SlideShare uma empresa Scribd logo
1 de 18
Effectively Planning Your Open Enrollment
    within Oracle Advanced Benefits


    Jeff Eaton
    Practice Manager, Compensation & Benefits




1                                               © 2009 KBACE Technologies, Inc.
Agenda
    • System Demo –OAB Open Enrollment Using Self-Service
    • Phase 1 - Preparing for Open Enrollment
    • Phase 2 - Open Enrollment
    • Phase 3 - Post Open Enrollment
    • Key Reporting for Open Enrollment
    • KBACE OE Support Process
    • Q&A




2                                                     © 2009 KBACE Technologies, Inc.
System Demo:
    OAB Open Enrollment (OE) using Self Service




3                                           © 2009 KBACE Technologies, Inc.
Phase 1 - Preparing for Open Enrollment




4                                       © 2009 KBACE Technologies, Inc.
Phase 1 - Preparing for Open Enrollment
    • Main goal – Perform a dry run of OE to check for configuration/data errors

    • Start Early! – Plan for the dry run at least one to two months before the
      actual run in production

    • Identify a secured instance for the dry run

    • Clone latest production data into the Test Instance

    • Check and install new patches as required




5                                                                     © 2009 KBACE Technologies, Inc.
Configuration Validation/Changes
    • Check Payroll Calendars and Plan year periods
        •   Ensure that pay periods extend through out the end of the year
        •   Validate plan years are configured and dates are correct for the program and all plans

    • Add Scheduled Open to the program

    • Configure the re-instate code as applicable for your benefits program
        •   Check metalink note # 333568.1 for details on available re-instatement codes

    • End existing plans which are no longer offered

    • Add new plans if applicable
        •   Links options to the new plan and define rates



6                                                                                     © 2009 KBACE Technologies, Inc.
Configuration Validation/Changes
    • If eligibility for plans depend on service area check and make changes as
      required for the new plan year

    • Setup defaults as applicable
        •   Evaluate the need for new fast formulas & allocate time for development and
            testing. Plan Add/Drops may require fast formula to enforce the default logic

    • Set the coverage to start New for Flexible spending accounts

    • Modify rates/premiums on existing plans/option in plans

    • Use the mass update rate functionality to modify rate values

    • Setup Life Event collapsing rules if applicable

7                                                                             © 2009 KBACE Technologies, Inc.
Data Clean Up
    • Check and resolve all errors associated with ongoing benefits batch
      process
        •   Check error reports associated with the Default, Life Event, and Close Enrollment
            process.


    • Close unprocessed Life Events
        •   An employee will not get the open Life Event if he/she has an existing life event in
            started/unprocessed or detected Life Events
        •   Close enrollment process can be run with close mode parameter set to ‘Force
            Close’ to close all events in started status. Ensure that employees have made
            elections for those life events prior to this when completing in Production.




8                                                                               © 2009 KBACE Technologies, Inc.
Run Mock Open Enrollment
    • Run Open Enrollment on your entire participant population in the test
      instance

    • Check error reports and resolve errors

    • Run default enrollment process and check for errors

    • Validate defaults, new premiums, and rates

    • Ensure that employees are de-enrolled from ended plans in case of plan
      drops

    • Validate help texts and informational links in Self-Service and make
      changes if necessary

9                                                                   © 2009 KBACE Technologies, Inc.
Phase 2 –Open Enrollment




10                              © 2009 KBACE Technologies, Inc.
Open Enrollment
     • After validating the configuration and making necessary changes
      in prod, run Open Enrollment and Default Enrollment process

     • Resolve Errors associated with both the processes

     • Monitor Life Events which happen during the window and handle
      them on a case by case basis

     • Run Close Enrollment process once the window end date is
      reached. Note that no further changes can be made once this
      process is run
11                                                         © 2009 KBACE Technologies, Inc.
Open Enrollment Tips and Tricks
     • Use delivered batch processes “Manage Open Enrollment Window” to
       change the Open Enrollment window dates after it has been processed

