SlideShare uma empresa Scribd logo
1 de 38
Catherine Nash
USDA-NRCS
Temple, Texas
Background Information
 Caged egg-laying operation with 6 houses
 Lagoon size – unknown
 11 to 12 acre-ft of storage (size of football field 10 feet
deep)
 Operation began in late 1970’s
 Operator chose to shut-down facility in May 2006
 Demonstration project
 Determine costs for other lagoons across the state
 Address concerns in an impaired watershed
 Properly close to mitigate water quality impacts
How many lagoons?
Methodology
 Survey of existing site
 Determine extents of lagoon
 Approximate volumes
 Utilities
 Soil sampling to determine in-situ materials and check
for leakage
 Construction Specifications
 Site-specific
 Compilation of appropriate portions of NRCS national
construction standards
Methodology (continued)
 Draft Closure Plan and approval
 Construction Plans
 Contracting
 Construction Oversight
 Final Check-out
FULL
Lagoon(s)
Digging for Information
 Field Engineer Technician
 Located the contractor that originally built the facility
 Confirmed that there were two lagoons
 No plans available
 Found out when water was hooked up for the site 1978
Soil Sampling
Surveying Attempts
 Tried to use Sludge Judge – nothing went into the tube
 Tried pacing and using a range pole to establish depth
 Used Survey Grade GPS unit
 Took Surface Shot
 Used range pole to probe and determined
 Depth of sludge
 Depth of wastewater
Aerial Photo Reconnaissance
Source: 1960 Aerial Photo
Don’t Forget Power Lines
Survey Data Collected & CAD
 Approximately 2,000 data points were collected or
calculated (34 different field codes were used)
 Approximately 200 points were taken on the surface and
probed to obtain bottom of pond elevation and
wastewater level
 Modeled
 Existing Pond with Sludge
 Bottom of Pond
 Wastewater Level in Pond
 Proposed Final Grade
 Existing Concrete Slabs
Closure Plan
 Meetings with TCEQ
 Review of draft plan approved by TCEQ
 Final closure plan to be completed after vegetation is
established
Site Specific Construction
Specifications – March 2008
 Overview
 Scope & Location
 Utilities
 Safety
 Pollution Control
 SWPPP
 Mobilization and Demobilization
Site Specific Construction
Specifications – March 2008
 Overview (continued)
 Removal of litter, sludge and wastewater
 Structure Removal
 Earthfill and Excavation
 Seeding and Mulching
 Construction Survey
Contracting – Turn Key
 Sludge to be removed and land applied – 18,500 CY
 Removal of Concrete Slabs
 Earth moving – compacted fill estimated at 27,000 CY
 Final Seeding of Site
 Bids received began around $1.8M and exceeded $3M
Contracting – Phase 1
 Modified to only include removal and stockpiling of
sludge in windrows on-site
 Awarded Bid
 $3.25 per CY of sludge removed
 $10 per 1,000 gallons of water for pumping to neighbor
 Local SWCD found neighbor to take water
 Total cost $58,500
 Completed September 2009
Bid Closes and what happens
Empty Lagoons
Stockpiled Manure
Phase 2 – Sludge Hauling and Land
Application
 Local SWCD, NRCS and TSSWCB and found a
landowner that wanted the material
 Landowner receiving sludge contracted out of their own
pocket to have sludge hauled and spread on their
property
 Sludge hauler was from the Texas Panhandle
 Some of the cost was for mobilization/demobilization
 Application started January 2011 and was postponed
because of rainfall until April 2011
Slabs to be removed
Phase 3 – Final Grading
 Contract Awarded August 2011
 Final grading completed September 2011
 DOES NOT INCLUDE SEEDING AND
REVEGETATION – currently in a drought
 Silt fencing is in place
Challenges for Final Grading
 Power poles on-site
 Agreement was from 3 years ago when initially bid
 Had to renegotiate cost with power company
 Photo of finished grade
 Photo of work in progress
Phase 4 – Vegetation and
Paperwork
 Vegetate the site – Indian Grass, Klein Grass, Switch
Grass, Sideoats Grama, Plains Bristlegrass, Wild Rye,
Rye Grass
 Landowner deed recordation
 Final Closure Plan
SLUDGEANALYSIS
2006
Range Average
Nitrogen (%) 1.2-2.8 2.11
Phosphorus (%) 4 - 4.7 4.4
Potassium (%) 1.6 - 3.8 2
Calcium 16.6 - 38.9 21.8
Magnesium (%) 1.7 - 2.4 2.1
Sodium ($) 0.5 - 0.7 0.6
Zinc (%) 0.06 - 0.19 0.14
Iron (%) 0.45 - 1.0 0.6
Copper (ppm) 61 - 261 197.7
Manganese (%) 0.1 - 2.2 1.8
pH 7.0 - 7.3 7.2
Conductivity 6280
Total Carbon (%) 19.7
Dry Matter (%) 24 - 53 33.6
P2O5 (lbs/dry ton) 185 210 200
P2O5 (lbs/wet ton) 48-103 67
Sludge Analysis - 2009
% (dry basis)
N 1.5
P 5.7
K 1.6
Dry Matter 74%
WASTEWATER
ANALYSIS2006
N % 0.099
P ppm 172.4
K ppm 3171
Ca ppm 479.7
Mg ppm 147.7
Na ppm 901
Zn ppm 5.76
Fe ppm 7.04
Cu ppm 1.079
Mn ppm 4.967
pH 7.8
Conductivity umhos/cm 16580
Total Carbon % 0.282
NH4-N % 0.1525
Date Received 2/24/2006
Color Brown/ Pink
P2O5 ppm 391.348
EFFLUENT
ANALYSIS2007 N % 0.0174
P % 0.0073
K % 0.1619
Ca % 0.0051
Mg % 0.0098
Na % 0.0327
Zn ppm 0.13
Fe ppm 2.66
Cu ppm 0.05
Mn ppm 0.30
Cost
Component Quantity Cost per unit Cost
Sludge and Water Removal
– stockpile on-site
18,000 CY $3.25/CY $58,500
Wastewater None $10/1,000
gallons
N/a
Sludge Hauling and
Application
12,103 Tons $7.484/Ton $90,580 (basically
$5.03/CY)
Subtotal for removal $149,080
Concrete Slab Removal 1,800 CY $11.60/CY $20,880
Earthwork 27,200 CY $2.50/CY $68,000
Miscellaneous $2,100
Seeding 10 acres $180/Acre $1,800
Subtotal for Site Work $92,780
TOTAL TO DATE $241,860
Additional Costs
 Engineering – Surveying, Civil 3D, Drawings,
Specifications, Design Report
 Closure Plan Development
 Contracting Time and Expenses
 Meetings, coordination, and other communication
time
 Soil, Waste, and Wastewater Analysis
 Moving Power Lines
 Final Establishment of Vegetation
Thank you!

