SlideShare uma empresa Scribd logo
1 de 87
KIMBERLY  AREA  SCHOOL DISTRICT  2009 ANNUAL MEETING Monday September 28, 2009 6:30 PM - Budget Hearing 7:00 PM - Annual Meeting KIMBERLY HIGH SCHOOL W2662 Kennedy Avenue Kimberly WI  54136
KIMBERLY AREA SCHOOL DISTRICT BUDGET HEARING Presented by: Gary Kvasnica  Director of Business Services
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 STUDENT ACHIEVEMENT As evidenced by our test scores, the District continues to be one of the higher achieving Districts in the Fox Valley, as well as the State The Kimberly Area School District as a low spending, high achieving District, continues to provide our Community with great value
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 Compiled by the Wisconsin Tax Payers Alliance
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 Compiled by the Wisconsin Tax Payers Alliance
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 Compiled by the Wisconsin Tax Payers Alliance Read Math Pct. Decile Pct. Decile 4th Grade K12- District Average 81   77   Kimberly 91 3 93 2 8th Grade K12- District Average 84   75   Kimberly 92 3 92 2 10th Grade K12- District Average 75   70   Kimberly 89 1 87 1
 
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 Compiled by the Wisconsin Tax Payers Alliance DISTRICT PER STUDENT EXPENDITURES 2008-09 BUDGET     Instruction   Comparative Exp.     Sal. & Pupil  Instr. Bldg. Pupil Capital Exp./ Total % St. Avg. Type Name Total Fringe Serv. Supp. Admin. Grds. Trans. Debt Exp. Amt. decile (+/-) K-12 DISTRICT AVG. 6,732 5,701 493 542 861 1,117 458 778 11,491 9,746 K-12 Kimberly 6,190 5,079 470 491 675 900 277 1,244 10,784 8,726 10 -13.1
KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW  -  2008/09 Enrollment continued  to Grow  An increase of 132 Full Time Equivalent (4K and 5K count as .5) in students 08/09 vs. 80 in 07/08 Higher Rate than Expected
JANSSEN BOILER REPLACMENT Reduced heating costs by 32% Replaced 47 year-old Boilers with new Energy Efficient System Unlike many Districts, we were able to fund our project without having to ask tax payers for additional money.   Capital Improvement Fund established by District allowed us to set aside funding over a several year period KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09
JANSSEN BOILER REPLACMENT KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Before After Heat pipes were installed in ceiling with ceiling/light replacement project to reduce costs
JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Excavated a large retention pond to address drainage issues
JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Removed compacted soils for stadium football field and installed new fill along with Synthetic Field Turf
SYNTHETIC FIELD TURF KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 ,[object Object],[object Object],[object Object],The approximately $700,000 in Athletic Complex Upgrades Funded through Capital Improvement Fund and Community Donations  ,[object Object],[object Object],JOHN  S TREET ATHLETIC COMPLEX UPGRADES
JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Athletic Complex Donor Wall constructed and donated to the District by Sanderfoot Masonry and other contractors
KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW  -  2008/09 OTHER FACILITY  IMPROVEMENTS
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Westside School Improvements 2 st  Year of a 3-Year Carpet Replacement Plan 07/08 08/09
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Westside School Improvements Replaced deteriorated Wood Fascia with Steel Fascia
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Chalkboards at Janssen replaced with Whiteboards Before After
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Mapleview Improvements Replaced Bathroom Partitions Before After
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Janssen Improvements Drain tiles installed in play area to address water build-up after snow and heavy rainfall
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Sunrise School Improvements Asphalt in Visitor Parking Lot Milled and Replaced Before After
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Sunrise School Improvements Painting of Building Exterior completed Before After
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 Woodland Improvements Handicap Accessible Playground with Rubberized Surface for Wheelchair Access
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 JRG Middle School Improvements RE-ROOFED SECTION B
KIMBERLY AREA SCHOOL DISTRICT  THE YEAR IN REVIEW – 2008/09 JRG Middle School Sandy Huiting Learning Center Outside Place for Kids to Meet and Learn Parent and Community Funded New Retention Pond allowed us to Build
KIMBERLY AREA SCHOOL DISTRICT   FACILITIES  The improvements just listed have  been paid for out of Capital Improvements Fund Helps insure that Capital Improvements done when needed Tax Levy for this Fund is included within Revenue Limits Separate Fund that can only be used for Capital Improvements
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW - 2008/09 Energy Conservation The new Boiler System at Janssen significantly  reduced energy consumption  Mapleview light replacement Plan completed with energy efficient lights in entrances Janssen lighting replacement Plan completed New Software installed that automatically turns off computers when not in use
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW - 2008/09 TECHNOLOGY  IMPROVEMENTS Replaced old Computers at the Middle School Added Hardware and Software to improve interoperability between different software products Replaced Network Switches to increase performance Installed video projectors at High School and Middle School to enhance learning Increased Storage Capacity Implemented Mobile Computer Lab at Middle School to enhance learning
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Insurance Change Moved to New Plan Administrator For Non-Teaching  Staff for Self-Funded Dental Plan Reason : Vendor has negotiated lower fees with Dentists
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Implemented a New Employee Savings Plan Meets new IRS Guidelines for  403(b) Tax Deferred Savings  Plans for Public Sector Employees Offers Employees a variety of no-load mutual funds at a cost significantly lower than previous plans Investment Providers selected by a Volunteer Committee of District Employees  After-tax (Roth) component now available Similar to 401K in Private Sector
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Wisconsin Retirement System Unfunded Liability Paid-Off ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW  -  2008/09 Post Retirement Benefits   Paid Health & Dental Benefits for certain  staff retiring after age 55 Negotiated as a cost saving measure many years ago ,[object Object],Several recent developments have Impacted ,[object Object],The costs of these future retirement benefits will be substantial To help protect future school boards and taxpayers from  this significant  future Liability the District established a Trust to help fund this Liability.  Post Retirement Benefits
KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW  -  2008/09 Created in 2002/03 Can only be used to pay Retiree Benefits 08/09 Contributions Current Trust Fund Balance   Post Retirement Benefit   Trust Disbursements 08/09 Fund Balance Increase Interest Earned District is not obligated to make payments toward the Trust   $1,312,005 $882,738 $191,064 $620,331 -  $3,186,912
KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW  -  2008/09 Post Retirement CDO Investment In December of 2006 the District invested $700,000 from the Post Retirement Trust and borrowed $4,300,000 to purchase $5,000,000 in a Collateralized Debt Obligations (CDO’s) for the Trust The  market value of investment  declined substantially Credit linked AA rated Corporate Debt of approximately 140 investment grade companies that matures in 7-years. Goal – Generate approximately $550,000 investment incomes at end of the 7 year term The District believes it was mislead regarding the investment and has filed a lawsuit along with 4 other Wisconsin School Districts seeking rescission, damages and attorney fees
KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 District Owned Land Sold  At prior Annual Meeting electorate  Authorized District to sell a lot adjacent to Woodland School Lot was sold for $37,500!
KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10!
KIMBERLY AREA SCHOOL DISTRICT   WHAT’S NEW IN 2009/10 STATE BUDGET SHORTFALL Cost-of-Living Increase under Revenue  Controls  decreased by $75 per student or $308,467 Less Money to Operate State aid reduced by approximately 2.5% Under Revenue Controls decreases in State Aid result in increased taxes
KIMBERLY AREA SCHOOL DISTRICT   WHAT’S NEW IN 2009/10 FEDERAL STIMULUS FUNDING Purpose: Stimulate Economy & Aid Financially Strapped School Districts American Recovery and Reinvestment Act  (ARRA) District to receive $946,414 over a 2-year period to help implement student achievement initiatives for our special education students
KIMBERLY AREA SCHOOL DISTRICT   WHAT’S NEW IN 2009/10 NEW LABOR LEGISLATION Qualified Economic Offer (QEO) Eliminated from Teacher Contracts ,[object Object],[object Object],-  Helped keep labor costs in line with state imposed revenue controls Arbitration rules revised ,[object Object],[object Object],Number of hours that an employee has to work to qualify for the Wisconsin Retirement System (State Pension Plan) has been reduced
KIMBERLY AREA SCHOOL DISTRICT   WHAT’S NEW IN 2009/10 Increase in Wisconsin Retirement System Contributions As a result of the recent economic downturn, investments used to pay  retirement benefits for state employees have declined substantially The required District contribution for 2010 has increased by .6% to 11% of an employee’s salary  Fortunately - District paid off unfounded portion of the Wisconsin Retirement System liability in 08/09 thereby lessening  the impact of the increase ,[object Object],[object Object]
KIMBERLY AREA SCHOOL DISTRICT   WHAT’S NEW IN 2009/10 FACILITY IMPROVEMENTS
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10 Westside School Improvements Final Year of a 3-Year Carpet Replacement Plan 08/09 09/10
KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Westside School Improvements Deteriorated Concrete and Asphalt in Front Drive Replaced Before After
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Janssen Improvements Replaced original Sinks, Faucets and Water Fountains Before After
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Janssen Improvements Replaced antiquated Clocks with Automated Clocks Before After
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Sunrise School Improvements Asphalt in North Playground Milled and Replaced Before After
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Mapleview Improvements Widened Receiving Room Door Before After Easier more Efficient Egress for Distributing Supplies
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Water Line Improvements Replaced deteriorated Water Main at Middle School Connected Water Line to the Woodland Field Irrigation System
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   JRG Middle School Improvements Before After Replaced old Locker Room Doors
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   JRG Middle School Improvements RE-ROOFED SECTION OVER TECH ED AND ART ROOM
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Resurfaced Tennis Courts at High School and Middle School Before After
KIMBERLY AREA SCHOOL DISTRICT  WHATS NEW IN 2009/10   Administration Building Improvements Before After Second Floor Reconfigured for Additional Staff
KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Energy Conservation With the Installation of the Boiler System at Janssen all schools with the of exception Sunrise Elementary have above average energy efficiency With one-time freed up money because of Federal Stimulus Funding, the District plans to implement additional energy conservation projects at Sunrise and other schools to help reduce future operating costs Completed Sunrise Gym Lighting Replacement
KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 TECHNOLOGY  IMPROVEMENTS Replaced old  Computers  at Janssen and Administration Replaced  Network  Switches to increase performance & reliability Installed video projectors at Westside, Janssen and Sunrise to enhance learning Completed Virtualization Project Implemented Mobile Computer Lab at High School to enhance learning ,[object Object],[object Object],[object Object]
Continued Health Insurance Cost Containment KIMBERLY AREA SCHOOL DISTRICT  WHAT’S NEW IN 2009/10 Our Non-Teaching Staff moved from a Point-of-Service Network to a Single Provider System (HMO) The rising cost of health Insurance continues to be a major concern in this era of revenue controls Cost of a Family Plan approximately $2,000 less than would have been under the old plan
KIMBERLY AREA SCHOOL DISTRICT  WHAT’S NEW IN 2009/10 Unsettled Labor Agreements  Teacher and Para-Professional  Contracts expired on June 30, 2009 Have not settled 09-11 contracts with either labor group as of the date of this publication
Enrollment KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 The District projects continued Growth at a slower rate
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE The District receives a large percentage of its funding from the State State has had difficulty balancing its Budget over the past several years Expected to worsen with recent economic decline and  continued structural imbalances of the budget District will need to remain diligent  to maintain its strong financial position It is likely that there will be even more restrictive revenue controls and further reductions in state aid
Enrollment Growth KIMBERLY AREA SCHOOL DISTRICT THE FUTURE The District receives significantly less revenue per student than the state average Offset in past by the District’s rapid enrollment growth As growth and corresponding revenue increases  lessen, we will need to adjust our spending accordingly