     • “Reopen Life Events Batch” can be used to re-open previously closed life
       events. Use this in conjunction with “Manage Open Enrollment Window” to
       alter the window of previously closed event

     • Set communication types to trigger when employees make explicit
       elections and use this to monitor progress during Open Enrollment




12                                                                  © 2009 KBACE Technologies, Inc.
Phase 3 – Post Open Enrollment




13                                    © 2009 KBACE Technologies, Inc.
Post Open Enrollment
     • Validate the following
         •   All employees should have an Open Enrollment Life Event
              •   This is essential even if there are no enrollment changes as Open is
                  responsible for assigning new rates to all participants
         •   Plans no longer offered do not have any enrollment
         •   Rate and Premium changes
         •   Coverage and Rate Start date
         •   Element Entry values for Benefits elements
         •   Coverage was restarted for FSA plans




14                                                                               © 2009 KBACE Technologies, Inc.
Managing Life Events Post Open Enrollment
     • Any life event which happens prior to the beginning of the new plan year will
       back out the open life event

     • A Life Event timeliness fast formula can be used to set certain events with
       an occurred date prior to the beginning of the plan year to manual

     • Such life events need to be evaluated on a case by case basis - any event
       which will result in a change of eligibility/rates should be processed
       followed by a re-process of the Open Life Event

     • Resolve Action Items and Certifications




15                                                                     © 2009 KBACE Technologies, Inc.
Key Reports for Open Enrollment
     • Life Events in detected, manual, or unprocessed status to be able to
       identify any events that may impact the Open Enrollment process

     • Discrepancies such as enrollments with no elements or the opposite,
       duplicate rates, overlaps in rates, and employees with suspended coverage
       and no interim coverage

     • Action Items/Certifications such as those that have not designated a
       beneficiary or designated any/all required dependents

     • Migration/Movement to be able to identify for any new or ended plans
       where that population came from or moved to


16                                                                   © 2009 KBACE Technologies, Inc.
KBACE Open Enrollment Support
     • KBACE has a track record of successfully helping numerous clients through
       their Open Enrollment process each year

     • KBACE offers a proactive, well documented process to get you through
       Open Enrollment, from early communication to your employee population
       and proactive requirements gathering, all the way through to configuration
       support before, during, and after your Open Enrollment period.

     • KBACE Open Enrollment support can be structured in many different ways
       from just a few ad-hoc hours during Open Enrollment to having a full time
       Open Enrollment support resource assigned
         •   This could be as simple as assisting with training on Oracle’s Mass Update of Rates
             functionality to as much as running the entire Open Enrollment process for your company
             to include project management, functional and technical configuration, and coordination
             with carriers

17                                                                                  © 2009 KBACE Technologies, Inc.
Questions & Answers
               Speaker:
               Jeff Eaton
               Email: jeaton@kbace.com
               Phone: 603-566-5767


               Recording & Presentation:
               http://kbace.com/index.php/events/
               webinars/online-archives




18                                       © 2009 KBACE Technologies, Inc.

Mais conteúdo relacionado

Mais procurados

Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
robgirvan
 
Oracle fusion middleware training with placements and certification
Oracle fusion middleware training with placements and certificationOracle fusion middleware training with placements and certification
Oracle fusion middleware training with placements and certification
magnificsmily
 
Kapil_Resume_Change Manager
Kapil_Resume_Change ManagerKapil_Resume_Change Manager
Kapil_Resume_Change Manager
Kapil Sharma
 
Reflections on18monthfederaldevopstransformation2015
Reflections on18monthfederaldevopstransformation2015Reflections on18monthfederaldevopstransformation2015
Reflections on18monthfederaldevopstransformation2015
steelthread
 

Mais procurados (20)

Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = Success
 
Building a Credible Performance Measurement Baseling
Building a Credible Performance Measurement BaselingBuilding a Credible Performance Measurement Baseling
Building a Credible Performance Measurement Baseling
 
The Intersection of Earned Value Management and Agile Software Development
The Intersection of Earned Value Management and Agile Software DevelopmentThe Intersection of Earned Value Management and Agile Software Development
The Intersection of Earned Value Management and Agile Software Development
 
