March	
  
                                             11




Transportation for the Nation
Case Study – Washington State:
Washington Pooled Funds effort




TFTN Strategic Plan Case Study
Overview:
The Washington State Transportation Framework project (WA-Trans) is an
exemplary project for cooperation and partnership at all levels of
government, including 8 Federal Agencies, 7 States, 14 Washington State
agencies, 23 counties, 10 cities, 9 tribal governments, and 20 other private
and public entities, to build a framework transportation data layer. The
primary goal of this project is to build a statewide transportation database
using a continuously evolving and improving collaborative effort. WA-
Trans has been working in cooperation with six other state departments of
transportation to develop computer-based tools that facilitate
transportation data sharing and integration. The computer-based tools
portion of the project has been financed with federal funds, specifically
Transportation Pooled Funds (TPF).

Project Background:
The WA-Trans project began in 2000, when the Puget Sound Regional
Council (PSRC) led an effort to develop a transportation framework model
within the King, Pierce, Snohomish, and Kitsap counties in Washington
State. In 2003, the project name officially changed to WA-Trans, and
Oregon became an active partner in the project. Business needs analysis
and data model design work began as well. In 2004, standards design
and development began, and core datasets were determined and
defined. Pilot projects began to take shape and business needs were
addressed with pilot project requirements and specifications. By the end
of 2004, the WA-Trans data standards and data model, and a high-level
architecture design were completed; and funding became available for
WA-Trans to hire a technical lead. In 2005, WA-Trans began the Puget
Sound pilot, which included Pierce County, King County, PSRC and USGS.
The goal of the pilot was to the test WA-Trans data model usability by
translating data from King and Pierce Counties into WA-Trans, integrating
that data into a seamless dataset, and providing it back to the counties,
as well as USGS. As of 2005, four states also participated in the program
and funding was provided for a TPF Study.
In 2006, the WA-Trans database was implemented and transformers were
developed using FME Workbench software. These transformers allow
Pierce County and King County to provide their data to WA-Trans and
have it automatically transformed to the WA-Trans schema and loaded
into the WA-Trans database. An innovative concept termed ’agreement
points‘ was developed, which allowed data to be connected across
borders more efficiently without requiring each entity to change their
data within their jurisdiction.
By 2007, six states were participating with WA-Trans in the TPF Study.
Bidirectional transformation of data from the counties to WA-Trans and
back again was completed successfully. A return on investment (ROI)
study showed positive benefits to local, regional, state, and federal
agencies. The results of this study showed a conservative estimate of $27
million in savings over 20 years with an 11% ROI and a break-even point
within one year of completion. A Data Provider portal was researched
and prototyped, which allowed data providers to submit data to WA-
Trans over the Internet.
In 2008, WA-Trans completed the Puget Sound pilot, incorporating local
data from King, Kitsap, and Pierce Counties. Prototype Data User and
Data Provider portals were completed.
In 2009, database and portal packages were delivered to all participating
TPF partners in an effort to test transferability of processes into different
states. Software to automate processing was researched and Change
Detection and Change Management were completed. A seven-county
implementation project was initiated to provide local road data to
support safety program needs. Clark, King, Kitsap, Pierce, Snohomish,
Spokane, and Thurston counties participated. The dataset included local
address and route information, and state route information. Later in the
year, the Eastern Washington Regional dataset project was initiated as a
WA-Trans implementation effort. Adams, Ferry, Lincoln, Pend Oreille,
Stevens, and Whitman counties participated in this project.
Automating Data Integration, Data Update processes, and feature-level
metadata dominated WA-Trans in 2010. Completing refinement and
documentation of the Integration and Workflow of data from local
providers, including addresses and routes with state route information into
the WA-Framework data structure, was a significant accomplishment. The
ability to string together automated processes was researched. The
process for provider data submittal and transformation into the WA-Trans
standardized database, change detection, and the flagging of these
changes for the update process was completely automated.
TPF Partners Software Packages that include: Software, Process
descriptions, SQL and Spatial ETL Code, and detailed documentation are
expected to begin in April 2011. Data Update and maintenance process
research and software development is continuing and expectations are
that completed software will be delivered by June 2011.
After all of the successes of the program, looking forward, the lack of
adequate funding has become a serious issue and the program could
potentially come to an end.