KIMBERLY AREA SCHOOL DISTRICT   THE FUTURE Wisconsin Retirement System Contributions As a result of the recent economic downturn, investments used to pay  retirement benefits for state employees have declined substantially To make up for these losses, School Districts will need to substantially increase contributions over the next several years We need to work with our labor groups to have them help share the financial burden of these increases
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Health Insurance   The District, our Labor Unions, Health Care Providers, Insurance Carriers, State and Federal Government  must  all work together to address issues! As Costs continue to rise
KIMBERLY AREA SCHOOL DISTRICT  THE FUTURE Labor Relations With the elimination of labor cost controls (QEO) and more restrictive revenue limits The District will need to work closely and creatively with our labor groups to provide fair compensation without eroding the quality of education
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Energy Costs Less money will be available to educate children unless we continue to find ways  to reduce energy consumption Energy Costs are rising at a faster rate then our Revenue The District has been a leader in Energy Conservation
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Technology As these Funds become unavailable, the District will be challenged to meet the goals for our Technology Plan The District has paid for a large portion of our Technology with Grant Funding and Referendum Proceeds
KIMBERLY AREA SCHOOL DISTRICT THE FUTURE CHALANGE With further limitations on revenue and increasing  costs Difficult choices may need to be made District is currently in good Financial Shape We will need to prioritize what is most important
KIMBERLY AREA SCHOOL DISTRICT BUDGET MESSAGE ASSUMPTIONS AFFECTING TAX LEVY AND RATE FOR 2009/10 ,[object Object],[object Object],The amount a homeowner would pay for every $1,000 of  Equalized Property Value If the Tax Rate were $9.00 per $1000 of Equalized Valuation and an individuals property had an equalized value of $100,000 the tax rate would be $900 Total Amount of Tax Revenue Assessed Value  is the property value as determined by the individual Municipality Equalized Value  is total Fair Market Value of all properties  within the District.  This includes several municipalities.
KIMBERLY AREA SCHOOL DISTRICT BUDGET MESSAGE ASSUMPTIONS AFFECTING TAX LEVY AND RATE FOR 2009/10 -  30 Additional Students -  If more Students, Revenue Cap and  Tax Levy will  increase ,[object Object],[object Object],-  Estimated at 0% increase.  If higher, Tax Rate will decrease The above estimates  should  be finalized in October! ,[object Object],-  If more than projected, Tax Levy will increase ,[object Object],-  If higher than projected, Tax Levy will decrease -  Cost of Living Increase of $200 per student
KIMBERLY AREA SCHOOL DISTRICT BUDGET HIGHLIGHTS TAX LEVY GENERAL FUND DEBT SERVICE CAPITAL IMPROVEMENTS *COMMUNITY SERVICE TOTAL Actual 2008-09 $9,607,904 $4,260,503 $ 553,150 $46,415 $14,467,972 Budget  Dollar   Percent 2009-10  Change   Change $11,033,938  $1,426,034   14.84% $531,000  -$  22,150  - 4.00% $15,645,534  $1,177,562  8.14% $4,049,080  -$211,423  - 4.96% $31,516   - $  14,899   -32.10%
KIMBERLY AREA SCHOOL DISTRICT BUDGET HIGHLIGHTS TAX LEVY 2006-07 2007-08 2008-09 2009-10 Amount $14,593,571 Increase/Decrease $ 15,645,534  $1,177,562  8.14% - $155,321  - 1.4%  $14,467,972 $ 29,712  0.2% Under the Revenue Control Formula - If State Aid decreases the Tax Levy increases $14,438,250 The State Aid increase in 09-10 is significantly less than 07-08 & 08-09
TAX RATE PER $1,000 OF EQUALIZED ASSESSED VALUATION GENERAL FUND DEBT SERVICE CAPITAL IMPROVEMENTS  COMMUNITY SERVICE TOTAL Actual 2008-09 $5.94 $2.63 $0.34 $0.03 $  8.94 Budget   DOLLAR PERCENT 2009-10 *  CHANGE  CHANGE $6.81   $0.87  14.65% * Tax rate is estimated.  The actual rate can not be determined  until property valuation is certified by  the Department of Revenue in October. $0.33  -$0.01  - 2.94%  $0.02   -$ 0.01   -33.00% $9.66  $0.72  8.05% $2.50  -$0.13  - 4.94%
Increased Tax Rate Impact Examples   ,[object Object],[object Object],Home Value Tax Increase $100,000 $72.00 $150,000 $108.00 $200,000 $144.00 Please note that the above increases are based on the market value of a home.  Municipalities are tax based on assessed value.  The assessed value will vary between the 5 municipalities within the District’s boundaries .
* 2009-10 Property Valuations and the corresponding Tax Rate are estimated.  Actuals can not  be determined until property valuation is certified by the Department of Revenue in October.
FUND ACCOUNTING ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Unaudited  2009-10  Dollar  Percent  GENERAL FUND     2008-09    Budget   Change   Change Revenue (Money Coming In)  $38,522,030  $40,948,450  $2,426,420 6.30% The increase in total revenue is primarily related to an estimated $1,426,434 increase in Property Taxes as a result of a reduction in General State Aid.  General State Aid increased by $453,242.  The other significant increase was $672,629 for Revenue from other school districts for their children attending our District under Open Enrollment
Salary and Benefit Expenses for new and existing staff increased by  $2,522,400   Unaudited  2009-10  Dollar  Percent  GENERAL FUND 2008-09   Budget   Change   Change Expenses  (Money Going Out )   $37,789,197 $40,948,450 $3,159,253 8.36%
KIMBERLY AREA SCHOOL DISTRICT 2009-10 STAFFING Additional Staff may be hired after the start of the school year to address unanticipated  enrollment and growth related issues. Additional Staff includes: (.5) Family and Consumer Education Teacher at High School (.5) Spanish Teacher at High School (.33) Physical Education Teacher at High School  (.5) World Language/Spanish Teacher at the Middle School (1) 7th Grade Teacher (3) Elementary/Intermediate Teachers (.6) Title I Math Teacher  * (.5) Early Childhood Teacher  * (.5) Early Childhood Paraprofessional  * (.24) School Psychologist (.05) Secretary (1) Special Education Coordinator of Instructional Services  * Staffing Reductions Include: (.5) English Teacher at High School (.17) Math Teacher at High School (.67) Science Teacher at High School (2) Custodians Net Increase of 5.38 Employees ,[object Object]
SIGNIFICANT GENERAL FUND EXPENSE INCREASES  ,[object Object],[object Object],[object Object],[object Object],+  $450,0000 +  $276,227 ,[object Object],[object Object],[object Object],+ $1,365,817 ,[object Object],+1,156,583 ,[object Object],+ $138,222
SIGNIFICANT CAPTIAL EQUIPMENT PURCHASES  Copier Replacements $80,000 Computer System Replacements & Networking Hardware $109,000
SIGNIFICANT GENERAL FUND EXPENSE  DECREASES  Short-Term Borrowing  Expenses - ($44,602) Technology Related Equipment - ($252,000) Budget includes the same dollar allotment per student as last year in non-salaried expenditures where practical Interfund Transfer to the Special Education Fund reduced as a result of Federal Stimulus Funding  - ($3,111)
 