Sap ehp6 to ehp7 upgradation projects
Sap ehp6 to ehp7 upgradation projectsSap ehp6 to ehp7 upgradation projects
Sap ehp6 to ehp7 upgradation projects
 
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
 
Oracle fusion middleware training with placements and certification
Oracle fusion middleware training with placements and certificationOracle fusion middleware training with placements and certification
Oracle fusion middleware training with placements and certification
 
Kapil_Resume_Change Manager
Kapil_Resume_Change ManagerKapil_Resume_Change Manager
Kapil_Resume_Change Manager
 
Integrating cost schedule and technical performance
Integrating cost schedule and technical performanceIntegrating cost schedule and technical performance
Integrating cost schedule and technical performance
 
Reflections on18monthfederaldevopstransformation2015
Reflections on18monthfederaldevopstransformation2015Reflections on18monthfederaldevopstransformation2015
Reflections on18monthfederaldevopstransformation2015
 
Cutover activities
Cutover activitiesCutover activities
Cutover activities
 
Prosoft BI Accelerator
Prosoft BI AcceleratorProsoft BI Accelerator
Prosoft BI Accelerator
 
CM MatchPoint Agile Session
CM MatchPoint Agile SessionCM MatchPoint Agile Session
CM MatchPoint Agile Session
 
Mainframe vug july 30 2015
Mainframe vug july 30 2015Mainframe vug july 30 2015
Mainframe vug july 30 2015
 
Lean Professional Kaizen - Week 6 of 6
Lean Professional Kaizen - Week 6 of 6Lean Professional Kaizen - Week 6 of 6
Lean Professional Kaizen - Week 6 of 6
 
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
 
PeopleSoft 9.1 Upgrade for a Leading Education Services Company
PeopleSoft 9.1 Upgrade for a Leading Education Services CompanyPeopleSoft 9.1 Upgrade for a Leading Education Services Company
PeopleSoft 9.1 Upgrade for a Leading Education Services Company
 
How to - Enhancement Pack 5
How to - Enhancement Pack 5How to - Enhancement Pack 5
How to - Enhancement Pack 5
 
REALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptREALTECH SmartChange solutions ppt
REALTECH SmartChange solutions ppt
 
Walter_resume_PTM
Walter_resume_PTMWalter_resume_PTM
Walter_resume_PTM
 
In the Beginning, There Was the Log - Webinar with Martin Hubel
In the Beginning, There Was the Log - Webinar with Martin HubelIn the Beginning, There Was the Log - Webinar with Martin Hubel
In the Beginning, There Was the Log - Webinar with Martin Hubel
 

Destaque

Projek bangkit#16
Projek bangkit#16Projek bangkit#16
Projek bangkit#16
Bob Teoh
 
Specify Jan Feb 2017
Specify Jan Feb 2017Specify Jan Feb 2017
Specify Jan Feb 2017
Paul Bradwell
 
PANKAJ SETHI CV.pl
PANKAJ SETHI CV.plPANKAJ SETHI CV.pl
PANKAJ SETHI CV.pl
Sethi Pankaj
 
日本語総まとめ N2 読解
日本語総まとめ N2 読解日本語総まとめ N2 読解
日本語総まとめ N2 読解
sofyanasrun
 

Destaque (15)

MOTOR 2 TAK
MOTOR 2 TAKMOTOR 2 TAK
MOTOR 2 TAK
 
P&G Marketing capabilities HBR case
P&G Marketing capabilities HBR caseP&G Marketing capabilities HBR case
P&G Marketing capabilities HBR case
 
Projek bangkit#16
Projek bangkit#16Projek bangkit#16
Projek bangkit#16
 
Specify Jan Feb 2017
Specify Jan Feb 2017Specify Jan Feb 2017
Specify Jan Feb 2017
 
Informatyka do zal
Informatyka do zalInformatyka do zal
Informatyka do zal
 
PANKAJ SETHI CV.pl
PANKAJ SETHI CV.plPANKAJ SETHI CV.pl
PANKAJ SETHI CV.pl
 
second term tegnologia
second term tegnologiasecond term tegnologia
second term tegnologia
 
