SCHOOL OF ARCHITECTURE, BUILDING & DESIGN 
Research Unit for Modern Architecture Studies in Southeast Asia 
Foundation of Natural and Built Environments 
Introduction to the Construction Industry 
Prerequisite: None 
Lecturers: Hasmanira Mokhtar, Noorul Iffa Mohd Nayan, Jaqurliyn Ann See Peng _____________________________________________________________________ 
Project 1B (Group and Individual) – updated as of 18th Sept 2014 
Profession in construction industry – Building Teams: Identifying their specific roles 
30% (30% Group, Individual performance based on peer assessment) 
Submission date – 14th October 2014 
Introduction 
It is not the beauty of a building you should look at ; 
It is the construction of the foundation that will stand the test of time.. 
David Allan Coe 
Objectives of Project 
 To enable students to develop an understanding of the building team, its organization, their duties, responsibilities and the inter-relationship within which they will seek employment, career progression or further study. 
 To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. 
 To assess the students understanding on the general construction process from the sketch plan to completion of a building and introduce the scope of work handled by the players involved. 
Learning Outcomes 
 Explain and illustrate structures of organizations and the team involved in the construction industry. 
 Explain the roles and responsibilities of the entities touching briefly the legal and contractual procedures and impact. 
 Ability to document their observations and understanding from interview session and research resources as well as to communicate in a systematic and convincing booklet.
Tasks 
PART I : INTERVIEW 
- In a group of 5 members, you are required to interview one of the professions from the following list. The profession will be randomly assigned to you. 
- You are then required to select a firm or company in which the profession assigned to you work in. Set up an interview with him/her. 
- In the interview session, you are required to find out 
o the company profile (history, company structure and any relevant information) 
o the profile/background of your interviewee in construction industry (his working experience, projects he involved in, and any other relevant information) 
o two (2) projects in which your profession involved 
o his/her roles and responsibilities in that particular projects 
o other relevant information… 
- You are advised to plan and think of the questions and structure of the interview properly to avoid second appointment with your interviewee. 
- You are also required to record the interview session as a part and parcel of the submission component in this assignment. 
- List of Building Team : 
No 
Profession (ICI) 
1 
Architect 
2 
Interior Architect/Interior Designer 
3 
Quantity Surveyor 
4 
Landscape Architect 
5 
Civil and Structural Engineer 
6 
Mechanical and Electrical Engineer 
- The questions you ask during the interview shall gain further detail information about the process and procedure the key player has to carry out in order to complete a project according to the client needs. 
PART 2 : MAGAZINE 
- From the information gathered through the interview in Part I, your next task is to create a magazine that would demonstrate your understanding in Part I. 
- The magazine should include the following components : 
o Company profile 
o Profile of the interviewee 
o Introduction of the project(s) that your interviewee work in 
o Detailed description and explanation of his/her roles and responsibilities in that particular project(s) 
- You may refer to their current company profile (if any), however you are required to express the information with your own words and style. Should plagiarism is found, penalty will be applied. 
- You can either feature ONE or TWO projects that your interviewee involved in. No. of project to be featured is dependent on the scale of the project. The project however is not necessarily a completed project.
Submission Requirement 
- CD which includes the video recording of the interview and softcopy of your magazine in PDF format 
- An A5 sized, colored and printed magazine 
- The magazine should be 8 – 12 pages 
- Submission date : 14th. October 2014
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN 
Modern Architecture Studies in Southeast Asia (MASSA) Research Unit 
Foundation in Natural and Built Environments 
PEER ASSESSMENT FORM(PRIVATE & CONFIDENTIAL) QSB30105 Introduction to Construction Industry 