Lessons Learned and Challenges:

Mais conteúdo relacionado

Mais procurados

Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
Koniag
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
Koniag
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014
State of Georgia
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
KSI Koniag
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD Presentation
KSI Koniag
 
Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summary
artba
 
LBMA-DMTI Case Study
LBMA-DMTI Case StudyLBMA-DMTI Case Study
LBMA-DMTI Case Study
The LBMA
 

Mais procurados (17)

I-95 Corridor
I-95 CorridorI-95 Corridor
I-95 Corridor
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
 
Overview oftransportationforthenation v4
Overview oftransportationforthenation v4Overview oftransportationforthenation v4
Overview oftransportationforthenation v4
 
Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014Georgia Geospatial Network for GIO presentation 2014
Georgia Geospatial Network for GIO presentation 2014
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
 
TFTN Executive Steering Committee (10-20-2010)
TFTN Executive Steering Committee (10-20-2010)TFTN Executive Steering Committee (10-20-2010)
TFTN Executive Steering Committee (10-20-2010)
 
HIFLD Presentation
HIFLD PresentationHIFLD Presentation
HIFLD Presentation
 
SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)
 
Utah Tribal Leaders Meeting 3.24.11
Utah Tribal Leaders Meeting 3.24.11Utah Tribal Leaders Meeting 3.24.11
Utah Tribal Leaders Meeting 3.24.11
 
UT Rural Telecom Conf 3.16.11
UT Rural Telecom Conf 3.16.11UT Rural Telecom Conf 3.16.11
UT Rural Telecom Conf 3.16.11
 
Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summary
 
WV 3D Elevation Program (3DEP) / BAA Overview
WV 3D Elevation Program (3DEP) / BAA OverviewWV 3D Elevation Program (3DEP) / BAA Overview
WV 3D Elevation Program (3DEP) / BAA Overview
 
A Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in FloridaA Review of MPO Long Range Transportation Plans in Florida
A Review of MPO Long Range Transportation Plans in Florida
 
LBMA-DMTI Case Study
LBMA-DMTI Case StudyLBMA-DMTI Case Study
LBMA-DMTI Case Study
 
UNLOCKING DATA FOR LAND GOVERNANCE PERFORMANCE MONITORING AND LAND POLICY DIA...
UNLOCKING DATA FOR LAND GOVERNANCE PERFORMANCE MONITORING AND LAND POLICY DIA...UNLOCKING DATA FOR LAND GOVERNANCE PERFORMANCE MONITORING AND LAND POLICY DIA...
UNLOCKING DATA FOR LAND GOVERNANCE PERFORMANCE MONITORING AND LAND POLICY DIA...
 
MTA Bus Customer Information Systems
MTA Bus Customer Information SystemsMTA Bus Customer Information Systems
MTA Bus Customer Information Systems
 
Introduction to New Jersey's State Broadband Initiative and Broadband Data Map
Introduction to New Jersey's State Broadband Initiative and Broadband Data MapIntroduction to New Jersey's State Broadband Initiative and Broadband Data Map
Introduction to New Jersey's State Broadband Initiative and Broadband Data Map
 

Destaque (7)

Ohio final
Ohio finalOhio final
Ohio final
 
Narc tftn overview_v1
Narc tftn overview_v1Narc tftn overview_v1
Narc tftn overview_v1
 
Virginia
VirginiaVirginia
Virginia
 
man TELE-satellite 1005
man TELE-satellite 1005man TELE-satellite 1005
man TELE-satellite 1005
 
Federal roads mtg trans survey-results 9
Federal roads mtg   trans survey-results 9Federal roads mtg   trans survey-results 9
Federal roads mtg trans survey-results 9
 
1.4 widner panel presentation
1.4 widner panel presentation1.4 widner panel presentation
1.4 widner panel presentation
 
Emission inventory of air pollution from vehicle fleet in phnom penh
Emission  inventory of air pollution from vehicle fleet in phnom penhEmission  inventory of air pollution from vehicle fleet in phnom penh
Emission inventory of air pollution from vehicle fleet in phnom penh
 

Semelhante a Wa final

November Committee at Large Meeting
November Committee at Large MeetingNovember Committee at Large Meeting
November Committee at Large Meeting
KSI Koniag
 
Andrea Loeffelholz Resume 2016
Andrea Loeffelholz Resume 2016Andrea Loeffelholz Resume 2016
Andrea Loeffelholz Resume 2016
Andrea Loeffelholz
 
Resume - Carl Harris
Resume - Carl HarrisResume - Carl Harris
Resume - Carl Harris
Carl Harris
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Koniag
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
KSI Koniag
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
KSI Koniag
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
Koniag
 
Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010
KSI Koniag
 

Semelhante a Wa final (20)

November Committee at Large Meeting
November Committee at Large MeetingNovember Committee at Large Meeting
November Committee at Large Meeting
 
NSDI 2.0
NSDI 2.0NSDI 2.0
NSDI 2.0
 
Andrea Loeffelholz Resume 2016
Andrea Loeffelholz Resume 2016Andrea Loeffelholz Resume 2016
Andrea Loeffelholz Resume 2016
 
CTDC DC Case Study
CTDC DC Case StudyCTDC DC Case Study
CTDC DC Case Study
 
Resume - Carl Harris
Resume - Carl HarrisResume - Carl Harris
Resume - Carl Harris
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
Nsgic mid year_strategic_plannning_for_tftn_presentation_march_2010
 
Trinity_Case-Study
Trinity_Case-StudyTrinity_Case-Study
Trinity_Case-Study
 
Next Generation of Traveler Information
Next Generation of Traveler InformationNext Generation of Traveler Information
Next Generation of Traveler Information
 
ICT - an introduction in Government setup
ICT - an introduction in Government setupICT - an introduction in Government setup
ICT - an introduction in Government setup
 
ODDC Context - Accessing, Opening and Using Government Data in Five Indian Ci...
ODDC Context - Accessing, Opening and Using Government Data in Five Indian Ci...ODDC Context - Accessing, Opening and Using Government Data in Five Indian Ci...
ODDC Context - Accessing, Opening and Using Government Data in Five Indian Ci...
 
Revised presentation
Revised presentationRevised presentation
Revised presentation
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
Tftn overview gis dot
Tftn overview gis dotTftn overview gis dot
Tftn overview gis dot
 
NSGIC Mid-Year Meeting
NSGIC Mid-Year MeetingNSGIC Mid-Year Meeting
NSGIC Mid-Year Meeting
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
Team overview gist april 2010
Team overview gist april 2010Team overview gist april 2010
Team overview gist april 2010
 
David Cowen UW-Madison Geospatial Summit 2015
David Cowen UW-Madison Geospatial Summit 2015David Cowen UW-Madison Geospatial Summit 2015
David Cowen UW-Madison Geospatial Summit 2015
 
No More Half Fast: Improving US Broadband Download Speed. Georgetown Universi...
No More Half Fast: Improving US Broadband Download Speed. Georgetown Universi...No More Half Fast: Improving US Broadband Download Speed. Georgetown Universi...
No More Half Fast: Improving US Broadband Download Speed. Georgetown Universi...
 
Developing Shared Transportation and Economic Development Visions, Goals, and...
Developing Shared Transportation and Economic Development Visions, Goals, and...Developing Shared Transportation and Economic Development Visions, Goals, and...
Developing Shared Transportation and Economic Development Visions, Goals, and...
 

Mais de KSI Koniag

November Committee at Large Notes
November Committee at Large NotesNovember Committee at Large Notes
November Committee at Large Notes
KSI Koniag
 
GIS-T Notes Public
GIS-T Notes PublicGIS-T Notes Public
GIS-T Notes Public
KSI Koniag
 
NSGIC TFTN Workshop
NSGIC TFTN WorkshopNSGIC TFTN Workshop
NSGIC TFTN Workshop
KSI Koniag
 
ESRI UC Public
ESRI UC PublicESRI UC Public
ESRI UC Public
KSI Koniag
 
Agenda Executive Steering Committee Notes
Agenda Executive Steering Committee NotesAgenda Executive Steering Committee Notes
Agenda Executive Steering Committee Notes
KSI Koniag
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
KSI Koniag
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findings
KSI Koniag
 
Interview trends
Interview trendsInterview trends
Interview trends
KSI Koniag
 
GIS-T April 2010 findings
GIS-T April 2010 findingsGIS-T April 2010 findings
GIS-T April 2010 findings
KSI Koniag
 
GIS-Pro September 2010 findings
GIS-Pro September  2010 findingsGIS-Pro September  2010 findings
GIS-Pro September 2010 findings
KSI Koniag
 
Federal roads mtg trans survey-results 9
Federal roads mtg  trans survey-results 9Federal roads mtg  trans survey-results 9
Federal roads mtg trans survey-results 9
KSI Koniag
 
Spatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5minSpatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5min
KSI Koniag
 
2.3 blackstone tfn panel
2.3 blackstone tfn panel2.3 blackstone tfn panel
2.3 blackstone tfn panel
KSI Koniag
 
2.3 mel seigler virginia panelpresentation
2.3 mel seigler virginia panelpresentation2.3 mel seigler virginia panelpresentation
2.3 mel seigler virginia panelpresentation
KSI Koniag
 
2.2 navteq tftn presentation skip parker
2.2 navteq tftn presentation skip parker2.2 navteq tftn presentation skip parker
2.2 navteq tftn presentation skip parker
KSI Koniag
 