A New Paris Protocol? The EU’s Role in International Climate Negotiations
A New Paris Protocol? The EU’s Role in International Climate NegotiationsA New Paris Protocol? The EU’s Role in International Climate Negotiations
A New Paris Protocol? The EU’s Role in International Climate Negotiations
 
The Dustbowl "dirty30s"
The Dustbowl "dirty30s"The Dustbowl "dirty30s"
The Dustbowl "dirty30s"
 
hand sanitizer
hand sanitizerhand sanitizer
hand sanitizer
 
Prader Willi Syndrome ppt1
Prader Willi Syndrome ppt1Prader Willi Syndrome ppt1
Prader Willi Syndrome ppt1
 
オープンアクセスモニタリングと欧州のOpenAIREプロジェクト(ドイツ出張報告)
オープンアクセスモニタリングと欧州のOpenAIREプロジェクト(ドイツ出張報告)オープンアクセスモニタリングと欧州のOpenAIREプロジェクト(ドイツ出張報告)
オープンアクセスモニタリングと欧州のOpenAIREプロジェクト(ドイツ出張報告)
 
SOAL UNTUK LATIHAN
SOAL UNTUK LATIHANSOAL UNTUK LATIHAN
SOAL UNTUK LATIHAN
 
日本語総まとめ N2 読解
日本語総まとめ N2 読解日本語総まとめ N2 読解
日本語総まとめ N2 読解
 
Reforma energética en México: Avances y resultados a dos años. Francisco Salazar
Reforma energética en México: Avances y resultados a dos años. Francisco SalazarReforma energética en México: Avances y resultados a dos años. Francisco Salazar
Reforma energética en México: Avances y resultados a dos años. Francisco Salazar
 

Semelhante a KBACE Open Enrollment Webinar

334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
PunithKrishnaBarla
 
Testing in agile is it easier said than done
Testing in agile   is it easier said than done Testing in agile   is it easier said than done
Testing in agile is it easier said than done
Archana Joshi
 
Archana Joshi Testing in agile is it easier said than done
Archana Joshi Testing in agile   is it easier said than doneArchana Joshi Testing in agile   is it easier said than done
Archana Joshi Testing in agile is it easier said than done
Archana Joshi
 
KBACE Individual Compensation Distribution Webinar
KBACE Individual Compensation Distribution WebinarKBACE Individual Compensation Distribution Webinar
KBACE Individual Compensation Distribution Webinar
KBACE Technologies, Inc.
 
Oracle Applications Period Closing Processes Humtv
Oracle Applications Period Closing Processes   HumtvOracle Applications Period Closing Processes   Humtv
Oracle Applications Period Closing Processes Humtv
Attiq Ahmed
 

Semelhante a KBACE Open Enrollment Webinar (20)

Oracle Advanced Benefits Webinar Slides
Oracle Advanced Benefits Webinar SlidesOracle Advanced Benefits Webinar Slides
Oracle Advanced Benefits Webinar Slides
 
Upgrading or migrating to a higher AEM version - Planning and process
Upgrading or migrating to a higher AEM version - Planning and processUpgrading or migrating to a higher AEM version - Planning and process
Upgrading or migrating to a higher AEM version - Planning and process
 
KBACE Acquisitions & Divestitures
KBACE Acquisitions & Divestitures KBACE Acquisitions & Divestitures
KBACE Acquisitions & Divestitures
 
Santosh 8.5 yrs
Santosh 8.5 yrsSantosh 8.5 yrs
Santosh 8.5 yrs
 
How Developers and Quality Engineer Collaborate at Salesforce
How Developers and Quality Engineer Collaborate at SalesforceHow Developers and Quality Engineer Collaborate at Salesforce
How Developers and Quality Engineer Collaborate at Salesforce
 
Senthil Murugan_Kandasamy_Resume
Senthil Murugan_Kandasamy_ResumeSenthil Murugan_Kandasamy_Resume
Senthil Murugan_Kandasamy_Resume
 
334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
334845_EPM – Threshold-based Approvals in EPM Cloud Planning.pdf
 
