UNCLASSIFIED / FOUO




                       National Guard
                      Black Belt Training
                           Module 05

               CPI Roles and Responsibilities


                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Define
                                                           8-STEP PROCESS
                                                                                                    6. See
   1.Validate          2. Identify           3. Set         4. Determine        5. Develop                          7. Confirm        8. Standardize
                                                                                                   Counter-
      the             Performance         Improvement           Root             Counter-                            Results            Successful
                                                                                                   Measures
    Problem               Gaps              Targets             Cause           Measures                            & Process            Processes
                                                                                                   Through

       Define                   Measure                      Analyze                         Improve                          Control



                                           ACTIVITIES                             TOOLS
                           •   Identify Problem                               •Project Charter
                           •   Validate Problem Statement                     •Project Selection Tools
                           •   Establish Strategic Alignment                  •Value Stream Map
                           •   Gather Voice of the Customer & Business        •Various Financial Analysis
                           •   Create Goal Statement                          •Effective Meeting Skills
                           •   Validate Business Case                         •Stakeholder Analysis
                           •   Determine Project Scope                        •Communication Plan
                           •   Select and Launch Team                         •SIPOC Map
                           •   Develop Project Timeline                       •High-Level Process Map
                           •   Create Communication Plan                      •Project Management Tools
                           •   Prepare High-Level Process Map / SIPOC         •VOC and Kano Analysis
                           •   Complete Define Tollgate                       •RACI and Quad Charts
                                                                              •Strategic Alignment
                                                                                                                                                       2
                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Learning Objectives

       Explain CPI roles and responsibilities
       Understand DACI chart
       Discuss role of change agent




                                                                       3
                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Deployment Roles
                                                  •   Owns vision, direction, business results
                                                  •   Leads change
                                                  •   Allocates Resources
                                                  •   Owns Value Streams
                  CPI Office                                                             Line Departments
                                                         Executive
   • Owns Deployment Plan                                Leadership
   • Owns Communication                                                                                 • Owns Project Charter
     Plan                                                                                               • Owns Financial Results
                          Deployment                                                Project             • Removes Barriers
   • Reports Metrics       Director                                              Sponsor/Owner

                                                All Employees
                                             • Provide data and voice of
                        Master                 customer inputs
                      Black Belts                                                                 Team
                                             • Apply concepts to their own                       Members
    • Trains Black Belts                       jobs and work areas
    • Leads Enterprise-wide
     Projects                                                                                    • Participate in CPI Events and
    • Full-time position                                                                           Projects
                                                                                                 • Part time
                                  Black Belts                         Green Belts
                                                               • Lead and/or support CPI
                       • Expert on CPI Principles and            Events & Projects
                         Tools                                 • Full time or part time role
                       • Leads CPI Events & Projects
                       • Trains & Coaches Green Belts
                       • Full time or part time role                                                                               4
                                                                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Deployment Director Roles
             Head of the CPI Office (normally full-time)
             Owns the CPI Deployment plan
             Owns the Communication plan
             Captures metrics
             Reports directly to the organization’s
              commander
             Breaks down organizational barriers
             Strategically aligns, recommends and
              prioritizes projects
                                                                       5
                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Project Sponsor Responsibilities
          Must have a vested interest in success of the project
          Empowers the team
          Breaks down barriers
          Responsible for project charter
          Must commit to active support
               – Helps kick off project
               – Meets regularly with Black Belt to review progress
               – Attends the final out-brief
          Signs off on Project Tollgates
          Celebrates project success

                                                                                6
                                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Process Owner Responsibilities
       Individual(s) responsible for the implementation of
        process changes
       Can be (but does not have to be) Project Sponsor or
        Black Belt
       Works with Project Sponsor to develop project
        charter
       Must commit to active support as full time or part
        time team member – no surprises!
       Signs off on Project Tollgates
       Implements process sustainment
       Collects, monitors and reports benefits
                                                                         7
                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Resource/Financial Manager

       Helps to determine financial and operational
        benefits of the project
       Signs off on Financial Benefit estimates at the
        Measure and Control phases of the project
       Often collects and reports benefits
       Validates actual financial and operational
        benefits achieved



                                                                    8
                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Master Black Belt Responsibilities

               Provides leadership and guidance for CPI
                implementation
               Provides guidance and counsel to the site
                Commander, CPI Office, Senior Leadership,
                Project Sponsors, and Belts in CPI efforts
               MBB may also be assigned to enterprise-wide
                projects and Value Stream transformations
               Train and mentor belts



                                                                           9
                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Black Belt Responsibilities


     Assist Project Sponsor and teams to lead, schedule,
      plan and facilitate at least 2 CPI projects
     Often assigned to Value Stream transformations
     Full time or part time
     Train and/or mentor Green Belts and team members




                                                                     10
                                               UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Green Belt Responsibilities
         Under the guidance of a Black Belt:
          Lead, schedule, plan and facilitate CPI events
           and projects
          Assist team with outbriefs
          Capture results, lessons learned and future
           opportunities
          Normally works for the Project Sponsor and
           may be part-time or full-time
          Train and mentor team members

                                                                         11
                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Team Responsibilities
      Cross functional team including:
       Members from the work area (inside
        eyes – minimum 1/3)
       Members from outside work area (outside
        eyes willing to question non-value added
        activities)
       Customer (internal/external) voice
       Suppliers/Partners/Safety Rep/Quality Rep



                                                                   12
                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Use SIPOC to Find Team Members
                      Outside Stakeholders: Regulatory Agencies, etc.

                                          Process


       Suppliers           Process      Process Step       Process
                            Step 1           2              Step 3
         Safety
                           Process         Process          Process
         Quality            Step 4          Step 5           Step 6



                                    External Customer(s):
                                  Those who receive or use
                                   your product or service,
                                  outside your organization


                                                                                       13
                                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




The Roles of Change
          Process Owners/Project Sponsors:
                 – The individual or group who has the power to
                   sanction or legitimize change
                 – Responsible for creating an environment that
                   enables the necessary changes to be made on
                   time and within budget
          Change Agents:
                 – The individuals or groups who are responsible
                   for actually making the change
                 – Understand and diagnose the problem, develop
                   a plan to address the problem and execute the
                   change effectively (Green Belts, Black Belts,
                   and Team Members)
  SOURCE: Daryl C. Conner “Managing at the Speed of Change”                         14
                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




DACI Chart
            Defines roles of team members as:
             Driver – Responsible for completing
              project deliverables
             Approver – Responsible for Project
              Charter and tollgate approvals
             Contributor – Team members and
              resources supporting the project
             Informed – Other stakeholders essential
              to success of the project
                                                                     15
                                               UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Cross Functional Team Template
                          Team Members
         Name         Role                Affiliation   DACI
                      Black Belt                        Driver
                      Master Black Belt                 Driver
                      Project Sponsor                   Approver
                      Process Owner                     Approver
                                                        Contributor
                                                        Contributor
                                                        Contributor
                                                        Contributor
                                                        Inform
                                                        Inform
                                                        Inform
                                                        Inform




                                                                                 16
                                                           UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




   NG CPI Tollgate Approvals
                                                                        8-STEP PROCESS
       1. Validate           2. Identify                3. Set           4. Find Root          5. Develop          6. See C-Ms   7. Confirm
                                                                                                                                                        8. Standardize
        Problem                 Gaps                   Targets              Cause                 C-Ms              Through       Results

             Define                  Measure                              Analyze                           Improve                        Control
      Project Charter
       • Problem Stmt         Detailed As Is Process               Potential Xs                   “To Be” Process Map            Process Control Plan
       • Defect Definition   Map                                 •   Brainstorming
                                                                 •   5 Whys                        Solution Generation /         Process Owner
       • Goal Statement                                              Fishbone                    Prioritization
                                Value Stream Map                •                                                               Accountability
       • Project Scope          Key Process Metrics             •   Affinity Diagram
       • Business Impact
       • Strat Alignment      Data Collection Plan                 Critical Xs                    Improvement Strategy      Updated Financial
                                                                 •   Cause & Effect Matrix           • Improvement Model      Benefits
                              Measure Systems
      Sponsor & Team                                            •   Hypothesis Testing              • Implementation Plan
                             Analysis                                                                • Pilot                  Replication Opportunities
                                                                 •   Regression
      Replication Check      Data Collected                                                        • “X” Improvement Target
                                                                 •   Time Studies
      Measurable Y             Baseline Data Analysis          •   Theory of Constraints          Mistake Proofing               Project Documentation
      Voice of Customer          • Descriptive Stats                                                                                of revised policies,
                                                                    FMEA                                                            SOP’s, procedures, and
      Customer Specs             • Graphs                            • Risk Analysis
                                                                                                                                     training
      Voice of Business          • Pareto Charts                     • Risk Mitigation Plan

