SlideShare a Scribd company logo
1 of 24
Chartered Land Surveyors & Engineers
What we Think..!!
Solutions Provided
• Land & Hydrographic Surveying
• Terrestrial mapping of architectural sites
• Engineering & Construction Projects Surveying and
Mapping
• Dimensional control on mechanical installations
• Cadastral Surveying
• Deformation monitoring
Services Provided
4
• Geomatics
• Civil Engineering Consulting
• Project Management
• Architectural
• Highway/Road Design
• Airport Engineering
• Geotechnical Engineering
• GIS
• Photogrammetry
• Housing Schemes
• Computer Aided Drafting
• Construction Supervision
GPS Control Survey Projects
• Gabral Kalam Hydropower Project (Swat) – KPK
• Shagarthang Hydropower Project – Gilgit Baltistan
• Power Transmission Line – Neelum Jhelum HPP to Rawat
to Ghakhar Sub-Stations - 335 Km. Punjab & AJK
• Bostan-Zob Railways – 295 Km.- Balochistan
• Azad Pattan Hydropower Project – AJK
5
GPS Control Survey Projects
• Sarkand – Moro Powerline Powers Setting out – 100 Km -
Sindh
• Solar Power Plant – Kallar Kahar – 300 acres Topo Survey-
Punjab
• Potohar Climate Change Smart Irrigated Agriculture Project
• 10,000 acres Topo Survey – Punjab
• Iran-Pakistan Gas Pipeline – 800 Km – Balochistan & Sindh
6
• Kabul River Bed sounding using lead line - KPK
• Ashkot Hydropower Project - AJK
• Tanda Dam – KPK
• Gulpur Hydropower Project AJK
7
Project Photos
Project Photos
Survey work at Ghazi Barotha Hydropower Project
8
Project Photos…
9
Vehicle mounted GPS
Setting out of works at construction site
10
Project Photos
Monitoring concrete placement
11
Project Photos
Dimensional control on Mechanical Fabrications & Installations
12
Project Photos
Iran Pakistan Gas Pipeline
13
Project Photos
Iran Pakistan Gas Pipeline
14
Project Photos
Iran Pakistan Gas Pipeline
15
Project Photos
Monitoring vertical settlement on a thermal power plant
installations using N-3 precise level and invar staves.
16
Project Photos
Water Resources & Power Development Projects
• Jinnah Hydropower Project – Mianwali (Punjab)
• Patrind Hydropower Project – AJK & KPK
• Kheyal Kawar Hydropower Project – KPK
• Dasu Hydropower Project – KPK
• Ashkot Hydropower Project – AJK
• Gulpur Hydropower Project –AJK
• Suki Kinari Hydropower Project – AJK
• Shagarthang Hydropower Project – G&B
17
Gas Pipeline Projects
• 6 km – Gas line for Thermal Station – Zam Zama Gas Field
• Establishment of Survey Control along ≈ 800 km Iran –
Pakistan Gas Pipeline Project.
• Topo Survey for Pumping Station
• River and Streams crossing survey for the Gas Pipeline
• Topo Survey of 200 km section of the Iran- Pakistan Gas
Pipeline (200 m wide strip).
18
Survey Instruments
19
Total Stations
• Topcon GPT-3502LN (Reflectorless
up to 2km range) – Japan
• Sokkia Set 530 R – Japan
• Sokkia Set 610 K – Japan
• Sokkia Set 630 R – Japan
• Leica TPC 407 – Swiss
• Nikon DTM 332 – Japan
• DADI - China
Leveling Instruments
• Wild NA – 2 Swiss
• Leica NA – 728
• Sprinter Electronic - Swiss
Theodolites T2 -Swiss
20
Survey Instruments
GPS Dual Frequency Geodetic Class
• Leica GPS 500 Series + RTK - 6 Units
• Leica GPS 1200 Series + RTK - 2 Units
Hand Held GPS
• Magellan SporTrak – 2 Units
• Garmin GPS 12 – 1 Unit
• Magellan Triton – 1 Unit
• Garmin eTrex 30 – 3 Units
• Wild Plane Table + Alidade RK-1
• 6 Persons Rubber Boat – 1
• Echo Sounder – OHMEX (U.K.)
 SonarMite SM 3 – 1 Unit
 SonarMite SM 4 – 1 Unit
 Hand Held Echo Sounder – Japan – 1 Unit
• Lap Top Computer Field Use – 6 units
• HP A-0 Size Plotter Design Jet 500 Series
21
Survey Instruments
22
Project Locations
23
Our Clients
24
for your attention.

