2. Profile
ARB registered and Trusteeships:
RIBA Chartered Rothwell
Architect Preservation Trust,
Holy Trinity Rothwell
PGDip in Trust, The Orton
Architectural Trust
Conservation from
De Montfort Committees: RIBA
University CAG, RIBA Premises,
APT Midlands
Memberships: SPAB,
3. YMCA, Leicester
R
A
c
RIBA Stages C + D
Heat recovery from kitchen and
bathroom extracts to utilise
existing chimney flues for air
supply and extract.
Additional insulation added to
ceiling void / loft space. No
change to existing fabric.
only Additional insulation added to
ceiling void / loft space. No
change to existing fabric.
All existing timber and UPVC
windows to remain as existing,
repaired as necessary.
Bedroom En-Suite Bedroom
Built for YMCA in
UPVC soil stacks to discharge
into UPVC horizontal runs Exisitng suspended ceiling tiles
and grid removed from site and
replaced with new plastered
ceilings with access hatches as
necessary.
All existing timber and UPVC
All existing timber and UPVC windows to remain as existing,
windows to remain as existing, repaired as necessary.
repaired as necessary.
1901
New steel escape stair.
Insulated plasterboard dryling
to exisitng walls. No change to
existing fabric.
Bedroom En-Suite En-Suite Bedroom
Horizontal drain runs laid to
Existing original ceilings falls to discharge into external
1,895
retained and repaired. soil stacks connecting to
external horizontal drain run.
Non-slip timber decking with
galvanised steel edge beam
and balustrading. Hardwood
All existing timber and UPVC
windows to remain as existing, Bed deck New suspended ceilings to
conceal service void over.
handrail.
repaired as necessary.
175
First floor sanitaryware to
discharge through floor slab
into horizontal drain running
Refurbishment and
Steel beams to support decking
within ceiling void of retail units
built into existing brickwork and
under. To be fitted with AAV s
supported on steel posts.
where possible
2,100
Cranked steel posts to support
decking bracketed off existing
brickwork.
Studio Flat Studio Flat
Existing window from main
staircase re-located with new
lintel over to replace poor
quality replacement window
and door.
THEATRE DRESSING ROOM
remodelling to meet
Datum 100.00 No works to this area
Existing external horizontal
drain run replaced with external
quality UPVC discharging into
vertical stacks connecting to
exsitng underground drain run
under basement.
current needs of
YMCA OFFICES
No works to this area
GRANBY STREET SATISFACTION REAR COURTYARD
No works to this area
YMCA
THEATRE BASEMENT
No works to this area
SATISFACTION BASEMENT
No works to this area
Datum 93.00
SECTION FROM GRANBY STREET THROUGH TO THEATRE ROOMS @ 1:50 (Section BB)
4. Revision: Date:
A JRK Updated generally 20/02/2009
4 Bed
Cluster Flat 4 Bed
Unit 7 Cluster Flat
Unit 14
Unit 2
F
F
Unit 3 1 Bed
Studio Flat
Unit 8 1 Bed
Studio Flat
Unit 4
Unit 15
F
Unit 5
F
F
4 Bed 4 Bed
Cluster Flat 1 Bed Cluster Flat
Unit 9 Studio Flat Unit 16
Unit 13
1 Bed
Studio Flat
Unit 6
F
F
F
1 Bed F
Studio Flat
Unit 12
4 Bed
4 Bed
Cluster Flat
Cluster Flat
Unit 17
Unit 10
LEGEND
In ces 00
di
ac S83
ca sib
B
te le
Indicates areas of
s to
6 us o
headroom less
Be te :
than 1500mm
Cl nit N
d
U
F
F
4 us o
rF
F
F
Be te :
la
Cl nit N
d rF
Mostly accessible
t
6 Bed
U
to DD266:2007
Cluster Flat
1 tud No
Be io :
0
0
Unit 18
la
0
S nit
1
1
t
d Fl
1
6 Bed
U
Indicates
2
2
2
Cluster Flat
3
3
3 accessible to
4
4
BS8300
at
MEZZANINE LEVEL PLAN @ 1:200 SECOND FLOOR PLAN @ 1:200 Unit 11 THIRD FLOOR PLAN @ 1:200
4
5
5
5
6 Bed
1 Bed Cluster Flat
Studio Flat Unit No:
Unit 2
4 Bed
1 Bed Cluster Flat
Studio Flat Unit No:
Unit 3
1 Bed
1 Bed
Studio Flat
Studio Flat
Unit 4
Unit No:
1 Bed
Studio Flat
Unit 5
Access to all Units
except Unit 18. N
1 Bed
Studio Flat
Unit 1
0 1 2 3 4 5
Disabled access to
Units 1, 9, 11, 12 + 16
r gp
Able-bodied access to Architects · Project Managers · Quantity Surveyors
130 New Walk
Units 9, 10, 12, 16 + 17 Leicester
LE1 7JA
Tel: 0116 204 5800, Fax: 0116 204 5801
email: design@rg-p.co.uk, www.rg-p.co.uk
PROPOSED ACCOMMODATION SCHEDULE Project:
Room Accessible to Proposed refurbishment
Area in sqm Less-abled East Street
First Floor + Mezzanine Leicester, LE1 6EY
Unit 2 1 Bed Studio 40.1 NO
Unit 3 1 Bed Studio 36.8 NO for YMCA Leicester
Unit 4 1 Bed Studio 32.9 NO
Unit 5 1 Bed Studio 30.8 NO
Sheet title:
Unit 1 1 Bed Studio 33.8 YES Feasibility Plans
5 TOTAL 174.4
Ref:
Second Floor 6977/ 021 rev.a.
