JAYA SUPERMARKET
     COLLAPSE


Group 3
Kartini Bt Muhamad
Kartini Bt Ibrahim
Lim Teck Chee
Objectives
 To know the process and
 procedure involved in
 demolition of building.

To educate people about the
importance of adopting ethical
conducts to prevent disastrous
consequences
Introduction
 Structural demolition is defined as an
  operation to bring down or destruct the
  structure. It can be completely or partially
  dismantling of a structure by planned and
  controlled methods in order to ensure the
  safety of work.
 Buildings, like all structures, are designed
  to support certain loads without
  deforming excessively.
 The loads are the weights of people and
  objects, the weight of rain and snow and
Causes of Collapse
 The causes of building collapse can be
  classified under general headings to facilitate
  analysis.
 These headings are:
                         Bad Design
                     Faulty Construction
                     Foundation Failure
                     Extraordinary Loads
                  Unexpected Failure Modes
                    Combination of Causes
The Evaluation of Demolition
           Techniques
 Demolition techniques for structure is greatly
  affected by the structure form using
  reinforcement concrete, pre stressed
  concrete, plain concrete or masonry and the
  size of the constructed structural.
 The location of the building, range of the
  demolition either is whole or partial
  demolition, grade of safety in work and the
  time taken to demolish the structure will
  greatly affect the evaluation if demolition
  technique.
 The evaluation of demolition method is a very
Experience and knowledge play crucial
 role in demolition engineering. Those
 parameters will affect the decision of
 engineer in determine the suitable method
 of demolition
 Many demolition techniques had invented
 and applied in this world such as using
 machinery method, hand
 method, chemical agent, explosion and
 hydraulic demolition.
CASE
STUDY
Background of Case Study
 Built in 1974, it was one of the first supermarkets in
  Petaling Jaya and has survived the many facets of
  development until now.
 The shopping centre was involved in a controversy in the
  early 1990s when it built its present 10-storey car park
  extension - four storeys higher than what the building
  plans approved by the then Petaling Jaya Municipal
  Council (MPPJ).
 The building has four storeys of retail units, five storeys
  of office units and four storeys of carparks. The building
  has been earmarked for redevelopment, where it will be
  demolished and rebuilt with better-planned features like
  loading bays, access roads and security.
 One of the city’s earliest landmarks, Jaya
  Supermarket, collapsed while demolition
  work was going on.
 A 10-storey office block at the other end of
  the building was not affected.
 It was on the process of the reconstruction of
  a four-storey complex and basement parking
  along Jalan Semangat.
 People around there saw that six cranes
  falling down along with the building.
 Claimed the lives of seven Indonesian
  construction workers. Three others were
  injured.
Reasons of the Collapse
• Initial investigations showed that the
  contractor, Pembinaan C.W Yap Sdn Bhd, did not get
  the greenlight from the Department Of Safety and
  Health (DOSH) to start demolition, although it did get
  approval from the Petaling Jaya City Council to carry
  out the work.
• Investigation also state that the contractor not use the
  proper methods for demolish the building.
• Indicated overloading caused by heavy machines
  may have triggered the collapse.
• Eight heavy demolition tractors were in the building
  when the incident occurred.
• Nine mini excavators were to be hoisted on the
  building’s two roofs — three at the ninth floor and six
  at the fourth floor roofs.
Action Taken
• A month after the incident, the state government
  blacklisted the owner and firms (6) involved in the
  redevelopment of the Jaya Supermarket.