Mais conteúdo relacionado

Mais procurados

Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Recycling and Resource Management Division
 
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...National Institute of Food and Agriculture
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryDaljit Brar
 
Soil organic carbon in soils of the northern permafrost zones: Information st...
Soil organic carbon in soils of the northern permafrost zones: Information st...Soil organic carbon in soils of the northern permafrost zones: Information st...
Soil organic carbon in soils of the northern permafrost zones: Information st...ExternalEvents
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateSteve Williams
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28Steve Williams
 
Measuring and monitoring soil carbon stocks from point to continental scale i...
Measuring and monitoring soil carbon stocks from point to continental scale i...Measuring and monitoring soil carbon stocks from point to continental scale i...
Measuring and monitoring soil carbon stocks from point to continental scale i...ExternalEvents
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 UpdateSteve Williams
 
Gsoc17 fredy neira
Gsoc17 fredy neira Gsoc17 fredy neira
Gsoc17 fredy neira Fredy Neira
 
RECSOIL: Recarbonization of global soils (agricultural)
RECSOIL: Recarbonization of global soils (agricultural)RECSOIL: Recarbonization of global soils (agricultural)
RECSOIL: Recarbonization of global soils (agricultural)Soils FAO-GSP
 
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...National Institute of Food and Agriculture
 
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...EnviroForensics
 
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...Nick Jenshak
 
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...National Institute of Food and Agriculture
 
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...ExternalEvents
 

Mais procurados (20)

Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
 
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...
Multi-scale analysis of microbe-climate interactions in greenhouse gas emissi...
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success Story
 
Soil organic carbon in soils of the northern permafrost zones: Information st...
Soil organic carbon in soils of the northern permafrost zones: Information st...Soil organic carbon in soils of the northern permafrost zones: Information st...
Soil organic carbon in soils of the northern permafrost zones: Information st...
 
RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
Measuring and monitoring soil carbon stocks from point to continental scale i...
Measuring and monitoring soil carbon stocks from point to continental scale i...Measuring and monitoring soil carbon stocks from point to continental scale i...
Measuring and monitoring soil carbon stocks from point to continental scale i...
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 Update
 
Gsoc17 fredy neira
Gsoc17 fredy neira Gsoc17 fredy neira
Gsoc17 fredy neira
 
RECSOIL: Recarbonization of global soils (agricultural)
RECSOIL: Recarbonization of global soils (agricultural)RECSOIL: Recarbonization of global soils (agricultural)
RECSOIL: Recarbonization of global soils (agricultural)
 
Georgia SURFAC Sites Poster
Georgia SURFAC Sites PosterGeorgia SURFAC Sites Poster
Georgia SURFAC Sites Poster
 
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...
Soil Microbial Communities: Key Indicators of Soil Carbon Transformations Whe...
 
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...
Using Soil Gas Concentration Mapping to Predict Soil Vapor Extraction Radius ...
 
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...
Research poster - 2018 Battelle Conference on Remediation of Chlorinated Comp...
 
Payne developing criteria for soil health
Payne developing criteria for soil healthPayne developing criteria for soil health
Payne developing criteria for soil health
 
Using soil data to inform soil health
Using soil data to inform soil healthUsing soil data to inform soil health
Using soil data to inform soil health
 
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...
NIFA-BARD Collaborative: Rapid Hydrophobicity Sensing and Computing through M...
 
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...
Calculating changes in soil carbon in Japanese agricultural land by IPCC-tier...
 

Semelhante a Case Study: Closure of an Earthen Lagoon

The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...IES / IAQM
 
Effects of biochar on soil properties and erosion potential in a degraded san...
Effects of biochar on soil properties and erosion potential in a degraded san...Effects of biochar on soil properties and erosion potential in a degraded san...
Effects of biochar on soil properties and erosion potential in a degraded san...ExternalEvents
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityFairfax County
 
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxjack60216
 
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...Daniel Eyde
 
Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Steve Williams
 
Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and DataStankovic G
 
Soil & Landscape Mapping Technologies
Soil & Landscape Mapping TechnologiesSoil & Landscape Mapping Technologies
Soil & Landscape Mapping TechnologiesAmanda Woods
 
Leachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment optionsLeachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment optionsAyushi Chaturvedi
 
Seminar- balaganesh.ppt
Seminar- balaganesh.pptSeminar- balaganesh.ppt
Seminar- balaganesh.pptssuser72a1812
 
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Michael Hewitt, GISP
 
Simulating_Presentation_2nd_June_4publishing.pdf
Simulating_Presentation_2nd_June_4publishing.pdfSimulating_Presentation_2nd_June_4publishing.pdf
Simulating_Presentation_2nd_June_4publishing.pdfFantahun Dugassa
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshLokesh Saini
 
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...ExternalEvents
 

Semelhante a Case Study: Closure of an Earthen Lagoon (20)

The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
The Former Avenue Coking Works and Chemical Plant: Remediation Scheme and Ver...
 
Project proposal
Project proposalProject proposal
Project proposal
 
Effects of biochar on soil properties and erosion potential in a degraded san...
Effects of biochar on soil properties and erosion potential in a degraded san...Effects of biochar on soil properties and erosion potential in a degraded san...
Effects of biochar on soil properties and erosion potential in a degraded san...
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste Facility
 
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
 
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...
A Review of Zeolite Based Treatment Water Systems and Thier Applicability in ...
 
Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008Navy Presentation on Site 27 to Moffett RAB July 17, 2008
Navy Presentation on Site 27 to Moffett RAB July 17, 2008
 
Aoc sediment update_part 1
Aoc sediment update_part 1Aoc sediment update_part 1
Aoc sediment update_part 1
 
Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and Data
 
14-Mar-2014 - Susan Orgill - Soil Carbon under perennial pasture in SE NSW
14-Mar-2014 - Susan Orgill - Soil Carbon under perennial pasture in SE NSW14-Mar-2014 - Susan Orgill - Soil Carbon under perennial pasture in SE NSW
14-Mar-2014 - Susan Orgill - Soil Carbon under perennial pasture in SE NSW
 
Soil & Landscape Mapping Technologies
Soil & Landscape Mapping TechnologiesSoil & Landscape Mapping Technologies
Soil & Landscape Mapping Technologies
 
Leachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment optionsLeachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment options
 
Disputation_VN3_short
Disputation_VN3_shortDisputation_VN3_short
Disputation_VN3_short
 
Seminar- balaganesh.ppt
Seminar- balaganesh.pptSeminar- balaganesh.ppt
Seminar- balaganesh.ppt
 
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
 
Landfilling
Landfilling Landfilling
Landfilling
 
Simulating_Presentation_2nd_June_4publishing.pdf
Simulating_Presentation_2nd_June_4publishing.pdfSimulating_Presentation_2nd_June_4publishing.pdf
Simulating_Presentation_2nd_June_4publishing.pdf
 
Evaluating ephemeral gully erosion
Evaluating ephemeral gully erosionEvaluating ephemeral gully erosion
Evaluating ephemeral gully erosion
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
 

Mais de LPE Learning Center

Animal agriculture adaptation planning guide (climate change)
Animal agriculture adaptation planning guide (climate change)Animal agriculture adaptation planning guide (climate change)
Animal agriculture adaptation planning guide (climate change)LPE Learning Center
 
Is it weather or is it climate? What is the difference?
Is it weather or is it climate? What is the difference?Is it weather or is it climate? What is the difference?
Is it weather or is it climate? What is the difference?LPE Learning Center
 
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...LPE Learning Center
 
Mitigation of greenhouse gas emissions in animal agriculture
Mitigation of greenhouse gas emissions in animal agricultureMitigation of greenhouse gas emissions in animal agriculture
Mitigation of greenhouse gas emissions in animal agricultureLPE Learning Center
 
Contribution of greenhouse gas emissions: animal agriculture in perspective
Contribution of greenhouse gas emissions: animal agriculture in perspectiveContribution of greenhouse gas emissions: animal agriculture in perspective
Contribution of greenhouse gas emissions: animal agriculture in perspectiveLPE Learning Center
 
Impact of aerosols on respiratory health of dairy workers and residents livin...
Impact of aerosols on respiratory health of dairy workers and residents livin...Impact of aerosols on respiratory health of dairy workers and residents livin...
Impact of aerosols on respiratory health of dairy workers and residents livin...LPE Learning Center
 
Estimation of infectious risks in residential populations near a center pivot...
Estimation of infectious risks in residential populations near a center pivot...Estimation of infectious risks in residential populations near a center pivot...
Estimation of infectious risks in residential populations near a center pivot...LPE Learning Center
 
User capabilities and next generation phosphorus (p) indices
User capabilities and next generation phosphorus (p) indicesUser capabilities and next generation phosphorus (p) indices
User capabilities and next generation phosphorus (p) indicesLPE Learning Center
 
Phosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalPhosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalLPE Learning Center
 
How legacy nutrients affect farm conservation measures
How legacy nutrients affect farm conservation measuresHow legacy nutrients affect farm conservation measures
How legacy nutrients affect farm conservation measuresLPE Learning Center
 
Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...LPE Learning Center
 
Estimation of phosphorus loss from agricultural land in the heartland region ...
Estimation of phosphorus loss from agricultural land in the heartland region ...Estimation of phosphorus loss from agricultural land in the heartland region ...
Estimation of phosphorus loss from agricultural land in the heartland region ...LPE Learning Center
 
Checking ambition with reality the pros and cons of different approaches to s...
Checking ambition with reality the pros and cons of different approaches to s...Checking ambition with reality the pros and cons of different approaches to s...
Checking ambition with reality the pros and cons of different approaches to s...LPE Learning Center
 
Removing phosphorus from drainage water the phosphorus removal structure
Removing phosphorus from drainage water the phosphorus removal structureRemoving phosphorus from drainage water the phosphorus removal structure
Removing phosphorus from drainage water the phosphorus removal structureLPE Learning Center
 
Legacy phosphorus in calcareous soils effects of long term poultry litter app...
Legacy phosphorus in calcareous soils effects of long term poultry litter app...Legacy phosphorus in calcareous soils effects of long term poultry litter app...
Legacy phosphorus in calcareous soils effects of long term poultry litter app...LPE Learning Center
 
Identify and synthesize methods to refine phosphorus indices from three regio...
Identify and synthesize methods to refine phosphorus indices from three regio...Identify and synthesize methods to refine phosphorus indices from three regio...
Identify and synthesize methods to refine phosphorus indices from three regio...LPE Learning Center
 
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...LPE Learning Center
 

Mais de LPE Learning Center (20)

Animal agriculture adaptation planning guide (climate change)
Animal agriculture adaptation planning guide (climate change)Animal agriculture adaptation planning guide (climate change)
Animal agriculture adaptation planning guide (climate change)
 
Is it weather or is it climate? What is the difference?
Is it weather or is it climate? What is the difference?Is it weather or is it climate? What is the difference?
Is it weather or is it climate? What is the difference?
 
