SlideShare uma empresa Scribd logo
1 de 53
Baixar para ler offline
Document Control on Capital Projects
“Paper to Electronic Records Paradigm Shift”
Case Study: How we brought it all together

Presented by:

Keith Atteck
Supervisor, Information Management
Vale Inco Limited
Business Development
April 2009

ARMA Toronto Symposium 2009

DM#319048

1
Disclaimer

The views expressed in this presentation do not
necessarily represent the views of Vale Inco Limited

April 2009

ARMA Toronto Symposium 2009

2
Outline
 The Company
 Business Issues
 RIM Program
 Document Control Practice
 Document Management
 Single Format - Adobe Acrobat
 Process Automation - DM Workflow
 Change of Mindset
 The Journey
April 2009

ARMA Toronto Symposium 2009

3
The Company
Vale - Companhia Vale do Rio Doce (CVRD) (NYSE: RIO)
 www.vale.com
 Vale was born in 1942 in Brasil
Vale Inco Limited, a wholly-owned subsidiary of Vale
 Vale Inco Limited - International Nickel Company of Canada Limited was
incorporated 1916
 www.valeinco.com
Together
 Worlds largest producer of Iron Ore and one of the worlds largest producers of Nickel
 Vale also produces copper, manganese, ferroalloys, bauxite, alumina, aluminum,
coal, cobalt, PGMs
 Vale operates on five continents through its mining operations, mineral research
plants, and commercial offices
 ~ 100,000 employees, including outsourced workers worldwide

April 2009

ARMA Toronto Symposium 2009

4
Vale Worldwide

April 2009

ARMA Toronto Symposium 2009

5
Capital Projects
The Project Delivery System (PDS) is Vale Inco’s
method of executing capital projects in conformance with
Vale’s project execution methodology and in accordance
with generally accepted project management industry
guidelines using an established set of standards, which
supports Vale Inco’s business objectives.
Document Control is a component of the Project Delivery
System, managing the mission critical information assets
that deliver successful projects and provide knowledge to
employees across the organization.

April 2009

ARMA Toronto Symposium 2009

6
Information Management - Why?
Now, where
did I put
that
document?

Why must
information be
systematically
managed and
protected?

April 2009

eRecords on
Servers make
the job more
critical?

ARMA Toronto Symposium 2009

7
Business Issues - Digital Vs. Paper

As much as 93% of information generated today is in
electronic form compared to the only 30% that is
printed.
Paper
7%

Printed
30%

Digital
93%

Remain
Digital
70%

Source: (Technology in Government, March/April 2006, Vol. 13, No.2)

April 2009

ARMA Toronto Symposium 2009

8
Business Issues – E-mail




Cannot keep everything – we
need to have criteria for what
to keep



Communication practices
must be planned and
controlled



April 2009

Project e-mails are records,
retained for content of
message

Electronic Document and
Records Management
System (EDRMS) is the
only way to connect e-mail
content to business activity
through classification

ARMA Toronto Symposium 2009

9
Future, Current

Present & Past

Business Issues – Technology
Paper Record, Blue Print Drawing
1.

Print, Index, Folder, Cabinet, Box, Binder, Stick File, etc.

Electronic File – Name.doc, xls, ppt, pdf, dgn, dwg, etc.
2.

Hard Drive – PC or Laptop, C: Folders

3.

Network Shared Drive, S: I: Folders

4.

Outlook – E-mail, Personal Folders

5.

Intranet, FTP, Extranet – Web Sites

6.

Floppy, CD, DVD, PDA, Flash Drives, etc.

7.

Tracking Databases – PRISM, Ellipse, Oracle, etc.

EDMS & Collaboration
eRecords Management
Imaging – Eliminating paper

April 2009

ARMA Toronto Symposium 2009

10
Case Example - Topic
Paper to electronic records paradigm shift
 Paper the record – electronic the convenience
Paradigm Shift
 Electronic the record – Paper the convenience
Document Control for global capital projects
 Electronic records - the only way to go!
This change of mind set is the key to success
 Change of culture
 Change of business practice

April 2009

ARMA Toronto Symposium 2009

11
Business Issues: Evidence
Canada - CAN/CGSB 72.34-2005 - Electronic Records as Documentary
Evidence
5.2.1 Those who wish to present an electronic record as evidence in legal
proceedings shall be able to prove
 a) authenticity of the record;
 b) integrity of the Records Management System that a record was
recorded or stored in; and
 c) that it is "a record made in the usual and ordinary course of
business" or that it is otherwise exempt from the legal rule barring
hearsay evidence.

April 2009

ARMA Toronto Symposium 2009

12
Business Issues: Best Practices
International

ISO 15489:2001 – Information and Documentation – Records
Management – Guidelines

United States

ANSI/AIIM TR31-2004 – Legal Acceptance of Records Produced
by Information Technology Systems

Canada

CAN/CGSB 72.34-2005 - Electronic Records as Documentary
Evidence

United
Kingdom

BIP 0008-2004 – Code of Practice for Legal Admissibility and
evidentiary weight of information stored electronically

Europe

MoReq2 Specification – Model Requirements for the
Management of Electronic Records

Australia

PROS 99/007: Version 2: 2005 Management of Electronic
Records - Victorian Electronic Records Strategy (VERS)

April 2009

ARMA Toronto Symposium 2009

13
Records & Information
Management (RIM)
Program

Foundation for success

April 2009

ARMA Toronto Symposium 2009

14
RIM Program

Is the document a:

Record???

 Shows evidence of activity
 Shows evidence of decision
 Shows evidence of a
transaction

 File it!!!!!
Transitory Record???
 Short-term value
 No value after reading
 Duplicate document

• Read it
• Do required action
• Securely Dispose
If in doubt – file it!!!
April 2009

ARMA Toronto Symposium 2009

15
RIM Program
Lifecycle Management
Governance Framework
Manage information as an
Asset
Records Classification and
Retention foundation of
collaboration & knowledge
Ensures relevancy of
information retained
Ensures sustainability of
Electronic Document & Records
Management System (EDRMS)
April 2009

ARMA Toronto Symposium 2009

16
RIM Program
Business Rules
 Process to ensure the
authenticity and integrity
of records
 Ensure integrity and
reliability of the record
keeping system
 Sets the basis for defining
day-to-day procedures
 Business rules support
training
April 2009

ARMA Toronto Symposium 2009

17
RIM Program

Transitory Decision

April 2009

Record Lifecycle Pipeline

ARMA Toronto Symposium 2009

Business Rules

18
Document Control Practice

Case Study

April 2009

ARMA Toronto Symposium 2009

19
Document Control - Objectives
 Organize documentation consistently
 Facilitate the engineering review processes
 Reduce duplication and storage requirements
 Make project documents easy to locate
 Provide secure controlled access
 Share project knowledge with the required people
 Make project documentation available anywhere
 Prevent misplacement or loss of project information
April 2009

