PROJECT REPORT ON VOCATIONAL
          TRAINING
             IN

      INDIAN RAILWAY
ACKNOWLEDGEMENT
We (Subhra Das, Kumar Saurabh, Soutik Das & Uddipan
Halder) students of Camellia Institute of Technology
Digberia(Badu Road, Madhyamgram) would like to pay
our Heart Felt Thanks to the Indian Railway for providing
an Immense knowledge and Cooperation. We would like
to express our Gratitude to Mr A.K.Ghosh.
We are greatful to our Training Guides, Inspiration and
Constructive Suggestion that is helpful for us during the
Training Period.
       1. Mr Debasis Roy (SSE/TSR/SPR)
       2. Mr Alok Chowdhury(SSE/IC/TSR/NKG)
INTRODUCTION
Indian Railway is the world’s fourth largest
commercial, by number of employees with
over 1.4 million employees. Railways were first
introduced in India in 1853. Indian Railways
operates both long distance and suburban rail
systems on a multi-gauge network of board
meter and narrow gauges.
From 20th December 2010, the railways had
developed a 5 digit numbering system. This
need is required because IR runs 10,000 trains
daily.
AT


  SEALDAH STATION


   SSE/E(G)/SDAH-I


(POWER HOUSE AND SUB-
      STATION)
SEALDAH STATION

   At first We went to Sealdah station power
 house, from there we all sent to ‘Dakineshwar
Sub-station’, their We saw feeders that took the
power from CESC and supplied to various colony
                ,pump, pillers, etc.
DAKINESHWAR SUB-STATION
   2 x 25 kV autotransformer system




The 2 x 25 kV autotransformer system may be used on 25 kV lines to reduce
energy losses. It should not be confused with the 50 kV system. The voltage
between the overhead line (3) and the feeder line (5) is 50 kV but the voltage
between the overhead line (3) and the running rails (4) remains at 25 kV and this
is the voltage supplied to the train. This system is used by Indian Railways
FEEDER
The feeders that receives the power from CESC, and the
power is step down with the help of step down
transformer and then supplied to various
colonies, piller box, etc. This process is shown with the
help of above connection diagram.
6kv from CESC goes to HT OCB 400A with the help of HT
busbar 400A is divided into two 200A and sent to two
transformer each of 250 kVA then sent to various parts.
OIL TYPE TRANSFORMER
• Transformer oil or insulating oil is usually a highly-refined mineral oil that is stable at high
temperatures and has excellent electrical insulating properties. It is used in oil-filled
transformers, circuit breakers. Its functions are to insulate, suppress corona and arcing, and
to serve as a coolant.

• The oil helps cool the transformer. Because it also provides part of the electrical insulation
between internal live parts, transformer oil must remain stable at high temperatures for an
extended period. To improve cooling of large power transformers, the oil-filled tank may
have external radiators through which the oil circulates by natural convection.

• The flash point (min) and pour point (max) are 140 °C and −6 °C respectively. The
dielectric strength of new untreated oil is 12 MV/m (RMS) and after treatment it should be
>24 MV/m (RMS).
Testing and oil quality
• Transformer oils are subject to electrical and mechanical stresses while a
   transformer is in operation. In addition there is contamination caused by
   chemical interactions with windings and other solid insulation, catalyzed by
   high operating temperature. As a result the original chemical properties of
   transformer oil changes gradually, rendering it ineffective for its intended
   purpose after many years. Hence this oil has to be periodically tested to
   ascertain its basic electrical properties,
These tests can be divided into:-

1.Dissolved gas analysis
2.Furan analysis
3.PCB analysis
4.General electrical & physical tests:-
         Color & Appearance
         Breakdown Voltage
         Water Content
AT
BARASAT CARSHED
   SSE/TRS/BT
TRACTION




In Overhead Electrification Systems, the supply of electricity is
through an overhead system of suspended cables known as the
Catenary
The loco uses a Pantograph, to make contact with the overhead
contact cable and draw electricity from it to power its motors.
The return path for the electricity is through the body of the loco and
the wheels to the tracks, which are electrically grounded.




Conductivity may be reduced in cases of dirt and debris on the rails.
There are 2 types of Electrification System in Indian Railways –

• DC System: In DC systems with overhead catenary, the basic
  principle is the same, with the catenary being supplied
  electricity at 1.5Kv DC. The current from the catenary goes
  directly to the motors OR convert the DC supply to AC
  internally using inverters or a motor-generator combination
  which then drives AC motors.
• Single system (AC): The overhead catenary is fed electricity
  at 25Kv AC (single-phase) from feeding posts which are
  positioned at frequent intervals alongside the track.

  A Remote Control Centre, has facilities for controlling the
  power supply to different sections of the catenaries fed by
  several substations in the area.
VOLTAGE USED FOR ELECTRIC TRACTION IN
                        INDIA


•   Voltages used are 1.5Kv DC and 25Kv AC for mainline trains.

• The 1.5Kv DC overhead system is used around Bombay.

• The Calcutta Metro uses 750V DC traction with a third-rail
mechanism for delivering the electricity to the EMUs.

• The Calcutta trams use 550V DC with an overhead catenary system
with underground return conductors.

●Delhi Metro uses 25KV AC Overhead Traction.
NO LOAD TESTING SCHEDULE OF A ASSEMBLED
                  TRACTION MOTOR

(1)   The motor is run at 1500 RPM, if running is smooth the motor is run for 30
      minutes.
(2)   The rotation of the motor is changed and run at 1500 RPM for another 30
      minute. Steady state temperature rise, should motor exceed 35degree centi
      to 40degree centi.
(3)    The speed is increased to 2000 RPM and run up to 15 minutes.
(4)   The speed is increased to about 2725 RPM.
      Temperature rise in the zone should not exceed 50 to 60 degree centigrade.
AT

NARKELDANGA CARSHED

    SSE/TRS/NKG
APPARATUS USED
•   PANTOGRAPH
•   MAIN TRANSFORMER
•   RECTIFIER
•   REVERSER
•   CLR
•   WINDING CHANGE-OVER SWITCH
•   BATTERY & BATTERY CHARGER
•   PROTECTION CIRCUIT AND RELAY
•   SWITCH GROUP 1 & 2
DISC JUNCTION


PANTOGRAPH                      CURRENT          MAIN
                              TRANSFORMER    TRANSFORMER




SMOOTHING                        RECTIFIER       TAP
 REACTOR                                       CHANGER




 ADDITIONAL
 SMOOTHING                       REVERSER       MOTOR
  REACTOR



                      BLOCK DIAGRAM
TRACTIVE EFFORT DISTRIBUTION IN E.M.U.
Electric multiple unit:

Electric multiple units (EMU) are the most dependable transport system in urban areas.
An EMU generally comprises of 9 coaches. In some cases it can be 12 coaches also.
There are 2 types of coaches with respect point of view.
One is the motor coach and other is the trailer coach.
Here in the EMU there are 3 motor coaches and 6 trailer coaches in the total of 9
coaches EMU.
On other there are 4 motor coaches and 8 trailer coaches in the total of 12 coaches EMU.
GENERAL CONFIGURATION OF Nine coaches E.M.U.
Twelve coaches E.M.U.




T/L = Trailer Coach
M/C = Motor Coach
Presented by –

  1.   Subhra Das
  2.   Kumar Saurabh
  3.   Soutik Das
  4.   Uddipan Halder

Mais conteúdo relacionado

Mais procurados

PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDTarang Mittal
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction Systemsahotaharman
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final uploadBishal Rimal
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco ShedAarti Ojha
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
NWR summer training ppt
NWR summer training pptNWR summer training ppt
NWR summer training pptKaushu Deshwal
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
Traction system
Traction systemTraction system
Traction systematul giri
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting bookfiroj shaik
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTNikunj Parashar
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training reportKaushu Deshwal
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasiShubham​ Yadav
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESPawan Sharma
 

Mais procurados (20)

PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
NWR summer training ppt
NWR summer training pptNWR summer training ppt
NWR summer training ppt
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
The diesel locomotive
The diesel locomotiveThe diesel locomotive
The diesel locomotive
 
Traction system
Traction systemTraction system
Traction system
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
 
Diesel locomotive works, varanasi
Diesel locomotive works, varanasiDiesel locomotive works, varanasi
Diesel locomotive works, varanasi
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCES
 

Semelhante a Railway training

Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer TraningGaurav Singh
 
Delhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxDelhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxMAYANKSHARMA852342
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docHarishYadav582451
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx7009AKASHMODANWAL
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptxSohailKhan490408
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptxsameed4
 
Intenship in traction motor shed
Intenship in traction motor shedIntenship in traction motor shed
Intenship in traction motor shedPallavPant4
 
Railay internship report
Railay internship reportRailay internship report
Railay internship reportsubham gahir
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...ravi9898000178
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)99sunilkumar
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training reportAvinash Kumawat
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railwaySURAJBHAKTA4
 

Semelhante a Railway training (20)

Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer Traning
 
Delhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptxDelhi metro rail corporation PPT En.pptx
Delhi metro rail corporation PPT En.pptx
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
 
Railway ppt
Railway pptRailway ppt
Railway ppt
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptx
 
Electric traction
Electric tractionElectric traction
Electric traction
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
 
Intenship in traction motor shed
Intenship in traction motor shedIntenship in traction motor shed
Intenship in traction motor shed
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training report
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 

Último

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 

Último (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 

Railway training

  • 1. PROJECT REPORT ON VOCATIONAL TRAINING IN INDIAN RAILWAY
  • 2. ACKNOWLEDGEMENT We (Subhra Das, Kumar Saurabh, Soutik Das & Uddipan Halder) students of Camellia Institute of Technology Digberia(Badu Road, Madhyamgram) would like to pay our Heart Felt Thanks to the Indian Railway for providing an Immense knowledge and Cooperation. We would like to express our Gratitude to Mr A.K.Ghosh. We are greatful to our Training Guides, Inspiration and Constructive Suggestion that is helpful for us during the Training Period. 1. Mr Debasis Roy (SSE/TSR/SPR) 2. Mr Alok Chowdhury(SSE/IC/TSR/NKG)
  • 3. INTRODUCTION Indian Railway is the world’s fourth largest commercial, by number of employees with over 1.4 million employees. Railways were first introduced in India in 1853. Indian Railways operates both long distance and suburban rail systems on a multi-gauge network of board meter and narrow gauges. From 20th December 2010, the railways had developed a 5 digit numbering system. This need is required because IR runs 10,000 trains daily.
  • 4. AT SEALDAH STATION SSE/E(G)/SDAH-I (POWER HOUSE AND SUB- STATION)
  • 5. SEALDAH STATION At first We went to Sealdah station power house, from there we all sent to ‘Dakineshwar Sub-station’, their We saw feeders that took the power from CESC and supplied to various colony ,pump, pillers, etc.
  • 6. DAKINESHWAR SUB-STATION 2 x 25 kV autotransformer system The 2 x 25 kV autotransformer system may be used on 25 kV lines to reduce energy losses. It should not be confused with the 50 kV system. The voltage between the overhead line (3) and the feeder line (5) is 50 kV but the voltage between the overhead line (3) and the running rails (4) remains at 25 kV and this is the voltage supplied to the train. This system is used by Indian Railways
  • 7. FEEDER The feeders that receives the power from CESC, and the power is step down with the help of step down transformer and then supplied to various colonies, piller box, etc. This process is shown with the help of above connection diagram. 6kv from CESC goes to HT OCB 400A with the help of HT busbar 400A is divided into two 200A and sent to two transformer each of 250 kVA then sent to various parts.