Dev ops assessment deck
Dev ops assessment deck Dev ops assessment deck
Dev ops assessment deck
 
Testing in agile is it easier said than done
Testing in agile   is it easier said than done Testing in agile   is it easier said than done
Testing in agile is it easier said than done
 
Archana Joshi Testing in agile is it easier said than done
Archana Joshi Testing in agile   is it easier said than doneArchana Joshi Testing in agile   is it easier said than done
Archana Joshi Testing in agile is it easier said than done
 
Robert Latest cv
Robert Latest cvRobert Latest cv
Robert Latest cv
 
KBACE Individual Compensation Distribution Webinar
KBACE Individual Compensation Distribution WebinarKBACE Individual Compensation Distribution Webinar
KBACE Individual Compensation Distribution Webinar
 
Shift Left Quality Assurance: How to do it. Why it matters.
Shift Left Quality Assurance: How to do it. Why it matters.Shift Left Quality Assurance: How to do it. Why it matters.
Shift Left Quality Assurance: How to do it. Why it matters.
 
Prasad_BV_updated
Prasad_BV_updatedPrasad_BV_updated
Prasad_BV_updated
 
Delivering applications at the pace of business
Delivering applications at the pace of businessDelivering applications at the pace of business
Delivering applications at the pace of business
 
Resume
ResumeResume
Resume
 
0916 resume
0916  resume0916  resume
0916 resume
 
Oracle Applications Period Closing Processes Humtv
Oracle Applications Period Closing Processes   HumtvOracle Applications Period Closing Processes   Humtv
Oracle Applications Period Closing Processes Humtv
 
Case Study : Manual & Automation Testing
Case Study : Manual & Automation TestingCase Study : Manual & Automation Testing
Case Study : Manual & Automation Testing
 
Meetup Sydney 2018.11.08
Meetup Sydney 2018.11.08Meetup Sydney 2018.11.08
Meetup Sydney 2018.11.08
 

Mais de KBACE Technologies, Inc.

Migrating from Sales Force to Oracle CRM On Demand Webinar
Migrating from Sales Force to Oracle CRM On Demand WebinarMigrating from Sales Force to Oracle CRM On Demand Webinar
Migrating from Sales Force to Oracle CRM On Demand Webinar
KBACE Technologies, Inc.
 
The Risk of SQL Forms within Oracle Applications
The Risk of SQL Forms within Oracle ApplicationsThe Risk of SQL Forms within Oracle Applications
The Risk of SQL Forms within Oracle Applications
KBACE Technologies, Inc.
 
KBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented ArchitectureKBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented Architecture
KBACE Technologies, Inc.
 

Mais de KBACE Technologies, Inc. (17)

KBACE Oracle Learning Management Release 12.1 Webinar
KBACE Oracle Learning Management Release 12.1 WebinarKBACE Oracle Learning Management Release 12.1 Webinar
KBACE Oracle Learning Management Release 12.1 Webinar
 
Migrating from Sales Force to Oracle CRM On Demand Webinar
Migrating from Sales Force to Oracle CRM On Demand WebinarMigrating from Sales Force to Oracle CRM On Demand Webinar
Migrating from Sales Force to Oracle CRM On Demand Webinar
 
KBACE Learning Platform Webinar
KBACE Learning Platform WebinarKBACE Learning Platform Webinar
KBACE Learning Platform Webinar
 
KBACE iRecruitment Webinar
KBACE iRecruitment WebinarKBACE iRecruitment Webinar
KBACE iRecruitment Webinar
 
KBACE Common Extensions for Oracle iRecruitment
KBACE Common Extensions for Oracle iRecruitmentKBACE Common Extensions for Oracle iRecruitment
KBACE Common Extensions for Oracle iRecruitment
 
KBACE Incentive Compensation Webinar
KBACE Incentive Compensation WebinarKBACE Incentive Compensation Webinar
KBACE Incentive Compensation Webinar
 
The Risk of SQL Forms within Oracle Applications
The Risk of SQL Forms within Oracle ApplicationsThe Risk of SQL Forms within Oracle Applications
The Risk of SQL Forms within Oracle Applications
 