ARMA Toronto Symposium 2009

20
Document Control - Scope
Interface

Interface

Information
Communication
Transaction

Information
Communication
Transaction

Vale Inco Operational
Environment

Project
Environment
Owners
Team

External Contractors
Environment

Document Control
Responsibility

April 2009

ARMA Toronto Symposium 2009

21
Document Control - Scope at Completion of Project
Turnover

Transmittal

Vale Inco Operational
Environment

Deliverables

Transmittal

Project
Environment
Owners
Team

External Contractors
Environment

Document Control
Responsibility

April 2009

ARMA Toronto Symposium 2009

22
Document Control - Scope after Project is Completed

Project
Environment
(Archived)

Vale Inco Operational
Environment

April 2009

ARMA Toronto Symposium 2009

23
Document Control - Procedures
Standard for Format of Deliverables
 Provides instruction to the contractors on deliverables
 Defines the format of submittals and transmittals
 Defines the software applications and usage
Communications Planning
 Interface Procedures
 Transmittal protocols
 Work process integration
Correspondence & e-mail management
 One topic per correspondence
 Write a Question to get an Answer
 Escalate if minds do not meet - meetings
April 2009

ARMA Toronto Symposium 2009

24
Document Control - Guiding Principles
SINGLE authoritative source of information

 All documents will be filed electronically

1

 Into one system as a normal course of business
 Project team members depend on the system
Manage only ONE COPY – Original Record

 File once – use many times - in many ways
 All transacted records made from the document
management system
FIRST point of contact principle

 The person who is first point of contact with documentation
is responsible for determining and ensuring that
documentation is appropriately filed
April 2009

ARMA Toronto Symposium 2009

25
Document Control - Auditing
Benefits of Auditing
 Understanding degree of compliance to stated practice
 Identifying gaps in procedures and training
 Helps people understand how to apply the process
Due Diligence Reviews
 Conduct regular reviews of all projects
 Identifies changes in the project environment and gaps in training
 Provide timely helpful hints to key team members
Compliance Reviews
 Critical for demonstrating integrity of systems, tools and procedures
 Management knows if the systems, tools and procedures are working
 Statistical analysis demonstrates deficiencies in recordkeeping

April 2009

ARMA Toronto Symposium 2009

26
Document
Management

1
EDMS

SINGLE authoritative source of information

April 2009

ARMA Toronto Symposium 2009

27
Document Management - Access
Single authoritative source
of information
Access to documents from:


Citrix MetaFrame



Microsoft Outlook



Web Browsers



Windows Explorer



Authoring Applications



Internet Collaboration

April 2009

ARMA Toronto Symposium 2009

28
Document Management - Filing & Searching
Document
Sets
• Folders
• Related

Saves
Search

• User Defined
• Shared

Document
• Created
• Captured

Document Filing

Document Search

Profile
Search

Profile

• Defaults
• Fill out

Access Control
April 2009

Full Text Index
For Content Searching
ARMA Toronto Symposium 2009

Document
• Found
• Opened

29
Document Management - Facets of information - Views
Transmittal package
Document Type

Project #

Doc. Ref. Code

Work package

Author

Task description
April 2009

ARMA Toronto Symposium 2009

30
Document Management - Who files the document?

Managers
spend more
time Using
information

Executive
Director
Manager
Engineer
Supervisor
Technical
Employee
Staff

April 2009

Use
File

Subordinates
spend more
time capturing
/ creating and
filing
information

ARMA Toronto Symposium 2009

 You file your own
documents
 People tend only to create 1
new document every 2
days
 Most new documents are
copies of previous work or
renditions of others work
 The vast majority of emails
are transitory in nature
 Searching for information is
the most time consuming
part of any persons job
 Time spent filing & properly
classifying documents is
time well spent

31
EDMS - Benefits
Easy to use interface
 Work from where you like to work
 Fast complete access to all documents
 Set up views of documents to suit your needs
Easy to set-up, manage and close-out
 Project reports can be linked to dash boards
 Complete transactional audit trail
 Eliminate all unnecessary storage systems
Single authoritative source of documents

April 2009

ARMA Toronto Symposium 2009

32
Single Format

1
One file format for review

April 2009

ARMA Toronto Symposium 2009

33
Adobe Acrobat - Interface

My comments on this document.



Single Interface for all reviews



Easy Navigation – Thumbnails – Book Marks – Comments - Stamps



Full Text Search

April 2009

ARMA Toronto Symposium 2009

34
Adobe Acrobat - Benefits
Everyone already knows Adobe Reader
 All documents can be published to PDF
 Reports are bound as a single document
 Full text searchable document
All comments are attributable to the author
 Complete audit trail
 Office supplies are reduced or eliminated
 Easy to search the EDMS for documents
Keeps all documents in the EDMS

April 2009

ARMA Toronto Symposium 2009

35
Process Automation

1

One work process

April 2009

ARMA Toronto Symposium 2009

36
April 2009

Project Controls Manager

R R
R OC R
R C R
C R R
R R C
C R R
C R R

Contracts Administrator

T
T
T
T
T
T
T

Safety Coordinator

Construction Coordinator

Project Enginer

R
R
R
R
R
R
R

Site Engineer

Document Control

Contract Preparation
Site Preparation
Geotechnical Work
O
Civil Works
O
Mechanical Equipment Design O
Electrical
O
Process Control
O

Project Manager

Legend:
O - Originator
R - Reviewer
C - Collator
T - Transmittor

EP / CM Consultant

Process Automation - Distribution Matrix

R OC R
R
R
R
R
R
R
R
R
R
R
R

ARMA Toronto Symposium 2009

The Matrix is compiled
with the assistance of:
 Project Manager
 Project Controls
 Document Control
 Team members
The Matrix is used to
develop Routing
templates

37
Process Automation - Workflow Charting
Originator
Recipient

T

T

Parallel
Stage

DC

Reviewer(s)

Eng

Reviewer(s)

Coord

Collator

Serial
Stage
MGR

Transmitter

DC

Same day

April 2009

3 days

1 day

ARMA Toronto Symposium 2009

1 day

= 5 days

38
Process Automation - Workflow - Benefits
Automates the distribution & routing process
 No extra copies are made
 Distributions are recorded
 Distributions are more efficient
 Very little document collation required
Deadlines are set and monitored
 Processing speed is improved
 Know where documents are in a review process
 Track the progress of reviews
 Complete audit trail
Keeps all documents in the EDMS