Why does climate change?
Why does climate change?Why does climate change?
Why does climate change?
 
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...
The current state of cap-and-trade in the U.S. and the mandatory greenhouse g...
 
Mitigation of greenhouse gas emissions in animal agriculture
Mitigation of greenhouse gas emissions in animal agricultureMitigation of greenhouse gas emissions in animal agriculture
Mitigation of greenhouse gas emissions in animal agriculture
 
Contribution of greenhouse gas emissions: animal agriculture in perspective
Contribution of greenhouse gas emissions: animal agriculture in perspectiveContribution of greenhouse gas emissions: animal agriculture in perspective
Contribution of greenhouse gas emissions: animal agriculture in perspective
 
What Is a Water Footprint?
What Is a Water Footprint?What Is a Water Footprint?
What Is a Water Footprint?
 
What Is a Land Footprint?
What Is a Land Footprint?What Is a Land Footprint?
What Is a Land Footprint?
 
Impact of aerosols on respiratory health of dairy workers and residents livin...
Impact of aerosols on respiratory health of dairy workers and residents livin...Impact of aerosols on respiratory health of dairy workers and residents livin...
Impact of aerosols on respiratory health of dairy workers and residents livin...
 
Estimation of infectious risks in residential populations near a center pivot...
Estimation of infectious risks in residential populations near a center pivot...Estimation of infectious risks in residential populations near a center pivot...
Estimation of infectious risks in residential populations near a center pivot...
 
User capabilities and next generation phosphorus (p) indices
User capabilities and next generation phosphorus (p) indicesUser capabilities and next generation phosphorus (p) indices
User capabilities and next generation phosphorus (p) indices
 
Phosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalPhosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goal
 
How legacy nutrients affect farm conservation measures
How legacy nutrients affect farm conservation measuresHow legacy nutrients affect farm conservation measures
How legacy nutrients affect farm conservation measures
 
Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...
 
Estimation of phosphorus loss from agricultural land in the heartland region ...
Estimation of phosphorus loss from agricultural land in the heartland region ...Estimation of phosphorus loss from agricultural land in the heartland region ...
Estimation of phosphorus loss from agricultural land in the heartland region ...
 
Checking ambition with reality the pros and cons of different approaches to s...
Checking ambition with reality the pros and cons of different approaches to s...Checking ambition with reality the pros and cons of different approaches to s...
Checking ambition with reality the pros and cons of different approaches to s...
 
Removing phosphorus from drainage water the phosphorus removal structure
Removing phosphorus from drainage water the phosphorus removal structureRemoving phosphorus from drainage water the phosphorus removal structure
Removing phosphorus from drainage water the phosphorus removal structure
 
Legacy phosphorus in calcareous soils effects of long term poultry litter app...
Legacy phosphorus in calcareous soils effects of long term poultry litter app...Legacy phosphorus in calcareous soils effects of long term poultry litter app...
Legacy phosphorus in calcareous soils effects of long term poultry litter app...
 
Identify and synthesize methods to refine phosphorus indices from three regio...
Identify and synthesize methods to refine phosphorus indices from three regio...Identify and synthesize methods to refine phosphorus indices from three regio...
Identify and synthesize methods to refine phosphorus indices from three regio...
 
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...
Modeling phosphorus runoff in the chesapeake bay region to test the phosphoru...
 