Write the proficiency level from the rubric that fits each group members’ participation in the box under the collaboration skill. Include your own name in the list. For ranking, use “1” for the group member that you feel contributed the most to the work, followed by other group members in order of contributions. The ranking should reflect the participant level of each member. 
Name of Group Member 
Participation 
Leadership 
Communication 
Cooperation 
Time Management 
TOTAL (Out of 25) 
RANK 
1. 
2. 
3. 
4. 
5. 
6. 
5 
4 
3 
2 
1 
Participation 
Group member participated fully and was always on task in class. 
Group member often participated, was usually on time and did their task well, and immediately, if prompted. 
Group member sometimes participated, occasionally wasted time or sometimes worked on unrelated material. 
Group member was often missing, contributed minimally or often worked on unrelated material. 
Group member did not participate, wasted time, or worked on unrelated material. 
Leadership 
Group member assumed leadership in an appropriate way when necessary by helping the group stay on track, encouraging group participation, posing solutions to problems, and having a positive attitude. 
Group member occasionally assumed leadership in an appropriate way, inconsistently, and generally helped to maintain good group participation, and having a positive attitude. 
Group member usually allowed others to assume leadership or often dominated the group. 
Group member seldom assumed leadership and occasionally undermined the leadership of others. 
Group member did not assume leadership or assumed it in a nonproductive manner and generally behaved in a manner detrimental to the overall attitude of the group. 
Communication 
Group member listened carefully to others’ ideas. Group member offered detailed, constructive feedback when appropriate. 
Group member often listened to others’ ideas and offered feedback that was usually relevant and appropriate. 
Group member sometimes listened to others and interrupted them. Group member occasionally offered constructive feedback, but sometimes the comments were inappropriate or not useful. 
Group member often did not listen to others. Feedback was seldom given and usually inappropriate o unhelpful. 
Group member did not listen to others and often interrupted them. Group member did not offer constructive or useful feedback. 
Cooperation 
Group member treated others respectfully and shared the workload fairly. 
Group member usually treated others respectfully and often tried to share workload fairly. 
Group member sometimes treated others disrespectfully or did not share the workload fairly. 
Group member often treated others disrespectfully and often tried to distribute workload unfairly. 
Group member treated others disrespectfully or did not share the workload fairly. 
Time Management 
Group member completed assigned tasks on time. 
Group member completed most of the task assigned on time. 
Group member sometimes did not complete the assigned tasks on time and occasionally forced the group to make last-minute adjustments and changes to accommodate missing work. 
Group member did not complete most of the tasks assigned on time. 
Group member did not complete most of the assigned tasks on time and often forced the group to make last-minute adjustments and changes to accommodate missing work.
List down some of the main tasks that had been assigned to you for this assignment and briefly describe your performance: 
1. _________________________________________________________________________________________________ 
2. _________________________________________________________________________________________________ 
3. _________________________________________________________________________________________________ 
You may also list any other contributions that you feel you have made for your team: 
___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ __________________________________________________________________________________________________ 
Briefly comment on the contributions of other group member, particularly those you feel contributed more or less than expected: 
___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ __________________________________________________________________________________________________ 
Student’s Signature : Date: 
Student’s Name : Student ID: 
This section for comments by Lecturers / Tutors:

Mais conteúdo relacionado

Semelhante a Project 1B - Profession in Construction Industry

1 bici updated
1 bici   updated1 bici   updated
1 bici updatedrivenhau
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updatedlimziahuei
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updatedKingEdge
 
Ici project 1 b
Ici project 1 bIci project 1 b
Ici project 1 bSongKit96
 
Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01WadeLim
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdfFoo Zhi Fung
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updatedSarah Esa
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updatedKailyn Lee
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdfJordon Wong
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfdanielsong15
 
Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01WadeLim
 
Ici assignemnt 2 project brief
Ici assignemnt 2 project briefIci assignemnt 2 project brief
Ici assignemnt 2 project briefbrandonliaw97
 
Assignment 1B interview (BRIEF) 14052015.pdf
Assignment 1B interview (BRIEF) 14052015.pdfAssignment 1B interview (BRIEF) 14052015.pdf
Assignment 1B interview (BRIEF) 14052015.pdfXying Lee
 

Semelhante a Project 1B - Profession in Construction Industry (20)

1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
1 bici updated-2
1 bici   updated-21 bici   updated-2
1 bici updated-2
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
Ici project 1 b
Ici project 1 bIci project 1 b
Ici project 1 b
 
Ici project 1b
Ici project 1bIci project 1b
Ici project 1b
 
Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdf
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
ds1 bici updated
ds1 bici   updatedds1 bici   updated
ds1 bici updated
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdf
 
icip2.pdf
icip2.pdficip2.pdf
icip2.pdf
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01Iciprojectbrief1b 141129213936-conversion-gate01
Iciprojectbrief1b 141129213936-conversion-gate01
 
Ici assignemnt 2 project brief
Ici assignemnt 2 project briefIci assignemnt 2 project brief
Ici assignemnt 2 project brief
 
Assignment 1B interview (BRIEF) 14052015.pdf
Assignment 1B interview (BRIEF) 14052015.pdfAssignment 1B interview (BRIEF) 14052015.pdf
Assignment 1B interview (BRIEF) 14052015.pdf
 

Mais de Kai Yun Pang

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiKai Yun Pang
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - ReportKai Yun Pang
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump StationKai Yun Pang
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial AppraisalKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal Kai Yun Pang
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012Kai Yun Pang
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Kai Yun Pang
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S HotelKai Yun Pang
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study ReportKai Yun Pang
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - JournalKai Yun Pang
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service Kai Yun Pang
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final AccountKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - QuestionKai Yun Pang
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK LandKai Yun Pang
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 

