SlideShare uma empresa Scribd logo
1 de 4
Baixar para ler offline
1
1
Jayson A. Oraa
 Al Satwa Road, Al Badaa Service Road, Satwa, Dubai, United Arab Emirates.
E-mail: jasonoraa@yahoo.com
Tel. +971-507137158
Objective Seeking in the Progressive career in the field of QA/QC with a professionlly managed growing
company utilizing my qualifications experience in order to grow along with the company
Experience profile QA/QC Engineer ( February 2016 up to present)
Client: Nakheel
Main Contractor: Al Futtaim Carrilion
Project: W-hotel & Residence palm Jumeirah, dubai
Company: Emirates water tech. landscape, swimming pool & waterfeature
 To coordinate with construction crew for on‐going civil/structural activities, including but
not limited to excavation, backfilling, compaction, rebar inspection, formwork inspection,
Field Density Test, concrete pouring, etc.
 To review the relevant documents prior to start of construction e.g. IFC, project
specification etc.
 Must be able to do inspection of structural steel fabrication, erection till final inspection.
 Must have experience in Pre‐engineered building erection.
 To initiate the RFI’s for Client’s witness of inspection points as per ITPs.
 To be more proactive to construction crew for advising to correct the activities this could
lead to non‐conformance.
 Be vigilant for upcoming scheduled activities in advance to coordinate with 3rd parties in
advance for the activities require testing e.g. FDT, Concreting etc.
 To coordinate with surveyor to finalize the bench mark survey setting out prior to start of
construction.
QA/QC- MEP Engineer ( October 2015 to February 2016)
Client: Dubai Parks & Resorts
Project: Raj Mahal Bollywood Theater,
Company: Emirates Technical and Thermal System
 To perform specialist QAQC techniques on critical structures and processes.
 To report deviations from approved plans and specifications
 To coordinate inspections with Consultant / Client and to communicate with production
team
 To review all materials received on the site, inspecting them, ensuring they are as per
approval.
 To conduct testing within the required specification and to monitor frequency of testing.
To attend and participating in QAQC meetings.
 To work with the Lab Coordinator to conduct tests as per the project specification.
 To proactively supervise the closure of NCR’s, suggesting innovative ideas for
improvement.
2
2
 Verify the accuracy of shop drawings and their compliance to the specification,
consultant’s design and existing local authority standard.
 Coordinate with other project personnel to ensure that deadlines, procedures, and other
project requirements are met.
 Method Statement preparation
 Operation Maintenance Manual Preparation
QA/QC- MEP-( February 2014 to October 2014)
Client: Emaar Properties
Project: LA CASA COMMUNITY – 253 VILLAS ARABIAN RANCHES Dubai United Arab Emirates
Company: Emirates Technical and Thermal System
 To assist QAQC Manager to prepare project reports.
 To perform specialist QAQC techniques on critical structures and processes.
 To report deviations from approved plans and specifications
 To coordinate inspections with Consultant / Client and to communicate with production
team
 To review all materials received on the site, inspecting them, ensuring they are as per
approval.
 To conduct testing within the required specification and to monitor frequency of testing.
To attend and participating in QAQC meetings.
 To work with the Lab Coordinator to conduct tests as per the project specification.
 To proactively supervise the closure of NCR’s, suggesting innovative ideas for
improvement.
QA/QC- MEP-( June 2013 to February 2014).
Client: ADAC- Abu Dhabi Airports Company
Project: Airport Terminal 3 Expansion – Abu Dhabi United Arab Emirates
