SlideShare uma empresa Scribd logo
1 de 2
KEALII M.G. RIBAO  808.269.0522
kealii.ribao@gmail.com
 2 3 7 5 Lakeshore Driv e
Klam ath Falls, OR 9 7 6 01
MECOP Project List
Lam ResearchCorporationMECOP InternshipProject List
1. One-Touch-Fitting Solution
-Created a solution for the many failing 1/8” one-touch pneumatic fittings that were failing
in the field, which led to critical down times
2. Sending/Retrieving
- Retrieved parts from receiving and vendors, shipped and delivered parts to customers
and suppliers, usually for expedited orders
3. De-gas Box Testing
- Used a data acquisition system (DAQ) to test the rate of diffusion of helium and argon
through the TFE tubing in the newly designed de-gas box
4. De-gas Box Ferrell Design
- Designed a new ferrell to prevent pinching the 1/16” TFE tubing in the degas box that
connects the gas source to the TFE tubing within the de-gas box
5. Pro-Engineer CFD Nitride Shower Head (SHD) Assemblies
- Created three different assemblies to make up an upgrade kit for a customer to prevent
breakage of the fragile ceramic SHD and radio frequency (RF) connectors during
installation
6. RF Strap Design
- Designed a copper RF strap used to connect the RF signal from the RF generator thought
the shower head. The newly designed copper RF strap was a component of the upgrade kit
assembly in (5.) above.
7. CKD Valve Bank Upgrade Kit
- Modified electrical housing and valve bank assemblies for a costumer upgrade kit. Rev
rolled multiple BOM’s and drawings that report to the upgrade kit.
7. Design Threads on Collar and Parasitic Plasma Suppression Plates
- Created threads on models and drawings indicating the mounting mechanism for the
parasitic plasma suppression upgrade kit assembly
8. Ceramic Tennis Racket Robotic Wafer Transfer Arm
- Designed two typed of difference ceramic transfer arms used to transfer wafer’s from
station to station by the control of a robot
9. Plugged ULV Shower Head with Aluminum
- Used wound aluminum to plug a ULV showerhead into hexagonal pattern and then tested
the hexagonal pattern on the R&D tool in the App’s Lab.
10. Test Convexity and Concavity of Showerheads
- Tested different areas of showerheads Manufactured by different vendors to see compare
results, and to confirm that showerhead are designed within tolerance and meet Lam specs.
11. Showerhead External Edge Flow Modulator
- Test fit showerhead external edge flow modulator with vendor manufacture. This design
was to modulate the secondary purge flow around the showerhead by increasing the
effective diameter but retaining the RF capacitance of the showerhead by using a non-
KEALII M.G. RIBAO  808.269.0522
kealii.ribao@gmail.com
 2 3 7 5 Lakeshore Driv e
Klam ath Falls, OR 9 7 6 01
conductive engineered plastic, Ultem 1000. This design allowed for only one variable, flow
rather than affecting flow and RF had we made the ring from metal.
12. Heated Pedestal Temperature Analysis
-Took 49 data points evenly distributed on a heated pedestal and recorded the
temperatures at each point to determine if the temperature is uniform throughout the
heated pedestal.
13. Update and Release SIRF Cover
- ECR released the rev roll of the SIRF convert to be VXL and VXT compatible
14. SSR Control Box Remount
- Designed a new bracket and extended the cables connecting to the SSR control box to
enable the door of the box to open greater than 90 degrees. Performed FEA in Pro-Engineer
Mechanica to validate proper load analysis.
Tested and installed the cables and bracket myself in the Apps Lab.
15. Create OEM Spec Sheets
- Created OEM spec sheets for 1/8” 90 degree pneumatic one-touch-fitting and
M5 X 0.5-6H hex nut
16. AMPDS Vacuum Switch Relocation
- Designed an upgrade kit moving the vacuum switch (verifies vacuum draw to carry toxins
away) down the stream of the flow to prevent pressure spikes that would shut the tool
down for unrealistic reasons.
17. PR Reduction Plan
- Extensive daily tasks of conducting statistical PR data analysis in Microsoft Access, Excel,
and PowerPoint to create a plan to prevent PR’s from being generated, and reduce the
overall amount PR’s in backlog. Worked very closely with directors, upper level
management, and the vice-president of engineering to reduce the amount of PR’s in the
Deposition Product Group (DPG).