    Jaya Section Fourteen Sdn Bhd (land owner and
    developer)
    DP Architects Sdn Bhd (that submitted the
    building plan)
   Meinhardht (M) Sdn Bhd (engineering company)
   Pembinaan CW Yap Sdn Bhd (contractor)
    Jurutera Perunding Sdn Bhd (engineering
    contractor)
    DLS Management (project manager).
 Syarikat Pembinaan C.W Yap Sdn Bhd, the
  main contractor in charge of demolition and
  reconstruction at the site was charged at the
  Sessions Court under Section 17(1) of the
  Occupational Safety and Health Act 1994.
 Sub-contractor Lian Hup Earth Work and
  Construction Sdn Bhd was charged under
  Section 15 (1) of the same Act for failing, as
  employer, to ensure safety, health and welfare
  of all employees during work.
 The companies face a fine not exceeding
  RM50,000 or imprisonment for a term not
  exceeding two years or both upon conviction.
 Housing and Local Government deputy minister
  Datuk Seri Lajim Ukin had said that the
  information in the report was classified under
  the Official Secrets Act (OSA).
 He slammed the classification of the report over
  the incident that involved public interest, adding
  that this had prevented parties affected by the
  collapse to claim for losses.
Demolition Regulation
 Demolition is dealt with under the Building
 Act 1984.
 Any person who intends to carry out the
 demolition of a building must inform the local
 authority.
 No one can start demolition work unless the
 local authority has been notified.
 It requires six weeks prior notice to be given
 to the Local Authority Building Control before
 demolition begins.
 The Local Authority Building Control may
 decide to issue a notice within six weeks on
 receipt of the notification to specify conditions
 that need to be met which may include
 precautions to protect adjoining properties
 and the public.
 Demolition work must also comply with the
 Construction (Design and Management)
 Regulations 1994 and a health and safety
 plan produced by the principal contractor.
Summary of Cases Study
  Did not get       • Still continue to the demolition process
 approval from
    DOSH.

 Not follow the
  demolition        • Building collapsed.
  regulation

         No
  compensation • The victim cannot claim their losses
                    because no approval from DOSH.
for all the victims
No           • Not consider the weight of
 responsibility
on the safety in     the crane that will effect
   workplace         the stability of the building



   The fine        • They will do the same
imposed is not
commensurate         thing again .
Pictures
METHODOLOGY
   USE TO
 ANALYSE THE
 CASE STUDY
Utilitarianism
• Definition: actions that serve to maximize human
  well-being.
    Balance the need of society with the need of
    individual and what will provide the most benefit to the
    most people.


• Good: They will built a new supermarket that
  give benefit to society (after demolition) complete
  all the necessary things in daily live.
• Bad: Environmental Issues(not follow the
  demolition regulation-collapsed)
Safety and Risk
             Safety is a value of judgment ,but precise
SAFET        because in many cases we can readily
  Y          distinguish a safe design from an unsafe One.

             Risk is a key element in engineering design
 RISK        ,it is impossible to design anything to be
             completely risk free.

              Engineer have a responsibility to ensure that their work is
              conduct in the most environmentally safe manner possible.
EXPLAINATI    there was no mention of explosives being used in the
              method statement.
   ON         The contractors structure were did not dismiss the
              possibility of the building crumbling if the wrong anchors .
Virtue Ethics
              • define as moral distinction and goodness.
 Definition



              • The engineers not monitor during demolition
                process.
              • They not consider the weight of the machine
Irresponsible • They not thinking about the environmental situation
No
            • The victims cannot claim their losses.
sympathy



            • Continue the demolition even though did
Impatient     not have approval from DOSH.


            • Do not care about their worker’s right and
Unconcern     the people around the collapsed building.
Rights Ethics
• Definition: right ethics holds that people have
  fundamental right that other people have a duty
  to respect.
• From Case Study:
  The right to have a comfortable supermarket.
  The right to pay attention to our customers or
    workers .
   cannot let our customers or workers suffer
    because of our project.
Duty Ethics
• Definition: people have duties , an
  important one is which is to protect the
  right of others
• From this case study:
      Pay the compensation to the victims.
      be honest, careful, and trustworthy.
      willingness to admit mistake.
IEEE Codes Of Ethics
 DEFINITION:
 To accept responsibility in making decisions
 consistent with the safety, health and welfare of the
 public and to disclose promptly factors that might
 endanger the public or the environment.


 RELATE TO CASE STUDY:
 The construction company should consider the
 safety of their workers and public around their
 project building .However, they didn’t consider the
 consequences if their project failure and just think
 to finish their work.
Discussion
• The government should take other pro-active
  steps to avoid future disasters.
• They seem to be charged only under OSHA if
  they are found guilty.
• The max fine is just RM50k or imprisonment for
  a term not exceeding two years or both upon
  convinction.That really is nothing for these
  companies.
• Proper risk assessment is the most fundamental
  issue of commitment to safety.
We can take a cue from neighboring Singapore.
 Singapore Building Control Act 1989
 introduced several new measures to regulate
 the construction industry.
 In regulating the design and supervision of a
 construction building, a developer must appoint
 an Accredited Checker,
 Their duties are to evaluate, analyze and
 review the structural design in the plans of any
 building works and perform such original
 calculations.
 The Accredited Checker must be independent
 in that he must have no professional or financial
 interest in the building works.
Conclusion
• In summary, we are able to see and appreciate
  that construction liability is a complex issue.
• Finding a cause of a collapse of a building is
  never easy. For most of the time it will be a
  guessing game or a process of elimination.
• With so many uncertainties and issues at
  hand, it is best for the Government to take pro-
  active steps to better regulate the construction
  industry.
• The developments in Singapore would be a
  good starting point for us to compare and
  emulate.