April 2009

ARMA Toronto Symposium 2009

39
Summary

The power of ONE!
1. One filing system

1

EDMS

2. One document format
3. One work process

Simplicity
 Eliminate duplication
 Eliminate paper
 Eliminate waste

It is the integrated system that makes it work
April 2009

ARMA Toronto Symposium 2009

40
Summary of Benefits
By filing continuously throughout the project:
 project information is always available;
 teams can assemble, relocate and disassemble
faster;
 resources can work on multiple projects;
 we can automate standard work processes;

Effort

 we can reduce or eliminate office supplies;
 reports can be linked to PDS;
 turnover packages can be assembled during the
project;

Start

Timeline

Finish

 the close out requires little effort; and
 the record is always current & complete;

April 2009

ARMA Toronto Symposium 2009

41
Implementing EDMS is a

Change of Mindset
Lets get some of the basics understood

April 2009

ARMA Toronto Symposium 2009

42
EDMS is a Change of Mindset
Requestor asks a
Task performer to do something

Task Performer
Documents their task

Requestor
Works for a specific
department that performs a
function for the organization

Task Performer
Should look at who is
requesting the document to
determine how to file it

Document is Classified
According to what it is About
and
the function that it supports

April 2009

ARMA Toronto Symposium 2009

43
EDMS is a Change of Mindset

Collaborators
Access and use the document
to support their Tasks

Requestor
Accesses the document to
complete the Task

Document
Only filed once
Used many times
In many ways
Task Performer
Uses the document to support
ongoing work or future work
April 2009

Researchers
Search for a document that
may support their current Task
ARMA Toronto Symposium 2009

44
Ecosystem of Information

Imagine
Working in one environment where all records are;
 Created or Captured – once,
 Collaborated Globally – version controlled, and
 Managed – as records.
Being Confident that;
 You can find the original record – every time,
 You know who worked on it – who used it, and
 You know what it was used for – related to activity.
Know that:
 You never have to search any other system,
 You can leverage the collective wisdom and knowledge of the organization, and
 Your efforts will not be lost or misplaced.
April 2009

ARMA Toronto Symposium 2009

45
Establishing Habits
Safety has become the culture of Vale
Inco
 It is the first item addressed in
meetings
 It is measured and reported on

Document Control Practice & EDMS
must become the culture of our projects,
a part of day-to-day work
 Second after safety at all meetings –
points of discussion
 Measured and reported on
April 2009

ARMA Toronto Symposium 2009

46
Business Issues - Summary
Paper to electronic records paradigm shift
 E-mail conundrum
 Document as a vital asset
 Document as a productivity barrier
 Document in an emergency recovery plan
 Potential liability of documents
 Trusting electronic records
 Documents support compliance
 Capturing and managing intellectual assets
April 2009

ARMA Toronto Symposium 2009

47
The Journey

April 2009

ARMA Toronto Symposium 2009

48
How we started…….
EDM - 1997 – 2000
 Initially sponsored by Engineering
 “Stop the bleeding” of electronic files
 Limited requirements - simply a storage tool
IT Focused, no strategy, no business rules
 Limited server infrastructure
 Multiple departmental libraries
 Multiple departmental metadata profiles

April 2009

ARMA Toronto Symposium 2009

49
Where are we now? - 2009
Strategic direction, Leapfrog to electronic records
 Leadership – capital projects
 RIM Program
 Stop the need to keep paper
Robust Systems Architecture
 Components – EDMS, Workflow, Collaboration, Imaging
 Global approach – Failover, load balancing, access points
 IT deployment and helpdesk support

April 2009

ARMA Toronto Symposium 2009

50
How did we get there?
Leadership with a vision and driven
 Continuously securing sponsorship
 Expert consultants
 Provide direction to IT
Leading by example
 Getting out and communicating - marketing
 Present the value proposition
 Training program – customer specific
 Continuous follow-up

April 2009

ARMA Toronto Symposium 2009

51
Lessons Learned


Senior management sponsorship hard to get and keep



Connect the business case and practice to projects



Get the best experts to advise on program development



Develop a complete eco-system for information



Pick the easy targets, the others will see the results



In-house IT technical support is critical



But watch out for IT practices and initiatives that conflict with RIM



The training program will make or break the deployment



Collect stories about information failures



Network, tell your story, be involved



Plant seeds

April 2009

ARMA Toronto Symposium 2009

52
Questions ?????
Contact: Keith Atteck
Supervisor, Information Management
Vale Inco Limited
Business Development
2101 Hadwen Road
Mississauga, Ontario, Canada L5K 2L3
keith.atteck@valeinco.com
Ph: 905.403.3179

April 2009

ARMA Toronto Symposium 2009

53

Mais conteúdo relacionado

Mais procurados

Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013John Cachat
 
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...Marlon Dumas
 
Introduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and RedesignIntroduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and RedesignMarlon Dumas
 
Project Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsProject Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsSIVAKUMAR_G
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation ApproachZero Wait-State
 
Industrial Stamping & Mfg
Industrial Stamping & MfgIndustrial Stamping & Mfg
Industrial Stamping & Mfgadamtomlan
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013John Cachat
 
Introduction to Operational Excellence (2-day workshop)
Introduction to Operational Excellence (2-day workshop)Introduction to Operational Excellence (2-day workshop)
Introduction to Operational Excellence (2-day workshop)Flevy.com Best Practices
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016W3 Group Canada Inc.
 
IT Application Decommissioning - Application Retirement Services
IT Application Decommissioning - Application Retirement ServicesIT Application Decommissioning - Application Retirement Services
IT Application Decommissioning - Application Retirement ServicesAvenDATA
 
Polca Qrm Presentation Final
Polca Qrm Presentation FinalPolca Qrm Presentation Final
Polca Qrm Presentation FinalMark Dawson
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesA JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesTeamCain
 
PLM Implementing Successful Transformational Change
PLM Implementing Successful Transformational ChangePLM Implementing Successful Transformational Change
PLM Implementing Successful Transformational ChangeDavid G Sherburne
 
Digital Core Transformation - SAP S/4HANA
Digital Core Transformation - SAP S/4HANADigital Core Transformation - SAP S/4HANA
Digital Core Transformation - SAP S/4HANADeloitte Switzerland
 

Mais procurados (19)

Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013
 
Lean IT Transformation
Lean IT TransformationLean IT Transformation
Lean IT Transformation
 
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
Fundamentals of Business Process Management: A Quick Introduction to Value-Dr...
 
Introduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and RedesignIntroduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and Redesign
 
ARAS - change management
ARAS - change managementARAS - change management
ARAS - change management
 
Project Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsProject Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementations
 
Oracle Aim Methodology
Oracle Aim MethodologyOracle Aim Methodology
Oracle Aim Methodology
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation Approach
 
Industrial Stamping & Mfg
Industrial Stamping & MfgIndustrial Stamping & Mfg
Industrial Stamping & Mfg
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013
 
Introduction to Operational Excellence (2-day workshop)
Introduction to Operational Excellence (2-day workshop)Introduction to Operational Excellence (2-day workshop)
Introduction to Operational Excellence (2-day workshop)
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
 
IT Application Decommissioning - Application Retirement Services
IT Application Decommissioning - Application Retirement ServicesIT Application Decommissioning - Application Retirement Services
IT Application Decommissioning - Application Retirement Services
 
Polca Qrm Presentation Final
Polca Qrm Presentation FinalPolca Qrm Presentation Final
Polca Qrm Presentation Final
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesA JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
 
Project Plan ERP Sample by ijaz haider malik weboriez@hotmail
Project Plan ERP Sample by ijaz haider malik weboriez@hotmailProject Plan ERP Sample by ijaz haider malik weboriez@hotmail
Project Plan ERP Sample by ijaz haider malik weboriez@hotmail
 
PLM Implementing Successful Transformational Change
PLM Implementing Successful Transformational ChangePLM Implementing Successful Transformational Change
PLM Implementing Successful Transformational Change
 
Digital Core Transformation - SAP S/4HANA
Digital Core Transformation - SAP S/4HANADigital Core Transformation - SAP S/4HANA
Digital Core Transformation - SAP S/4HANA
 

Destaque

Iso 9000 standards
Iso 9000 standardsIso 9000 standards
Iso 9000 standardsMohit Singla
 
What is Document Management
What is Document ManagementWhat is Document Management
What is Document ManagementRadix Software
 
Iso procedure for document control
Iso procedure for document controlIso procedure for document control
Iso procedure for document controlkristanashly
 
Documents Control Process
Documents Control ProcessDocuments Control Process
Documents Control ProcessAshok Kumar
 
Document Control
Document ControlDocument Control
Document ControlDan Junkins
 
Vendom Document Control System User Manual
Vendom Document Control System User Manual Vendom Document Control System User Manual
Vendom Document Control System User Manual Lantech-Soft
 
How to Spot a Good Document Control System
How to Spot a Good Document Control SystemHow to Spot a Good Document Control System
How to Spot a Good Document Control SystemEtQ, Inc.
 
Document Control in Regulated FDA Environments - When and how to stick with p...
Document Control in Regulated FDA Environments - When and how to stick with p...Document Control in Regulated FDA Environments - When and how to stick with p...
Document Control in Regulated FDA Environments - When and how to stick with p...Jeff Thomas
 
Document control management march lagos
Document  control management   march lagosDocument  control management   march lagos
Document control management march lagosPetro Nomics
 
Document Control in FDA Regulated Environments - When and how to automate
Document Control in FDA Regulated Environments - When and how to automateDocument Control in FDA Regulated Environments - When and how to automate
Document Control in FDA Regulated Environments - When and how to automateJeff Thomas
 
eDMS247 document control application
eDMS247 document control applicationeDMS247 document control application
eDMS247 document control applicationDoug Littlejohn
 
Top 5 document controller cover letter samples
Top 5 document controller cover letter samplesTop 5 document controller cover letter samples
Top 5 document controller cover letter samplesjompote
 
Myths of validation
Myths of validationMyths of validation
Myths of validationJeff Thomas
 
Project management information system
Project management information systemProject management information system
Project management information systemPradeep Patel, PMP®
 
Karomi Project Document Control
Karomi Project Document ControlKaromi Project Document Control
Karomi Project Document ControlKaromi Technology
 
Document control, clearing, special gl, taxes SAP Fi
Document control, clearing, special gl, taxes SAP FiDocument control, clearing, special gl, taxes SAP Fi
Document control, clearing, special gl, taxes SAP FiLav Kumar
 
Project document management with SharePoint
Project document management with SharePointProject document management with SharePoint
Project document management with SharePointAmila Hendahewa
 
Document Management System
Document Management SystemDocument Management System
Document Management SystemSuresh Ramani
 
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control Course Outline - Quality Management QMS ISO 9001:2008 - Document Control
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control Lorson Resources Limited
 

Destaque (20)

Iso 9000 standards
Iso 9000 standardsIso 9000 standards
Iso 9000 standards
 
What is Document Management
What is Document ManagementWhat is Document Management
What is Document Management
 
Document Control Procedure
Document Control ProcedureDocument Control Procedure
Document Control Procedure
 
Iso procedure for document control
Iso procedure for document controlIso procedure for document control
Iso procedure for document control
 
Documents Control Process
Documents Control ProcessDocuments Control Process
Documents Control Process
 
Document Control
Document ControlDocument Control
Document Control
 
Vendom Document Control System User Manual
Vendom Document Control System User Manual Vendom Document Control System User Manual
Vendom Document Control System User Manual
 
How to Spot a Good Document Control System
How to Spot a Good Document Control SystemHow to Spot a Good Document Control System
How to Spot a Good Document Control System
 
Document Control in Regulated FDA Environments - When and how to stick with p...
Document Control in Regulated FDA Environments - When and how to stick with p...Document Control in Regulated FDA Environments - When and how to stick with p...
Document Control in Regulated FDA Environments - When and how to stick with p...
 
Document control management march lagos
Document  control management   march lagosDocument  control management   march lagos
Document control management march lagos
 
Document Control in FDA Regulated Environments - When and how to automate
Document Control in FDA Regulated Environments - When and how to automateDocument Control in FDA Regulated Environments - When and how to automate
Document Control in FDA Regulated Environments - When and how to automate
 
eDMS247 document control application
eDMS247 document control applicationeDMS247 document control application
eDMS247 document control application
 
Top 5 document controller cover letter samples
Top 5 document controller cover letter samplesTop 5 document controller cover letter samples
Top 5 document controller cover letter samples
 
Myths of validation
Myths of validationMyths of validation
Myths of validation
 
Project management information system
Project management information systemProject management information system
Project management information system
 
Karomi Project Document Control
Karomi Project Document ControlKaromi Project Document Control
Karomi Project Document Control
 
Document control, clearing, special gl, taxes SAP Fi
Document control, clearing, special gl, taxes SAP FiDocument control, clearing, special gl, taxes SAP Fi
Document control, clearing, special gl, taxes SAP Fi
 
Project document management with SharePoint
Project document management with SharePointProject document management with SharePoint
Project document management with SharePoint
 
Document Management System
Document Management SystemDocument Management System
Document Management System
 
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control Course Outline - Quality Management QMS ISO 9001:2008 - Document Control
Course Outline - Quality Management QMS ISO 9001:2008 - Document Control
 

Semelhante a 2009 ARMA Toronto Symposium - Document Control on Capital Projects - Paper to Electronic Records Paradigm Shift

2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...
2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...
2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...Keith Atteck C.Tech. ERMm
 
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...Keith Atteck C.Tech. ERMm
 