Mais de Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 

Último

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 

Último (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 

Project 1B - Profession in Construction Industry

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments Introduction to the Construction Industry Prerequisite: None Lecturers: Hasmanira Mokhtar, Noorul Iffa Mohd Nayan, Jaqurliyn Ann See Peng _____________________________________________________________________ Project 1B (Group and Individual) – updated as of 18th Sept 2014 Profession in construction industry – Building Teams: Identifying their specific roles 30% (30% Group, Individual performance based on peer assessment) Submission date – 14th October 2014 Introduction It is not the beauty of a building you should look at ; It is the construction of the foundation that will stand the test of time.. David Allan Coe Objectives of Project  To enable students to develop an understanding of the building team, its organization, their duties, responsibilities and the inter-relationship within which they will seek employment, career progression or further study.  To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry.  To assess the students understanding on the general construction process from the sketch plan to completion of a building and introduce the scope of work handled by the players involved. Learning Outcomes  Explain and illustrate structures of organizations and the team involved in the construction industry.  Explain the roles and responsibilities of the entities touching briefly the legal and contractual procedures and impact.  Ability to document their observations and understanding from interview session and research resources as well as to communicate in a systematic and convincing booklet.
  • 2. Tasks PART I : INTERVIEW - In a group of 5 members, you are required to interview one of the professions from the following list. The profession will be randomly assigned to you. - You are then required to select a firm or company in which the profession assigned to you work in. Set up an interview with him/her. - In the interview session, you are required to find out o the company profile (history, company structure and any relevant information) o the profile/background of your interviewee in construction industry (his working experience, projects he involved in, and any other relevant information) o two (2) projects in which your profession involved o his/her roles and responsibilities in that particular projects o other relevant information… - You are advised to plan and think of the questions and structure of the interview properly to avoid second appointment with your interviewee. - You are also required to record the interview session as a part and parcel of the submission component in this assignment. - List of Building Team : No Profession (ICI) 1 Architect 2 Interior Architect/Interior Designer 3 Quantity Surveyor 4 Landscape Architect 5 Civil and Structural Engineer 6 Mechanical and Electrical Engineer - The questions you ask during the interview shall gain further detail information about the process and procedure the key player has to carry out in order to complete a project according to the client needs. PART 2 : MAGAZINE - From the information gathered through the interview in Part I, your next task is to create a magazine that would demonstrate your understanding in Part I. - The magazine should include the following components : o Company profile o Profile of the interviewee o Introduction of the project(s) that your interviewee work in o Detailed description and explanation of his/her roles and responsibilities in that particular project(s) - You may refer to their current company profile (if any), however you are required to express the information with your own words and style. Should plagiarism is found, penalty will be applied. - You can either feature ONE or TWO projects that your interviewee involved in. No. of project to be featured is dependent on the scale of the project. The project however is not necessarily a completed project.
  • 3. Submission Requirement - CD which includes the video recording of the interview and softcopy of your magazine in PDF format - An A5 sized, colored and printed magazine - The magazine should be 8 – 12 pages - Submission date : 14th. October 2014
  • 4. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Modern Architecture Studies in Southeast Asia (MASSA) Research Unit Foundation in Natural and Built Environments PEER ASSESSMENT FORM(PRIVATE & CONFIDENTIAL) QSB30105 Introduction to Construction Industry Write the proficiency level from the rubric that fits each group members’ participation in the box under the collaboration skill. Include your own name in the list. For ranking, use “1” for the group member that you feel contributed the most to the work, followed by other group members in order of contributions. The ranking should reflect the participant level of each member. Name of Group Member Participation Leadership Communication Cooperation Time Management TOTAL (Out of 25) RANK 1. 2. 3. 4. 5. 6. 5 4 3 2 1 Participation Group member participated fully and was always on task in class. Group member often participated, was usually on time and did their task well, and immediately, if prompted. Group member sometimes participated, occasionally wasted time or sometimes worked on unrelated material. Group member was often missing, contributed minimally or often worked on unrelated material. Group member did not participate, wasted time, or worked on unrelated material. Leadership Group member assumed leadership in an appropriate way when necessary by helping the group stay on track, encouraging group participation, posing solutions to problems, and having a positive attitude. Group member occasionally assumed leadership in an appropriate way, inconsistently, and generally helped to maintain good group participation, and having a positive attitude. Group member usually allowed others to assume leadership or often dominated the group. Group member seldom assumed leadership and occasionally undermined the leadership of others. Group member did not assume leadership or assumed it in a nonproductive manner and generally behaved in a manner detrimental to the overall attitude of the group. Communication Group member listened carefully to others’ ideas. Group member offered detailed, constructive feedback when appropriate. Group member often listened to others’ ideas and offered feedback that was usually relevant and appropriate. Group member sometimes listened to others and interrupted them. Group member occasionally offered constructive feedback, but sometimes the comments were inappropriate or not useful. Group member often did not listen to others. Feedback was seldom given and usually inappropriate o unhelpful. Group member did not listen to others and often interrupted them. Group member did not offer constructive or useful feedback. Cooperation Group member treated others respectfully and shared the workload fairly. Group member usually treated others respectfully and often tried to share workload fairly. Group member sometimes treated others disrespectfully or did not share the workload fairly. Group member often treated others disrespectfully and often tried to distribute workload unfairly. Group member treated others disrespectfully or did not share the workload fairly. Time Management Group member completed assigned tasks on time. Group member completed most of the task assigned on time. Group member sometimes did not complete the assigned tasks on time and occasionally forced the group to make last-minute adjustments and changes to accommodate missing work. Group member did not complete most of the tasks assigned on time. Group member did not complete most of the assigned tasks on time and often forced the group to make last-minute adjustments and changes to accommodate missing work.
  • 5. List down some of the main tasks that had been assigned to you for this assignment and briefly describe your performance: 1. _________________________________________________________________________________________________ 2. _________________________________________________________________________________________________ 3. _________________________________________________________________________________________________ You may also list any other contributions that you feel you have made for your team: ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ __________________________________________________________________________________________________ Briefly comment on the contributions of other group member, particularly those you feel contributed more or less than expected: ___________________________________________________________________________________________________________ ___________________________________________________________________________________________________________ __________________________________________________________________________________________________ Student’s Signature : Date: Student’s Name : Student ID: This section for comments by Lecturers / Tutors: