ASME SECTION VIII DIV 2
Article D-4 Welded Joints
• AM-400 Welded Joint Categories
– Category defines the location of a joint in a vessel
– Established for use in specifying joint type and
degree of inspection
– Based on service, material and thickness, special
requirements are specified in code
• Category A
• Category B
• Category C
• Category D
Article D-4 Welded Joints
Article F-1 General Fabrication Requirements
• AF-104 Repair of defective materials
– Defect may be removed and material repaired by
vessel manufacturer or unless prohibited by
material specification may also be repaired by
material manufacturer with approval of vessel
manufacturer
– Material repair that exceed those permitted by
material specification shall be made to satisfaction
of inspector
Article F-1 General Fabrication Requirements
– AM-104.1 Examination of defective area
• By MPT (Article 9-1) or by LPT (Article 9-2)
– AM-104.2 Repair by welding
• Procedure & welds must be qualified in
accordance with Sec IX, including impact testing
• Repaired material shall be heat treated when
required
– AM-104.3 Examination of finished weld
• Article F-1 General Fabrication Requirements
• By Radiography (Article I-5) when depth of weld
deposit exceeds 10 mm or one-half material
thickness
Article F-1 General Fabrication Requirements
• AF-112 Base metal preparation
• AF-112.1 Examination of materials
a Material examination before fabrication for
detecting defects which would affect safety of vessel.
Examination of edges of base materials (including
edges of openings cut through thickness)
b Cut edges of thickness >= 38 mm shall be examined
by MPT or LPT
c For openings, cut edges of all thickness, examination
by MPT or LPT
AF-220 Specific requirements for welded joints
Table AF-241.1
AF-220 Specific requirements for welded joints
• AF-228 Liquid Penetrant Examination
– All austenitic Cr-Ni alloy steel welds, both butt &
fillet, which exceeds nominal thickness of 19 mm
shall be examined (Article 9-2)
– LPT after heat treatment, if performed
– All crack shall be eliminated
AF-230 Miscellaneous Welding requirements
• AF-235 Identification markings or records for welders
or welding operators
– Stamp identifying number, letter or symbol on or
adjacent to and at intervals of not more than 1 m
along the welds in plates >= 6 mm in thickness or
record of welders / WOs employed on each joints
shall be kept
– For multiple welds, tube to tube sheet welds
• QA system shall have a procedure to identify
welders or welding operators
• Welds in each category are of same type and
configuration and are welded with same WPS
Article I-5 Radiographic Examination
• AI-510 Acceptance standard for radiographs of welds
• AI-511 Unacceptable defects and repair requirements
– Imperfections are unacceptable under following
condition
• Any crack or incomplete fusion or penetration
• Any elongated indication which has length
greater than
– 6 mm for t upto 19 mm
– 1/3t for t from 19 mm to 56 mm
– 19 mm for t over 56 mm
Article I-5 Radiographic Examination
• AI-511 Unacceptable defects and repair requirements
– Imperfections are unacceptable under following
condition
• Any group of aligned indications with aggregate
length greater than t in length of 12t, except
distance between successive imperfections
exceeds 6L where L is length of longest
imperfection in group
• Rounded indications in excess of that specified in
Appendix 4
t - thickness of weld excluding any allowable
reinforcement, including throat of fillet if any
Article T-2 Impact testing of welds and vessel test
plates of ferrous materials
• AT-203 Impact tests of vessel test plates
– When base material is required to be impact tested,
impact testing of weld and HAZ shall be made for
category A & B joints in accordance with AT-201
for each qualified procedure used in vessel
– Test plate shall be from one of heats of vessel or
group of vessels
– For category A joint, test plate shall, where
practicable, be welded as an extension to end of
production joint or welded as close to start of
production welding as practicable, utilizing
equipment, welding material and procedures which
are to be used on production joints
Article T-2 Impact testing of welds and vessel test
plates of ferrous materials
• AT-203 Impact tests of vessel test plates
– For category B joint (welded using different welding
procedure than used on category A joints, test plate
shall be welded under production welding
conditions used for vessel, using same type of
equipment and at same location and using same
procedures as used for joint and it shall be welded
concurrently with production welds or as closed to
start of production welding as practicable
Article T-2 Impact testing of welds and vessel test
plates of ferrous materials
• AT-203.1 Number of vessel Impact Plates required
– For each vessel, one test plate shall be made for each
welding procedure used for category A & B
– In addition, for category A & B joints, following
requirements shall apply
• For automatic or semi automatic welding, one
test plate in each position
• For manual welding, vertical upward welded test
plate qualify for all position.
• AT-203.2 Rejection
– If PTC fails to meet the impact requirements, welds
represented shall be unacceptable. Reheat treatment
and retesting or retesting only are permitted.
Article 9-1 MPE – Article 9-2 LPE
• 9-130 Acceptance standard
– All surfaces to be examined shall be free of
• Relevant linear indications
• Relevant rounded indications greater than 5 mm
• Four or more relevant rounded indication in a
line separated by 1.5 mm or less, edge to edge
Article 9-3 Ultrasonic Examination of welds
• 9-320 Acceptance-Rejection standards
– Indications characterized as cracks, lack of fusion or
incomplete penetration are unacceptable regardless
of length
– Other imperfections are unacceptable if indications
exceed reference level amplitude and have lengths
which exceed
• 6 mm for t upto 19 mm
• 1/3t for t from 19 mm to 57 mm
• 19 mm for t over 57 mm
T-thickness of weld, excluding any allowable
reinforcement

