Jesse W. Jackson
Power Transformer Tester
 I am a power transformer
tester that trained and
worked in Ulsan, South
Korea for Hyundai Heavy
Industries (HHI) in the
Electro Electric Systems
Division. I have tested
power transformers out in
the field and inside the
protected confines of a test
bay.
Control Room
 Working the controls in the control room with Mr. Park,
Chief Test Engineer in the 500kV control room. This room is
equipped with Hipotronics RIV - Partial Discharge
Equipment and Haefely Impulse Generator PC Controls with
High Resolution Impulse Analyzing System and Generator
Controls.
Control Room
 Observing voltage and
current readings during
No-Load Current No-Load
Loss testing. Performing
calculations for No-Load
Impedance.
500kV Test Bay
 Checking the connections
before lightning impulse
testing and observing the
stage connections on
Haefely Impulse Voltage
Generator.
200kV Test Bay
 Connecting cables on the TV side for No-Load
Current No-Load Loss testing.
200kV Test Bay
 Making connections to the B phase on the TV side
during the Lightning Impulse testing.
500kV Test Bay
 Standing on 1100MVA power transformer studying
the delta LV bushings.
Doble Engineering Equipment
 Experience using the
M4100 for power
factor and 10kV
excitation current
testing on bushings and
transformers.
 Experience using
M5300 and M5200 for
Sweep Frequency
Response Analysis.
Experience with DTA software
Experience interpreting SFRA graphs
Experience using Tettex / Raytech and Meggar
for winding resistance and core ground testing
Experience using Tettex / Raytech and Meggar
equipment for transformer turn ratio testing
Experience using the Fluke IR Thermometer,
Digital Multimeter and Thermal Imager
Experience working with ABB bushings, IEEE Std C57, IEC
Std and Maschinenfabrik Reinhausen tap changers
Certification

Mais conteúdo relacionado

Mais procurados

mobile charger project
mobile charger projectmobile charger project
mobile charger projectYãwãr Cena
 
7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instruments7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instrumentsJawad Khan
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015ashok kumar
 
Transformer Seminar - Buck-Boost
Transformer Seminar - Buck-BoostTransformer Seminar - Buck-Boost
Transformer Seminar - Buck-BoostAcme Electric
 
flying capacitor multi level inverter
flying capacitor multi level inverterflying capacitor multi level inverter
flying capacitor multi level invertermaulik patel
 
Test schedule hvr tr rev02
Test schedule hvr tr rev02Test schedule hvr tr rev02
Test schedule hvr tr rev02praveenraj1435
 
Auto selection of any aviliable phase
Auto selection of any aviliable phaseAuto selection of any aviliable phase
Auto selection of any aviliable phasenajeebs10
 
Inverters
InvertersInverters
Inverterspopet
 
5 emi ac bridges (with marking)
5 emi  ac bridges (with marking)5 emi  ac bridges (with marking)
5 emi ac bridges (with marking)Jawad Khan
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resumeAbbas Fadhil
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Jitendra final ppt
Jitendra final pptJitendra final ppt
Jitendra final pptjitendra9694
 

Mais procurados (19)

mobile charger project
mobile charger projectmobile charger project
mobile charger project
 
7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instruments7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instruments
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
Transformer Seminar - Buck-Boost
Transformer Seminar - Buck-BoostTransformer Seminar - Buck-Boost
Transformer Seminar - Buck-Boost
 
flying capacitor multi level inverter
flying capacitor multi level inverterflying capacitor multi level inverter
flying capacitor multi level inverter
 
Test schedule hvr tr rev02
Test schedule hvr tr rev02Test schedule hvr tr rev02
Test schedule hvr tr rev02
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
Boost converter
Boost converterBoost converter
Boost converter
 
Auto selection of any aviliable phase
Auto selection of any aviliable phaseAuto selection of any aviliable phase
Auto selection of any aviliable phase
 
Inverters
InvertersInverters
Inverters
 
Corrected1
Corrected1Corrected1
Corrected1
 
Basics of Power Inverters
Basics of Power InvertersBasics of Power Inverters
Basics of Power Inverters
 
Corrected1
Corrected1Corrected1
Corrected1
 
Rec101 unit iv emi
Rec101 unit iv emiRec101 unit iv emi
Rec101 unit iv emi
 
5 emi ac bridges (with marking)
5 emi  ac bridges (with marking)5 emi  ac bridges (with marking)
5 emi ac bridges (with marking)
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Jitendra final ppt
Jitendra final pptJitendra final ppt
Jitendra final ppt
 

