SlideShare uma empresa Scribd logo
1 de 4
Baixar para ler offline
Jawad Ali Khan PEC no: ELECT/43920
House no 212/33, Street 17-B, Gulbahar no 2, Peshawar, Pakistan | 0092 332 9284 987 | jawadalikhan6@gmail.com
Skype: jawadkhan6127
Objective
Looking for a position of Electrical Engineer (Electronics or Communication) in an Electronics and Telecom company
where my managerial, inter-personal and technical skills be utilized to achieve organizational goals with the least
available resource. A dedicated team player who can be relied upon to help your company achieve its goals.
Education
BS-ELECTRICAL ENGINEERING | JUNE 2014 | NUCES-FAST
· Major: Electronics
· Minor: Programming in C and C++, Digital Signal Processing, Computer Logic Designing, μ- Processor Interfacing,
Feedback Control Systems, Electro-Mechanical Systems
· Related Final Year Project: Wind Speed Data Recording System for Remote Areas
HIGHER SECONDARY SCHOOL CERTIFICATE | APRIL 2010 | EDWARDES COLLEGE SCHOOL
· Major: Pre-Engineering
· Minor: Physics, Chemistry, Mathematics,
SECONDARY SCHOOL CETRICATE | MAY 2008 | EDWARDES COLLEGE SCHOOL
· Major: General Science
Minor: Physics, Chemistry, Mathematics, Computer Science
Page 2
Experience
CUSTOMER SUPPORT TECHNICAL ENGINEER | ZTE CORPORATION, PAKISTAN | SEPTEMBER 2016-PRESENT
Responsibilities includes:
 Technical assistance to the Customer
 L3 Maintenance of the Customer's Optical Fiber Network of Longhaul Transmission
 Maintaining the spare parts record for the L3 support
CORE TRANSMISSION ENGINEER | ZTE CORPORATION, PAKISTAN | JULY 2014-MAY 2016
Maintenance of PTCL Transmission projects, OSNR Maintenance, MSP configuration, testing of faulty boards, version
upgradation of the cards, maintenance of PTCL project are the routine tasks after successful nationwide completion of
project. The key role during projects was assignment of SUCCESSFUL COMPLETION OF ACCEPTANCE TESTS.
Responsibilities includes:
 Installation, Commissioning, Integration and successful completion of Provisional Acceptance Test (PAT) for
PTCL Backbone Transport Network and Lahore Metro Transport Network.
 Working as Team Lead for the execution of Project PTCL 40 to 80 Lambda Expansion in Lahore Metro DWDM
Transport Network.
 Operation and maintenance of Transport Network nodes installed for PTCL in Central Region.
 Integration of new systems with old systems for up-gradation of lambdas.
 Worked on different health check activities like software version up-gradation of on-site installed equipment.
 Maintenance of PTCL Long-haul and Lahore Metro SDH/DWDM Network.
 Trouble shooting of installed network elements i.e. Cisco Switches, Routers and Firewalls.
 To restore and take the backup of various working databases i.e. Oracle & SQL Server.
 Addition of new modules to the existing system like CTI servers, Web Servers and IVR Servers.
 Testing and debugging of the software, report the errors and enhancing performance as per the end user’s
requirement
 Data security and error free migration to new platforms
Projects
RESTORATION OF TRANSMISSION SYSTEM AT LAHORE (EGERTON ROAD PTCL EXCHANGE) AFTER FIRE INCIDENT
AND UPGRADATION OF PTCL LAHORE SHORT-HAUL SYSTEM
On September 28th, 2014, fire broke out in PTCL Egerton Road Exchange due to which all the services on transmission
system were suspended. In this project, the lost transmission system of Egerton Road was restored.
The project, along with Egerton Road Restoration, included 40x80 lambda for Lahore PTCL Metro System.
The responsibilities in Project included:
1- Pre- project Planning.
2- Site Surveys.
3- Strategy making for Project Implementation.
4- Supervision of Installation Phase.
5- Commissioning and Configuration of the Systems
6- Old amplifiers upgradation (NOC Activities).
7- Integration of new systems (L+ band) with old systems (L band) (NOC Activities).
8- Optimization of two rings (NOC Activities).
9- Successful completion of PAT
The job also included assurance of constant OSNR and BERs
Page 3
PTCL DWDM 40X80G LAMBDA'S UPGRADATION OF PTCL LONGHAUL NETWROK
In this project of PTCL, ZTE is providing PTCL with DWDM equipment for the multiplexing different wavelengths and then
transmit to the client by cascading ZXONE8000 with SDH (Synchronous Digital Hierarchy) Rack. The main operation of
DWDM is based on the Multiplexing and De- Multiplexing phenomena. There are two cards installed in the ZXONE8000
named as ODU (Optical De- multiplexing Unit) and OMU (Optical Multiplexing Unit) which are used for multiplexing and
demultiplexing processes. Two way traffic is collected at ODU which separates the desired traffic from the multiplexed
traffic and passes the remaining traffic to OMU with the data that has to be transmitted with previously received data. The
traffic is then sent to the next site in the ring.
POWER TRANSFER THROUGH DIRECT INDUCTION (WIRELESS)
This project was the semester project, on individual basis, when we were taught course of ELECTROMAGNETIC THEORY.
Our instructor assigned us to implement what we studied in the course. I selected to work on the wireless power transfer.
The main idea was derived from the working principle of transformer i- e Mutual Induction between primary and
secondary coils. The given task was simulation based but however, I continued working on it as soon as semester was
over. Results were obtained with almost 10% error but range was up to few centimeters
WIND SPEED DATA RECORDING SYSTEM FOR REMOTE AREAS (FINAL YEAR PROJECT)
This project was a fine combination of analog and digital electronics. This project was designed so as to fulfill the
requirements of the current energy crisis in Pakistan. The function of the project is to decide whether an area is suitable
for installation of Wind Power Generation System. Yearly data is recorded for the specific area and data is sent to the
monitoring room via GSM for analysis by experts. Also EEPROM is used on major basis for storage purpose in case GSM is
crashed.
Hands-On Softwares
 CORBA
 Netnumen U31
 E300
 DEV- C++
 MATLAB
 PLC (Programmable logic Controller)
 ModelSim - Verilog/VHDL
 MicroWind
 DSCH
 Dreamweaver
 Keil
 μ- visionArduino
 LAB View
Page 4
Reference
MUHAMMAD NOUMAN KHAN
Regional Project Manager, ZTE Pakistan
Email: muhammad.nouman.khan@z te.com.cn
Contact number: 0092 301 5226633
MALIK FAHAD HASSAN
Chief Engineer NM&O, ZTE Pakistan
Email: fahad.hassan@z te.com.cn
Contact number: 0092 314 5145226