KBACE Data Quality Management Webinar
KBACE Data Quality Management WebinarKBACE Data Quality Management Webinar
KBACE Data Quality Management Webinar
 
KBACE Ceridian Webinar
KBACE Ceridian WebinarKBACE Ceridian Webinar
KBACE Ceridian Webinar
 
KBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented ArchitectureKBACE Applied Service Oriented Architecture
KBACE Applied Service Oriented Architecture
 
KBACE Applied OBIEE
KBACE Applied OBIEEKBACE Applied OBIEE
KBACE Applied OBIEE
 
KBACE Applied Identity Management
KBACE Applied Identity ManagementKBACE Applied Identity Management
KBACE Applied Identity Management
 
KBACE Self Service HR Common Extensions
KBACE Self Service HR Common ExtensionsKBACE Self Service HR Common Extensions
KBACE Self Service HR Common Extensions
 
KBACE iRecruitment 12.1 Webinar
KBACE iRecruitment 12.1 WebinarKBACE iRecruitment 12.1 Webinar
KBACE iRecruitment 12.1 Webinar
 
KBACE OLM Extensions Webinar
KBACE OLM Extensions WebinarKBACE OLM Extensions Webinar
KBACE OLM Extensions Webinar
 
Oracle Compensation Workbench Webinar
Oracle Compensation Workbench WebinarOracle Compensation Workbench Webinar
Oracle Compensation Workbench Webinar
 
Comp ben121enhancementswebinar
Comp ben121enhancementswebinarComp ben121enhancementswebinar
Comp ben121enhancementswebinar
 

Último

Último (20)