 
2009 ANNUAL MEETING Motion will be made to adopt a Tax Levy of  $15,645,534 as presented to you, the electorate KIMBERLY AREA SCHOOL DISTRICT
More detailed information is available in the Annual Meeting Booklet or can be obtained at the Administrative Offices on 217 E. Kimberly Avenue Do you have any questions? Gary Kvasnica, the Director of Business Services, can be reached at 788-7900.  Thank You!
KIMBERLY AREA SCHOOL DISTRICT ANNUAL MEETING AGENDA ITEM Sale of District  Land no longer needed for Educational Purposes   The District acquired Lot 84 of the Jeff Meadows Subdivision in 2005 and had a  path installed to provide walking access to Woodland School The District has been approached by the  owner of the lot to east of lot 84 asking us to sell the southeast portion of Lot 84 up to 5 feet away from the  walking path that divides the property The District does not need this land to the east of the walking path and would prefer not having to maintain it

Mais conteúdo relacionado

Destaque (13)

Salamzadeh 4
Salamzadeh 4Salamzadeh 4
Salamzadeh 4
 
یک رویکرد تحقیقاتی عملی در ارتباط با کارآفرینی
یک رویکرد تحقیقاتی عملی در ارتباط با کارآفرینییک رویکرد تحقیقاتی عملی در ارتباط با کارآفرینی
یک رویکرد تحقیقاتی عملی در ارتباط با کارآفرینی
 