      Project Timeline         Est Financial Benefits                                             FMEA                         Visual Process Control
                                                                                                 •   Risk Analysis               Tools (Optional)
    Communication Plan       Control Charts (as                                                •   Risk Mitigation Plan
   • Stakeholder Analysis    needed)
    High Level Process       Process Capability                                                    Control Charts
   Map (SIPOC)                                                                                       Process Capability
       I accept the Define       I accept the Measure                 I accept the Analyze             I accept the Improve           I accept the Control
             Tollgate                  Tollgate                             Tollgate                         Tollgate                       Tollgate

              (Sponsor)                 (Sponsor)                            (Sponsor)                         (Sponsor)                    (Sponsor)

           (Process Owner)           (Process Owner)                      (Process Owner)                   (Process Owner)              (Process Owner)

               (MBB)                     (MBB)                                (MBB)                             (MBB)                        (MBB)
                                     (Finance Owner)                                                                                     (Finance Owner)
                                                                                                                                                                         17
                                                                                                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




DACI Roles

          CPI Deployment Director - Informed
          Project Sponsor - Approver
             Process Owner - Approver
             Resource/Financial Manager - Contributor
             Master Black Belt - Driver
             Black Belt - Driver
             Green Belt – Driver or Contributor
             Team Member - Contributor
             Other Key Stakeholders - Informed


                                                                               18
                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Takeaways

          CPI Deployment Director Roles
          Project Sponsor Responsibilities
             Process Owner Responsibilities
             Resource/Financial Manager Responsibilities
             Master Black Belt Responsibilities
             Black Belt Responsibilities
             Green Belt Responsibilities
             Team Responsibilities
             The Roles of Change


                                                                             19
                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                                        20
                                  UNCLASSIFIED / FOUO

Mais conteúdo relacionado

Mais procurados

NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateNG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateLeanleaders.org
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of CustomerLeanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project ManagementLeanleaders.org
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessLeanleaders.org
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateLeanleaders.org
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateLeanleaders.org
 

Mais procurados (20)

NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 14 DEFINE Tollgate
NG BB 14 DEFINE TollgateNG BB 14 DEFINE Tollgate
NG BB 14 DEFINE Tollgate
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of Customer
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake Proofing
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project Management
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the Process
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE Tollgate
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE Tollgate
 

Destaque

NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixLeanleaders.org
 
Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofingLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisLeanleaders.org
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousLeanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 

Destaque (8)

NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) Matrix
 
Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects Analysis
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - Continuous
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 

Semelhante a NG BB 05 Roles and Responsibilities

Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayneNASAPMC
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 
Business Continuity Presentation
Business Continuity PresentationBusiness Continuity Presentation
Business Continuity PresentationJack_Gabriel
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
Project management
Project managementProject management
Project managementSameer Kumar
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groupsvanessahartsfield
 
I Process Framework Private Equity Portfolio Co
I Process Framework Private Equity Portfolio CoI Process Framework Private Equity Portfolio Co
I Process Framework Private Equity Portfolio CoRamesh_Krish123
 
Dean.david
Dean.davidDean.david
Dean.davidNASAPMC
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority CouncilGherda Stephens
 

Semelhante a NG BB 05 Roles and Responsibilities (20)

NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Business Continuity Presentation
Business Continuity PresentationBusiness Continuity Presentation
Business Continuity Presentation
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
Project management
Project managementProject management
Project management
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
Project management office value
Project management office valueProject management office value
Project management office value
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
 
Web 2.0 Implementation Using Communities of Practice
Web 2.0 Implementation Using Communities of PracticeWeb 2.0 Implementation Using Communities of Practice
Web 2.0 Implementation Using Communities of Practice
 
I Process Framework Private Equity Portfolio Co
I Process Framework Private Equity Portfolio CoI Process Framework Private Equity Portfolio Co
I Process Framework Private Equity Portfolio Co
 
Dean.david
Dean.davidDean.david
Dean.david
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority Council
 
M&A Process Model
M&A Process ModelM&A Process Model
M&A Process Model
 

Mais de Leanleaders.org

Mais de Leanleaders.org (20)

D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 

Último

Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 

Último (20)

Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 

NG BB 05 Roles and Responsibilities

  • 1. UNCLASSIFIED / FOUO National Guard Black Belt Training Module 05 CPI Roles and Responsibilities UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Define 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control ACTIVITIES TOOLS • Identify Problem •Project Charter • Validate Problem Statement •Project Selection Tools • Establish Strategic Alignment •Value Stream Map • Gather Voice of the Customer & Business •Various Financial Analysis • Create Goal Statement •Effective Meeting Skills • Validate Business Case •Stakeholder Analysis • Determine Project Scope •Communication Plan • Select and Launch Team •SIPOC Map • Develop Project Timeline •High-Level Process Map • Create Communication Plan •Project Management Tools • Prepare High-Level Process Map / SIPOC •VOC and Kano Analysis • Complete Define Tollgate •RACI and Quad Charts •Strategic Alignment 2 Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUO Learning Objectives  Explain CPI roles and responsibilities  Understand DACI chart  Discuss role of change agent 3 UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO CPI Deployment Roles • Owns vision, direction, business results • Leads change • Allocates Resources • Owns Value Streams CPI Office Line Departments Executive • Owns Deployment Plan Leadership • Owns Communication • Owns Project Charter Plan • Owns Financial Results Deployment Project • Removes Barriers • Reports Metrics Director Sponsor/Owner All Employees • Provide data and voice of Master customer inputs Black Belts Team • Apply concepts to their own Members • Trains Black Belts jobs and work areas • Leads Enterprise-wide Projects • Participate in CPI Events and • Full-time position Projects • Part time Black Belts Green Belts • Lead and/or support CPI • Expert on CPI Principles and Events & Projects Tools • Full time or part time role • Leads CPI Events & Projects • Trains & Coaches Green Belts • Full time or part time role 4 UNCLASSIFIED / FOUO
  • 5. UNCLASSIFIED / FOUO CPI Deployment Director Roles  Head of the CPI Office (normally full-time)  Owns the CPI Deployment plan  Owns the Communication plan  Captures metrics  Reports directly to the organization’s commander  Breaks down organizational barriers  Strategically aligns, recommends and prioritizes projects 5 UNCLASSIFIED / FOUO
  • 6. UNCLASSIFIED / FOUO Project Sponsor Responsibilities  Must have a vested interest in success of the project  Empowers the team  Breaks down barriers  Responsible for project charter  Must commit to active support – Helps kick off project – Meets regularly with Black Belt to review progress – Attends the final out-brief  Signs off on Project Tollgates  Celebrates project success 6 UNCLASSIFIED / FOUO
  • 7. UNCLASSIFIED / FOUO Process Owner Responsibilities  Individual(s) responsible for the implementation of process changes  Can be (but does not have to be) Project Sponsor or Black Belt  Works with Project Sponsor to develop project charter  Must commit to active support as full time or part time team member – no surprises!  Signs off on Project Tollgates  Implements process sustainment  Collects, monitors and reports benefits 7 UNCLASSIFIED / FOUO
  • 8. UNCLASSIFIED / FOUO Resource/Financial Manager  Helps to determine financial and operational benefits of the project  Signs off on Financial Benefit estimates at the Measure and Control phases of the project  Often collects and reports benefits  Validates actual financial and operational benefits achieved 8 UNCLASSIFIED / FOUO
  • 9. UNCLASSIFIED / FOUO Master Black Belt Responsibilities  Provides leadership and guidance for CPI implementation  Provides guidance and counsel to the site Commander, CPI Office, Senior Leadership, Project Sponsors, and Belts in CPI efforts  MBB may also be assigned to enterprise-wide projects and Value Stream transformations  Train and mentor belts 9 UNCLASSIFIED / FOUO
  • 10. UNCLASSIFIED / FOUO Black Belt Responsibilities  Assist Project Sponsor and teams to lead, schedule, plan and facilitate at least 2 CPI projects  Often assigned to Value Stream transformations  Full time or part time  Train and/or mentor Green Belts and team members 10 UNCLASSIFIED / FOUO
  • 11. UNCLASSIFIED / FOUO Green Belt Responsibilities Under the guidance of a Black Belt:  Lead, schedule, plan and facilitate CPI events and projects  Assist team with outbriefs  Capture results, lessons learned and future opportunities  Normally works for the Project Sponsor and may be part-time or full-time  Train and mentor team members 11 UNCLASSIFIED / FOUO