Último

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 

Último (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Case Study: Closure of an Earthen Lagoon

  • 2.
  • 3. Background Information  Caged egg-laying operation with 6 houses  Lagoon size – unknown  11 to 12 acre-ft of storage (size of football field 10 feet deep)  Operation began in late 1970’s  Operator chose to shut-down facility in May 2006  Demonstration project  Determine costs for other lagoons across the state  Address concerns in an impaired watershed  Properly close to mitigate water quality impacts
  • 5. Methodology  Survey of existing site  Determine extents of lagoon  Approximate volumes  Utilities  Soil sampling to determine in-situ materials and check for leakage  Construction Specifications  Site-specific  Compilation of appropriate portions of NRCS national construction standards
  • 6. Methodology (continued)  Draft Closure Plan and approval  Construction Plans  Contracting  Construction Oversight  Final Check-out
  • 8. Digging for Information  Field Engineer Technician  Located the contractor that originally built the facility  Confirmed that there were two lagoons  No plans available  Found out when water was hooked up for the site 1978
  • 10. Surveying Attempts  Tried to use Sludge Judge – nothing went into the tube  Tried pacing and using a range pole to establish depth  Used Survey Grade GPS unit  Took Surface Shot  Used range pole to probe and determined  Depth of sludge  Depth of wastewater
  • 13. Survey Data Collected & CAD  Approximately 2,000 data points were collected or calculated (34 different field codes were used)  Approximately 200 points were taken on the surface and probed to obtain bottom of pond elevation and wastewater level  Modeled  Existing Pond with Sludge  Bottom of Pond  Wastewater Level in Pond  Proposed Final Grade  Existing Concrete Slabs
  • 14. Closure Plan  Meetings with TCEQ  Review of draft plan approved by TCEQ  Final closure plan to be completed after vegetation is established
  • 15. Site Specific Construction Specifications – March 2008  Overview  Scope & Location  Utilities  Safety  Pollution Control  SWPPP  Mobilization and Demobilization
  • 16. Site Specific Construction Specifications – March 2008  Overview (continued)  Removal of litter, sludge and wastewater  Structure Removal  Earthfill and Excavation  Seeding and Mulching  Construction Survey
  • 17.
  • 18. Contracting – Turn Key  Sludge to be removed and land applied – 18,500 CY  Removal of Concrete Slabs  Earth moving – compacted fill estimated at 27,000 CY  Final Seeding of Site  Bids received began around $1.8M and exceeded $3M
  • 19. Contracting – Phase 1  Modified to only include removal and stockpiling of sludge in windrows on-site  Awarded Bid  $3.25 per CY of sludge removed  $10 per 1,000 gallons of water for pumping to neighbor  Local SWCD found neighbor to take water  Total cost $58,500  Completed September 2009
  • 20. Bid Closes and what happens
  • 21.
  • 22.
  • 23.
  • 25. Phase 2 – Sludge Hauling and Land Application  Local SWCD, NRCS and TSSWCB and found a landowner that wanted the material  Landowner receiving sludge contracted out of their own pocket to have sludge hauled and spread on their property  Sludge hauler was from the Texas Panhandle  Some of the cost was for mobilization/demobilization  Application started January 2011 and was postponed because of rainfall until April 2011
  • 26.
  • 27. Slabs to be removed
  • 28. Phase 3 – Final Grading  Contract Awarded August 2011  Final grading completed September 2011  DOES NOT INCLUDE SEEDING AND REVEGETATION – currently in a drought  Silt fencing is in place
  • 29. Challenges for Final Grading  Power poles on-site  Agreement was from 3 years ago when initially bid  Had to renegotiate cost with power company
  • 30.  Photo of finished grade  Photo of work in progress
  • 31. Phase 4 – Vegetation and Paperwork  Vegetate the site – Indian Grass, Klein Grass, Switch Grass, Sideoats Grama, Plains Bristlegrass, Wild Rye, Rye Grass  Landowner deed recordation  Final Closure Plan
  • 32. SLUDGEANALYSIS 2006 Range Average Nitrogen (%) 1.2-2.8 2.11 Phosphorus (%) 4 - 4.7 4.4 Potassium (%) 1.6 - 3.8 2 Calcium 16.6 - 38.9 21.8 Magnesium (%) 1.7 - 2.4 2.1 Sodium ($) 0.5 - 0.7 0.6 Zinc (%) 0.06 - 0.19 0.14 Iron (%) 0.45 - 1.0 0.6 Copper (ppm) 61 - 261 197.7 Manganese (%) 0.1 - 2.2 1.8 pH 7.0 - 7.3 7.2 Conductivity 6280 Total Carbon (%) 19.7 Dry Matter (%) 24 - 53 33.6 P2O5 (lbs/dry ton) 185 210 200 P2O5 (lbs/wet ton) 48-103 67
  • 33. Sludge Analysis - 2009 % (dry basis) N 1.5 P 5.7 K 1.6 Dry Matter 74%
  • 34. WASTEWATER ANALYSIS2006 N % 0.099 P ppm 172.4 K ppm 3171 Ca ppm 479.7 Mg ppm 147.7 Na ppm 901 Zn ppm 5.76 Fe ppm 7.04 Cu ppm 1.079 Mn ppm 4.967 pH 7.8 Conductivity umhos/cm 16580 Total Carbon % 0.282 NH4-N % 0.1525 Date Received 2/24/2006 Color Brown/ Pink P2O5 ppm 391.348
  • 35. EFFLUENT ANALYSIS2007 N % 0.0174 P % 0.0073 K % 0.1619 Ca % 0.0051 Mg % 0.0098 Na % 0.0327 Zn ppm 0.13 Fe ppm 2.66 Cu ppm 0.05 Mn ppm 0.30
  • 36. Cost Component Quantity Cost per unit Cost Sludge and Water Removal – stockpile on-site 18,000 CY $3.25/CY $58,500 Wastewater None $10/1,000 gallons N/a Sludge Hauling and Application 12,103 Tons $7.484/Ton $90,580 (basically $5.03/CY) Subtotal for removal $149,080 Concrete Slab Removal 1,800 CY $11.60/CY $20,880 Earthwork 27,200 CY $2.50/CY $68,000 Miscellaneous $2,100 Seeding 10 acres $180/Acre $1,800 Subtotal for Site Work $92,780 TOTAL TO DATE $241,860
  • 37. Additional Costs  Engineering – Surveying, Civil 3D, Drawings, Specifications, Design Report  Closure Plan Development  Contracting Time and Expenses  Meetings, coordination, and other communication time  Soil, Waste, and Wastewater Analysis  Moving Power Lines  Final Establishment of Vegetation