  • 8. OIL TYPE TRANSFORMER • Transformer oil or insulating oil is usually a highly-refined mineral oil that is stable at high temperatures and has excellent electrical insulating properties. It is used in oil-filled transformers, circuit breakers. Its functions are to insulate, suppress corona and arcing, and to serve as a coolant. • The oil helps cool the transformer. Because it also provides part of the electrical insulation between internal live parts, transformer oil must remain stable at high temperatures for an extended period. To improve cooling of large power transformers, the oil-filled tank may have external radiators through which the oil circulates by natural convection. • The flash point (min) and pour point (max) are 140 °C and −6 °C respectively. The dielectric strength of new untreated oil is 12 MV/m (RMS) and after treatment it should be >24 MV/m (RMS).
  • 9. Testing and oil quality • Transformer oils are subject to electrical and mechanical stresses while a transformer is in operation. In addition there is contamination caused by chemical interactions with windings and other solid insulation, catalyzed by high operating temperature. As a result the original chemical properties of transformer oil changes gradually, rendering it ineffective for its intended purpose after many years. Hence this oil has to be periodically tested to ascertain its basic electrical properties, These tests can be divided into:- 1.Dissolved gas analysis 2.Furan analysis 3.PCB analysis 4.General electrical & physical tests:- Color & Appearance Breakdown Voltage Water Content
  • 10. AT BARASAT CARSHED SSE/TRS/BT
  • 11. TRACTION In Overhead Electrification Systems, the supply of electricity is through an overhead system of suspended cables known as the Catenary The loco uses a Pantograph, to make contact with the overhead contact cable and draw electricity from it to power its motors.
  • 12. The return path for the electricity is through the body of the loco and the wheels to the tracks, which are electrically grounded. Conductivity may be reduced in cases of dirt and debris on the rails.
  • 13. There are 2 types of Electrification System in Indian Railways – • DC System: In DC systems with overhead catenary, the basic principle is the same, with the catenary being supplied electricity at 1.5Kv DC. The current from the catenary goes directly to the motors OR convert the DC supply to AC internally using inverters or a motor-generator combination which then drives AC motors. • Single system (AC): The overhead catenary is fed electricity at 25Kv AC (single-phase) from feeding posts which are positioned at frequent intervals alongside the track. A Remote Control Centre, has facilities for controlling the power supply to different sections of the catenaries fed by several substations in the area.
  • 14. VOLTAGE USED FOR ELECTRIC TRACTION IN INDIA • Voltages used are 1.5Kv DC and 25Kv AC for mainline trains. • The 1.5Kv DC overhead system is used around Bombay. • The Calcutta Metro uses 750V DC traction with a third-rail mechanism for delivering the electricity to the EMUs. • The Calcutta trams use 550V DC with an overhead catenary system with underground return conductors. ●Delhi Metro uses 25KV AC Overhead Traction.
  • 15. NO LOAD TESTING SCHEDULE OF A ASSEMBLED TRACTION MOTOR (1) The motor is run at 1500 RPM, if running is smooth the motor is run for 30 minutes. (2) The rotation of the motor is changed and run at 1500 RPM for another 30 minute. Steady state temperature rise, should motor exceed 35degree centi to 40degree centi. (3) The speed is increased to 2000 RPM and run up to 15 minutes. (4) The speed is increased to about 2725 RPM. Temperature rise in the zone should not exceed 50 to 60 degree centigrade.
  • 16. AT NARKELDANGA CARSHED SSE/TRS/NKG
  • 17. APPARATUS USED • PANTOGRAPH • MAIN TRANSFORMER • RECTIFIER • REVERSER • CLR • WINDING CHANGE-OVER SWITCH • BATTERY & BATTERY CHARGER • PROTECTION CIRCUIT AND RELAY • SWITCH GROUP 1 & 2
  • 18. DISC JUNCTION PANTOGRAPH CURRENT MAIN TRANSFORMER TRANSFORMER SMOOTHING RECTIFIER TAP REACTOR CHANGER ADDITIONAL SMOOTHING REVERSER MOTOR REACTOR BLOCK DIAGRAM
  • 20. Electric multiple unit: Electric multiple units (EMU) are the most dependable transport system in urban areas. An EMU generally comprises of 9 coaches. In some cases it can be 12 coaches also. There are 2 types of coaches with respect point of view. One is the motor coach and other is the trailer coach. Here in the EMU there are 3 motor coaches and 6 trailer coaches in the total of 9 coaches EMU. On other there are 4 motor coaches and 8 trailer coaches in the total of 12 coaches EMU. GENERAL CONFIGURATION OF Nine coaches E.M.U.
  • 21. Twelve coaches E.M.U. T/L = Trailer Coach M/C = Motor Coach
  • 22. Presented by – 1. Subhra Das 2. Kumar Saurabh 3. Soutik Das 4. Uddipan Halder