  • 12. UNCLASSIFIED / FOUO Team Responsibilities Cross functional team including:  Members from the work area (inside eyes – minimum 1/3)  Members from outside work area (outside eyes willing to question non-value added activities)  Customer (internal/external) voice  Suppliers/Partners/Safety Rep/Quality Rep 12 UNCLASSIFIED / FOUO
  • 13. UNCLASSIFIED / FOUO Use SIPOC to Find Team Members Outside Stakeholders: Regulatory Agencies, etc. Process Suppliers Process Process Step Process Step 1 2 Step 3 Safety Process Process Process Quality Step 4 Step 5 Step 6 External Customer(s): Those who receive or use your product or service, outside your organization 13 UNCLASSIFIED / FOUO
  • 14. UNCLASSIFIED / FOUO The Roles of Change  Process Owners/Project Sponsors: – The individual or group who has the power to sanction or legitimize change – Responsible for creating an environment that enables the necessary changes to be made on time and within budget  Change Agents: – The individuals or groups who are responsible for actually making the change – Understand and diagnose the problem, develop a plan to address the problem and execute the change effectively (Green Belts, Black Belts, and Team Members) SOURCE: Daryl C. Conner “Managing at the Speed of Change” 14 UNCLASSIFIED / FOUO
  • 15. UNCLASSIFIED / FOUO DACI Chart Defines roles of team members as:  Driver – Responsible for completing project deliverables  Approver – Responsible for Project Charter and tollgate approvals  Contributor – Team members and resources supporting the project  Informed – Other stakeholders essential to success of the project 15 UNCLASSIFIED / FOUO
  • 16. UNCLASSIFIED / FOUO Cross Functional Team Template Team Members Name Role Affiliation DACI Black Belt Driver Master Black Belt Driver Project Sponsor Approver Process Owner Approver Contributor Contributor Contributor Contributor Inform Inform Inform Inform 16 UNCLASSIFIED / FOUO
  • 17. UNCLASSIFIED / FOUO NG CPI Tollgate Approvals 8-STEP PROCESS 1. Validate 2. Identify 3. Set 4. Find Root 5. Develop 6. See C-Ms 7. Confirm 8. Standardize Problem Gaps Targets Cause C-Ms Through Results Define Measure Analyze Improve Control  Project Charter • Problem Stmt  Detailed As Is Process  Potential Xs  “To Be” Process Map  Process Control Plan • Defect Definition Map • Brainstorming • 5 Whys  Solution Generation /  Process Owner • Goal Statement Fishbone Prioritization  Value Stream Map • Accountability • Project Scope  Key Process Metrics • Affinity Diagram • Business Impact • Strat Alignment  Data Collection Plan  Critical Xs  Improvement Strategy  Updated Financial • Cause & Effect Matrix • Improvement Model Benefits  Measure Systems  Sponsor & Team • Hypothesis Testing • Implementation Plan Analysis • Pilot Replication Opportunities • Regression  Replication Check  Data Collected • “X” Improvement Target • Time Studies  Measurable Y  Baseline Data Analysis • Theory of Constraints  Mistake Proofing  Project Documentation  Voice of Customer • Descriptive Stats of revised policies,  FMEA SOP’s, procedures, and  Customer Specs • Graphs • Risk Analysis training  Voice of Business • Pareto Charts • Risk Mitigation Plan  Project Timeline  Est Financial Benefits  FMEA  Visual Process Control • Risk Analysis Tools (Optional)  Communication Plan  Control Charts (as • Risk Mitigation Plan • Stakeholder Analysis needed)  High Level Process  Process Capability  Control Charts Map (SIPOC)  Process Capability I accept the Define I accept the Measure I accept the Analyze I accept the Improve I accept the Control Tollgate Tollgate Tollgate Tollgate Tollgate (Sponsor) (Sponsor) (Sponsor) (Sponsor) (Sponsor) (Process Owner) (Process Owner) (Process Owner) (Process Owner) (Process Owner) (MBB) (MBB) (MBB) (MBB) (MBB) (Finance Owner) (Finance Owner) 17 UNCLASSIFIED / FOUO
  • 18. UNCLASSIFIED / FOUO DACI Roles  CPI Deployment Director - Informed  Project Sponsor - Approver  Process Owner - Approver  Resource/Financial Manager - Contributor  Master Black Belt - Driver  Black Belt - Driver  Green Belt – Driver or Contributor  Team Member - Contributor  Other Key Stakeholders - Informed 18 UNCLASSIFIED / FOUO
  • 19. UNCLASSIFIED / FOUO Takeaways  CPI Deployment Director Roles  Project Sponsor Responsibilities  Process Owner Responsibilities  Resource/Financial Manager Responsibilities  Master Black Belt Responsibilities  Black Belt Responsibilities  Green Belt Responsibilities  Team Responsibilities  The Roles of Change 19 UNCLASSIFIED / FOUO
  • 20. UNCLASSIFIED / FOUO What other comments or questions do you have? 20 UNCLASSIFIED / FOUO