Capgemini Kpn Presentation Obug 2009
Capgemini Kpn Presentation Obug 2009Capgemini Kpn Presentation Obug 2009
Capgemini Kpn Presentation Obug 2009mdekam
 
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docx
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docxITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docx
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docxvrickens
 
Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...EMC Forum India
 
Maven Application Lifecycle Management for Alfresco
Maven Application Lifecycle Management for AlfrescoMaven Application Lifecycle Management for Alfresco
Maven Application Lifecycle Management for Alfrescoguest67a9ba
 
PDF/Archive: Preserving Electronic Assets
PDF/Archive: Preserving Electronic AssetsPDF/Archive: Preserving Electronic Assets
PDF/Archive: Preserving Electronic AssetsBetsy Fanning
 
Irma Article Edrm Software Design And Selection
Irma Article Edrm Software Design And SelectionIrma Article Edrm Software Design And Selection
Irma Article Edrm Software Design And SelectionConni Christensen
 
Additive mfg consortium overview 2010
Additive mfg consortium overview 2010Additive mfg consortium overview 2010
Additive mfg consortium overview 2010Dmitry Tseitlin
 
Methods Over Madness 2003 Ver.
Methods Over Madness 2003 Ver.Methods Over Madness 2003 Ver.
Methods Over Madness 2003 Ver.Tom Weinberger
 
Cmmi bp-aids
Cmmi bp-aidsCmmi bp-aids
Cmmi bp-aidsjmaal49
 
eTOM and ITIL engagements
eTOM and ITIL engagementseTOM and ITIL engagements
eTOM and ITIL engagementsAhmed Selim
 
Records Management - The Art of Throwing Things Away - Alfresco Software
Records Management - The Art of Throwing Things Away - Alfresco SoftwareRecords Management - The Art of Throwing Things Away - Alfresco Software
Records Management - The Art of Throwing Things Away - Alfresco SoftwareAlfresco Software
 
Warehouse Inventory Asset Management Solution Presentation
Warehouse Inventory Asset Management Solution PresentationWarehouse Inventory Asset Management Solution Presentation
Warehouse Inventory Asset Management Solution Presentationwillyaoll
 
Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010EPPIC Inc.
 
I40 pack ml at arla foods v8
I40 pack ml at arla foods v8I40 pack ml at arla foods v8
I40 pack ml at arla foods v8Arne Svendsen
 
From ISO to Implementation A framework for ECM Implementation
From ISO to Implementation  A framework for ECM ImplementationFrom ISO to Implementation  A framework for ECM Implementation
From ISO to Implementation A framework for ECM Implementationgbroadbent67
 
70a1bee5afaa499bff2de1419845-2545809091213.ppt
70a1bee5afaa499bff2de1419845-2545809091213.ppt70a1bee5afaa499bff2de1419845-2545809091213.ppt
70a1bee5afaa499bff2de1419845-2545809091213.pptDeebikaKaliyaperumal
 

Semelhante a 2009 ARMA Toronto Symposium - Document Control on Capital Projects - Paper to Electronic Records Paradigm Shift (20)

2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...
2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...
2011 IM Symposium - eDiscovery - Turning Risks into Rewards Developing a Comp...
 
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...
2010 IQPC - Turning Risks into Rewards Developing a Comprehensive Records and...
 
Capgemini Kpn Presentation Obug 2009
Capgemini Kpn Presentation Obug 2009Capgemini Kpn Presentation Obug 2009
Capgemini Kpn Presentation Obug 2009
 
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docx
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docxITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docx
ITS 833 – INFORMATION GOVERNANCEChapter 7Dr. Omar Mohamed.docx
 
Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...
 
Maven Application Lifecycle Management for Alfresco
Maven Application Lifecycle Management for AlfrescoMaven Application Lifecycle Management for Alfresco
Maven Application Lifecycle Management for Alfresco
 
PDF/Archive: Preserving Electronic Assets
PDF/Archive: Preserving Electronic AssetsPDF/Archive: Preserving Electronic Assets
PDF/Archive: Preserving Electronic Assets
 
Irma Article Edrm Software Design And Selection
Irma Article Edrm Software Design And SelectionIrma Article Edrm Software Design And Selection
Irma Article Edrm Software Design And Selection
 
Pdfa Keynote
Pdfa KeynotePdfa Keynote
Pdfa Keynote
 
Additive mfg consortium overview 2010
Additive mfg consortium overview 2010Additive mfg consortium overview 2010
Additive mfg consortium overview 2010
 
Methods Over Madness 2003 Ver.
Methods Over Madness 2003 Ver.Methods Over Madness 2003 Ver.
Methods Over Madness 2003 Ver.
 
Cmmi bp-aids
Cmmi bp-aidsCmmi bp-aids
Cmmi bp-aids
 
eTOM and ITIL engagements
eTOM and ITIL engagementseTOM and ITIL engagements
eTOM and ITIL engagements
 
Records Management - The Art of Throwing Things Away - Alfresco Software
Records Management - The Art of Throwing Things Away - Alfresco SoftwareRecords Management - The Art of Throwing Things Away - Alfresco Software
Records Management - The Art of Throwing Things Away - Alfresco Software
 
Warehouse Inventory Asset Management Solution Presentation
Warehouse Inventory Asset Management Solution PresentationWarehouse Inventory Asset Management Solution Presentation
Warehouse Inventory Asset Management Solution Presentation
 
Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010Curriculum Architecture Design - November 2010
Curriculum Architecture Design - November 2010
 
I40 pack ml at arla foods v8
I40 pack ml at arla foods v8I40 pack ml at arla foods v8
I40 pack ml at arla foods v8
 
Top Line Strategies - MS xRM
Top Line Strategies - MS xRMTop Line Strategies - MS xRM
Top Line Strategies - MS xRM
 
From ISO to Implementation A framework for ECM Implementation
From ISO to Implementation  A framework for ECM ImplementationFrom ISO to Implementation  A framework for ECM Implementation
From ISO to Implementation A framework for ECM Implementation
 
70a1bee5afaa499bff2de1419845-2545809091213.ppt
70a1bee5afaa499bff2de1419845-2545809091213.ppt70a1bee5afaa499bff2de1419845-2545809091213.ppt
70a1bee5afaa499bff2de1419845-2545809091213.ppt
 

Mais de Keith Atteck C.Tech. ERMm

Arma Canada Conference 2017 Why your IG Strategy is Failing - Keith Atteck
Arma Canada Conference 2017   Why your IG Strategy is Failing - Keith AtteckArma Canada Conference 2017   Why your IG Strategy is Failing - Keith Atteck
Arma Canada Conference 2017 Why your IG Strategy is Failing - Keith AtteckKeith Atteck C.Tech. ERMm
 
Arma canada conference 2017 Evolutionary Perspectives on IG and RIM Philoso...
Arma canada conference 2017   Evolutionary Perspectives on IG and RIM Philoso...Arma canada conference 2017   Evolutionary Perspectives on IG and RIM Philoso...
Arma canada conference 2017 Evolutionary Perspectives on IG and RIM Philoso...Keith Atteck C.Tech. ERMm
 
How to build a winning ig ecm or rim strategy keith atteck
How to build a winning ig ecm or rim strategy   keith atteckHow to build a winning ig ecm or rim strategy   keith atteck
How to build a winning ig ecm or rim strategy keith atteckKeith Atteck C.Tech. ERMm
 
T14 sustainability - 3 keys to avoiding ig failures - keith atteck
T14   sustainability - 3 keys to avoiding ig failures - keith atteckT14   sustainability - 3 keys to avoiding ig failures - keith atteck
T14 sustainability - 3 keys to avoiding ig failures - keith atteckKeith Atteck C.Tech. ERMm
 
M43 how to build a winning ig, ecm or rim strategy - keith atteck
M43   how to build a winning ig, ecm or rim strategy - keith atteckM43   how to build a winning ig, ecm or rim strategy - keith atteck
M43 how to build a winning ig, ecm or rim strategy - keith atteckKeith Atteck C.Tech. ERMm
 
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...Keith Atteck C.Tech. ERMm
 

Mais de Keith Atteck C.Tech. ERMm (6)

Arma Canada Conference 2017 Why your IG Strategy is Failing - Keith Atteck
Arma Canada Conference 2017   Why your IG Strategy is Failing - Keith AtteckArma Canada Conference 2017   Why your IG Strategy is Failing - Keith Atteck
Arma Canada Conference 2017 Why your IG Strategy is Failing - Keith Atteck
 
Arma canada conference 2017 Evolutionary Perspectives on IG and RIM Philoso...
Arma canada conference 2017   Evolutionary Perspectives on IG and RIM Philoso...Arma canada conference 2017   Evolutionary Perspectives on IG and RIM Philoso...
Arma canada conference 2017 Evolutionary Perspectives on IG and RIM Philoso...
 
How to build a winning ig ecm or rim strategy keith atteck
How to build a winning ig ecm or rim strategy   keith atteckHow to build a winning ig ecm or rim strategy   keith atteck
How to build a winning ig ecm or rim strategy keith atteck
 
T14 sustainability - 3 keys to avoiding ig failures - keith atteck
T14   sustainability - 3 keys to avoiding ig failures - keith atteckT14   sustainability - 3 keys to avoiding ig failures - keith atteck
T14 sustainability - 3 keys to avoiding ig failures - keith atteck
 
M43 how to build a winning ig, ecm or rim strategy - keith atteck
M43   how to build a winning ig, ecm or rim strategy - keith atteckM43   how to build a winning ig, ecm or rim strategy - keith atteck
M43 how to build a winning ig, ecm or rim strategy - keith atteck
 
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...
2011 Canadian Institute - Records Retention - The Indispensable Nitty Gritty ...
 

Último

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Último (20)

GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 

2009 ARMA Toronto Symposium - Document Control on Capital Projects - Paper to Electronic Records Paradigm Shift

  • 1. Document Control on Capital Projects “Paper to Electronic Records Paradigm Shift” Case Study: How we brought it all together Presented by: Keith Atteck Supervisor, Information Management Vale Inco Limited Business Development April 2009 ARMA Toronto Symposium 2009 DM#319048 1
  • 2. Disclaimer The views expressed in this presentation do not necessarily represent the views of Vale Inco Limited April 2009 ARMA Toronto Symposium 2009 2
  • 3. Outline  The Company  Business Issues  RIM Program  Document Control Practice  Document Management  Single Format - Adobe Acrobat  Process Automation - DM Workflow  Change of Mindset  The Journey April 2009 ARMA Toronto Symposium 2009 3
  • 4. The Company Vale - Companhia Vale do Rio Doce (CVRD) (NYSE: RIO)  www.vale.com  Vale was born in 1942 in Brasil Vale Inco Limited, a wholly-owned subsidiary of Vale  Vale Inco Limited - International Nickel Company of Canada Limited was incorporated 1916  www.valeinco.com Together  Worlds largest producer of Iron Ore and one of the worlds largest producers of Nickel  Vale also produces copper, manganese, ferroalloys, bauxite, alumina, aluminum, coal, cobalt, PGMs  Vale operates on five continents through its mining operations, mineral research plants, and commercial offices  ~ 100,000 employees, including outsourced workers worldwide April 2009 ARMA Toronto Symposium 2009 4
  • 5. Vale Worldwide April 2009 ARMA Toronto Symposium 2009 5
  • 6. Capital Projects The Project Delivery System (PDS) is Vale Inco’s method of executing capital projects in conformance with Vale’s project execution methodology and in accordance with generally accepted project management industry guidelines using an established set of standards, which supports Vale Inco’s business objectives. Document Control is a component of the Project Delivery System, managing the mission critical information assets that deliver successful projects and provide knowledge to employees across the organization. April 2009 ARMA Toronto Symposium 2009 6
  • 7. Information Management - Why? Now, where did I put that document? Why must information be systematically managed and protected? April 2009 eRecords on Servers make the job more critical? ARMA Toronto Symposium 2009 7
  • 8. Business Issues - Digital Vs. Paper As much as 93% of information generated today is in electronic form compared to the only 30% that is printed. Paper 7% Printed 30% Digital 93% Remain Digital 70% Source: (Technology in Government, March/April 2006, Vol. 13, No.2) April 2009 ARMA Toronto Symposium 2009 8
  • 9. Business Issues – E-mail   Cannot keep everything – we need to have criteria for what to keep  Communication practices must be planned and controlled  April 2009 Project e-mails are records, retained for content of message Electronic Document and Records Management System (EDRMS) is the only way to connect e-mail content to business activity through classification ARMA Toronto Symposium 2009 9
  • 10. Future, Current Present & Past Business Issues – Technology Paper Record, Blue Print Drawing 1. Print, Index, Folder, Cabinet, Box, Binder, Stick File, etc. Electronic File – Name.doc, xls, ppt, pdf, dgn, dwg, etc. 2. Hard Drive – PC or Laptop, C: Folders 3. Network Shared Drive, S: I: Folders 4. Outlook – E-mail, Personal Folders 5. Intranet, FTP, Extranet – Web Sites 6. Floppy, CD, DVD, PDA, Flash Drives, etc. 7. Tracking Databases – PRISM, Ellipse, Oracle, etc. EDMS & Collaboration eRecords Management Imaging – Eliminating paper April 2009 ARMA Toronto Symposium 2009 10
  • 11. Case Example - Topic Paper to electronic records paradigm shift  Paper the record – electronic the convenience Paradigm Shift  Electronic the record – Paper the convenience Document Control for global capital projects  Electronic records - the only way to go! This change of mind set is the key to success  Change of culture  Change of business practice April 2009 ARMA Toronto Symposium 2009 11
  • 12. Business Issues: Evidence Canada - CAN/CGSB 72.34-2005 - Electronic Records as Documentary Evidence 5.2.1 Those who wish to present an electronic record as evidence in legal proceedings shall be able to prove  a) authenticity of the record;  b) integrity of the Records Management System that a record was recorded or stored in; and  c) that it is "a record made in the usual and ordinary course of business" or that it is otherwise exempt from the legal rule barring hearsay evidence. April 2009 ARMA Toronto Symposium 2009 12
  • 13. Business Issues: Best Practices International ISO 15489:2001 – Information and Documentation – Records Management – Guidelines United States ANSI/AIIM TR31-2004 – Legal Acceptance of Records Produced by Information Technology Systems Canada CAN/CGSB 72.34-2005 - Electronic Records as Documentary Evidence United Kingdom BIP 0008-2004 – Code of Practice for Legal Admissibility and evidentiary weight of information stored electronically Europe MoReq2 Specification – Model Requirements for the Management of Electronic Records Australia PROS 99/007: Version 2: 2005 Management of Electronic Records - Victorian Electronic Records Strategy (VERS) April 2009 ARMA Toronto Symposium 2009 13
  • 14. Records & Information Management (RIM) Program Foundation for success April 2009 ARMA Toronto Symposium 2009 14
  • 15. RIM Program Is the document a: Record???  Shows evidence of activity  Shows evidence of decision  Shows evidence of a transaction  File it!!!!! Transitory Record???  Short-term value  No value after reading  Duplicate document • Read it • Do required action • Securely Dispose If in doubt – file it!!! April 2009 ARMA Toronto Symposium 2009 15
  • 16. RIM Program Lifecycle Management Governance Framework Manage information as an Asset Records Classification and Retention foundation of collaboration & knowledge Ensures relevancy of information retained Ensures sustainability of Electronic Document & Records Management System (EDRMS) April 2009 ARMA Toronto Symposium 2009 16
  • 17. RIM Program Business Rules  Process to ensure the authenticity and integrity of records  Ensure integrity and reliability of the record keeping system  Sets the basis for defining day-to-day procedures  Business rules support training April 2009 ARMA Toronto Symposium 2009 17
  • 18. RIM Program Transitory Decision April 2009 Record Lifecycle Pipeline ARMA Toronto Symposium 2009 Business Rules 18
  • 19. Document Control Practice Case Study April 2009 ARMA Toronto Symposium 2009 19
  • 20. Document Control - Objectives  Organize documentation consistently  Facilitate the engineering review processes  Reduce duplication and storage requirements  Make project documents easy to locate  Provide secure controlled access  Share project knowledge with the required people  Make project documentation available anywhere  Prevent misplacement or loss of project information April 2009 ARMA Toronto Symposium 2009 20
  • 21. Document Control - Scope Interface Interface Information Communication Transaction Information Communication Transaction Vale Inco Operational Environment Project Environment Owners Team External Contractors Environment Document Control Responsibility April 2009 ARMA Toronto Symposium 2009 21
  • 22. Document Control - Scope at Completion of Project Turnover Transmittal Vale Inco Operational Environment Deliverables Transmittal Project Environment Owners Team External Contractors Environment Document Control Responsibility April 2009 ARMA Toronto Symposium 2009 22
  • 23. Document Control - Scope after Project is Completed Project Environment (Archived) Vale Inco Operational Environment April 2009 ARMA Toronto Symposium 2009 23
  • 24. Document Control - Procedures Standard for Format of Deliverables  Provides instruction to the contractors on deliverables  Defines the format of submittals and transmittals  Defines the software applications and usage Communications Planning  Interface Procedures  Transmittal protocols  Work process integration Correspondence & e-mail management  One topic per correspondence  Write a Question to get an Answer  Escalate if minds do not meet - meetings April 2009 ARMA Toronto Symposium 2009 24
  • 25. Document Control - Guiding Principles SINGLE authoritative source of information  All documents will be filed electronically 1  Into one system as a normal course of business  Project team members depend on the system Manage only ONE COPY – Original Record  File once – use many times - in many ways  All transacted records made from the document management system FIRST point of contact principle  The person who is first point of contact with documentation is responsible for determining and ensuring that documentation is appropriately filed April 2009 ARMA Toronto Symposium 2009 25
  • 26. Document Control - Auditing Benefits of Auditing  Understanding degree of compliance to stated practice  Identifying gaps in procedures and training  Helps people understand how to apply the process Due Diligence Reviews  Conduct regular reviews of all projects  Identifies changes in the project environment and gaps in training  Provide timely helpful hints to key team members Compliance Reviews  Critical for demonstrating integrity of systems, tools and procedures  Management knows if the systems, tools and procedures are working  Statistical analysis demonstrates deficiencies in recordkeeping April 2009 ARMA Toronto Symposium 2009 26