Semelhante a PPT JESSE JACKSON 2

Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
Powerhv Introduction
Powerhv  IntroductionPowerhv  Introduction
Powerhv IntroductionJohnny Chan
 
Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptxNoorulAmin67
 
transformer test system
transformer test systemtransformer test system
transformer test systemkennypowerhv
 
High voltage technology & insulation testing
High voltage technology & insulation testingHigh voltage technology & insulation testing
High voltage technology & insulation testingZeeshan Akhtar
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryvishalgohel12195
 
POWERHV INTRODUCTION 96dpi
POWERHV  INTRODUCTION 96dpiPOWERHV  INTRODUCTION 96dpi
POWERHV INTRODUCTION 96dpiJohnny Chan
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona College of Technology
 
2019 PowerHV Presentation
2019 PowerHV Presentation 2019 PowerHV Presentation
2019 PowerHV Presentation kennypowerhv
 
Solar show2
Solar show2Solar show2
Solar show2Bert1949
 
Module 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabusModule 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabusDrCVMOHAN
 
Pq3 transient over voltages
Pq3 transient over voltagesPq3 transient over voltages
Pq3 transient over voltagesDheeraj Suri
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET Journal
 
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTURE
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTUREJUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTURE
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTUREJackXie30
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 

Semelhante a PPT JESSE JACKSON 2 (20)

Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Powerhv Introduction
Powerhv  IntroductionPowerhv  Introduction
Powerhv Introduction
 
Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptx
 
kamal project ppt
kamal project pptkamal project ppt
kamal project ppt
 
transformer test system
transformer test systemtransformer test system
transformer test system
 
High voltage technology & insulation testing
High voltage technology & insulation testingHigh voltage technology & insulation testing
High voltage technology & insulation testing
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratory
 
POWERHV INTRODUCTION 96dpi
POWERHV  INTRODUCTION 96dpiPOWERHV  INTRODUCTION 96dpi
POWERHV INTRODUCTION 96dpi
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing Centre
 
2019 PowerHV Presentation
2019 PowerHV Presentation 2019 PowerHV Presentation
2019 PowerHV Presentation
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
Solar show2
Solar show2Solar show2
Solar show2
 
Module 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabusModule 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabus
 
16950
1695016950
16950
 
Pq3 transient over voltages
Pq3 transient over voltagesPq3 transient over voltages
Pq3 transient over voltages
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
 
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTURE
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTUREJUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTURE
JUNXY ENERGY Sereis Resistive, Inductive & Capactive AC LOAD BANK MANUFACTURE
 
App note fluke 435 ii
App note fluke 435 iiApp note fluke 435 ii
App note fluke 435 ii
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 

PPT JESSE JACKSON 2

  • 1. Jesse W. Jackson Power Transformer Tester  I am a power transformer tester that trained and worked in Ulsan, South Korea for Hyundai Heavy Industries (HHI) in the Electro Electric Systems Division. I have tested power transformers out in the field and inside the protected confines of a test bay.
  • 2. Control Room  Working the controls in the control room with Mr. Park, Chief Test Engineer in the 500kV control room. This room is equipped with Hipotronics RIV - Partial Discharge Equipment and Haefely Impulse Generator PC Controls with High Resolution Impulse Analyzing System and Generator Controls.
  • 3. Control Room  Observing voltage and current readings during No-Load Current No-Load Loss testing. Performing calculations for No-Load Impedance.
  • 4. 500kV Test Bay  Checking the connections before lightning impulse testing and observing the stage connections on Haefely Impulse Voltage Generator.
  • 5. 200kV Test Bay  Connecting cables on the TV side for No-Load Current No-Load Loss testing.
  • 6. 200kV Test Bay  Making connections to the B phase on the TV side during the Lightning Impulse testing.
  • 7. 500kV Test Bay  Standing on 1100MVA power transformer studying the delta LV bushings.
  • 8. Doble Engineering Equipment  Experience using the M4100 for power factor and 10kV excitation current testing on bushings and transformers.  Experience using M5300 and M5200 for Sweep Frequency Response Analysis.
  • 11. Experience using Tettex / Raytech and Meggar for winding resistance and core ground testing
  • 12. Experience using Tettex / Raytech and Meggar equipment for transformer turn ratio testing
  • 13. Experience using the Fluke IR Thermometer, Digital Multimeter and Thermal Imager
  • 14. Experience working with ABB bushings, IEEE Std C57, IEC Std and Maschinenfabrik Reinhausen tap changers