Notas do Editor

  1. I will be presenting some information on the closure of a poultry lagoon in Texas
  2. This is a photo of the facility with the full lagoons in the foreground taken in Spring 2006.
  3. This was a caged egg-laying operation which utilized 6 houses. It had converted to a dry waste management system. The lagoon size was initially unknown, but held approximately 11-12 acre-feet of storage, or 14,800 cubic meters of wastewater, which is one of the smaller lagoons in the area. The initial operation began in the late 1970’s and the operation shut-down in May 2006. This was a demonstration project between the Natural Resources Conservation Service (NRCS), the state soil conservation agency, Texas State Soil & Water Conservation Board (TSSWCB) and the local Soil & Water Conservation District. The purpose of the demonstration was to: establish costs for this practice as there are numerous similar situations across the state and remove a potential source of contamination from an impaired water shed.
  4. After taking samples, we did some digging at the local field office. From this aerial photo, we were able to determine that there were two lagoons and one mini pond.
  5. Now moving back to the actual methodology for the project. This consisted of surveying the existing site, soil sampling, construction specification and much more.
  6. Sampling of Sludge material that was sent to Texas A&M for evaluation
  7. This is a plan view of the operation. When the site was constructed initially the lagoon was built at the top of the hill, dirt for the lagoon was excavated and used as a building pad for the slab thus eliminating all outside drainage. The initial grade of the site prior to the installation of the facility is shown with green arrows. The grade is approximately 0.2% over the entire site.The entire site is less than 11 acres or 44,515 square meters, and the system was likely designed as a total evaporation system. The wastewater was recycled to flush the concrete alleys. The only freshwater was from the drinking nozzles.
  8. The use of a local technician allowed us to track down the original contractor, water hook-ups and so forth. However, the contractor could not recall any of the dimensions or details on the construction of the lagoon.
  9. Samples were taken to determine if the material was the same as indicated on the soils maps and to determine if there was any seepage into the surrounding soil at the sampling locations. The sampling indicated that the soils were acceptable for an in-situ lining material and there was not any indication of seepage from the lagoon.
  10. In order to establish the boundaries of the lagoons under the sludge and wastewater, we tried several methods until we came up with one that worked. The sludge judge did not work because the waste was too thick and would not go into the tube. Attempted to pace and use a range pole to establish the depth while dragging a raft, but did not have an accurate surface elevation or horizontal control. Finally, utilizing a survey grade GPS unit, along with a range pole, we were able to obtain a surface elevation, probed to the bottom with the range pole and took readings for the depth of the sludge and the wastewater level.
  11. Double decker rows of buzzards are missing now!
  12. Using old aerial photos and the United States Geological Survey quadrangle map which provides contours , we were able to determine what the site looked like prior to the installation of the poultry operation.
  13. It is important to remember both above ground and below ground utilities. In this case, the contractor had to obtain permission from the utility company in order to work under the line and this had to be address in the plans and specifications
  14. After all surveying work was completed, there were approximately 2,000 data points that were used to model using Eagle Point at the time the various levels of sludge, wastewater and then develop a final grading plan and associated quantities.
  15. Additionally, a draft closure plan was developed prior to any work for TCEQ review and approval. The final closure plan will be completed after vegetation is established on-site.
  16. These construction specifications addressed typical items that would be seen in most construction projects for NRCS.
  17. Additionally, the specifications included requirements for the removal of litter, sludge and wastewater, structure removal, earthfill and excavation, seeding and mulching, and final construction survey