Mais conteúdo relacionado

Mais procurados

DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
Anep Botak
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12
UTHM
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
마 이환
 
Tembok penahan
Tembok penahanTembok penahan
Tembok penahan
UTHM
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838
Bryan Chong Liang Chua
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towers
Miz Belle
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
Natalie Ulza
 

Mais procurados (20)

Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Topik 2 pengenalan lift
Topik 2 pengenalan liftTopik 2 pengenalan lift
Topik 2 pengenalan lift
 
Seminar Cakna KKP - Site Safety Supervisor (SSS)
Seminar Cakna KKP - Site Safety Supervisor (SSS)Seminar Cakna KKP - Site Safety Supervisor (SSS)
Seminar Cakna KKP - Site Safety Supervisor (SSS)
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Topik 3 punca kmalangan&pcegahan
Topik 3 punca kmalangan&pcegahanTopik 3 punca kmalangan&pcegahan
Topik 3 punca kmalangan&pcegahan
 
Slide latihan industri sesi jun 2014 copy
Slide latihan industri sesi jun 2014   copySlide latihan industri sesi jun 2014   copy
Slide latihan industri sesi jun 2014 copy
 
Tembok penahan
Tembok penahanTembok penahan
Tembok penahan
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838
 
Highland tower
Highland towerHighland tower
Highland tower
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towers
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Kejuruteraan struktur
Kejuruteraan strukturKejuruteraan struktur
Kejuruteraan struktur
 
klcc
klccklcc
klcc
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
 

Semelhante a Jaya supermarket presentation 2011 latest

ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORT
AJAY JAIN
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
Azlin lolin
 
Introduction to civil engineering...........
Introduction to civil engineering...........Introduction to civil engineering...........
Introduction to civil engineering...........
rajenkoley
 
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
Dr.Youssef Hammida
 

Semelhante a Jaya supermarket presentation 2011 latest (20)

ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORT
 
Rishabh kumar
Rishabh kumarRishabh kumar
Rishabh kumar
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
 
Constructional Techniques in 2k18
Constructional Techniques in 2k18Constructional Techniques in 2k18
Constructional Techniques in 2k18
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
 
VDIS1006 RESTORATION INTERIORS LECTURE 2- OH&S FOR HERITAGE BUILDINGS
VDIS1006 RESTORATION INTERIORS LECTURE 2- OH&S FOR HERITAGE BUILDINGSVDIS1006 RESTORATION INTERIORS LECTURE 2- OH&S FOR HERITAGE BUILDINGS
VDIS1006 RESTORATION INTERIORS LECTURE 2- OH&S FOR HERITAGE BUILDINGS
 
Research Paper
Research PaperResearch Paper
Research Paper
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
VDIS10011 Restoration Interiors 2 Lecture 2: OH&S for Heritage Buildings
VDIS10011 Restoration Interiors 2 Lecture 2:  OH&S for Heritage BuildingsVDIS10011 Restoration Interiors 2 Lecture 2:  OH&S for Heritage Buildings
VDIS10011 Restoration Interiors 2 Lecture 2: OH&S for Heritage Buildings
 
Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9
 
moulivakkam building collpse
moulivakkam building collpsemoulivakkam building collpse
moulivakkam building collpse
 
Introduction to civil engineering...........
Introduction to civil engineering...........Introduction to civil engineering...........
Introduction to civil engineering...........
 
Shiv - STAKEHOLDERS PRESENTATION FINAL REVIEW.ppt
Shiv - STAKEHOLDERS PRESENTATION FINAL REVIEW.pptShiv - STAKEHOLDERS PRESENTATION FINAL REVIEW.ppt
Shiv - STAKEHOLDERS PRESENTATION FINAL REVIEW.ppt
 
Dempolition notes Part 1.pdf
Dempolition notes Part 1.pdfDempolition notes Part 1.pdf
Dempolition notes Part 1.pdf
 
1153 3330-1-pb
1153 3330-1-pb1153 3330-1-pb
1153 3330-1-pb
 
Building Service Chapter 4
Building Service Chapter 4Building Service Chapter 4
Building Service Chapter 4
 
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
لماذا المهندسون لايصممون البناء ليقاوم الزلازل- - What is the meaning buildin...
 