 In-charge for overseeing all MEP QA/QC work
 Ensure the electrical/mechanical work carried out is as per approved shop drawing and
within the time frame and progress of the approved construction program.
 Ensure that the installation, inspection and testing of all the electrical/mechanical
equipment, fittings and work implemented meets the specification and the consultant
requirements
 Verify the accuracy of shop drawings and their compliance to the specification,
consultant’s design and existing local authority standard.
 Coordinate with other project personnel to ensure that deadlines, procedures, and other
project requirements are met.
 Preparing Inspection Request
 Preparing Operation Manual
QA/QC Engineer – May 2010 –May 2012
Company: Methac Contracting Company
Address: Jeddah Kingdom Saudi Arabia.
Responsibility:
 Ensure that all current issues concerning procedures, approved materials, shop
drawings, and standards are available at the point of use.
3
3
 Ensure workers are trained on correct and approved method of installation.
 Ensure that the work comply with the contract requirements / approved shop
drawings.
 Inspect for any material damages during handling, storage and installation.
 Ensure that the work is completed and inspected prior to the initiation of the
Inspection Test Request (ITR) for Consultant’s approval.
 Maintain comprehensive inspection and test records for further references.
QA/QC Engineer – June 2008 – Nov 2009
Company: Sgs landscaping contracting company
Address: Dasamrinas cavite city.
 In-charge for overseeing all Civil & MEP QA/QC work
 2. Ensure the electrical/mechanical work carried out is as per approved shop drawing and
within the time frame and progress of the approved construction program.
 3. Ensure that the installation, inspection and testing of all the electrical/mechanical
equipment, fittings and work implemented meets the specification and the consultant
requirements
 4. Verify the accuracy of shop drawings and their compliance to the specification,
consultant’s design and existing local authority standard.
 5. Coordinate with other project personnel to ensure that deadlines, procedures, and other
project requirements are met.
QA/QC Inspector– july 16 2003 – October 2005
Company: Filipinas Bravo Corporation- Consulting Engineering Services
Address: Mandluyong city. Philippines
 In-charge for overseeing all QA/QC work
 2. Ensure the electrical/mechanical work carried out is as per approved shop drawing and
within the time frame and progress of the approved construction program.
 3. Ensure that the installation, inspection and testing of all the electrical/mechanical
equipment, fittings and work implemented meets the specification and the consultant
requirements
 4. Verify the accuracy of shop drawings and their compliance to the specification,
consultant’s design and existing local authority standard.
 5. Coordinate with other project personnel to ensure that deadlines, procedures, and other
project requirements are met.
 Preparing Inspection Request
 Preparing Operation Manual
4
4
Education B.S. Computer Engineering (‘ 98-2001’)
AMA Computer University - Philippines
Knowledgeable
Skills & Technical
Computer Literate, Well experienced on Microsoft Windows Environment: MS Office (Lotus,
Word, Excel, Access, Power Point), Microsoft Networking, Photoshop, sketchup, Web Designing,
Data Processing & other computer aided works.
Personal Data Date of Birth : 06 December 1979
Age : 35
Reference
Nationality : Filipino
Marital Status : Married
Passport No. : EB0080274
Mr. Leo Gonzales
Landscape architect
Nakheel – Dubai, UAE
I hereby certify that the above information is true and correct to the best of my knowledge.