Na
NaNa
Na
 
PRESENTACION 4
PRESENTACION 4PRESENTACION 4
PRESENTACION 4
 
Methodology research catching it as it happens
Methodology research catching it as it happensMethodology research catching it as it happens
Methodology research catching it as it happens
 
BYOC Beginners Guide
BYOC Beginners GuideBYOC Beginners Guide
BYOC Beginners Guide
 
Bp+handout
Bp+handoutBp+handout
Bp+handout
 
Salamzadeh 1
Salamzadeh 1Salamzadeh 1
Salamzadeh 1
 
Business model speech
Business model speechBusiness model speech
Business model speech
 
Salamzadeh 3
Salamzadeh 3Salamzadeh 3
Salamzadeh 3
 
Business model
Business modelBusiness model
Business model
 
Business model speech
Business model speechBusiness model speech
Business model speech
 
Mgo Presentatie Ord 2011 08062011
Mgo Presentatie Ord 2011 08062011Mgo Presentatie Ord 2011 08062011
Mgo Presentatie Ord 2011 08062011
 

Semelhante a 2009 Annual Meeting Power Point

Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Kenneth Hogge Sr
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Imagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationImagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationAna Kelly
 
Imagine Beloit Powerpoint
Imagine Beloit PowerpointImagine Beloit Powerpoint
Imagine Beloit PowerpointRick McGrath
 
Asheville Energy Independence Initiative
Asheville  Energy  Independence  InitiativeAsheville  Energy  Independence  Initiative
Asheville Energy Independence InitiativeScrutiny Hooligans
 
RSS Renovation Town Meeting Slideshow
RSS Renovation Town Meeting SlideshowRSS Renovation Town Meeting Slideshow
RSS Renovation Town Meeting Slideshowmmceach
 
Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Rick McGrath
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012rcox726
 
V I E O Public Heaings On A R R A Funds May 6 To 8 2009
V I E O  Public  Heaings On  A R R A  Funds  May 6 To 8 2009V I E O  Public  Heaings On  A R R A  Funds  May 6 To 8 2009
V I E O Public Heaings On A R R A Funds May 6 To 8 2009Genevieve Whitaker
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09guest08a3ab
 
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziFacilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziSchoolDude Editors
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School EnergyCharter School Capital
 
Primary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesPrimary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesSarah Revell
 
Leasing & Operating Green
Leasing & Operating GreenLeasing & Operating Green
Leasing & Operating Greenjpnash
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Financing Solutions for Energy Upgrades
Financing Solutions for Energy UpgradesFinancing Solutions for Energy Upgrades
Financing Solutions for Energy UpgradesTraci McKenrick, CLFP
 
2008 09 April Budget Update
2008 09 April Budget Update2008 09 April Budget Update
2008 09 April Budget Updatedaveroot15
 
EnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEMEX
 

Semelhante a 2009 Annual Meeting Power Point (20)

Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Imagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationImagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum Presentation
 
Imagine Beloit Powerpoint
Imagine Beloit PowerpointImagine Beloit Powerpoint
Imagine Beloit Powerpoint
 
Asheville Energy Independence Initiative
Asheville  Energy  Independence  InitiativeAsheville  Energy  Independence  Initiative
Asheville Energy Independence Initiative
 
RSS Renovation Town Meeting Slideshow
RSS Renovation Town Meeting SlideshowRSS Renovation Town Meeting Slideshow
RSS Renovation Town Meeting Slideshow
 
Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
 
V I E O Public Heaings On A R R A Funds May 6 To 8 2009
V I E O  Public  Heaings On  A R R A  Funds  May 6 To 8 2009V I E O  Public  Heaings On  A R R A  Funds  May 6 To 8 2009
V I E O Public Heaings On A R R A Funds May 6 To 8 2009
 
FY13 BVSWMA Budget
FY13 BVSWMA BudgetFY13 BVSWMA Budget
FY13 BVSWMA Budget
 
Levy presentation2
Levy presentation2Levy presentation2
Levy presentation2
 
Budget Presentation 08 09
Budget Presentation 08 09Budget Presentation 08 09
Budget Presentation 08 09
 
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziFacilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School Energy
 
Primary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesPrimary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issues
 
Leasing & Operating Green
Leasing & Operating GreenLeasing & Operating Green
Leasing & Operating Green
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
Financing Solutions for Energy Upgrades
Financing Solutions for Energy UpgradesFinancing Solutions for Energy Upgrades
Financing Solutions for Energy Upgrades
 
2008 09 April Budget Update
2008 09 April Budget Update2008 09 April Budget Update
2008 09 April Budget Update
 
EnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local GovernmentEnPC - Successful Deployment in Local Government
EnPC - Successful Deployment in Local Government
 

