a Project Charter
Article-How to Write a Project Charter
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
 
Project Manual
Project ManualProject Manual
Project Manual
 
Pm600 1103 a-02-schwappach-loren-p1-t2
Pm600 1103 a-02-schwappach-loren-p1-t2Pm600 1103 a-02-schwappach-loren-p1-t2
Pm600 1103 a-02-schwappach-loren-p1-t2
 
Project_Brief_Lotus_Notes_to_Outlook_Conversion
Project_Brief_Lotus_Notes_to_Outlook_ConversionProject_Brief_Lotus_Notes_to_Outlook_Conversion
Project_Brief_Lotus_Notes_to_Outlook_Conversion
 
PMN1115 PM&BA-Merrick
PMN1115 PM&BA-MerrickPMN1115 PM&BA-Merrick
PMN1115 PM&BA-Merrick
 
Software Project Management: Budget
Software Project Management: BudgetSoftware Project Management: Budget
Software Project Management: Budget
 
Ktenas managing projects_kth_v3(for_slideshare)
Ktenas managing projects_kth_v3(for_slideshare)Ktenas managing projects_kth_v3(for_slideshare)
Ktenas managing projects_kth_v3(for_slideshare)
 
The Project Charter in a Nutshell
The Project Charter in a NutshellThe Project Charter in a Nutshell
The Project Charter in a Nutshell
 
art-of-project-planning
art-of-project-planningart-of-project-planning
art-of-project-planning
 
PFEG_1
PFEG_1PFEG_1
PFEG_1
 

Semelhante a Pm600 1103 a-02-schwappach-loren-p3-t1

Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hrPm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
Loren Schwappach
 
Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2
Loren Schwappach
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
cowinhelen
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
Michael Punzo
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
Michael Punzo
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project management
im8home85
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3
Loren Schwappach
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
cravennichole326
 
Project Management Strategy and Tactics 1 Course Learning .docx
Project Management Strategy and Tactics 1 Course Learning .docxProject Management Strategy and Tactics 1 Course Learning .docx
Project Management Strategy and Tactics 1 Course Learning .docx
pauline234567
 

Semelhante a Pm600 1103 a-02-schwappach-loren-p3-t1 (20)

Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hrPm610 1103 b-02-schwappach-loren-p5-gp5-hr
Pm610 1103 b-02-schwappach-loren-p5-gp5-hr
 
Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
Role andresponsiblities in project management
Role andresponsiblities in project managementRole andresponsiblities in project management
Role andresponsiblities in project management
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3
 
SDLC & Project Team roles_in practice
SDLC & Project Team roles_in practiceSDLC & Project Team roles_in practice
SDLC & Project Team roles_in practice
 
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxCHAPTER 2 Strategic Management and Project SelectionMore and m.docx
CHAPTER 2 Strategic Management and Project SelectionMore and m.docx
 
Understanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleUnderstanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project Article
 
Guid to implement initiating and planning processes
Guid to implement initiating and planning processesGuid to implement initiating and planning processes
Guid to implement initiating and planning processes
 
Project Management Strategy and Tactics 1 Course Learning .docx
Project Management Strategy and Tactics 1 Course Learning .docxProject Management Strategy and Tactics 1 Course Learning .docx
Project Management Strategy and Tactics 1 Course Learning .docx
 
STAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptxSTAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptx
 
9 Introducing Project Human Resource Management
9 Introducing Project Human Resource Management9 Introducing Project Human Resource Management
9 Introducing Project Human Resource Management
 
PMBOK7-101-200.pdf
PMBOK7-101-200.pdfPMBOK7-101-200.pdf
PMBOK7-101-200.pdf
 
book_project_management.pdf
book_project_management.pdfbook_project_management.pdf
book_project_management.pdf
 
Book project management
Book project managementBook project management
Book project management
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
Project management
Project managementProject management
Project management
 

Mais de Loren Schwappach

EE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers LabEE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers Lab
Loren Schwappach
 
Ee325 cmos design lab 7 report - loren k schwappach
Ee325 cmos design   lab 7 report - loren k schwappachEe325 cmos design   lab 7 report - loren k schwappach
Ee325 cmos design lab 7 report - loren k schwappach
Loren Schwappach
 
Ee325 cmos design lab 6 report - loren k schwappach
Ee325 cmos design   lab 6 report - loren k schwappachEe325 cmos design   lab 6 report - loren k schwappach
Ee325 cmos design lab 6 report - loren k schwappach
Loren Schwappach
 