Mais conteúdo relacionado

Mais procurados

Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wpVinu K S
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Makbul Cv
Makbul CvMakbul Cv
Makbul CvMakbul
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Bupathy Vidyapathy
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_seraj ahmad
 
Binukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERBinukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERbinukumar baral
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGramon carcido
 

Mais procurados (20)

SELVAM.CV
SELVAM.CVSELVAM.CV
SELVAM.CV
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wp
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Neel CV_Updated
Neel CV_UpdatedNeel CV_Updated
Neel CV_Updated
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_
 
CV- AMAL
CV- AMALCV- AMAL
CV- AMAL
 
Binukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERBinukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEER
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 

Semelhante a Jayson Oraa QAQC CV

Semelhante a Jayson Oraa QAQC CV (20)

Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Amir QC
Amir QCAmir QC
Amir QC
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Suresh cv-21.01.16
Suresh  cv-21.01.16Suresh  cv-21.01.16
Suresh cv-21.01.16
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 

Jayson Oraa QAQC CV

  • 1. 1 1 Jayson A. Oraa  Al Satwa Road, Al Badaa Service Road, Satwa, Dubai, United Arab Emirates. E-mail: jasonoraa@yahoo.com Tel. +971-507137158 Objective Seeking in the Progressive career in the field of QA/QC with a professionlly managed growing company utilizing my qualifications experience in order to grow along with the company Experience profile QA/QC Engineer ( February 2016 up to present) Client: Nakheel Main Contractor: Al Futtaim Carrilion Project: W-hotel & Residence palm Jumeirah, dubai Company: Emirates water tech. landscape, swimming pool & waterfeature  To coordinate with construction crew for on‐going civil/structural activities, including but not limited to excavation, backfilling, compaction, rebar inspection, formwork inspection, Field Density Test, concrete pouring, etc.  To review the relevant documents prior to start of construction e.g. IFC, project specification etc.  Must be able to do inspection of structural steel fabrication, erection till final inspection.  Must have experience in Pre‐engineered building erection.  To initiate the RFI’s for Client’s witness of inspection points as per ITPs.  To be more proactive to construction crew for advising to correct the activities this could lead to non‐conformance.  Be vigilant for upcoming scheduled activities in advance to coordinate with 3rd parties in advance for the activities require testing e.g. FDT, Concreting etc.  To coordinate with surveyor to finalize the bench mark survey setting out prior to start of construction. QA/QC- MEP Engineer ( October 2015 to February 2016) Client: Dubai Parks & Resorts Project: Raj Mahal Bollywood Theater, Company: Emirates Technical and Thermal System  To perform specialist QAQC techniques on critical structures and processes.  To report deviations from approved plans and specifications  To coordinate inspections with Consultant / Client and to communicate with production team  To review all materials received on the site, inspecting them, ensuring they are as per approval.  To conduct testing within the required specification and to monitor frequency of testing. To attend and participating in QAQC meetings.  To work with the Lab Coordinator to conduct tests as per the project specification.  To proactively supervise the closure of NCR’s, suggesting innovative ideas for improvement.
  • 2. 2 2  Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.  Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.  Method Statement preparation  Operation Maintenance Manual Preparation QA/QC- MEP-( February 2014 to October 2014) Client: Emaar Properties Project: LA CASA COMMUNITY – 253 VILLAS ARABIAN RANCHES Dubai United Arab Emirates Company: Emirates Technical and Thermal System  To assist QAQC Manager to prepare project reports.  To perform specialist QAQC techniques on critical structures and processes.  To report deviations from approved plans and specifications  To coordinate inspections with Consultant / Client and to communicate with production team  To review all materials received on the site, inspecting them, ensuring they are as per approval.  To conduct testing within the required specification and to monitor frequency of testing. To attend and participating in QAQC meetings.  To work with the Lab Coordinator to conduct tests as per the project specification.  To proactively supervise the closure of NCR’s, suggesting innovative ideas for improvement. QA/QC- MEP-( June 2013 to February 2014). Client: ADAC- Abu Dhabi Airports Company Project: Airport Terminal 3 Expansion – Abu Dhabi United Arab Emirates  In-charge for overseeing all MEP QA/QC work  Ensure the electrical/mechanical work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.  Ensure that the installation, inspection and testing of all the electrical/mechanical equipment, fittings and work implemented meets the specification and the consultant requirements  Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.  Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.  Preparing Inspection Request  Preparing Operation Manual QA/QC Engineer – May 2010 –May 2012 Company: Methac Contracting Company Address: Jeddah Kingdom Saudi Arabia. Responsibility:  Ensure that all current issues concerning procedures, approved materials, shop drawings, and standards are available at the point of use.
  • 3. 3 3  Ensure workers are trained on correct and approved method of installation.  Ensure that the work comply with the contract requirements / approved shop drawings.  Inspect for any material damages during handling, storage and installation.  Ensure that the work is completed and inspected prior to the initiation of the Inspection Test Request (ITR) for Consultant’s approval.  Maintain comprehensive inspection and test records for further references. QA/QC Engineer – June 2008 – Nov 2009 Company: Sgs landscaping contracting company Address: Dasamrinas cavite city.  In-charge for overseeing all Civil & MEP QA/QC work  2. Ensure the electrical/mechanical work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.  3. Ensure that the installation, inspection and testing of all the electrical/mechanical equipment, fittings and work implemented meets the specification and the consultant requirements  4. Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.  5. Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met. QA/QC Inspector– july 16 2003 – October 2005 Company: Filipinas Bravo Corporation- Consulting Engineering Services Address: Mandluyong city. Philippines  In-charge for overseeing all QA/QC work  2. Ensure the electrical/mechanical work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.  3. Ensure that the installation, inspection and testing of all the electrical/mechanical equipment, fittings and work implemented meets the specification and the consultant requirements  4. Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.  5. Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.  Preparing Inspection Request  Preparing Operation Manual
  • 4. 4 4 Education B.S. Computer Engineering (‘ 98-2001’) AMA Computer University - Philippines Knowledgeable Skills & Technical Computer Literate, Well experienced on Microsoft Windows Environment: MS Office (Lotus, Word, Excel, Access, Power Point), Microsoft Networking, Photoshop, sketchup, Web Designing, Data Processing & other computer aided works. Personal Data Date of Birth : 06 December 1979 Age : 35 Reference Nationality : Filipino Marital Status : Married Passport No. : EB0080274 Mr. Leo Gonzales Landscape architect Nakheel – Dubai, UAE I hereby certify that the above information is true and correct to the best of my knowledge.