Mais conteúdo relacionado

Mais procurados

2016-02-17 research seminar
2016-02-17 research seminar2016-02-17 research seminar
2016-02-17 research seminarifi8106tlu
 
3GNets LTE Testing Solutions and Services
3GNets LTE Testing Solutions and Services3GNets LTE Testing Solutions and Services
3GNets LTE Testing Solutions and Services3G Network Solutions
 
Resume_Updated
Resume_UpdatedResume_Updated
Resume_UpdatedRam Kumar
 
ATE Industry Trends
ATE Industry TrendsATE Industry Trends
ATE Industry TrendsHank Lydick
 
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...Yamato OKAMOTO
 
Jarrell Case Study
Jarrell Case StudyJarrell Case Study
Jarrell Case StudySteve Jones
 
Novel high functionality fault tolerant ALU
Novel high functionality fault tolerant ALUNovel high functionality fault tolerant ALU
Novel high functionality fault tolerant ALUTELKOMNIKA JOURNAL
 
VHDL Implementation of High Speed and Low Power BIST Based Vedic Multiplier
VHDL Implementation of High Speed and Low Power BIST Based Vedic MultiplierVHDL Implementation of High Speed and Low Power BIST Based Vedic Multiplier
VHDL Implementation of High Speed and Low Power BIST Based Vedic MultiplierIRJET Journal
 