  18. A design report, along with engineering drawings and construction specifications were prepared. I have included a handout with sample construction specifications for the entire project.
  19. Once all the engineering and technical work was completed, the initial thought for contracting the work was to have a turn key package where the contractor took care of all sludge hauling and land application, including finding the land to apply the sludge. The bids started at $1.8 million….. since there was not that much funding available, the project was split into various phases with our local offices doing much of the legwork.
  20. The project was broken into three phases initially; however, it is in its fourth phase at this time. Phase 1 consisted of removing the litter and stockpiling on-site
  21. As soon as the bid was closed, the site received 5-6 inches of rain. The contractor was responsible for all costs associated with this water; however, a stipulation was added that the contractor would be paid $10/1000 gallons if there was any additional rainfall.
  22. Here are some photos of the dewatering of the lagoon in phase 1
  23. The contractor used multiple types of equipment and conveyors to remove and stack the material on-site. Note: The sludge looks like a typical clay soil.
  24. Initially, a stationary hopper as shown on the left was used. The contractor switched after the first couple of days to a vibrating hopper to address the material sticking to the sides of the hopper.
  25. Here are some photos of the sludge stockpiled on-site and the empty lagoons.
  26. For phase 2, the local offices were able to find a landowner that wanted the material and was willing to pay for the transportation and spreading of the material. There was a significant amount of time spent finding this landowner, as the local applicators in the area were accustomed to poultry litter, but did not have equipment for spreading the sludge.
  27. The sludge applicator did a terrific job of removing all of the sludge from the site.
  28. The only thing remaining was the slabs to be demolished in Phase 3.
  29. Phase 3 was initially to include final grading and vegetation establishment. However, with the current drought situation in Texas, it was decided to remove the vegetation requirements from the contract. The site has an average slope of 0.2%, and silt fence was installed to reduce the possibility of erosion.
  30. One of the challenges for the final grading was moving the power poles that were on-site to avoid miniature islands around the poles. The agreement was from 3 years prior and the costs for moving the poles had more than tripled. With some good notes and negotiating skills, the local technician was able to reduce the cost to close to the original quote from 2008.
  31. This is a photo of the final site after grading and a close-up of the silt fence.
  32. The last phase consists of establishing the vegetation on-site. Since the site received some rainfall earlier this month. We decided to go with a native mixture for the site and planting should be completed by the end of the day. Additionally, the landowner will need to deed record the location of the lagoon as the designed earthfill and compaction requirements were not intended to support a structure and some shrinkage is expected. After vegetation is established, a final closure plan will be documented.
  33. Saqib Mukhtar from Texas A&M had agreed to perform the analysis of the sludge along with one of his graduate students. There were 8 samples taken. The sludge resembled dirt and had very little odor to it. This chart shows an average of the samples for the sludge.
  34. As the sludge was stockpiled, the local office took samples of sludge and had them analyzed. This is the average of approximately 20 samples that were taken, which is approximately 1 sample for every 1,000 CY.
  35. There were a few samples of wastewater that were collected and analyzed at the same time as well. This shows the results from the analysis in 2006.
  36. There were a few samples of wastewater that were collected and analyzed at the same time as well. This shows the results from the analysis in 2006.
  37. Here are the contractor costs to date… the $90,580 for sludge hauling and application was paid by the landowner receiving the sludge. The total spent by NRCS and TSSWCB to date is approximately $150k
  38. There is a significant amount of time and staff resources spent on this project that correlate to additional costs that are not included in the contracting costs.