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

KBACE Open Enrollment Webinar

  • 1. Effectively Planning Your Open Enrollment within Oracle Advanced Benefits Jeff Eaton Practice Manager, Compensation & Benefits 1 © 2009 KBACE Technologies, Inc.
  • 2. Agenda • System Demo –OAB Open Enrollment Using Self-Service • Phase 1 - Preparing for Open Enrollment • Phase 2 - Open Enrollment • Phase 3 - Post Open Enrollment • Key Reporting for Open Enrollment • KBACE OE Support Process • Q&A 2 © 2009 KBACE Technologies, Inc.
  • 3. System Demo: OAB Open Enrollment (OE) using Self Service 3 © 2009 KBACE Technologies, Inc.
  • 4. Phase 1 - Preparing for Open Enrollment 4 © 2009 KBACE Technologies, Inc.
  • 5. Phase 1 - Preparing for Open Enrollment • Main goal – Perform a dry run of OE to check for configuration/data errors • Start Early! – Plan for the dry run at least one to two months before the actual run in production • Identify a secured instance for the dry run • Clone latest production data into the Test Instance • Check and install new patches as required 5 © 2009 KBACE Technologies, Inc.
  • 6. Configuration Validation/Changes • Check Payroll Calendars and Plan year periods • Ensure that pay periods extend through out the end of the year • Validate plan years are configured and dates are correct for the program and all plans • Add Scheduled Open to the program • Configure the re-instate code as applicable for your benefits program • Check metalink note # 333568.1 for details on available re-instatement codes • End existing plans which are no longer offered • Add new plans if applicable • Links options to the new plan and define rates 6 © 2009 KBACE Technologies, Inc.
  • 7. Configuration Validation/Changes • If eligibility for plans depend on service area check and make changes as required for the new plan year • Setup defaults as applicable • Evaluate the need for new fast formulas & allocate time for development and testing. Plan Add/Drops may require fast formula to enforce the default logic • Set the coverage to start New for Flexible spending accounts • Modify rates/premiums on existing plans/option in plans • Use the mass update rate functionality to modify rate values • Setup Life Event collapsing rules if applicable 7 © 2009 KBACE Technologies, Inc.
  • 8. Data Clean Up • Check and resolve all errors associated with ongoing benefits batch process • Check error reports associated with the Default, Life Event, and Close Enrollment process. • Close unprocessed Life Events • An employee will not get the open Life Event if he/she has an existing life event in started/unprocessed or detected Life Events • Close enrollment process can be run with close mode parameter set to ‘Force Close’ to close all events in started status. Ensure that employees have made elections for those life events prior to this when completing in Production. 8 © 2009 KBACE Technologies, Inc.
  • 9. Run Mock Open Enrollment • Run Open Enrollment on your entire participant population in the test instance • Check error reports and resolve errors • Run default enrollment process and check for errors • Validate defaults, new premiums, and rates • Ensure that employees are de-enrolled from ended plans in case of plan drops • Validate help texts and informational links in Self-Service and make changes if necessary 9 © 2009 KBACE Technologies, Inc.
  • 10. Phase 2 –Open Enrollment 10 © 2009 KBACE Technologies, Inc.
  • 11. Open Enrollment • After validating the configuration and making necessary changes in prod, run Open Enrollment and Default Enrollment process • Resolve Errors associated with both the processes • Monitor Life Events which happen during the window and handle them on a case by case basis • Run Close Enrollment process once the window end date is reached. Note that no further changes can be made once this process is run 11 © 2009 KBACE Technologies, Inc.
  • 12. Open Enrollment Tips and Tricks • Use delivered batch processes “Manage Open Enrollment Window” to change the Open Enrollment window dates after it has been processed • “Reopen Life Events Batch” can be used to re-open previously closed life events. Use this in conjunction with “Manage Open Enrollment Window” to alter the window of previously closed event • Set communication types to trigger when employees make explicit elections and use this to monitor progress during Open Enrollment 12 © 2009 KBACE Technologies, Inc.
  • 13. Phase 3 – Post Open Enrollment 13 © 2009 KBACE Technologies, Inc.
  • 14. Post Open Enrollment • Validate the following • All employees should have an Open Enrollment Life Event • This is essential even if there are no enrollment changes as Open is responsible for assigning new rates to all participants • Plans no longer offered do not have any enrollment • Rate and Premium changes • Coverage and Rate Start date • Element Entry values for Benefits elements • Coverage was restarted for FSA plans 14 © 2009 KBACE Technologies, Inc.
  • 15. Managing Life Events Post Open Enrollment • Any life event which happens prior to the beginning of the new plan year will back out the open life event • A Life Event timeliness fast formula can be used to set certain events with an occurred date prior to the beginning of the plan year to manual • Such life events need to be evaluated on a case by case basis - any event which will result in a change of eligibility/rates should be processed followed by a re-process of the Open Life Event • Resolve Action Items and Certifications 15 © 2009 KBACE Technologies, Inc.
  • 16. Key Reports for Open Enrollment • Life Events in detected, manual, or unprocessed status to be able to identify any events that may impact the Open Enrollment process • Discrepancies such as enrollments with no elements or the opposite, duplicate rates, overlaps in rates, and employees with suspended coverage and no interim coverage • Action Items/Certifications such as those that have not designated a beneficiary or designated any/all required dependents • Migration/Movement to be able to identify for any new or ended plans where that population came from or moved to 16 © 2009 KBACE Technologies, Inc.
  • 17. KBACE Open Enrollment Support • KBACE has a track record of successfully helping numerous clients through their Open Enrollment process each year • KBACE offers a proactive, well documented process to get you through Open Enrollment, from early communication to your employee population and proactive requirements gathering, all the way through to configuration support before, during, and after your Open Enrollment period. • KBACE Open Enrollment support can be structured in many different ways from just a few ad-hoc hours during Open Enrollment to having a full time Open Enrollment support resource assigned • This could be as simple as assisting with training on Oracle’s Mass Update of Rates functionality to as much as running the entire Open Enrollment process for your company to include project management, functional and technical configuration, and coordination with carriers 17 © 2009 KBACE Technologies, Inc.
  • 18. Questions & Answers Speaker: Jeff Eaton Email: jeaton@kbace.com Phone: 603-566-5767 Recording & Presentation: http://kbace.com/index.php/events/ webinars/online-archives 18 © 2009 KBACE Technologies, Inc.