Último

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 

Último (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 

2009 Annual Meeting Power Point

  • 1. KIMBERLY AREA SCHOOL DISTRICT 2009 ANNUAL MEETING Monday September 28, 2009 6:30 PM - Budget Hearing 7:00 PM - Annual Meeting KIMBERLY HIGH SCHOOL W2662 Kennedy Avenue Kimberly WI 54136
  • 2. KIMBERLY AREA SCHOOL DISTRICT BUDGET HEARING Presented by: Gary Kvasnica Director of Business Services
  • 3. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09
  • 4. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 STUDENT ACHIEVEMENT As evidenced by our test scores, the District continues to be one of the higher achieving Districts in the Fox Valley, as well as the State The Kimberly Area School District as a low spending, high achieving District, continues to provide our Community with great value
  • 5. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 Compiled by the Wisconsin Tax Payers Alliance
  • 6. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 Compiled by the Wisconsin Tax Payers Alliance
  • 7. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 Compiled by the Wisconsin Tax Payers Alliance Read Math Pct. Decile Pct. Decile 4th Grade K12- District Average 81   77   Kimberly 91 3 93 2 8th Grade K12- District Average 84   75   Kimberly 92 3 92 2 10th Grade K12- District Average 75   70   Kimberly 89 1 87 1
  • 8.  
  • 9. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 Compiled by the Wisconsin Tax Payers Alliance DISTRICT PER STUDENT EXPENDITURES 2008-09 BUDGET     Instruction   Comparative Exp.     Sal. & Pupil Instr. Bldg. Pupil Capital Exp./ Total % St. Avg. Type Name Total Fringe Serv. Supp. Admin. Grds. Trans. Debt Exp. Amt. decile (+/-) K-12 DISTRICT AVG. 6,732 5,701 493 542 861 1,117 458 778 11,491 9,746 K-12 Kimberly 6,190 5,079 470 491 675 900 277 1,244 10,784 8,726 10 -13.1
  • 10. KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW - 2008/09 Enrollment continued to Grow An increase of 132 Full Time Equivalent (4K and 5K count as .5) in students 08/09 vs. 80 in 07/08 Higher Rate than Expected
  • 11. JANSSEN BOILER REPLACMENT Reduced heating costs by 32% Replaced 47 year-old Boilers with new Energy Efficient System Unlike many Districts, we were able to fund our project without having to ask tax payers for additional money. Capital Improvement Fund established by District allowed us to set aside funding over a several year period KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09
  • 12. JANSSEN BOILER REPLACMENT KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Before After Heat pipes were installed in ceiling with ceiling/light replacement project to reduce costs
  • 13. JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Excavated a large retention pond to address drainage issues
  • 14. JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Removed compacted soils for stadium football field and installed new fill along with Synthetic Field Turf
  • 15.
  • 16. JOHN STREET ATHLETIC COMPLEX UPGRADES KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Athletic Complex Donor Wall constructed and donated to the District by Sanderfoot Masonry and other contractors
  • 17. KIMBERLY AREA SCHOOL DISTRICT Budget Message THE YEAR IN REVIEW - 2008/09 OTHER FACILITY IMPROVEMENTS
  • 18. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Westside School Improvements 2 st Year of a 3-Year Carpet Replacement Plan 07/08 08/09
  • 19. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Westside School Improvements Replaced deteriorated Wood Fascia with Steel Fascia
  • 20. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Chalkboards at Janssen replaced with Whiteboards Before After
  • 21. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Mapleview Improvements Replaced Bathroom Partitions Before After
  • 22. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Janssen Improvements Drain tiles installed in play area to address water build-up after snow and heavy rainfall
  • 23. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Sunrise School Improvements Asphalt in Visitor Parking Lot Milled and Replaced Before After
  • 24. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Sunrise School Improvements Painting of Building Exterior completed Before After
  • 25. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Woodland Improvements Handicap Accessible Playground with Rubberized Surface for Wheelchair Access
  • 26. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 JRG Middle School Improvements RE-ROOFED SECTION B
  • 27. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 JRG Middle School Sandy Huiting Learning Center Outside Place for Kids to Meet and Learn Parent and Community Funded New Retention Pond allowed us to Build
  • 28. KIMBERLY AREA SCHOOL DISTRICT FACILITIES The improvements just listed have been paid for out of Capital Improvements Fund Helps insure that Capital Improvements done when needed Tax Levy for this Fund is included within Revenue Limits Separate Fund that can only be used for Capital Improvements
  • 29. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW - 2008/09 Energy Conservation The new Boiler System at Janssen significantly reduced energy consumption Mapleview light replacement Plan completed with energy efficient lights in entrances Janssen lighting replacement Plan completed New Software installed that automatically turns off computers when not in use
  • 30. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW - 2008/09 TECHNOLOGY IMPROVEMENTS Replaced old Computers at the Middle School Added Hardware and Software to improve interoperability between different software products Replaced Network Switches to increase performance Installed video projectors at High School and Middle School to enhance learning Increased Storage Capacity Implemented Mobile Computer Lab at Middle School to enhance learning