Review on optimized area,delay and power efficient carry select adder using n...
Review on optimized area,delay and power efficient carry select adder using n...Review on optimized area,delay and power efficient carry select adder using n...
Review on optimized area,delay and power efficient carry select adder using n...IRJET Journal
 
nikhil_muraleedharan
nikhil_muraleedharannikhil_muraleedharan
nikhil_muraleedharanNikhil Menon
 

Mais procurados (20)

Resume
ResumeResume
Resume
 
2016-02-17 research seminar
2016-02-17 research seminar2016-02-17 research seminar
2016-02-17 research seminar
 
Manoj_Resume
Manoj_ResumeManoj_Resume
Manoj_Resume
 
3GNets LTE Testing Solutions and Services
3GNets LTE Testing Solutions and Services3GNets LTE Testing Solutions and Services
3GNets LTE Testing Solutions and Services
 
Resume_Updated
Resume_UpdatedResume_Updated
Resume_Updated
 
ATE Industry Trends
ATE Industry TrendsATE Industry Trends
ATE Industry Trends
 
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...
IntelliLight: A Reinforcement Learning Approach for Intelligent Traffic Light...
 
1
11
1
 
M Abubakar cv
M Abubakar cvM Abubakar cv
M Abubakar cv
 
Planning and Optimization of LTE Radio Access Network for Urban Area at Taiz ...
Planning and Optimization of LTE Radio Access Network for Urban Area at Taiz ...Planning and Optimization of LTE Radio Access Network for Urban Area at Taiz ...
Planning and Optimization of LTE Radio Access Network for Urban Area at Taiz ...
 
Jarrell Case Study
Jarrell Case StudyJarrell Case Study
Jarrell Case Study
 
Kirit RF CV
Kirit RF CVKirit RF CV
Kirit RF CV
 
Manikandan
ManikandanManikandan
Manikandan
 
LTE RF Planning Tool - Atoll
LTE RF Planning Tool - AtollLTE RF Planning Tool - Atoll
LTE RF Planning Tool - Atoll
 
Novel high functionality fault tolerant ALU
Novel high functionality fault tolerant ALUNovel high functionality fault tolerant ALU
Novel high functionality fault tolerant ALU
 
VHDL Implementation of High Speed and Low Power BIST Based Vedic Multiplier
VHDL Implementation of High Speed and Low Power BIST Based Vedic MultiplierVHDL Implementation of High Speed and Low Power BIST Based Vedic Multiplier
VHDL Implementation of High Speed and Low Power BIST Based Vedic Multiplier
 
Review on optimized area,delay and power efficient carry select adder using n...
Review on optimized area,delay and power efficient carry select adder using n...Review on optimized area,delay and power efficient carry select adder using n...
Review on optimized area,delay and power efficient carry select adder using n...
 
Ads lab
Ads labAds lab
Ads lab
 
CV-Nidhin
CV-NidhinCV-Nidhin
CV-Nidhin
 
nikhil_muraleedharan
nikhil_muraleedharannikhil_muraleedharan
nikhil_muraleedharan
 

Destaque (15)

Da Hood Productions
Da Hood ProductionsDa Hood Productions
Da Hood Productions
 
Memoria ram, rom
Memoria ram, romMemoria ram, rom
Memoria ram, rom
 
Apresentação
ApresentaçãoApresentação
Apresentação
 
MatemáTica(Gaspar,Luis E Pedro)
MatemáTica(Gaspar,Luis E Pedro)MatemáTica(Gaspar,Luis E Pedro)
MatemáTica(Gaspar,Luis E Pedro)
 
Practicum
PracticumPracticum
Practicum
 
Data Needs for Epidemic Control
Data Needs for Epidemic ControlData Needs for Epidemic Control
Data Needs for Epidemic Control
 
Imagenes tics
Imagenes ticsImagenes tics
Imagenes tics
 
Taller de busquedad de informacion
Taller de busquedad de informacionTaller de busquedad de informacion
Taller de busquedad de informacion
 
Web 20
Web 20Web 20
Web 20
 
Bolsa monitores
Bolsa monitoresBolsa monitores
Bolsa monitores
 
Interim Results 2016
Interim Results 2016Interim Results 2016
Interim Results 2016
 