Ee325 cmos design lab 5 report - loren k schwappach
Ee325 cmos design   lab 5 report - loren k schwappachEe325 cmos design   lab 5 report - loren k schwappach
Ee325 cmos design lab 5 report - loren k schwappach
Loren Schwappach
 
Ee325 cmos design lab 4 report - loren k schwappach
Ee325 cmos design   lab 4 report - loren k schwappachEe325 cmos design   lab 4 report - loren k schwappach
Ee325 cmos design lab 4 report - loren k schwappach
Loren Schwappach
 
Ee325 cmos design lab 3 report - loren k schwappach
Ee325 cmos design   lab 3 report - loren k schwappachEe325 cmos design   lab 3 report - loren k schwappach
Ee325 cmos design lab 3 report - loren k schwappach
Loren Schwappach
 
Loren k. schwappach ee331 - lab 4
Loren k. schwappach   ee331 - lab 4Loren k. schwappach   ee331 - lab 4
Loren k. schwappach ee331 - lab 4
Loren Schwappach
 
Loren k. schwappach ee331 - lab 3
Loren k. schwappach   ee331 - lab 3Loren k. schwappach   ee331 - lab 3
Loren k. schwappach ee331 - lab 3
Loren Schwappach
 
Ee343 signals and systems - lab 2 - loren schwappach
Ee343   signals and systems - lab 2 - loren schwappachEe343   signals and systems - lab 2 - loren schwappach
Ee343 signals and systems - lab 2 - loren schwappach
Loren Schwappach
 
Ee343 signals and systems - lab 1 - loren schwappach
Ee343   signals and systems - lab 1 - loren schwappachEe343   signals and systems - lab 1 - loren schwappach
Ee343 signals and systems - lab 1 - loren schwappach
Loren Schwappach
 
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
Loren Schwappach
 
EE375 Electronics 1: lab 3
EE375   Electronics 1: lab 3EE375   Electronics 1: lab 3
EE375 Electronics 1: lab 3
Loren Schwappach
 
EE375 Electronics 1: lab 1
EE375   Electronics 1: lab 1EE375   Electronics 1: lab 1
EE375 Electronics 1: lab 1
Loren Schwappach
 
Ee395 lab 2 - loren - victor - taylor
Ee395   lab 2 - loren - victor - taylorEe395   lab 2 - loren - victor - taylor
Ee395 lab 2 - loren - victor - taylor
Loren Schwappach
 
Ee395 lab 1 - bjt - loren - victor - taylor
Ee395   lab 1 - bjt - loren - victor - taylorEe395   lab 1 - bjt - loren - victor - taylor
Ee395 lab 1 - bjt - loren - victor - taylor
Loren Schwappach
 
5 ee415 - adv electronics - presentation - schwappach
5   ee415 - adv electronics - presentation - schwappach5   ee415 - adv electronics - presentation - schwappach
5 ee415 - adv electronics - presentation - schwappach
Loren Schwappach
 
4 ee414 - adv electroncs - lab 3 - loren schwappach
4   ee414 - adv electroncs - lab 3 - loren schwappach4   ee414 - adv electroncs - lab 3 - loren schwappach
4 ee414 - adv electroncs - lab 3 - loren schwappach
Loren Schwappach
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappach
Loren Schwappach
 
2 ee414 - adv electroncs - lab 1 - loren schwappach
2   ee414 - adv electroncs - lab 1 - loren schwappach2   ee414 - adv electroncs - lab 1 - loren schwappach
2 ee414 - adv electroncs - lab 1 - loren schwappach
Loren Schwappach
 

Mais de Loren Schwappach (20)

Ubuntu OS Presentation
Ubuntu OS PresentationUbuntu OS Presentation
Ubuntu OS Presentation
 
EE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers LabEE312 Embedded Microcontrollers Lab
EE312 Embedded Microcontrollers Lab
 
Ee325 cmos design lab 7 report - loren k schwappach
Ee325 cmos design   lab 7 report - loren k schwappachEe325 cmos design   lab 7 report - loren k schwappach
Ee325 cmos design lab 7 report - loren k schwappach
 
Ee325 cmos design lab 6 report - loren k schwappach
Ee325 cmos design   lab 6 report - loren k schwappachEe325 cmos design   lab 6 report - loren k schwappach
Ee325 cmos design lab 6 report - loren k schwappach
 
Ee325 cmos design lab 5 report - loren k schwappach
Ee325 cmos design   lab 5 report - loren k schwappachEe325 cmos design   lab 5 report - loren k schwappach
Ee325 cmos design lab 5 report - loren k schwappach
 
Ee325 cmos design lab 4 report - loren k schwappach
Ee325 cmos design   lab 4 report - loren k schwappachEe325 cmos design   lab 4 report - loren k schwappach
Ee325 cmos design lab 4 report - loren k schwappach
 
Ee325 cmos design lab 3 report - loren k schwappach
Ee325 cmos design   lab 3 report - loren k schwappachEe325 cmos design   lab 3 report - loren k schwappach
Ee325 cmos design lab 3 report - loren k schwappach
 
Loren k. schwappach ee331 - lab 4
Loren k. schwappach   ee331 - lab 4Loren k. schwappach   ee331 - lab 4
Loren k. schwappach ee331 - lab 4
 
Loren k. schwappach ee331 - lab 3
Loren k. schwappach   ee331 - lab 3Loren k. schwappach   ee331 - lab 3
Loren k. schwappach ee331 - lab 3
 
Ee343 signals and systems - lab 2 - loren schwappach
Ee343   signals and systems - lab 2 - loren schwappachEe343   signals and systems - lab 2 - loren schwappach
Ee343 signals and systems - lab 2 - loren schwappach
 
Ee343 signals and systems - lab 1 - loren schwappach
Ee343   signals and systems - lab 1 - loren schwappachEe343   signals and systems - lab 1 - loren schwappach
Ee343 signals and systems - lab 1 - loren schwappach
 
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09Ee 352   lab 1 (tutorial) - schwappach - 15 oct 09
Ee 352 lab 1 (tutorial) - schwappach - 15 oct 09
 
EE375 Electronics 1: lab 3
EE375   Electronics 1: lab 3EE375   Electronics 1: lab 3
EE375 Electronics 1: lab 3
 
EE375 Electronics 1: lab 1
EE375   Electronics 1: lab 1EE375   Electronics 1: lab 1
EE375 Electronics 1: lab 1
 
Ee395 lab 2 - loren - victor - taylor
Ee395   lab 2 - loren - victor - taylorEe395   lab 2 - loren - victor - taylor
Ee395 lab 2 - loren - victor - taylor
 
Ee395 lab 1 - bjt - loren - victor - taylor
Ee395   lab 1 - bjt - loren - victor - taylorEe395   lab 1 - bjt - loren - victor - taylor
Ee395 lab 1 - bjt - loren - victor - taylor
 
5 ee415 - adv electronics - presentation - schwappach
5   ee415 - adv electronics - presentation - schwappach5   ee415 - adv electronics - presentation - schwappach
5 ee415 - adv electronics - presentation - schwappach
 
4 ee414 - adv electroncs - lab 3 - loren schwappach
4   ee414 - adv electroncs - lab 3 - loren schwappach4   ee414 - adv electroncs - lab 3 - loren schwappach
4 ee414 - adv electroncs - lab 3 - loren schwappach
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappach
 
2 ee414 - adv electroncs - lab 1 - loren schwappach
2   ee414 - adv electroncs - lab 1 - loren schwappach2   ee414 - adv electroncs - lab 1 - loren schwappach
2 ee414 - adv electroncs - lab 1 - loren schwappach
 

Último

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Último (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 