Mais conteúdo relacionado

Mais procurados

Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingabhi10apr
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingVarun Patel
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overviewAshifuddinAli
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects Saqib Rasool
 
Asme section 2C
Asme section 2CAsme section 2C
Asme section 2Charsh soni
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfTeddy Setiady
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsThang Do Minh
 
Piping handbook
Piping handbookPiping handbook
Piping handbookpdmsguy
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 

Mais procurados (20)

Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Welding Inspection
Welding InspectionWelding Inspection
Welding Inspection
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
Asme section 2C
Asme section 2CAsme section 2C
Asme section 2C
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
Piping handbook
Piping handbookPiping handbook
Piping handbook
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 

Destaque

Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studiesYogi Yogesh
 
Welded joints
Welded jointsWelded joints
Welded jointsJISHNU V
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonryKHUSHBU SHAH
 
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...Srishti Wakhloo
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Digvijaysinh Gohil
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 
Earthquake Resistant Building Construction
Earthquake Resistant Building ConstructionEarthquake Resistant Building Construction
Earthquake Resistant Building ConstructionRohan Narvekar
 
Building construction 1
Building construction 1Building construction 1
Building construction 1Waqas Aslam
 
PPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTSPPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTSHimanshu Yadav
 
Welding Presentation.
Welding Presentation.Welding Presentation.
Welding Presentation.jaimedawn
 
Earthquake resistant construction
Earthquake resistant constructionEarthquake resistant construction
Earthquake resistant constructionHarsh Jain
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 

Destaque (20)

Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
Welded joints
Welded jointsWelded joints
Welded joints
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonry
 
Stone masonry
Stone masonryStone masonry
Stone masonry
 
welded joints
welded jointswelded joints
welded joints
 
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...
Design & Construction Errors- How it Affects Repair and Rehabilitation of Str...
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )
 
PROJECT
PROJECTPROJECT
PROJECT
 
Masonry work
Masonry workMasonry work
Masonry work
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
Earthquake Resistant Building Construction
Earthquake Resistant Building ConstructionEarthquake Resistant Building Construction
Earthquake Resistant Building Construction
 
Welding Symbols
Welding SymbolsWelding Symbols
Welding Symbols
 
Welding and types
Welding and types Welding and types
Welding and types
 
Building construction 1
Building construction 1Building construction 1
Building construction 1
 
PPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTSPPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTS
 
Welding Presentation.
Welding Presentation.Welding Presentation.
Welding Presentation.
 
Earthquake resistant construction
Earthquake resistant constructionEarthquake resistant construction
Earthquake resistant construction
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Welding ppt
Welding pptWelding ppt
Welding ppt
 
Stone as a building material.
Stone as a building material.Stone as a building material.
Stone as a building material.
 

Semelhante a Asme sec viii div 2

ASME training.pdf
ASME training.pdfASME training.pdf
ASME training.pdfBaber6
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfdeckyantony
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptmohammed194284
 
Saes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsSaes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsabhi10apr
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdfmoumo1
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Denis Senin
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdfShahrukhKhan424745
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Carlos Trujillo
 

Semelhante a Asme sec viii div 2 (20)

ASME training.pdf
ASME training.pdfASME training.pdf
ASME training.pdf
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
Piping bv
Piping bvPiping bv
Piping bv
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
A449 equivalente a grado 5
A449 equivalente a grado 5A449 equivalente a grado 5
A449 equivalente a grado 5
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
 
Saes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsSaes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materials
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Iso new standards
Iso new standardsIso new standards
Iso new standards
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Asme guides weld canada
Asme guides weld canadaAsme guides weld canada
Asme guides weld canada
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
A002
A002A002
A002
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003
 

Mais de Jithu John

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptxJithu John
 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairsJithu John
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cuiJithu John
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processesJithu John
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009Jithu John
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gudJithu John
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsJithu John
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 

Mais de Jithu John (12)

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx
 
my ppt.pptx
my ppt.pptxmy ppt.pptx
my ppt.pptx
 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cui
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Alignment
AlignmentAlignment
Alignment
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steels
 
Weld defects
Weld defectsWeld defects
Weld defects
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 

