From:    Brandon Valdez                  To: David Ficklin - OnGoal
                                                                          Rory O’Connor – OnGoal
                             Office: Kansas City                          Lee Turner – OnGoal
                             Date:    9.8.2010                            Andy Heitmann – Turner
                                                                          Dave Dudzik - Turner
                             Re:      Wizards Stadium Project
                                      Update – Week of
                                      9.6.2010



 Current Activities this Week:

 Underground Utilities:
 Area 3 - Deep underground Plumbing continues.
 on the east side of France Family Drive. Installation of
 the gas service has commenced.

 Foundations:
 Area 4 Field Level – Upper Field wall forms are being       Area 3 – Underground plumbing installation
 installed.                                                  is ongoing at the lower dock area.

 Concrete Flatwork:
 Area 2 Concourse – Concrete placement for slab at
 South Concession Buildings is complete to column line
 15.

 Structural Steel Erection:
 Area 2 – Main Canopy Truss Erection are set to Column
 Line 6. Area 4 – Structural Steel in Sequence 3-3 is
 erected to column line 39.                                  Area 2 – CMU wall installation has started at
                                                             Stage.
 MEP Rough-in:
 Area 3 – Shallow electrical and plumbing rough-in is
 ongoing. Ductwork installation on Suite and Press Levels
 are ongoing. Plumbing rough-in is ongoing on Suite and
 Press Levels. Fire Protection rough-in is ongoing on
 Suite and Press Levels. Electrical rough-in is ongoing on
 Suite and Press Levels.

 Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels are ongoing. Exterior metal stud framing Area 4 – Structural Steel Erection Sequence
                                                           3-3 has been set to column line 39.

Building the Future
and sheathing installation is ongoing at Field, Suite, and
 Press Levels.

 Masonry:
 Area 1 Field Level – Masonry wall installation is ongoing
 in Areas E, F, G and H.

 Area 1, 2 Concourse Level – Masonry wall installation at          Area 3 – Canopy Truss erection is complete
 Main Concourse Buildings are underway.                            in Sequence 2-2 (installation of Truss to 6
                                                                   Line shown).
 Curtainwall:
 Area 1 – Curtainwall framing installation will continue
 at West Elevation. Installation of Curtainwall glass is
 ongoing.

 Projected Activities occurring next Week:

 Underground Utilities:
 Deep Plumbing installation will continue in Area 3.

 Foundations:
 Area 4 Field Level – Foundation wall installation for Main
 Stair will begin.                                                 Field Level Area 3 – Formwork of Main Stair
                                                                   support walls are being set.
 Concrete Flatwork:
 Area 3 Field Level – Concrete placement for Slab-on
 Grade at upper dock area will begin. Prep work for slab-
 on-grade for lower dock area will begin.

 Area 3 and 4 Field Level – Installation of on-grade seating
 risers and intermediate stairs will continue.

 Structural Steel Erection:
 Area 2 – Canopy truss installation at East side of Stadium
 will continue.
                                                                   Area 1 – Filled and polished CMU Block walls
 MEP Rough-in:                                                     at the Stair 4 and Restrooms.
 MEP Rough-in at Suite and Press Levels will continue.
 Ductwork installation on Press Level will continue. Fire
 Sprinkler installation will continue on Suite and Press Levels.




Building the Future
Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels will continue. Exterior Framing and
 sheathing installation will continue.

 Curtainwall:
 Area 1 – Curtain Framing and Glass installation will
 continue.
                                                           Area 1 – Installation of curtainwall framing
                                                           and Glass at West Building is ongoing.




                                                           Area 1 – Shot of the west building showing
                                                           the progress of the canopy decking on
                                                           trusses.




Building the Future
Additional Photos:




Area 1 – Shot of Suite fronts from roof of      Suite Level Area 1 – Shot looking through
Stadium Suite.                                  the glass at Suite Level Club.




                                                Concourse Level Area 1 – Masonry
Area 1 – Curtainwall framing installation at    installation continues on Concourse
south face of Club Areas.                       Buildings.




Field Level Area 3 – Installation of cast-in-   Field Level Area 3 – Upper dock slab edge
place risers continue on east side.             formwork is installed.




Building the Future

Mais conteúdo relacionado

Destaque

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destaque (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Construction Update 09-8-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.8.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 9.6.2010 Current Activities this Week: Underground Utilities: Area 3 - Deep underground Plumbing continues. on the east side of France Family Drive. Installation of the gas service has commenced. Foundations: Area 4 Field Level – Upper Field wall forms are being Area 3 – Underground plumbing installation installed. is ongoing at the lower dock area. Concrete Flatwork: Area 2 Concourse – Concrete placement for slab at South Concession Buildings is complete to column line 15. Structural Steel Erection: Area 2 – Main Canopy Truss Erection are set to Column Line 6. Area 4 – Structural Steel in Sequence 3-3 is erected to column line 39. Area 2 – CMU wall installation has started at Stage. MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Suite and Press Levels. Electrical rough-in is ongoing on Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing Area 4 – Structural Steel Erection Sequence 3-3 has been set to column line 39. Building the Future
  • 2. and sheathing installation is ongoing at Field, Suite, and Press Levels. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas E, F, G and H. Area 1, 2 Concourse Level – Masonry wall installation at Area 3 – Canopy Truss erection is complete Main Concourse Buildings are underway. in Sequence 2-2 (installation of Truss to 6 Line shown). Curtainwall: Area 1 – Curtainwall framing installation will continue at West Elevation. Installation of Curtainwall glass is ongoing. Projected Activities occurring next Week: Underground Utilities: Deep Plumbing installation will continue in Area 3. Foundations: Area 4 Field Level – Foundation wall installation for Main Stair will begin. Field Level Area 3 – Formwork of Main Stair support walls are being set. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade at upper dock area will begin. Prep work for slab- on-grade for lower dock area will begin. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at East side of Stadium will continue. Area 1 – Filled and polished CMU Block walls MEP Rough-in: at the Stair 4 and Restrooms. MEP Rough-in at Suite and Press Levels will continue. Ductwork installation on Press Level will continue. Fire Sprinkler installation will continue on Suite and Press Levels. Building the Future
  • 3. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Curtainwall: Area 1 – Curtain Framing and Glass installation will continue. Area 1 – Installation of curtainwall framing and Glass at West Building is ongoing. Area 1 – Shot of the west building showing the progress of the canopy decking on trusses. Building the Future
  • 4. Additional Photos: Area 1 – Shot of Suite fronts from roof of Suite Level Area 1 – Shot looking through Stadium Suite. the glass at Suite Level Club. Concourse Level Area 1 – Masonry Area 1 – Curtainwall framing installation at installation continues on Concourse south face of Club Areas. Buildings. Field Level Area 3 – Installation of cast-in- Field Level Area 3 – Upper dock slab edge place risers continue on east side. formwork is installed. Building the Future