  • 27. Document Management 1 EDMS SINGLE authoritative source of information April 2009 ARMA Toronto Symposium 2009 27
  • 28. Document Management - Access Single authoritative source of information Access to documents from:  Citrix MetaFrame  Microsoft Outlook  Web Browsers  Windows Explorer  Authoring Applications  Internet Collaboration April 2009 ARMA Toronto Symposium 2009 28
  • 29. Document Management - Filing & Searching Document Sets • Folders • Related Saves Search • User Defined • Shared Document • Created • Captured Document Filing Document Search Profile Search Profile • Defaults • Fill out Access Control April 2009 Full Text Index For Content Searching ARMA Toronto Symposium 2009 Document • Found • Opened 29
  • 30. Document Management - Facets of information - Views Transmittal package Document Type Project # Doc. Ref. Code Work package Author Task description April 2009 ARMA Toronto Symposium 2009 30
  • 31. Document Management - Who files the document? Managers spend more time Using information Executive Director Manager Engineer Supervisor Technical Employee Staff April 2009 Use File Subordinates spend more time capturing / creating and filing information ARMA Toronto Symposium 2009  You file your own documents  People tend only to create 1 new document every 2 days  Most new documents are copies of previous work or renditions of others work  The vast majority of emails are transitory in nature  Searching for information is the most time consuming part of any persons job  Time spent filing & properly classifying documents is time well spent 31
  • 32. EDMS - Benefits Easy to use interface  Work from where you like to work  Fast complete access to all documents  Set up views of documents to suit your needs Easy to set-up, manage and close-out  Project reports can be linked to dash boards  Complete transactional audit trail  Eliminate all unnecessary storage systems Single authoritative source of documents April 2009 ARMA Toronto Symposium 2009 32
  • 33. Single Format 1 One file format for review April 2009 ARMA Toronto Symposium 2009 33
  • 34. Adobe Acrobat - Interface My comments on this document.  Single Interface for all reviews  Easy Navigation – Thumbnails – Book Marks – Comments - Stamps  Full Text Search April 2009 ARMA Toronto Symposium 2009 34
  • 35. Adobe Acrobat - Benefits Everyone already knows Adobe Reader  All documents can be published to PDF  Reports are bound as a single document  Full text searchable document All comments are attributable to the author  Complete audit trail  Office supplies are reduced or eliminated  Easy to search the EDMS for documents Keeps all documents in the EDMS April 2009 ARMA Toronto Symposium 2009 35
  • 36. Process Automation 1 One work process April 2009 ARMA Toronto Symposium 2009 36
  • 37. April 2009 Project Controls Manager R R R OC R R C R C R R R R C C R R C R R Contracts Administrator T T T T T T T Safety Coordinator Construction Coordinator Project Enginer R R R R R R R Site Engineer Document Control Contract Preparation Site Preparation Geotechnical Work O Civil Works O Mechanical Equipment Design O Electrical O Process Control O Project Manager Legend: O - Originator R - Reviewer C - Collator T - Transmittor EP / CM Consultant Process Automation - Distribution Matrix R OC R R R R R R R R R R R R ARMA Toronto Symposium 2009 The Matrix is compiled with the assistance of:  Project Manager  Project Controls  Document Control  Team members The Matrix is used to develop Routing templates 37
  • 38. Process Automation - Workflow Charting Originator Recipient T T Parallel Stage DC Reviewer(s) Eng Reviewer(s) Coord Collator Serial Stage MGR Transmitter DC Same day April 2009 3 days 1 day ARMA Toronto Symposium 2009 1 day = 5 days 38
  • 39. Process Automation - Workflow - Benefits Automates the distribution & routing process  No extra copies are made  Distributions are recorded  Distributions are more efficient  Very little document collation required Deadlines are set and monitored  Processing speed is improved  Know where documents are in a review process  Track the progress of reviews  Complete audit trail Keeps all documents in the EDMS April 2009 ARMA Toronto Symposium 2009 39
  • 40. Summary The power of ONE! 1. One filing system 1 EDMS 2. One document format 3. One work process Simplicity  Eliminate duplication  Eliminate paper  Eliminate waste It is the integrated system that makes it work April 2009 ARMA Toronto Symposium 2009 40
  • 41. Summary of Benefits By filing continuously throughout the project:  project information is always available;  teams can assemble, relocate and disassemble faster;  resources can work on multiple projects;  we can automate standard work processes; Effort  we can reduce or eliminate office supplies;  reports can be linked to PDS;  turnover packages can be assembled during the project; Start Timeline Finish  the close out requires little effort; and  the record is always current & complete; April 2009 ARMA Toronto Symposium 2009 41
  • 42. Implementing EDMS is a Change of Mindset Lets get some of the basics understood April 2009 ARMA Toronto Symposium 2009 42
  • 43. EDMS is a Change of Mindset Requestor asks a Task performer to do something Task Performer Documents their task Requestor Works for a specific department that performs a function for the organization Task Performer Should look at who is requesting the document to determine how to file it Document is Classified According to what it is About and the function that it supports April 2009 ARMA Toronto Symposium 2009 43
  • 44. EDMS is a Change of Mindset Collaborators Access and use the document to support their Tasks Requestor Accesses the document to complete the Task Document Only filed once Used many times In many ways Task Performer Uses the document to support ongoing work or future work April 2009 Researchers Search for a document that may support their current Task ARMA Toronto Symposium 2009 44
  • 45. Ecosystem of Information Imagine Working in one environment where all records are;  Created or Captured – once,  Collaborated Globally – version controlled, and  Managed – as records. Being Confident that;  You can find the original record – every time,  You know who worked on it – who used it, and  You know what it was used for – related to activity. Know that:  You never have to search any other system,  You can leverage the collective wisdom and knowledge of the organization, and  Your efforts will not be lost or misplaced. April 2009 ARMA Toronto Symposium 2009 45
  • 46. Establishing Habits Safety has become the culture of Vale Inco  It is the first item addressed in meetings  It is measured and reported on Document Control Practice & EDMS must become the culture of our projects, a part of day-to-day work  Second after safety at all meetings – points of discussion  Measured and reported on April 2009 ARMA Toronto Symposium 2009 46
  • 47. Business Issues - Summary Paper to electronic records paradigm shift  E-mail conundrum  Document as a vital asset  Document as a productivity barrier  Document in an emergency recovery plan  Potential liability of documents  Trusting electronic records  Documents support compliance  Capturing and managing intellectual assets April 2009 ARMA Toronto Symposium 2009 47
  • 48. The Journey April 2009 ARMA Toronto Symposium 2009 48
  • 49. How we started……. EDM - 1997 – 2000  Initially sponsored by Engineering  “Stop the bleeding” of electronic files  Limited requirements - simply a storage tool IT Focused, no strategy, no business rules  Limited server infrastructure  Multiple departmental libraries  Multiple departmental metadata profiles April 2009 ARMA Toronto Symposium 2009 49
  • 50. Where are we now? - 2009 Strategic direction, Leapfrog to electronic records  Leadership – capital projects  RIM Program  Stop the need to keep paper Robust Systems Architecture  Components – EDMS, Workflow, Collaboration, Imaging  Global approach – Failover, load balancing, access points  IT deployment and helpdesk support April 2009 ARMA Toronto Symposium 2009 50
  • 51. How did we get there? Leadership with a vision and driven  Continuously securing sponsorship  Expert consultants  Provide direction to IT Leading by example  Getting out and communicating - marketing  Present the value proposition  Training program – customer specific  Continuous follow-up April 2009 ARMA Toronto Symposium 2009 51
  • 52. Lessons Learned  Senior management sponsorship hard to get and keep  Connect the business case and practice to projects  Get the best experts to advise on program development  Develop a complete eco-system for information  Pick the easy targets, the others will see the results  In-house IT technical support is critical  But watch out for IT practices and initiatives that conflict with RIM  The training program will make or break the deployment  Collect stories about information failures  Network, tell your story, be involved  Plant seeds April 2009 ARMA Toronto Symposium 2009 52
  • 53. Questions ????? Contact: Keith Atteck Supervisor, Information Management Vale Inco Limited Business Development 2101 Hadwen Road Mississauga, Ontario, Canada L5K 2L3 keith.atteck@valeinco.com Ph: 905.403.3179 April 2009 ARMA Toronto Symposium 2009 53