1.3 census tftn fusaro
1.3 census tftn fusaro1.3 census tftn fusaro
1.3 census tftn fusaro
KSI Koniag
 

Mais de KSI Koniag (17)

Washington
WashingtonWashington
Washington
 
November Committee at Large Notes
November Committee at Large NotesNovember Committee at Large Notes
November Committee at Large Notes
 
GIS-T Notes Public
GIS-T Notes PublicGIS-T Notes Public
GIS-T Notes Public
 
NSGIC TFTN Workshop
NSGIC TFTN WorkshopNSGIC TFTN Workshop
NSGIC TFTN Workshop
 
ESRI UC Public
ESRI UC PublicESRI UC Public
ESRI UC Public
 
Agenda Executive Steering Committee Notes
Agenda Executive Steering Committee NotesAgenda Executive Steering Committee Notes
Agenda Executive Steering Committee Notes
 
Tftn findings to date esri uc
Tftn findings to date esri ucTftn findings to date esri uc
Tftn findings to date esri uc
 
Nsgic annual 2010 findings
Nsgic annual 2010 findingsNsgic annual 2010 findings
Nsgic annual 2010 findings
 
Interview trends
Interview trendsInterview trends
Interview trends
 
GIS-T April 2010 findings
GIS-T April 2010 findingsGIS-T April 2010 findings
GIS-T April 2010 findings
 
GIS-Pro September 2010 findings
GIS-Pro September  2010 findingsGIS-Pro September  2010 findings
GIS-Pro September 2010 findings
 
Federal roads mtg trans survey-results 9
Federal roads mtg  trans survey-results 9Federal roads mtg  trans survey-results 9
Federal roads mtg trans survey-results 9
 
Spatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5minSpatial igniteorlando tftn_in5min
Spatial igniteorlando tftn_in5min
 
2.3 blackstone tfn panel
2.3 blackstone tfn panel2.3 blackstone tfn panel
2.3 blackstone tfn panel
 
2.3 mel seigler virginia panelpresentation
2.3 mel seigler virginia panelpresentation2.3 mel seigler virginia panelpresentation
2.3 mel seigler virginia panelpresentation
 
2.2 navteq tftn presentation skip parker
2.2 navteq tftn presentation skip parker2.2 navteq tftn presentation skip parker
2.2 navteq tftn presentation skip parker
 
1.3 census tftn fusaro
1.3 census tftn fusaro1.3 census tftn fusaro
1.3 census tftn fusaro
 

Último

Último (20)

Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 

Wa final

  • 1. March   11 Transportation for the Nation Case Study – Washington State: Washington Pooled Funds effort TFTN Strategic Plan Case Study
  • 2. Overview: The Washington State Transportation Framework project (WA-Trans) is an exemplary project for cooperation and partnership at all levels of government, including 8 Federal Agencies, 7 States, 14 Washington State agencies, 23 counties, 10 cities, 9 tribal governments, and 20 other private and public entities, to build a framework transportation data layer. The primary goal of this project is to build a statewide transportation database using a continuously evolving and improving collaborative effort. WA- Trans has been working in cooperation with six other state departments of transportation to develop computer-based tools that facilitate transportation data sharing and integration. The computer-based tools portion of the project has been financed with federal funds, specifically Transportation Pooled Funds (TPF). Project Background: The WA-Trans project began in 2000, when the Puget Sound Regional Council (PSRC) led an effort to develop a transportation framework model within the King, Pierce, Snohomish, and Kitsap counties in Washington State. In 2003, the project name officially changed to WA-Trans, and Oregon became an active partner in the project. Business needs analysis and data model design work began as well. In 2004, standards design and development began, and core datasets were determined and defined. Pilot projects began to take shape and business needs were addressed with pilot project requirements and specifications. By the end of 2004, the WA-Trans data standards and data model, and a high-level architecture design were completed; and funding became available for WA-Trans to hire a technical lead. In 2005, WA-Trans began the Puget Sound pilot, which included Pierce County, King County, PSRC and USGS. The goal of the pilot was to the test WA-Trans data model usability by translating data from King and Pierce Counties into WA-Trans, integrating that data into a seamless dataset, and providing it back to the counties, as well as USGS. As of 2005, four states also participated in the program and funding was provided for a TPF Study. In 2006, the WA-Trans database was implemented and transformers were developed using FME Workbench software. These transformers allow Pierce County and King County to provide their data to WA-Trans and have it automatically transformed to the WA-Trans schema and loaded into the WA-Trans database. An innovative concept termed ’agreement points‘ was developed, which allowed data to be connected across borders more efficiently without requiring each entity to change their data within their jurisdiction.
  • 3. By 2007, six states were participating with WA-Trans in the TPF Study. Bidirectional transformation of data from the counties to WA-Trans and back again was completed successfully. A return on investment (ROI) study showed positive benefits to local, regional, state, and federal agencies. The results of this study showed a conservative estimate of $27 million in savings over 20 years with an 11% ROI and a break-even point within one year of completion. A Data Provider portal was researched and prototyped, which allowed data providers to submit data to WA- Trans over the Internet. In 2008, WA-Trans completed the Puget Sound pilot, incorporating local data from King, Kitsap, and Pierce Counties. Prototype Data User and Data Provider portals were completed. In 2009, database and portal packages were delivered to all participating TPF partners in an effort to test transferability of processes into different states. Software to automate processing was researched and Change Detection and Change Management were completed. A seven-county implementation project was initiated to provide local road data to support safety program needs. Clark, King, Kitsap, Pierce, Snohomish, Spokane, and Thurston counties participated. The dataset included local address and route information, and state route information. Later in the year, the Eastern Washington Regional dataset project was initiated as a WA-Trans implementation effort. Adams, Ferry, Lincoln, Pend Oreille, Stevens, and Whitman counties participated in this project. Automating Data Integration, Data Update processes, and feature-level metadata dominated WA-Trans in 2010. Completing refinement and documentation of the Integration and Workflow of data from local providers, including addresses and routes with state route information into the WA-Framework data structure, was a significant accomplishment. The ability to string together automated processes was researched. The process for provider data submittal and transformation into the WA-Trans standardized database, change detection, and the flagging of these changes for the update process was completely automated. TPF Partners Software Packages that include: Software, Process descriptions, SQL and Spatial ETL Code, and detailed documentation are expected to begin in April 2011. Data Update and maintenance process research and software development is continuing and expectations are that completed software will be delivered by June 2011. After all of the successes of the program, looking forward, the lack of adequate funding has become a serious issue and the program could potentially come to an end. Lessons Learned and Challenges:
  • 4. As with many complex projects, communication is a key component in making a project successful early on. Having a communications person as the early lead to the project proved to be extremely beneficial for educating participants and gaining support to move forward with a common goal. Some of the challenges that were encountered in the program included: • Lack of internal WSDOT offices understanding of the differences between managing relational data versus geospatial data. • Lack of GIS expertise in small counties which created a significant barrier for entry for them into the program. • WSDOT did not initially understand the importance of addressing (much like many State DOT’s) due to their complete reliance on the state LRS. To WSDOT WA-Trans efforts with addresses seemed like a waste of resources. Some of the lessons learned in the program that could be applied to a national model included: • Local counties with strong GIS groups will see immediate benefits of a program that goes beyond their boundaries because they often have difficulty obtaining good data beyond their boundaries. • Local counties will become significantly important partners, even helping other surrounding counties that had no geospatial capabilities participate. • At the onset of a program it is important to create a perpetual ID system to accurately perform change detections. • Learning to educate local government agencies about a program, and asking them how the program could help them, versus telling them what the program can do for them will achieve a higher level of success • The need to have agreements in place (most likely memorandums of understanding) that are very specific and allow participants to freely share data at a regular frequency are time consuming but essential to a program’s success. Conclusions: The WA-Trans program has shown that a successful framework data program can be executed at the state level in which data can be collected from a local level, integrated at a state level, and shared to all project participants while saving money and benefiting the users at all levels of government. In addition, having individual states coordinate with the local government agencies within their states is a model that has been successful and is a model that can be reproduced and expanded to create a national framework data set.
  • 5. The incorporation of addressing into the WA-Trans program has proven that this collection of data plays a vital role in a Statewide Transportation Framework and addressing should be part of a national program to fully engage local government. Finally, it is critical to a state and/or a national program to have adequate funding for not only infrastructure, tools, staffing and data, but also for outreach and communication efforts. Sources: Michael Leierer, WA-Trans Project Manager and Technical Lead; and Bob Crabhorn, Independent Consultant interview on January 12, 2011; “WA-Trans Business Needs Document Version 2.0”, January, 2008. “The Agreement Point Process and Case Study Version 2.0” WA-Trans, Washington State Department of Transportation, April 4, 2008; “Providing Data to WA-Trans the First Time (and into the future)”, WA-Trans, Washington State Department of Transportation, July 10, 2009; “Integration Process Workflow (New Provider Data)”, WA-Trans, Washington State Department of Transportation, January 7, 2011; Washington State Framework for GIS Project Web site: http://www.wsdot.wa.gov/mapsdata/transframework/default.htm;