29ago.2015.enfermeria
29ago.2015.enfermeria29ago.2015.enfermeria
29ago.2015.enfermeria
 
Strategic Naming For Merging Healthcare Companies
Strategic Naming For Merging Healthcare CompaniesStrategic Naming For Merging Healthcare Companies
Strategic Naming For Merging Healthcare Companies
 
Vnx.su laguna 1993
Vnx.su laguna 1993Vnx.su laguna 1993
Vnx.su laguna 1993
 
Doh hool
Doh hoolDoh hool
Doh hool
 

Semelhante a Jawad Ali Khan (20)

Resume
ResumeResume
Resume
 
CV_ASIM_11_2014
CV_ASIM_11_2014CV_ASIM_11_2014
CV_ASIM_11_2014
 
CV(joshy C D)
CV(joshy C D)CV(joshy C D)
CV(joshy C D)
 
CV(joshy C D)
CV(joshy C D)CV(joshy C D)
CV(joshy C D)
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
CV
CVCV
CV
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
Zahid Iqbal Resume
Zahid Iqbal ResumeZahid Iqbal Resume
Zahid Iqbal Resume
 
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
 
Rahul resume
Rahul resumeRahul resume
Rahul resume
 
Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin Khante
 
shashank3
shashank3shashank3
shashank3
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Chahal CV
Chahal CVChahal CV
Chahal CV
 