Ethics in Engineering
Ethics in EngineeringEthics in Engineering
Ethics in Engineering
 
Contractors all risk insurance
Contractors all risk insuranceContractors all risk insurance
Contractors all risk insurance
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 

Jaya supermarket presentation 2011 latest

  • 1. JAYA SUPERMARKET COLLAPSE Group 3 Kartini Bt Muhamad Kartini Bt Ibrahim Lim Teck Chee
  • 2. Objectives To know the process and procedure involved in demolition of building. To educate people about the importance of adopting ethical conducts to prevent disastrous consequences
  • 3. Introduction  Structural demolition is defined as an operation to bring down or destruct the structure. It can be completely or partially dismantling of a structure by planned and controlled methods in order to ensure the safety of work.  Buildings, like all structures, are designed to support certain loads without deforming excessively.  The loads are the weights of people and objects, the weight of rain and snow and
  • 4. Causes of Collapse  The causes of building collapse can be classified under general headings to facilitate analysis.  These headings are: Bad Design Faulty Construction Foundation Failure Extraordinary Loads Unexpected Failure Modes Combination of Causes
  • 5. The Evaluation of Demolition Techniques  Demolition techniques for structure is greatly affected by the structure form using reinforcement concrete, pre stressed concrete, plain concrete or masonry and the size of the constructed structural.  The location of the building, range of the demolition either is whole or partial demolition, grade of safety in work and the time taken to demolish the structure will greatly affect the evaluation if demolition technique.  The evaluation of demolition method is a very
  • 6. Experience and knowledge play crucial role in demolition engineering. Those parameters will affect the decision of engineer in determine the suitable method of demolition  Many demolition techniques had invented and applied in this world such as using machinery method, hand method, chemical agent, explosion and hydraulic demolition.
  • 8. Background of Case Study  Built in 1974, it was one of the first supermarkets in Petaling Jaya and has survived the many facets of development until now.  The shopping centre was involved in a controversy in the early 1990s when it built its present 10-storey car park extension - four storeys higher than what the building plans approved by the then Petaling Jaya Municipal Council (MPPJ).  The building has four storeys of retail units, five storeys of office units and four storeys of carparks. The building has been earmarked for redevelopment, where it will be demolished and rebuilt with better-planned features like loading bays, access roads and security.
  • 9.  One of the city’s earliest landmarks, Jaya Supermarket, collapsed while demolition work was going on.  A 10-storey office block at the other end of the building was not affected.  It was on the process of the reconstruction of a four-storey complex and basement parking along Jalan Semangat.  People around there saw that six cranes falling down along with the building.  Claimed the lives of seven Indonesian construction workers. Three others were injured.
  • 10. Reasons of the Collapse • Initial investigations showed that the contractor, Pembinaan C.W Yap Sdn Bhd, did not get the greenlight from the Department Of Safety and Health (DOSH) to start demolition, although it did get approval from the Petaling Jaya City Council to carry out the work. • Investigation also state that the contractor not use the proper methods for demolish the building. • Indicated overloading caused by heavy machines may have triggered the collapse. • Eight heavy demolition tractors were in the building when the incident occurred. • Nine mini excavators were to be hoisted on the building’s two roofs — three at the ninth floor and six at the fourth floor roofs.
  • 11.
  • 12.
  • 13.
  • 14. Action Taken • A month after the incident, the state government blacklisted the owner and firms (6) involved in the redevelopment of the Jaya Supermarket.  Jaya Section Fourteen Sdn Bhd (land owner and developer)  DP Architects Sdn Bhd (that submitted the building plan) Meinhardht (M) Sdn Bhd (engineering company) Pembinaan CW Yap Sdn Bhd (contractor)  Jurutera Perunding Sdn Bhd (engineering contractor)  DLS Management (project manager).
  • 15.  Syarikat Pembinaan C.W Yap Sdn Bhd, the main contractor in charge of demolition and reconstruction at the site was charged at the Sessions Court under Section 17(1) of the Occupational Safety and Health Act 1994.  Sub-contractor Lian Hup Earth Work and Construction Sdn Bhd was charged under Section 15 (1) of the same Act for failing, as employer, to ensure safety, health and welfare of all employees during work.
  • 16.  The companies face a fine not exceeding RM50,000 or imprisonment for a term not exceeding two years or both upon conviction.  Housing and Local Government deputy minister Datuk Seri Lajim Ukin had said that the information in the report was classified under the Official Secrets Act (OSA).  He slammed the classification of the report over the incident that involved public interest, adding that this had prevented parties affected by the collapse to claim for losses.