Mais conteúdo relacionado

Mais procurados

SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHJohn Glenning
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide PresentationNick Picone
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersStatoil
 
Pro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualificationPro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualificationProSIM R & D Pvt. Ltd.
 
Simulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhyaSimulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhyaProSIM R & D Pvt. Ltd.
 
Progress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneProgress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneA. Rocketeer
 
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsSiesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsProSIM R & D Pvt. Ltd.
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...John Downs
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer
 
Parkchester April 2014 Management Report
Parkchester April 2014 Management ReportParkchester April 2014 Management Report
Parkchester April 2014 Management Reportjacevedo84
 
Seismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhoshSeismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhoshProSIM R & D Pvt. Ltd.
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systemsMartin Preene
 

Mais procurados (19)

SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide Presentation
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiers
 
Pro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualificationPro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualification
 
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
 
FINDINGS DRE and DE
FINDINGS DRE and DEFINDINGS DRE and DE
FINDINGS DRE and DE
 
Simulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhyaSimulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhya
 
Progress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneProgress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable Spaceplane
 
QS Energy (QSEP)
QS Energy (QSEP)QS Energy (QSEP)
QS Energy (QSEP)
 
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsSiesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
O & C Refurb
O & C RefurbO & C Refurb
O & C Refurb
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016
 
Parkchester April 2014 Management Report
Parkchester April 2014 Management ReportParkchester April 2014 Management Report
Parkchester April 2014 Management Report
 
Firth Bendau Poster
Firth Bendau PosterFirth Bendau Poster
Firth Bendau Poster
 
Seismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhoshSeismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhosh
 
Optimisation of geothermal systems
Optimisation of geothermal systemsOptimisation of geothermal systems
Optimisation of geothermal systems
 

Semelhante a Kealii Ribao - Lam Research MECOP Project List

Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsKoch Modular Process Systems, LLC.
 
Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installationMark Hensley
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...yusuf699644
 
Salter, Ed, 10 2012
Salter, Ed, 10 2012Salter, Ed, 10 2012
Salter, Ed, 10 2012els9000
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009dalw
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...AMI GE International
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothCase Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothKoch Modular Process Systems, LLC.
 
Item no
Item noItem no
Item norehant
 
SPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfSPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfOmarSAlAbri
 
SPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfSPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfOmarSAlAbri
 

Semelhante a Kealii Ribao - Lam Research MECOP Project List (20)

Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent Solvents
 
Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installation
 
resume-6
resume-6resume-6
resume-6
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
resumelrs_jan_2017
resumelrs_jan_2017resumelrs_jan_2017
resumelrs_jan_2017
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
SNL Small Modular Reactor Program
SNL Small Modular Reactor ProgramSNL Small Modular Reactor Program
SNL Small Modular Reactor Program
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
Salter, Ed, 10 2012
Salter, Ed, 10 2012Salter, Ed, 10 2012
Salter, Ed, 10 2012
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009Dal Wagner Cv Aug 2009
Dal Wagner Cv Aug 2009
 
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...Results of DigitArc Electrode Regulator and SmartArc power input optimization...
Results of DigitArc Electrode Regulator and SmartArc power input optimization...
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothCase Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
 
Item no
Item noItem no
Item no
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
SPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfSPE-96655-MS (1).pdf
SPE-96655-MS (1).pdf
 
SPE-96655-MS (1).pdf
SPE-96655-MS (1).pdfSPE-96655-MS (1).pdf
SPE-96655-MS (1).pdf
 