kumaresan_SAS Engg
kumaresan_SAS Enggkumaresan_SAS Engg
kumaresan_SAS Engg
 

Jawad Ali Khan

  • 1. Jawad Ali Khan PEC no: ELECT/43920 House no 212/33, Street 17-B, Gulbahar no 2, Peshawar, Pakistan | 0092 332 9284 987 | jawadalikhan6@gmail.com Skype: jawadkhan6127 Objective Looking for a position of Electrical Engineer (Electronics or Communication) in an Electronics and Telecom company where my managerial, inter-personal and technical skills be utilized to achieve organizational goals with the least available resource. A dedicated team player who can be relied upon to help your company achieve its goals. Education BS-ELECTRICAL ENGINEERING | JUNE 2014 | NUCES-FAST · Major: Electronics · Minor: Programming in C and C++, Digital Signal Processing, Computer Logic Designing, μ- Processor Interfacing, Feedback Control Systems, Electro-Mechanical Systems · Related Final Year Project: Wind Speed Data Recording System for Remote Areas HIGHER SECONDARY SCHOOL CERTIFICATE | APRIL 2010 | EDWARDES COLLEGE SCHOOL · Major: Pre-Engineering · Minor: Physics, Chemistry, Mathematics, SECONDARY SCHOOL CETRICATE | MAY 2008 | EDWARDES COLLEGE SCHOOL · Major: General Science Minor: Physics, Chemistry, Mathematics, Computer Science
  • 2. Page 2 Experience CUSTOMER SUPPORT TECHNICAL ENGINEER | ZTE CORPORATION, PAKISTAN | SEPTEMBER 2016-PRESENT Responsibilities includes:  Technical assistance to the Customer  L3 Maintenance of the Customer's Optical Fiber Network of Longhaul Transmission  Maintaining the spare parts record for the L3 support CORE TRANSMISSION ENGINEER | ZTE CORPORATION, PAKISTAN | JULY 2014-MAY 2016 Maintenance of PTCL Transmission projects, OSNR Maintenance, MSP configuration, testing of faulty boards, version upgradation of the cards, maintenance of PTCL project are the routine tasks after successful nationwide completion of project. The key role during projects was assignment of SUCCESSFUL COMPLETION OF ACCEPTANCE TESTS. Responsibilities includes:  Installation, Commissioning, Integration and successful completion of Provisional Acceptance Test (PAT) for PTCL Backbone Transport Network and Lahore Metro Transport Network.  Working as Team Lead for the execution of Project PTCL 40 to 80 Lambda Expansion in Lahore Metro DWDM Transport Network.  Operation and maintenance of Transport Network nodes installed for PTCL in Central Region.  Integration of new systems with old systems for up-gradation of lambdas.  Worked on different health check activities like software version up-gradation of on-site installed equipment.  Maintenance of PTCL Long-haul and Lahore Metro SDH/DWDM Network.  Trouble shooting of installed network elements i.e. Cisco Switches, Routers and Firewalls.  To restore and take the backup of various working databases i.e. Oracle & SQL Server.  Addition of new modules to the existing system like CTI servers, Web Servers and IVR Servers.  Testing and debugging of the software, report the errors and enhancing performance as per the end user’s requirement  Data security and error free migration to new platforms Projects RESTORATION OF TRANSMISSION SYSTEM AT LAHORE (EGERTON ROAD PTCL EXCHANGE) AFTER FIRE INCIDENT AND UPGRADATION OF PTCL LAHORE SHORT-HAUL SYSTEM On September 28th, 2014, fire broke out in PTCL Egerton Road Exchange due to which all the services on transmission system were suspended. In this project, the lost transmission system of Egerton Road was restored. The project, along with Egerton Road Restoration, included 40x80 lambda for Lahore PTCL Metro System. The responsibilities in Project included: 1- Pre- project Planning. 2- Site Surveys. 3- Strategy making for Project Implementation. 4- Supervision of Installation Phase. 5- Commissioning and Configuration of the Systems 6- Old amplifiers upgradation (NOC Activities). 7- Integration of new systems (L+ band) with old systems (L band) (NOC Activities). 8- Optimization of two rings (NOC Activities). 9- Successful completion of PAT The job also included assurance of constant OSNR and BERs
  • 3. Page 3 PTCL DWDM 40X80G LAMBDA'S UPGRADATION OF PTCL LONGHAUL NETWROK In this project of PTCL, ZTE is providing PTCL with DWDM equipment for the multiplexing different wavelengths and then transmit to the client by cascading ZXONE8000 with SDH (Synchronous Digital Hierarchy) Rack. The main operation of DWDM is based on the Multiplexing and De- Multiplexing phenomena. There are two cards installed in the ZXONE8000 named as ODU (Optical De- multiplexing Unit) and OMU (Optical Multiplexing Unit) which are used for multiplexing and demultiplexing processes. Two way traffic is collected at ODU which separates the desired traffic from the multiplexed traffic and passes the remaining traffic to OMU with the data that has to be transmitted with previously received data. The traffic is then sent to the next site in the ring. POWER TRANSFER THROUGH DIRECT INDUCTION (WIRELESS) This project was the semester project, on individual basis, when we were taught course of ELECTROMAGNETIC THEORY. Our instructor assigned us to implement what we studied in the course. I selected to work on the wireless power transfer. The main idea was derived from the working principle of transformer i- e Mutual Induction between primary and secondary coils. The given task was simulation based but however, I continued working on it as soon as semester was over. Results were obtained with almost 10% error but range was up to few centimeters WIND SPEED DATA RECORDING SYSTEM FOR REMOTE AREAS (FINAL YEAR PROJECT) This project was a fine combination of analog and digital electronics. This project was designed so as to fulfill the requirements of the current energy crisis in Pakistan. The function of the project is to decide whether an area is suitable for installation of Wind Power Generation System. Yearly data is recorded for the specific area and data is sent to the monitoring room via GSM for analysis by experts. Also EEPROM is used on major basis for storage purpose in case GSM is crashed. Hands-On Softwares  CORBA  Netnumen U31  E300  DEV- C++  MATLAB  PLC (Programmable logic Controller)  ModelSim - Verilog/VHDL  MicroWind  DSCH  Dreamweaver  Keil  μ- visionArduino  LAB View
  • 4. Page 4 Reference MUHAMMAD NOUMAN KHAN Regional Project Manager, ZTE Pakistan Email: muhammad.nouman.khan@z te.com.cn Contact number: 0092 301 5226633 MALIK FAHAD HASSAN Chief Engineer NM&O, ZTE Pakistan Email: fahad.hassan@z te.com.cn Contact number: 0092 314 5145226