Pm600 1103 a-02-schwappach-loren-p3-t1

  • 1. 1 Stakeholders of the SCRMP Project Loren Karl Schwappach Colorado Technical University PM600-1103A-02: Project Management Processes in Organizations Prepared for: Professor David Bowers
  • 2. STAKEHOLDERS OF THE SCRMP PROJECT 2 Abstract This paper is a detailed analysis of HLR Inc.’s SCRMP Project and the project stakeholders that need to be informed and involved with the project.
  • 3. STAKEHOLDERS OF THE SCRMP PROJECT 3 Stakeholders of the SCRMP Project Introduction to the SCRMP Project The Standard Customer Relationship Management Processes (SCRMP) project was is a major incentive by HLR Inc. as solution to create an accurate, shared, standardized customer information system and customer management process database and business process reengineering for consolidating management and market research data into a globally sharable and secure system shared by HLR Inc. divisions. SCRMP is the largest project ever undertaken by HLR Inc. and is imperative for the continual growth in sales development that is expected at HLR Inc. next year. The SCRMP project will be lead by HLR Inc’s Information Technology (IT) Department and will focus on updating the software and information systems of several departments to include IT, sales, product fulfillment, customer service, billing, and marketing. The project will also involve cooperative work between IT, current business unit managers, sales, product fulfillment, customer service, billing, marketing, and a software vender contracted for developing and installing the new information system required for the project. The software vender will play a large role in the SCRMP project and has been contracted to provide essential personnel with the skill and experience needed to develop and install the SCRMP software at all HLR Inc’s locations to include foreign locations and will be assigned to work with business unit managers and low level staff towards the project’s completion.
  • 4. STAKEHOLDERS OF THE SCRMP PROJECT 4 Before the project can be undertaken identification of the project stakeholders and project sponsor is necessary. Stakeholders The project stakeholders are the organizations (public, performing organizations, sponsors, or customers) or persons whose interests may be negatively or positively modified by the completion and performance of a project. Stakeholders are typically vigorously involved in a project and can exercise influence over the project’s success to include its’ project team members, and deliverables. (A guide to, 2008, p. 23) The first thing a project team should do before ever starting a new project is to determine both external and internal stakeholders. This will allow the project team to create a complete and accurate analysis of the expectations and project requirements matched to the stakeholder’s expectations for the project. The project manager must also maintain a healthy relationship with project stakeholders through consistent and effective communication and leadership. Stakeholders play a tremendous role on the life and death of most projects and so their significance can and should not be undervalued. (A guide to, 2008) Stakeholder’s roles may change from sporadic contributions in focus groups and surveys to complete project sponsorship. (A guide to, 2008) Since the most valuable thing to a project are the projects resources (time, personnel, money, equipment), negative stakeholder support can cause a project to be over with before it ever begins.
  • 5. STAKEHOLDERS OF THE SCRMP PROJECT 5 Some of the stakeholders of the SCRMP project include HLR Inc., the customers of HLR Inc. (as they will either be frustrated or pleased by the new system), the employees which utilize the SCRMP tools (sales, marketing, billing, customer service, product fulfillment), the software developer, SCRMP shareholders, SCRMP leadership and management, the IT department (whom are not only involved in the project but will have to deal with the consequences of the projects success), the sponsor, the program managers, the division chiefs and directors, the software designers, testers, project team, and the project manager. Identifying Project Stakeholders Stakeholder identification can be extremely difficult and is a never ending process. It might be argued that the most basic assembly line worker can be a stakeholder since his / her future service at a corporation is directly tied to the failure or success of a project. Failure to identify stakeholders can have devastating impacts on a projects timeline and budget. (A guide to, 2008) If they gain to lose or benefit from the project in any way they are most likely a project stakeholder. The following are some examples of stakeholders: customers/users, sponsors, portfolio managers, program managers, the project management office, project managers, project teams, functional managers, operations management, and seller/business partners. (A guide to, 2008) Project Sponsor
  • 6. STAKEHOLDERS OF THE SCRMP PROJECT 6 The project sponsor is the group or individual that assists the project by providing financial resources for a project. The project sponsor is also the champion of the project when it is first conceived and serves a spokesman leading the project forward until it is formally authorized. The project sponsor also provides guidance on objective setting, priority setting, project organizational structure, project policies and procedures, project master planning, up-front planning, key staffing, monitoring execution, and conflict resolution. (Kerzner, 2003) In the initial stages of a projects development the project sponsor is actively engaged in the project and is involved in such activities as: helping the project manager establish objectives, providing the project manager with political / environmental factors which could influence the project, establishing a projects priority, and functioning as the executive-client contact. I believe the SCRMP Project Sponsor is the Chief Information Officer (CIO) of HLR Inc. for all of the reasons just mentioned. I believe he is the executive-client contact that first initiated the project (although there is not enough information to validate this argument). The CIO openly supports the project while it seems others don’t see a need for it, and he has the authority and power to make the project happen. It could also be argued the division head of marketing or even the marketing department first conceived the project as a necessary requirement and thus sold senior management on the details. If that is the case then he / she / or the department itself maybe the project sponsor according to definition alone. However, I’ll stick to my guns and say I think it’s the CIO.
  • 7. STAKEHOLDERS OF THE SCRMP PROJECT 7 References Kerzner, H. (2003) Project management: A systems approach to planning, scheduling, and controlling (8th ed.). Hoboken, New Jersey: John Wiley & Sons, Inc. A Guide to the Project Management Body of Knowledge (4th ed.). (2008). Newtown Square, PA: Project Management Institute, Inc.