Kealii Ribao - Lam Research MECOP Project List

  • 1. KEALII M.G. RIBAO  808.269.0522 kealii.ribao@gmail.com  2 3 7 5 Lakeshore Driv e Klam ath Falls, OR 9 7 6 01 MECOP Project List Lam ResearchCorporationMECOP InternshipProject List 1. One-Touch-Fitting Solution -Created a solution for the many failing 1/8” one-touch pneumatic fittings that were failing in the field, which led to critical down times 2. Sending/Retrieving - Retrieved parts from receiving and vendors, shipped and delivered parts to customers and suppliers, usually for expedited orders 3. De-gas Box Testing - Used a data acquisition system (DAQ) to test the rate of diffusion of helium and argon through the TFE tubing in the newly designed de-gas box 4. De-gas Box Ferrell Design - Designed a new ferrell to prevent pinching the 1/16” TFE tubing in the degas box that connects the gas source to the TFE tubing within the de-gas box 5. Pro-Engineer CFD Nitride Shower Head (SHD) Assemblies - Created three different assemblies to make up an upgrade kit for a customer to prevent breakage of the fragile ceramic SHD and radio frequency (RF) connectors during installation 6. RF Strap Design - Designed a copper RF strap used to connect the RF signal from the RF generator thought the shower head. The newly designed copper RF strap was a component of the upgrade kit assembly in (5.) above. 7. CKD Valve Bank Upgrade Kit - Modified electrical housing and valve bank assemblies for a costumer upgrade kit. Rev rolled multiple BOM’s and drawings that report to the upgrade kit. 7. Design Threads on Collar and Parasitic Plasma Suppression Plates - Created threads on models and drawings indicating the mounting mechanism for the parasitic plasma suppression upgrade kit assembly 8. Ceramic Tennis Racket Robotic Wafer Transfer Arm - Designed two typed of difference ceramic transfer arms used to transfer wafer’s from station to station by the control of a robot 9. Plugged ULV Shower Head with Aluminum - Used wound aluminum to plug a ULV showerhead into hexagonal pattern and then tested the hexagonal pattern on the R&D tool in the App’s Lab. 10. Test Convexity and Concavity of Showerheads - Tested different areas of showerheads Manufactured by different vendors to see compare results, and to confirm that showerhead are designed within tolerance and meet Lam specs. 11. Showerhead External Edge Flow Modulator - Test fit showerhead external edge flow modulator with vendor manufacture. This design was to modulate the secondary purge flow around the showerhead by increasing the effective diameter but retaining the RF capacitance of the showerhead by using a non-
  • 2. KEALII M.G. RIBAO  808.269.0522 kealii.ribao@gmail.com  2 3 7 5 Lakeshore Driv e Klam ath Falls, OR 9 7 6 01 conductive engineered plastic, Ultem 1000. This design allowed for only one variable, flow rather than affecting flow and RF had we made the ring from metal. 12. Heated Pedestal Temperature Analysis -Took 49 data points evenly distributed on a heated pedestal and recorded the temperatures at each point to determine if the temperature is uniform throughout the heated pedestal. 13. Update and Release SIRF Cover - ECR released the rev roll of the SIRF convert to be VXL and VXT compatible 14. SSR Control Box Remount - Designed a new bracket and extended the cables connecting to the SSR control box to enable the door of the box to open greater than 90 degrees. Performed FEA in Pro-Engineer Mechanica to validate proper load analysis. Tested and installed the cables and bracket myself in the Apps Lab. 15. Create OEM Spec Sheets - Created OEM spec sheets for 1/8” 90 degree pneumatic one-touch-fitting and M5 X 0.5-6H hex nut 16. AMPDS Vacuum Switch Relocation - Designed an upgrade kit moving the vacuum switch (verifies vacuum draw to carry toxins away) down the stream of the flow to prevent pressure spikes that would shut the tool down for unrealistic reasons. 17. PR Reduction Plan - Extensive daily tasks of conducting statistical PR data analysis in Microsoft Access, Excel, and PowerPoint to create a plan to prevent PR’s from being generated, and reduce the overall amount PR’s in backlog. Worked very closely with directors, upper level management, and the vice-president of engineering to reduce the amount of PR’s in the Deposition Product Group (DPG).