  • 31. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Insurance Change Moved to New Plan Administrator For Non-Teaching Staff for Self-Funded Dental Plan Reason : Vendor has negotiated lower fees with Dentists
  • 32. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 Implemented a New Employee Savings Plan Meets new IRS Guidelines for 403(b) Tax Deferred Savings Plans for Public Sector Employees Offers Employees a variety of no-load mutual funds at a cost significantly lower than previous plans Investment Providers selected by a Volunteer Committee of District Employees After-tax (Roth) component now available Similar to 401K in Private Sector
  • 33.
  • 34.
  • 35. KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW - 2008/09 Created in 2002/03 Can only be used to pay Retiree Benefits 08/09 Contributions Current Trust Fund Balance Post Retirement Benefit Trust Disbursements 08/09 Fund Balance Increase Interest Earned District is not obligated to make payments toward the Trust $1,312,005 $882,738 $191,064 $620,331 - $3,186,912
  • 36. KIMBERLY AREA SCHOOL DISTRICT YEAR IN REVIEW - 2008/09 Post Retirement CDO Investment In December of 2006 the District invested $700,000 from the Post Retirement Trust and borrowed $4,300,000 to purchase $5,000,000 in a Collateralized Debt Obligations (CDO’s) for the Trust The market value of investment declined substantially Credit linked AA rated Corporate Debt of approximately 140 investment grade companies that matures in 7-years. Goal – Generate approximately $550,000 investment incomes at end of the 7 year term The District believes it was mislead regarding the investment and has filed a lawsuit along with 4 other Wisconsin School Districts seeking rescission, damages and attorney fees
  • 37. KIMBERLY AREA SCHOOL DISTRICT THE YEAR IN REVIEW – 2008/09 District Owned Land Sold At prior Annual Meeting electorate Authorized District to sell a lot adjacent to Woodland School Lot was sold for $37,500!
  • 38. KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10!
  • 39. KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 STATE BUDGET SHORTFALL Cost-of-Living Increase under Revenue Controls decreased by $75 per student or $308,467 Less Money to Operate State aid reduced by approximately 2.5% Under Revenue Controls decreases in State Aid result in increased taxes
  • 40. KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 FEDERAL STIMULUS FUNDING Purpose: Stimulate Economy & Aid Financially Strapped School Districts American Recovery and Reinvestment Act (ARRA) District to receive $946,414 over a 2-year period to help implement student achievement initiatives for our special education students
  • 41.
  • 42.
  • 43. KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 FACILITY IMPROVEMENTS
  • 44. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Westside School Improvements Final Year of a 3-Year Carpet Replacement Plan 08/09 09/10
  • 45. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Westside School Improvements Deteriorated Concrete and Asphalt in Front Drive Replaced Before After
  • 46. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Janssen Improvements Replaced original Sinks, Faucets and Water Fountains Before After
  • 47. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Janssen Improvements Replaced antiquated Clocks with Automated Clocks Before After
  • 48. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Sunrise School Improvements Asphalt in North Playground Milled and Replaced Before After
  • 49. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Mapleview Improvements Widened Receiving Room Door Before After Easier more Efficient Egress for Distributing Supplies
  • 50. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Water Line Improvements Replaced deteriorated Water Main at Middle School Connected Water Line to the Woodland Field Irrigation System
  • 51. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 JRG Middle School Improvements Before After Replaced old Locker Room Doors
  • 52. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 JRG Middle School Improvements RE-ROOFED SECTION OVER TECH ED AND ART ROOM
  • 53. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Resurfaced Tennis Courts at High School and Middle School Before After
  • 54. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Administration Building Improvements Before After Second Floor Reconfigured for Additional Staff
  • 55. KIMBERLY AREA SCHOOL DISTRICT WHATS NEW IN 2009/10 Energy Conservation With the Installation of the Boiler System at Janssen all schools with the of exception Sunrise Elementary have above average energy efficiency With one-time freed up money because of Federal Stimulus Funding, the District plans to implement additional energy conservation projects at Sunrise and other schools to help reduce future operating costs Completed Sunrise Gym Lighting Replacement
  • 56.
  • 57. Continued Health Insurance Cost Containment KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 Our Non-Teaching Staff moved from a Point-of-Service Network to a Single Provider System (HMO) The rising cost of health Insurance continues to be a major concern in this era of revenue controls Cost of a Family Plan approximately $2,000 less than would have been under the old plan
  • 58. KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 Unsettled Labor Agreements Teacher and Para-Professional Contracts expired on June 30, 2009 Have not settled 09-11 contracts with either labor group as of the date of this publication
  • 59. Enrollment KIMBERLY AREA SCHOOL DISTRICT WHAT’S NEW IN 2009/10 The District projects continued Growth at a slower rate
  • 60. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE
  • 61. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE The District receives a large percentage of its funding from the State State has had difficulty balancing its Budget over the past several years Expected to worsen with recent economic decline and continued structural imbalances of the budget District will need to remain diligent to maintain its strong financial position It is likely that there will be even more restrictive revenue controls and further reductions in state aid
  • 62. Enrollment Growth KIMBERLY AREA SCHOOL DISTRICT THE FUTURE The District receives significantly less revenue per student than the state average Offset in past by the District’s rapid enrollment growth As growth and corresponding revenue increases lessen, we will need to adjust our spending accordingly
  • 63. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Wisconsin Retirement System Contributions As a result of the recent economic downturn, investments used to pay retirement benefits for state employees have declined substantially To make up for these losses, School Districts will need to substantially increase contributions over the next several years We need to work with our labor groups to have them help share the financial burden of these increases
  • 64. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Health Insurance The District, our Labor Unions, Health Care Providers, Insurance Carriers, State and Federal Government must all work together to address issues! As Costs continue to rise
  • 65. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Labor Relations With the elimination of labor cost controls (QEO) and more restrictive revenue limits The District will need to work closely and creatively with our labor groups to provide fair compensation without eroding the quality of education
  • 66. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Energy Costs Less money will be available to educate children unless we continue to find ways to reduce energy consumption Energy Costs are rising at a faster rate then our Revenue The District has been a leader in Energy Conservation
  • 67. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE Technology As these Funds become unavailable, the District will be challenged to meet the goals for our Technology Plan The District has paid for a large portion of our Technology with Grant Funding and Referendum Proceeds
  • 68. KIMBERLY AREA SCHOOL DISTRICT THE FUTURE CHALANGE With further limitations on revenue and increasing costs Difficult choices may need to be made District is currently in good Financial Shape We will need to prioritize what is most important
  • 69.
  • 70.
  • 71. KIMBERLY AREA SCHOOL DISTRICT BUDGET HIGHLIGHTS TAX LEVY GENERAL FUND DEBT SERVICE CAPITAL IMPROVEMENTS *COMMUNITY SERVICE TOTAL Actual 2008-09 $9,607,904 $4,260,503 $ 553,150 $46,415 $14,467,972 Budget Dollar Percent 2009-10 Change Change $11,033,938 $1,426,034 14.84% $531,000 -$ 22,150 - 4.00% $15,645,534 $1,177,562 8.14% $4,049,080 -$211,423 - 4.96% $31,516 - $ 14,899 -32.10%
  • 72. KIMBERLY AREA SCHOOL DISTRICT BUDGET HIGHLIGHTS TAX LEVY 2006-07 2007-08 2008-09 2009-10 Amount $14,593,571 Increase/Decrease $ 15,645,534 $1,177,562 8.14% - $155,321 - 1.4% $14,467,972 $ 29,712 0.2% Under the Revenue Control Formula - If State Aid decreases the Tax Levy increases $14,438,250 The State Aid increase in 09-10 is significantly less than 07-08 & 08-09
  • 73. TAX RATE PER $1,000 OF EQUALIZED ASSESSED VALUATION GENERAL FUND DEBT SERVICE CAPITAL IMPROVEMENTS COMMUNITY SERVICE TOTAL Actual 2008-09 $5.94 $2.63 $0.34 $0.03 $ 8.94 Budget DOLLAR PERCENT 2009-10 * CHANGE CHANGE $6.81 $0.87 14.65% * Tax rate is estimated. The actual rate can not be determined until property valuation is certified by the Department of Revenue in October. $0.33 -$0.01 - 2.94% $0.02 -$ 0.01 -33.00% $9.66 $0.72 8.05% $2.50 -$0.13 - 4.94%
  • 74.
  • 75. * 2009-10 Property Valuations and the corresponding Tax Rate are estimated. Actuals can not be determined until property valuation is certified by the Department of Revenue in October.
  • 76.
  • 77.
  • 78. Salary and Benefit Expenses for new and existing staff increased by $2,522,400 Unaudited 2009-10 Dollar Percent GENERAL FUND 2008-09 Budget Change Change Expenses (Money Going Out ) $37,789,197 $40,948,450 $3,159,253 8.36%
  • 79.
  • 80.
  • 81. SIGNIFICANT CAPTIAL EQUIPMENT PURCHASES Copier Replacements $80,000 Computer System Replacements & Networking Hardware $109,000
  • 82. SIGNIFICANT GENERAL FUND EXPENSE DECREASES Short-Term Borrowing Expenses - ($44,602) Technology Related Equipment - ($252,000) Budget includes the same dollar allotment per student as last year in non-salaried expenditures where practical Interfund Transfer to the Special Education Fund reduced as a result of Federal Stimulus Funding - ($3,111)
  • 83.  
  • 84.  
  • 85. 2009 ANNUAL MEETING Motion will be made to adopt a Tax Levy of $15,645,534 as presented to you, the electorate KIMBERLY AREA SCHOOL DISTRICT
  • 86. More detailed information is available in the Annual Meeting Booklet or can be obtained at the Administrative Offices on 217 E. Kimberly Avenue Do you have any questions? Gary Kvasnica, the Director of Business Services, can be reached at 788-7900. Thank You!
  • 87. KIMBERLY AREA SCHOOL DISTRICT ANNUAL MEETING AGENDA ITEM Sale of District Land no longer needed for Educational Purposes The District acquired Lot 84 of the Jeff Meadows Subdivision in 2005 and had a path installed to provide walking access to Woodland School The District has been approached by the owner of the lot to east of lot 84 asking us to sell the southeast portion of Lot 84 up to 5 feet away from the walking path that divides the property The District does not need this land to the east of the walking path and would prefer not having to maintain it