More Related Content

Viewers also liked

COE Project Presentation
COE Project PresentationCOE Project Presentation
COE Project PresentationHenry Asante
 
Research Areas In Geomatics
Research Areas In GeomaticsResearch Areas In Geomatics
Research Areas In GeomaticsArup Dasgupta
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip BasicsA B Shinde
 
GGT 2016 Conference Presentation Slides
GGT 2016 Conference Presentation SlidesGGT 2016 Conference Presentation Slides
GGT 2016 Conference Presentation SlidesIsaac Chidi Abazu
 
SOC Processors Used in SOC
SOC Processors Used in SOCSOC Processors Used in SOC
SOC Processors Used in SOCA B Shinde
 
SOC System Design Approach
SOC System Design ApproachSOC System Design Approach
SOC System Design ApproachA B Shinde
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirsMohammed Salahat
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project reportramesh_x
 

Viewers also liked (11)

COE Project Presentation
COE Project PresentationCOE Project Presentation
COE Project Presentation
 
Research Areas In Geomatics
Research Areas In GeomaticsResearch Areas In Geomatics
Research Areas In Geomatics
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip Basics
 
GGT 2016 Conference Presentation Slides
GGT 2016 Conference Presentation SlidesGGT 2016 Conference Presentation Slides
GGT 2016 Conference Presentation Slides
 
SOC Processors Used in SOC
SOC Processors Used in SOCSOC Processors Used in SOC
SOC Processors Used in SOC
 
SOC System Design Approach
SOC System Design ApproachSOC System Design Approach
SOC System Design Approach
 
Dam
DamDam
Dam
 
Dams 1
Dams 1Dams 1
Dams 1
 
DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
 

Similar to Chartered Surveyors & Engineers Offer Land, Construction Solutions

Severn Partnership
Severn Partnership Severn Partnership
Severn Partnership Steve Jones
 
CONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptxCONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptxDeepakKumar751819
 
Power resources in pakistan
Power resources in pakistanPower resources in pakistan
Power resources in pakistanfauzia samreen
 
EL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxEL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxAdolph7
 
TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate PresentationArpita Pattnayak
 
B2 - Turkish Geothermal Development – Zorlu Case Study
B2 - Turkish Geothermal Development – Zorlu Case StudyB2 - Turkish Geothermal Development – Zorlu Case Study
B2 - Turkish Geothermal Development – Zorlu Case StudyIceland Geothermal
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3Bruce Brymer
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMAhmet Ozgur
 
Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)Parag Chaubey
 
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Basdew Rooplal
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...IEI GSC
 
Renewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptxRenewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptxTRANGEC
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAayoghEngineering
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14Kristipoom R-khubut
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25Anirban Datta, CEng
 

Similar to Chartered Surveyors & Engineers Offer Land, Construction Solutions (20)

Severn Partnership
Severn Partnership Severn Partnership
Severn Partnership
 
CONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptxCONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptx
 
Power resources in pakistan
Power resources in pakistanPower resources in pakistan
Power resources in pakistan
 
EL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxEL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptx
 
TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate Presentation
 
B2 - Turkish Geothermal Development – Zorlu Case Study
B2 - Turkish Geothermal Development – Zorlu Case StudyB2 - Turkish Geothermal Development – Zorlu Case Study
B2 - Turkish Geothermal Development – Zorlu Case Study
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIM
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)
 
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Alstom india
Alstom indiaAlstom india
Alstom india
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
Etricals - Profile
Etricals - ProfileEtricals - Profile
Etricals - Profile
 
Renewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptxRenewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptx
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdf
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25
 