Unit 12 1 Bed Studio 27.6 YES
Unit 6 1 Bed Studio 29.9 NO
Unit 8 1 Bed Studio 30.9 NO Scale:
Unit 7 4 Bed Cluster 98.8 NO 1:200, @ A1 1:3.03, 1:4, 1:3.00, 1:3.01 @ A1
1:1.14,
LE
Unit 9 4 Bed Cluster 109.4 YES
Unit 10 4 Bed Cluster 112.4 NO Date:
G
Unit 11 6 Bed Cluster 130.8 YES
Ar ces wit ir a
EN
28/01/2009
ac eas lcha
ea s
21 TOTAL 539.8
Access to
s to
Ar hee
D
wi B estr ss
w
Units 11 + 18 Drawn:
th S8 ict .
Third Floor
wh 30 ed
Unit 15 1 Bed Studio 28.3 NO
JRK
ee 0.
h cc
Unit 13 1 Bed Studio 34.2 NO
r
0
lch
0
Unit 14 4 Bed Cluster 97.4 NO
ai
1
Checked:
1
r
FIRST FLOOR PLAN @ 1:200 GROUND FLOOR PLAN @ 1:200
e
2 Unit 17 4 Bed Cluster 101.8 NO
JB
2
Unit 16 4 Bed Cluster 109.7 YES
3
3
G:6900s6977 Remodelling of Accommodation, YMCA East Street, Leicester6977 Current6977 2 Layouts Current6977 Layout Book.pln
Unit 18 6 Bed Cluster 107.9 NO
4
4
20 TOTAL 479.3 All dimensions to be checked on site. Do not scale off drawing.
5
5
This drawing is the copyright of the Architect and not to be reproduced without
their permission. Ordnance Survey map information reproduced with
46 GRAND TOTAL 1193.5 permission of HMSO Crown Copyright reserved.
rg+p Ltd. Trading as rg+p.
FLOOR AREA SCHEDULE
Basement Lower GF Upper GF First Second Third TOTALS
Existing Residential (Gross) 0.0 0.0 0.0 0.0 659.5 593.3 1252.8
Existing Res. Circulation etc. 0.0 0.0 0.0 0.0 118.3 122.2 240.5
Existing Residential (Nett) 0.0 0.0 0.0 0.0 541.2 471.1 1012.3
Existing YMCA (Gross) 0.0 47.8 556.2 821.9 0.0 0.0 1425.9
Existing Retail 0.0 403.0 0.0 0.0 0.0 0.0 403.0
Existing Total Other (Gross) 0.0 451.8 556.2 821.9 0.0 0.0 1829.9
Proposed Residential (Gross) 0.0 0.0 0.0 188.9 659.5 593.3 1441.7
Proposed Resi.Circulation etc. 0.0 0.0 0.0 17.9 119.7 114.0 251.6
Proposed Residential (Nett) 0.0 0.0 0.0 174.4 539.8 479.3 1193.5
Proposed YMCA (Gross) 501.1 47.8 556.2 633.0 0.0 0.0 1738.1
Proposed Retail 0.0 403.0 0.0 0.0 0.0 0.0 403.0
5. = high. HIA = high. HIA = high. HIA = high. HIA = high. HIA = high. HIA = v. high. HIA = high. HIA = v. high. HIA = high. HIA = high. HIA = high.
££ ££ £££ £££ ££ £££ £££ £££ ££ ££ ££
MI
= high. HIA = me d. HIA = low. HIA = me d. HIA = high. HIA = low. HIA = high. HIA = high. HIA = high. HIA = me d. HIA = me d. HIA = me d.
££ £ £££ £££ ££ £££ ££ ££ ££ ££ ££
MI
Leicester Castle
= high. HIA = me d. HIA = low. HIA = me d. HIA = high. HIA = low. HIA = high. HIA = high. HIA = high. HIA = me d. HIA = me d. HIA = me d.
££ £ £££ £££ ££ £££ ££ ££ ££ ££ ££
MI
= high. HIA = me d. HIA = low. HIA = me d. HIA = high. HIA = low. HIA = high. HIA = me d. HIA = high. HIA = me d. HIA = me d. HIA = me d.
££ £ £££ £££ ££ £££ ££ ££ ££ ££ ££
LM
= me d. HIA = me d. HIA = low. HIA = me d. HIA = low. HIA = me d. HIA = me d. HIA = me d. HIA = me d. HIA = me d. HIA = low. HIA = me d.
££ £ £££ £££ ££ £££ ££ ££ ££ ££ ££
LM S
= v. high. HIA = v. high. HIA = v. high. HIA = v. high. HIA = v. high. HIA = low. HIA = v. high. HIA = v. high. HIA = v. high. HIA = v. high. HIA = v. high. HIA = v. high.
£ ££££ ££££ ££££ ££££ ££ ££££ ££££ ££££ ££££ ££££ ££££
(p arking) M L
= low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low. HIA = low.
£££ ££ £££ £££ ££ ££ ££ ££ ££ £££ £££
(p arking)
= high. HIA = high. HIA = high. HIA = me d. HIA = high. HIA = high. HIA = high. HIA = high. HIA = high. HIA = high. HIA = high. HIA = high.
£ ££££ ££££ £ ££££ ££ ££ £££ ££££ ££££ ££££ ££££
a ct of use on Le ast cost of
ic = low. £ implementing use.
a ct of use on
ic = me dium.
a ct of use on
mod erate cost of
££ implementing use.
high cost of
Pond Pon
ic = high. £££ implementing use.
a ct of use on Prohibitive cost of
ic = very high. ££££ implementing use.
8
RIBA Stages A + B 7
3, 4 + 5
2
only
6
CASTLE YARD
Assessment for 1
bringing vacant
9
10
11
buildings back 14
12
13
EW
ET
into use.
18
VI
RE
LE
15
ST
ST
17
CA
TLE
16
C AS