Último

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 

Último (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 

Asme sec viii div 2

  • 2. Article D-4 Welded Joints • AM-400 Welded Joint Categories – Category defines the location of a joint in a vessel – Established for use in specifying joint type and degree of inspection – Based on service, material and thickness, special requirements are specified in code • Category A • Category B • Category C • Category D
  • 4. Article F-1 General Fabrication Requirements • AF-104 Repair of defective materials – Defect may be removed and material repaired by vessel manufacturer or unless prohibited by material specification may also be repaired by material manufacturer with approval of vessel manufacturer – Material repair that exceed those permitted by material specification shall be made to satisfaction of inspector
  • 5. Article F-1 General Fabrication Requirements – AM-104.1 Examination of defective area • By MPT (Article 9-1) or by LPT (Article 9-2) – AM-104.2 Repair by welding • Procedure & welds must be qualified in accordance with Sec IX, including impact testing • Repaired material shall be heat treated when required – AM-104.3 Examination of finished weld • Article F-1 General Fabrication Requirements • By Radiography (Article I-5) when depth of weld deposit exceeds 10 mm or one-half material thickness
  • 6. Article F-1 General Fabrication Requirements • AF-112 Base metal preparation • AF-112.1 Examination of materials a Material examination before fabrication for detecting defects which would affect safety of vessel. Examination of edges of base materials (including edges of openings cut through thickness) b Cut edges of thickness >= 38 mm shall be examined by MPT or LPT c For openings, cut edges of all thickness, examination by MPT or LPT
  • 7. AF-220 Specific requirements for welded joints
  • 9. AF-220 Specific requirements for welded joints • AF-228 Liquid Penetrant Examination – All austenitic Cr-Ni alloy steel welds, both butt & fillet, which exceeds nominal thickness of 19 mm shall be examined (Article 9-2) – LPT after heat treatment, if performed – All crack shall be eliminated
  • 10. AF-230 Miscellaneous Welding requirements • AF-235 Identification markings or records for welders or welding operators – Stamp identifying number, letter or symbol on or adjacent to and at intervals of not more than 1 m along the welds in plates >= 6 mm in thickness or record of welders / WOs employed on each joints shall be kept – For multiple welds, tube to tube sheet welds • QA system shall have a procedure to identify welders or welding operators • Welds in each category are of same type and configuration and are welded with same WPS
  • 11. Article I-5 Radiographic Examination • AI-510 Acceptance standard for radiographs of welds • AI-511 Unacceptable defects and repair requirements – Imperfections are unacceptable under following condition • Any crack or incomplete fusion or penetration • Any elongated indication which has length greater than – 6 mm for t upto 19 mm – 1/3t for t from 19 mm to 56 mm – 19 mm for t over 56 mm
  • 12. Article I-5 Radiographic Examination • AI-511 Unacceptable defects and repair requirements – Imperfections are unacceptable under following condition • Any group of aligned indications with aggregate length greater than t in length of 12t, except distance between successive imperfections exceeds 6L where L is length of longest imperfection in group • Rounded indications in excess of that specified in Appendix 4 t - thickness of weld excluding any allowable reinforcement, including throat of fillet if any
  • 13. Article T-2 Impact testing of welds and vessel test plates of ferrous materials • AT-203 Impact tests of vessel test plates – When base material is required to be impact tested, impact testing of weld and HAZ shall be made for category A & B joints in accordance with AT-201 for each qualified procedure used in vessel – Test plate shall be from one of heats of vessel or group of vessels – For category A joint, test plate shall, where practicable, be welded as an extension to end of production joint or welded as close to start of production welding as practicable, utilizing equipment, welding material and procedures which are to be used on production joints
  • 14. Article T-2 Impact testing of welds and vessel test plates of ferrous materials • AT-203 Impact tests of vessel test plates – For category B joint (welded using different welding procedure than used on category A joints, test plate shall be welded under production welding conditions used for vessel, using same type of equipment and at same location and using same procedures as used for joint and it shall be welded concurrently with production welds or as closed to start of production welding as practicable
  • 15. Article T-2 Impact testing of welds and vessel test plates of ferrous materials • AT-203.1 Number of vessel Impact Plates required – For each vessel, one test plate shall be made for each welding procedure used for category A & B – In addition, for category A & B joints, following requirements shall apply • For automatic or semi automatic welding, one test plate in each position • For manual welding, vertical upward welded test plate qualify for all position. • AT-203.2 Rejection – If PTC fails to meet the impact requirements, welds represented shall be unacceptable. Reheat treatment and retesting or retesting only are permitted.
  • 16. Article 9-1 MPE – Article 9-2 LPE • 9-130 Acceptance standard – All surfaces to be examined shall be free of • Relevant linear indications • Relevant rounded indications greater than 5 mm • Four or more relevant rounded indication in a line separated by 1.5 mm or less, edge to edge
  • 17. Article 9-3 Ultrasonic Examination of welds • 9-320 Acceptance-Rejection standards – Indications characterized as cracks, lack of fusion or incomplete penetration are unacceptable regardless of length – Other imperfections are unacceptable if indications exceed reference level amplitude and have lengths which exceed • 6 mm for t upto 19 mm • 1/3t for t from 19 mm to 57 mm • 19 mm for t over 57 mm T-thickness of weld, excluding any allowable reinforcement