Chartered Surveyors & Engineers Offer Land, Construction Solutions

  • 3. Solutions Provided • Land & Hydrographic Surveying • Terrestrial mapping of architectural sites • Engineering & Construction Projects Surveying and Mapping • Dimensional control on mechanical installations • Cadastral Surveying • Deformation monitoring
  • 4. Services Provided 4 • Geomatics • Civil Engineering Consulting • Project Management • Architectural • Highway/Road Design • Airport Engineering • Geotechnical Engineering • GIS • Photogrammetry • Housing Schemes • Computer Aided Drafting • Construction Supervision
  • 5. GPS Control Survey Projects • Gabral Kalam Hydropower Project (Swat) – KPK • Shagarthang Hydropower Project – Gilgit Baltistan • Power Transmission Line – Neelum Jhelum HPP to Rawat to Ghakhar Sub-Stations - 335 Km. Punjab & AJK • Bostan-Zob Railways – 295 Km.- Balochistan • Azad Pattan Hydropower Project – AJK 5
  • 6. GPS Control Survey Projects • Sarkand – Moro Powerline Powers Setting out – 100 Km - Sindh • Solar Power Plant – Kallar Kahar – 300 acres Topo Survey- Punjab • Potohar Climate Change Smart Irrigated Agriculture Project • 10,000 acres Topo Survey – Punjab • Iran-Pakistan Gas Pipeline – 800 Km – Balochistan & Sindh 6
  • 7. • Kabul River Bed sounding using lead line - KPK • Ashkot Hydropower Project - AJK • Tanda Dam – KPK • Gulpur Hydropower Project AJK 7 Project Photos
  • 8. Project Photos Survey work at Ghazi Barotha Hydropower Project 8
  • 10. Setting out of works at construction site 10 Project Photos
  • 12. Dimensional control on Mechanical Fabrications & Installations 12 Project Photos
  • 13. Iran Pakistan Gas Pipeline 13 Project Photos
  • 14. Iran Pakistan Gas Pipeline 14 Project Photos
  • 15. Iran Pakistan Gas Pipeline 15 Project Photos
  • 16. Monitoring vertical settlement on a thermal power plant installations using N-3 precise level and invar staves. 16 Project Photos
  • 17. Water Resources & Power Development Projects • Jinnah Hydropower Project – Mianwali (Punjab) • Patrind Hydropower Project – AJK & KPK • Kheyal Kawar Hydropower Project – KPK • Dasu Hydropower Project – KPK • Ashkot Hydropower Project – AJK • Gulpur Hydropower Project –AJK • Suki Kinari Hydropower Project – AJK • Shagarthang Hydropower Project – G&B 17
  • 18. Gas Pipeline Projects • 6 km – Gas line for Thermal Station – Zam Zama Gas Field • Establishment of Survey Control along ≈ 800 km Iran – Pakistan Gas Pipeline Project. • Topo Survey for Pumping Station • River and Streams crossing survey for the Gas Pipeline • Topo Survey of 200 km section of the Iran- Pakistan Gas Pipeline (200 m wide strip). 18
  • 19. Survey Instruments 19 Total Stations • Topcon GPT-3502LN (Reflectorless up to 2km range) – Japan • Sokkia Set 530 R – Japan • Sokkia Set 610 K – Japan • Sokkia Set 630 R – Japan • Leica TPC 407 – Swiss • Nikon DTM 332 – Japan • DADI - China Leveling Instruments • Wild NA – 2 Swiss • Leica NA – 728 • Sprinter Electronic - Swiss Theodolites T2 -Swiss
  • 20. 20 Survey Instruments GPS Dual Frequency Geodetic Class • Leica GPS 500 Series + RTK - 6 Units • Leica GPS 1200 Series + RTK - 2 Units Hand Held GPS • Magellan SporTrak – 2 Units • Garmin GPS 12 – 1 Unit • Magellan Triton – 1 Unit • Garmin eTrex 30 – 3 Units
  • 21. • Wild Plane Table + Alidade RK-1 • 6 Persons Rubber Boat – 1 • Echo Sounder – OHMEX (U.K.)  SonarMite SM 3 – 1 Unit  SonarMite SM 4 – 1 Unit  Hand Held Echo Sounder – Japan – 1 Unit • Lap Top Computer Field Use – 6 units • HP A-0 Size Plotter Design Jet 500 Series 21 Survey Instruments