 Building Experiences
 Credentials
 Organization Chart
Gruppo Inveco in Serbia
Cases of successful industrial projects in Serbia
Nova Pazova
Year 2015.
Ind. Area Nova Pazova
Sqmt 8.000 BROWNFIELD
Sremska Mitrovica
Year 2013/2014
Ind. Area S. Mitrovica
Sqmt 19.135 GREENFIELD
Kostolac
Year 2012.
Ind. Area Kostolac
Sqmt 8.000 BROWNFIELD
Subotica
Year 2012
Ind. Area Bajmok
Sqmt 8.500 GREENFIELD
Kragujevac
Year 2011
Ind. Area Kasarna Grošnica
Sqmt 13.900 GREENFIELD
Niš
Year 2010
Ind. Area Donje Međurovo
Sqmt 10.209 GREENFIELD
As a General Contractor,
INVECO I.B.C. realized
several projects for
international clients
who chose Serbia for
their new production
localizations.
Building Experiences - Serbia 2010.-2015.
CREDENTIALS & REFERENCES
CARRIED OUT PROJECTS 6
TOTAL SQM 50.000 sqm
AVERAGE TIMING FOR PROJECT DELIVERY < 9 months
TOTAL TURNOVER 33 MLN €
SPECIAL FOUNDATIONS works
BROWNFIELD general installation
SYSTEMS installation
MAIN CLIENTS
Credentials: Cooper Standard
Outcome
• Feasibility Study and selection of the land;
• Project-time scheduling;
• Definition of the preliminary project to start bureaucratic process;
• Relationship management with Authorities and Municipalities;
• Obtaining of preliminary and generic permits;
• Draft of structural, architectural and system projects;
• Construction management, testing and start of production.
Critical aspects
 Slow Cadaster (Land register) process;
 Local grid operator connection process (many requests of additional documents);
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Sremska Mitrovica
S
• ADMINISTRATIVE EFFICIENCY OF THE
MUNICIPALITY
• CONNECTIONS: Beograd airport - Nikola
Tesla, Close to Beograd Town
W • LACK OF HIGHLY - SKILLED LABOUR
O
• COMMERCIAL RELATIONS WITH NEAR
VOJVODINA REGION
• B2B OPPORTUNITIES
T
Optimized management of 12 subcontractors
Building Experiences - Serbia 2010.-2015.
Cooper Standard
project
GANTT
20.000 SQMT
Building Experiences - Serbia 2010.-2015.
Credentials
Cooper Standard Factory
Building Process Images
Municipality of Sremska
Mitrovica, Serbia
2013./2014.
Credentials : PMC Automotive
Outcome
• Feasibility Study and selection of the land with FIAT staff;
• Project time scheduling;
• Definition of the preliminary project to start bureaucratic process;
• Relationship management with Authorities and Municipalities;
• Obtaining of preliminary and generic permits;
• Draft of structural, architectural and system projects;
• Construction management, testing and start of production.
Critical aspects
 Harsh weather conditions (-20° and snow) caused works to be stopped for days;
 The customer has changed the final design of the project several times
(extra costs & time)
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Kragujevac
S
• ALREADY HIGHLY INDUSTRIALIZED AREA (F.A.S.+ INDUCED)
• PRESENCE OF ENGINEERING COLLEGES (professional
training)
• PLENTY OF HIGHLY-SKILLED LABOUR (AUTOMOTIVE)
W
• RAW/MANUFACTURING/SERVICES HIGH COSTS
• MORE EXPENSIVE THAN OTHER LOCATIONS
• MUCH HIGHER SALARY
• LOCAL SPECULATION EVENTS
O • VIRTUOUS CYCLE OF DEVELOPMENT IN THE AREA
T • INFLATION AND SALARY INCREASE
Optimized management of 20 subcontractors
Building Experiences - Serbia 2010.-2015.
Credentials
PMC Automotive Factory
Building Process Images
Municipality of
Kragujevac, Serbia
2011.
Credentials : CLN Group
Outcome
• Feasibility Study for ‘’special foundations’’;
• Draft of structural and executive projects;
• Construction management and testing.
Critical aspects
 Financial instability of local subcontractors:
we were constantly requested for pre-payments and advances on the work.
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Kostolac
S • GOOD LINKS TO THE MAIN ROADS
W
• LIMITED SIZE OF THE INDUSTRIAL AREA
• LIMITED NUMBER OF INDUSTRIAL PLAYERS
• LACK OF HIGHLY - SKILLED LABOUR
O • PRESENCE OF A DISTRIC HEATING SYSTEM
T • LOCAL CRIME
Optimized management of 3 subcontractors
Credentials : Dytech F&F Serbia
Outcome
• Feasibility Study and selection of the land;
• Project time scheduling;
• Definition of the preliminary project to start bureaucratic process;
• Relationship management with Authorities and Municipalities;
• Obtaining of preliminary and generic permits;
• Draft of structural, architectural and system projects;
• Construction management.
Critical aspects
 Dytech still did not start production;
 Obtaining Incentives VS Strategic market approach
(short-term choice) (long-term choice)
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Niš
S
• FREE ZONE OPPORTUNITIES;
• LOW LABOUR COST
• CONNECTIONS: Konstantin Veliki Airport,
HIGHWAY E-75 NIS-BEOGRAD
W • AVAILABILITY OF PUBLIC INDUSTRIAL URBANIZED AREAS
O
• PRESENCE OF MAJOR INDUSTRIAL PLAYERS
• B2B OPPORTUNITIES
• PLENTY OF HIGHLY - SKILLED LABOUR
T • BUREAUCRACY PROCESS
Optimized management of 10 subcontractors
Building Experiences - Serbia 2010.-2015.
Credentials
Dythech F&F Serbia
Factory Building Process
Images
Municipality of
Niš, Serbia
2010.
Credentials : ContiTech Fluid Serbia
Outcome
• Project time scheduling;
• Draft of executive systems installation projects;
• Construction management, testing and start of production
Critical aspects
 Designers nominated by the customer uncooperative: we were requested to
deliver technical files and maintenance manuals in Serbian language (even if
original documentation issued by the manufacturer did not include that
language).
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Subotica
S
• LARGE INDUSTRIALIZED AREAS
• CLOSE WITH HUNGARY BORDERS (Market opportunities)
• FREE ZONE OPPORTUNITIES
W
• LIMITED SIZE OF THE INDUSTRIAL AREAS
• LIMITED NUMBER OF INDUSTRIAL PLAYERS
• UNPROFESSIONAL LOCAL ENGINEERING COMPANY
O • ADMINISTRATIVE EFFICIENCY OF THE MUNICIPALITY
• NEW INDUSTRIAL INVESTORS ARE WELCOME
T
Optimized management of 8 subcontractors
Building Experiences - Serbia 2010.-2015.
Credentials
ContiTech Fluid Serbia
Factory Building Process
Images
Municipality of
Subotica, Serbia
2012.
Credentials : Plados Telma
Outcome
• Renovation of the “Brownfield”
• Project time scheduling;
• Relationship management with Authorities and Municipalities;
• Mechanical systems projects with validation under Serbian standards;
• Obtaining permits from municipality;
• Fire protection project and permit
Critical aspects
 Difficulties in respecting all current fire protection prescriptions when dealing
with a “brownfield” built under outdated standards
Building Experiences - Serbia 2010.-2015.
SWOT ANALYSIS in the
municipality of Nova Pazova
S
• ASSISTENCE FROM VOJVODINA INVESTMENT
PROMOTION - VIP
• FREE ZONE OPPORTUNITIES
W • LIMITED SIZE OF THE INDUSTRIAL AREAS
• LIMITED NUMBER OF IAVAILABLE “BROWNFIELDS”
O
• FAST BUILDING PERMIT PROCEDURE FROM THE
MUNICIPALITY
• NEW INDUSTRIAL INVESTORS ARE WELCOME
T
Optimized management of 5 subcontractors
Building Experiences - Serbia 2010.-2015.
Banking Experience
Cooper Standard project
Financial provision
Total real estate investment 13.3 MLN€
Equity ratio 30%
Debt ratio 70%
Financial partner UniCredit Bank
Type of loan 7-year mortgage loan
Cooper Standard d.o.o. in Sremska Mitrovica
Inveco I.B.C.
Cooper Standard Automotive D.o.o
2. Build and deliver1. Build to-lease
INVECO I.B.C.
INVECO I.B.C.
Cooper Standard Automotive D.o.o
mortgage loan
build to deliver
mortgage loan
lease
Client’s
final
choice
INVECO I.B.C.
Organization Chart
CFO
Dott. Gabriele Salciarini
PRESIDENT
Fernando Barbetti
DIRECTOR
Filippo Barbetti
PROJECT MANAGER
Ing. Raffaele Urbani
ACCOUNT MANAGER
Ing. Andrea Girelli
FISCAL CONSULTANT
FERTIST D.o.o. Vladimir
ACCOUNTANT
Marija Savić
CIVIL ENGINEER
Ing. Željko Murić
OFFICE CHIEF
Arh. Milica Čakić
MECHANICAL ENGINEER
Ing. Danilo Babić
MARKETING DEPT.
Aleksandar Bakšunović
ELECTRICAL ENGINEER
Ing. Stevan Simeunović
SUPPLIERS
SUB CONTRACTORS
Inveco Holding S.p.a.
Headquarters:
Via A. Manzoni, 82
06135-Perugia-Italy
Phone: +39 075 39 83 21
Fax: +39 075 599 61 56
inveco@gruppoinveco.it
www.gruppoinveco.com
Gruppo Inveco
CANADA
MEXICO
BRASIL
ARGENTINA
PORTUGAL
TUNISIA
ITALY SERBIA
RUSSIA
TURKEY