  • 17. Demolition Regulation  Demolition is dealt with under the Building Act 1984.  Any person who intends to carry out the demolition of a building must inform the local authority.  No one can start demolition work unless the local authority has been notified.  It requires six weeks prior notice to be given to the Local Authority Building Control before demolition begins.
  • 18.  The Local Authority Building Control may decide to issue a notice within six weeks on receipt of the notification to specify conditions that need to be met which may include precautions to protect adjoining properties and the public.  Demolition work must also comply with the Construction (Design and Management) Regulations 1994 and a health and safety plan produced by the principal contractor.
  • 19. Summary of Cases Study Did not get • Still continue to the demolition process approval from DOSH. Not follow the demolition • Building collapsed. regulation No compensation • The victim cannot claim their losses because no approval from DOSH. for all the victims
  • 20. No • Not consider the weight of responsibility on the safety in the crane that will effect workplace the stability of the building The fine • They will do the same imposed is not commensurate thing again .
  • 22.
  • 23. METHODOLOGY USE TO ANALYSE THE CASE STUDY
  • 24. Utilitarianism • Definition: actions that serve to maximize human well-being.  Balance the need of society with the need of individual and what will provide the most benefit to the most people. • Good: They will built a new supermarket that give benefit to society (after demolition) complete all the necessary things in daily live. • Bad: Environmental Issues(not follow the demolition regulation-collapsed)
  • 25. Safety and Risk Safety is a value of judgment ,but precise SAFET because in many cases we can readily Y distinguish a safe design from an unsafe One. Risk is a key element in engineering design RISK ,it is impossible to design anything to be completely risk free. Engineer have a responsibility to ensure that their work is conduct in the most environmentally safe manner possible. EXPLAINATI there was no mention of explosives being used in the method statement. ON The contractors structure were did not dismiss the possibility of the building crumbling if the wrong anchors .
  • 26. Virtue Ethics • define as moral distinction and goodness. Definition • The engineers not monitor during demolition process. • They not consider the weight of the machine Irresponsible • They not thinking about the environmental situation
  • 27. No • The victims cannot claim their losses. sympathy • Continue the demolition even though did Impatient not have approval from DOSH. • Do not care about their worker’s right and Unconcern the people around the collapsed building.
  • 28. Rights Ethics • Definition: right ethics holds that people have fundamental right that other people have a duty to respect. • From Case Study: The right to have a comfortable supermarket. The right to pay attention to our customers or workers .  cannot let our customers or workers suffer because of our project.
  • 29. Duty Ethics • Definition: people have duties , an important one is which is to protect the right of others • From this case study:  Pay the compensation to the victims.  be honest, careful, and trustworthy.  willingness to admit mistake.
  • 30. IEEE Codes Of Ethics DEFINITION: To accept responsibility in making decisions consistent with the safety, health and welfare of the public and to disclose promptly factors that might endanger the public or the environment. RELATE TO CASE STUDY: The construction company should consider the safety of their workers and public around their project building .However, they didn’t consider the consequences if their project failure and just think to finish their work.
  • 31. Discussion • The government should take other pro-active steps to avoid future disasters. • They seem to be charged only under OSHA if they are found guilty. • The max fine is just RM50k or imprisonment for a term not exceeding two years or both upon convinction.That really is nothing for these companies. • Proper risk assessment is the most fundamental issue of commitment to safety.
  • 32. We can take a cue from neighboring Singapore.  Singapore Building Control Act 1989 introduced several new measures to regulate the construction industry.  In regulating the design and supervision of a construction building, a developer must appoint an Accredited Checker,  Their duties are to evaluate, analyze and review the structural design in the plans of any building works and perform such original calculations.  The Accredited Checker must be independent in that he must have no professional or financial interest in the building works.
  • 33. Conclusion • In summary, we are able to see and appreciate that construction liability is a complex issue. • Finding a cause of a collapse of a building is never easy. For most of the time it will be a guessing game or a process of elimination. • With so many uncertainties and issues at hand, it is best for the Government to take pro- active steps to better regulate the construction industry. • The developments in Singapore would be a good starting point for us to compare and emulate.