1. RESUME
NAME KEVIN BREED
JOB TITLE PIPING DESIGNER (P.D.M.S.)
DATE OF BIRTH 16 FEBRUARY 1959
ADDRESS 15 WINCHELSEA ROAD
RYE
EAST SUSSEX TN31 7EJ
MOBILE TEL. No. 07826751029
HOME No. 01797 214176
WORK TEL. No. 0207 585 6041
QUALIFICATIONS O.N.C. MECHANICAL ENGINEERING
OFFSHORE SURVIVAL COURSE – EXPIRES FEB 2018
OFFSHORE MEDICAL – EXPIRES MAR 2016
TRAINING LASER SURVEY CLASH CHECKING IN PDMS (LMI)
M.D.S PIPE SUPPORT COURSE FOR DESIGN & DRAFT
AUTOCAD 2D (BASIC DRAFTING)
PDMS SILICON GRAPHICS & PC FORMAT – DESIGN & DRAFT
MERCAD – USING MICROSTATION & OMNI-PIPE
MICROSOFT – WORD, ACCESS, EXCEL & E-MAIL
P.D.M.S TRAINING COURSE
LUMMUS TRAINING COURSE
EXPERIENCE
GENESIS OIL & GAS CONSULTANTS – LONDON
JAN 15 – APR 15 NOSPCO – KAMOSE PLATFORM DETAIL DESIGN
EQUIPLMNET LAYOUT AND PIPING DESIGN FOR WELLHEAD PLATFORM
DEC 14 GSPC DEEN DAYAL FIELD DEVELOPMENT
SITE TRIP TO EVALUATE EXISTING ONSHORE GAS PLANT FOR
EXPANSION, PRODUCING PLOT PLANS FOR NEW PROCESS UNITS
JUN 14 – NOV 14 SASOL – MOZAMBIQUE PSA SURFACE FACILITIES FEED
PIPING LAYOUT FOR MAIN PROCESS AREA INCLUDING DE-BUTANISER,
DE-ETHANISER & STABILISER COLUMNS WITH ASSOCIATED PUMPS &
COOLERS
FEB 13 – APR 14 BG TUNISIA – HASDRUBAL PLATFORM
PIPING SUPERVISOR ON OFFSHORE SHUTDOWN
PROBLEM SOLVING DURING PIPE INSTALLATION
BG TUNISIA – HANNIBAL GAS PLANT -2014 SHUTDOWN SCOPE
SITE SURVEYS FOR RELIEF & BLOWDOWN, HOT OIL SYSTEM,
SULPHURIC ACID PLANT
BG TUNISIA – HASDRUBAL PLATFORM
SITE SURVEYS FOR NEW FLOWLINE MANIFOLD EXTENSION &
MODIFICATIONS TO WATER FILTER SYSTEM. LINE PUNCHING DURING
SHUTDOWN
1
2. RDS/KCA DEUTAG - LONDON
DEC 12 – FEB 13 BP - CLAIR RIDGE
PIPE SUPPORT MODELLING AND CHECKING ON DSM & DER MODULES
GENESIS OIL & GAS CONSULTANTS – LONDON
JUN 12 – NOV 12 OMV TUNISIA – SOUTH TUNISIA GAS PROJECT
PLANT LAYOUT FOR PIG LAUNCHERS/RECEIVERS & VALVE STATIONS
MAR 10 – MAY 12 BG TUNISIA – MISKAR PLATFORM
OFFSHORE SURVEY FOR NEW FLOWLINE
PLATFORM MODS USING LASER SURVEY
BG TUNISIA - HANNIBAL GAS PLANT
ON SITE SUPPORT FOR CONSTRUCTION TEAM DURING SHUTDOWN.
SITE SURVEYS FOR COMPRESSOR HOUSE FIREWATER SYSTEM,
RELIEF/BLOWDOWN MODIFICATIONS ,NRU AND AMINE SYSTEMS
UPGRADES. SURVEYS FOR NEW ESDV/DCS MODIFICATIONS
JAN 10 – FEB 10 BP GUPCO – HILAL PLATFORM
OFFSHORE SURVEY ON WELLHEAD PLATFORM
CONCEPTUAL STUDIES FOR REPAI/REPLACEMENT OPTIONS
JUN 09 – DEC 09 ROSNEFT – BIR SEBA GAS PLANT
FEED STUDY FOR COMPRESSORS & MOLECULAR SIEVE
UNIT,FIREWATER SYSTEM
JAN 09 – JUN 09 SHELL NORSKE – ORMEN LANGE PLANT
FEED STUDY FOR COMPRESSORS & SCRUBBERS
BULK MTO
SEP 08 – JAN 09 YORK FIELD DEVELPOMENT
FEED STUDY FOR NUI PLATFORM
EQUIPMENT LAYOUTS & PROCESS PIPING ARANGEMENT FOR BULK MTO
MAR 08 – AUG 08 PIPE SUPPORT STANDARDS & PIPING HOOK-UP STANDARDS
NOV 07 – FEB 08 FAIRFIELD ENERGY – CLIPPER SOUTH DEVELOPMENT
FEED STUDY FOR NUI PLATFORM - PLOT PLAN & PIPING LAYOUTS FOR
WELLBAY,PROPPANT REMOVAL,SEPARATION & GAS EXPORT WITH
SEPARATE GAS COMPRESSION PLATFORM
FEASABILITYSTUDY FOR CONVERTING BRITANNIA JACK-UP TO
PROCESSING PRODUCTION FACILITY
AUG 07 – OCT 07 BP EGYPT - SETH PLATFORM
FIELD STUDY FOR NUI PLATFORM
FIELD LAYOUTS & PLOT PLAN DEVELOPMENT
MAY 07 – JUL 07 EON/RUHRGAS – BABBAGE FIELD DEVELOPMENT
FEED STUDY FOR NUI PLATFORM – PLOT PLAN & PIPING LAYOUT FOR
WELLBAY,PROPPANT REMOVAL,SEPARATION AND GAS EXPORT
DEC 06 – APR 07 BG TUNISIA - MISKAR FIELD DEVELOPMENT
PIPE ROUTING FOR NEW FLOWLINES ON EXISTING PLATFORM
PIPE ROUTING FOR NEW COALESCER
PIPE SUPPORT DESIGN & DRAFT FOR FLOWLINES & ASSOCIATED PIPING
CLASH CHECKING USING LASER SURVEY INFORMATION
2
3. APR 06 – NOV 06 C B & I – JOHN BROWN – LONDON
PERU LNG EXPORT PROJECT
BUILDING BLOCK MODEL IN PDMS FOR BULK MATERIAL TAKE-OFF
JETTY EQUIPMENT & PIPING LAYOUT
JUL 05 – APR 06 GENESIS OIL & GAS CONSULTANTS - LONDON
BG TUNISIA - MISKAR FIELD DEVELOPMENT
PIPE SUPPORT DESIGN FOR NEW FLOWLINES
CAVENDISH FIELD DEVELOPMENT
PIPING SITE QUERIES
PIPE SUPPORT DESIGN & DETAIL FOR FLOWLINES, PIG LAUNCHER
GENERATOR & UTILITY LINES USING PDMS DESIGN & DRAFT
AUTOCAD DRAFTING FOR PROCESS GROUP -P & I D’S ,UFD’S
APR 04 – JUL 05 C B & I – JOHN BROWN - LONDON
ENCANA BUZZARD FIELD DEVELOPMENT
PDMS PIPING LAYOUT FOR RE-CYCLE AND BLOWDOWN VALVES
PDMS PIPE SUPPORT DESIGN (USING MDS) FOR NON-CRITICAL
PIPING,CHECKING AND PDMS DRAFTING PIPE SUPPORT DETAILS
NOV 03 – MAR 04 PHARMADULE EMTUNGA – SWEDEN
ELI LILLY PHARMACEUTICAL PLANT – INDIANAPOLIS
PDMS PIPING LAYOUT AND ISOMETRIC PRODUCTION FOR
HARVEST FEED TANKS AND ASSOCIATED EQUIPMENT
JUN 03 - OCT 03 KCA-DEUTAG DRILLING - LONDON
BP AZERI FIELD – AZERBAIJAN
UTILITY PIPING AND FIREWATER PIPING LAYOUT FOR DRILLING
SUPPORT AND DERRICK MODULES
JAN 03 – MAY 03 GENESIS OIL & GAS CONSULTANTS - LONDON
MARATHON SEVEN HEADS FIELD - IRELAND
PIPING, SUPPORTS, CABLE TRAY & HVAC BUILD FOR PDMS MODEL
ISOMETRICS, PIPING G.A. AND SUPPORT LOCATION G.A. ‘S
JULY 01 – JAN 03 AMEC OFFSHORE - LONDON
SHELL BONGA F.P.SO. – NIGERIA
WORKING FOR STRESS DEPARTMENT, CREATING STRESS SKETCHES
(USING ISODRAFT) COMPILING CRITICAL LINE LIST.STRESS REGISTER
AND P & I D MARK-UPS
JAN 01 – JUN 01 ABB BRNO – CZECH REPUBLIC
BASF POLYMER PROCESS PLANT – LUDWIGSHAVEN
ISOMETRIC AND LAYOUT CHECKING USING PDMS CLASHER/DATACON
SEPT 00 – JAN 01 WARTSILA VAASA – FINLAND
PDMS PIPING LAYOUT FOR VARIOUS DIESEL FIRED POWER PLANTS
PRODUCING ISOMETRICS & GENERAL ARRANGEMENTS
JULY 00 – SEPT 00 AMEC OFFSHORE - ABERDEEN
SHELL SHEARWATER DEVELOPMENT
ONSHORE SUPPORT FOR OFFSHORE HOOK-UP & COMMISSIONING
TEAMS – DEALING WITH QUERIES & PROBLEM SOLVING
3
4. JULY 99 – MAY 00 ABB – ALSTOM – SWITZERLAND
CHIBA MILL - GT 26 - POWER PLANT
PIPING LAYOUT FOR FUEL GAS FIRED TURBINES
PDMS MODELLING FOR FOUNDATIONS, STEELWORK, HVAC, CABLE
TRAYS & SUPPORTS
JULY 98 – MAY 99 AMEC PROCESS AND ENERGY - LONDON
SHELL SHEARWATER DEVELOPMENT
PDMS CLASH CHECKING, ISOMETRIC & SUPPORT CHECKING
ISOMETRIC CONTROL & ISSUING USING IN-HOUSE SOFTWARE
NOV 96 – JUNE 98 ABB KRAFTWERKE - SWITZERLAND
API FALCONARA – GT13E2 - POWER PLANT
PIPING LAYOUT FOR GAS TURBINE HALL & EXTERNAL EQUIPMENT
PDMS MODELLING FOR FOUNDATIONS, STEELWORK, HVAC, TRAYS
& SUPPORTS. PDMS MODEL DEVELOPMENT OF GT 24 & GT 26 MACHINES
JAN 96 – NOV 96 KVAERNER INSTALLASJON – NORWAY
NORSKE-SHELL – DRAUGEN UPGRADE
CLASH CHECKING NEW PIPES ON EXISTING PLATFORM, USING MERCAD
& OFFSHORE SURVEYS.
UPDATING ORIGINAL PDS DRAWINGS USING PDMS DRAFT
SEP 94 – DEC 95 ABB KRAFTWERKE – SWITZERLAND
MUARA TAWAR - GT13E2 - POWER PLANT
PDMS MODELLING OF GAS TURBINE HALL.
PIPING LAYOUT FOR EXTERNAL PIPING, SUPPORTS & EQUIPMENT
ISOMETRIC, G.A. AND SUPPORT DETAIL PRODUCTION
APR 93 – SEP 94 AMEC ENGINEERING - LONDON
CONOCO BRITANNIA DEVELOPMENT
PRODUCTION OF PLOT PLANS & EQUIPMENT LAYOUTS USING
PDMS DESIGN & DRAFT. VALVE TAKE-OFF FROM P& I ‘S INPUT INTO
ACCESS DATABASE FOR COST SAVING EXERCISES
JUL 90 – MAR 93 AMEC ENGINEERING -LONDON/TEESIDE
SHELL NELSON FIELD DEVELOPMENT
LINE PUNCHING STRESS SKETCHES FOR SUPPORT CHECK
SITE SURVEY FOR WEIGHT CONTROL ESTIMATE BEFORE JACK-UP
PDMS INPUT FOR PROCESS PIPING & EQUIPMENT (FLARE DRUM,
MOL PUMPS, COALESCER, P.W. DRUM & HYDROCYCLONES etc)
JUL 89 – JUN 90 DOW CHEMICALS – HOLLAND
DOWLEX CHEMICAL PLANT – TARRAGONA
PDMS CO-ORDINATOR INVOLVED IN GENERAL RUNNING OF COMPUTER
SIDE OF PROJECT – PRODUCTION OF ISOMETRICS, GA’S , VIEWS etc
AUG 88 – JUN 89 LUMMUS CREST – GERMANY
BAYER ANILIN PROJECT
TANK FARM STUDIES & PDMS INPUT OF EQUIPMENT,STEEL & PIPING
BAYER DORMAGEN PROJECT
PDMS PIPE INPUT FOR ISO & GA PRODUCTION
AL FURAT OIL FIELD
PDMS PIPE, EQUIPMENT, STEELWORK FOR ISO & GA PRODUCTION
4
5. OTHER COMPANIES INCLUDING SHELL INTERNATIONAL, MATTHEW HALL, BOC CRYOPLANTS,
SANTE FE BRAUN, PROTECH INTERNATIONAL BV, WIMPEY, McDERMOTT & CE LUMMUS
OTHER PROJECTS INCLUDE LUBE OIL PLANTS, REFINERIES AND NUCLEAR PLANTS
SITE WORK INCLUDES SHELL TEESIDE (6 MONTHS) BP HULL ACETIC ACID PLANT(2 YEARS),
ESSO FAWLEY REFINERY (6 MONTHS) AND SCOTT BADER PLASTICISER UNIT (6 MONTHS)
5
6. OTHER COMPANIES INCLUDING SHELL INTERNATIONAL, MATTHEW HALL, BOC CRYOPLANTS,
SANTE FE BRAUN, PROTECH INTERNATIONAL BV, WIMPEY, McDERMOTT & CE LUMMUS
OTHER PROJECTS INCLUDE LUBE OIL PLANTS, REFINERIES AND NUCLEAR PLANTS
SITE WORK INCLUDES SHELL TEESIDE (6 MONTHS) BP HULL ACETIC ACID PLANT(2 YEARS),
ESSO FAWLEY REFINERY (6 MONTHS) AND SCOTT BADER PLASTICISER UNIT (6 MONTHS)
5