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

CV Naser Baki 2015
CV Naser Baki 2015CV Naser Baki 2015
CV Naser Baki 2015
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
Mostafa Elshamy Resume
Mostafa Elshamy ResumeMostafa Elshamy Resume
Mostafa Elshamy Resume
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
AHMAD ELSAYED
AHMAD ELSAYEDAHMAD ELSAYED
AHMAD ELSAYED
 
Zuher Mirza CV
Zuher Mirza CVZuher Mirza CV
Zuher Mirza CV
 
MUGHAL 2
MUGHAL 2MUGHAL 2
MUGHAL 2
 
Stelian Dragomir CV
Stelian Dragomir CVStelian Dragomir CV
Stelian Dragomir CV
 
Cv mišković ranko
Cv mišković rankoCv mišković ranko
Cv mišković ranko
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
mahmoud cv
mahmoud cv mahmoud cv
mahmoud cv
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014
 
Resume_Amruth Karjigi_6 years_
Resume_Amruth Karjigi_6 years_Resume_Amruth Karjigi_6 years_
Resume_Amruth Karjigi_6 years_
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
CV2
CV2CV2
CV2
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
Mohamed Abdelaal cv
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cv
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 

Semelhante a Gruppo inveco 2016

Semelhante a Gruppo inveco 2016 (20)

CV
CVCV
CV
 
riyasdeen - qs
riyasdeen - qsriyasdeen - qs
riyasdeen - qs
 
mY cV PDF
mY cV PDFmY cV PDF
mY cV PDF
 
The New Era: BIM for High Speed Rail
The New Era: BIM for High Speed RailThe New Era: BIM for High Speed Rail
The New Era: BIM for High Speed Rail
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL Consulting
 
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Preetish Daniel PDS Piping
Preetish Daniel PDS PipingPreetish Daniel PDS Piping
Preetish Daniel PDS Piping
 
Resume_Sanket Dalvi
Resume_Sanket DalviResume_Sanket Dalvi
Resume_Sanket Dalvi
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
CV Joseph Rey C. Marilla
CV Joseph Rey C. MarillaCV Joseph Rey C. Marilla
CV Joseph Rey C. Marilla
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
Trainig
Trainig Trainig
Trainig
 
CV., Till now
CV., Till nowCV., Till now
CV., Till now
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
 

Gruppo inveco 2016

  • 2. “The biggest problem is not to let people accept new ideas, but to let them forget the old ones.” “La difficoltà non sta nel credere nelle nuove idee, ma nel fuggire dalle vecchie.” John Maynard Keynes
  • 3.  Building Experiences  Credentials  Organization Chart Gruppo Inveco in Serbia
  • 4. Cases of successful industrial projects in Serbia Nova Pazova Year 2015. Ind. Area Nova Pazova Sqmt 8.000 BROWNFIELD Sremska Mitrovica Year 2013/2014 Ind. Area S. Mitrovica Sqmt 19.135 GREENFIELD Kostolac Year 2012. Ind. Area Kostolac Sqmt 8.000 BROWNFIELD Subotica Year 2012 Ind. Area Bajmok Sqmt 8.500 GREENFIELD Kragujevac Year 2011 Ind. Area Kasarna Grošnica Sqmt 13.900 GREENFIELD Niš Year 2010 Ind. Area Donje Međurovo Sqmt 10.209 GREENFIELD
  • 5. As a General Contractor, INVECO I.B.C. realized several projects for international clients who chose Serbia for their new production localizations. Building Experiences - Serbia 2010.-2015. CREDENTIALS & REFERENCES CARRIED OUT PROJECTS 6 TOTAL SQM 50.000 sqm AVERAGE TIMING FOR PROJECT DELIVERY < 9 months TOTAL TURNOVER 33 MLN € SPECIAL FOUNDATIONS works BROWNFIELD general installation SYSTEMS installation MAIN CLIENTS
  • 6. Credentials: Cooper Standard Outcome • Feasibility Study and selection of the land; • Project-time scheduling; • Definition of the preliminary project to start bureaucratic process; • Relationship management with Authorities and Municipalities; • Obtaining of preliminary and generic permits; • Draft of structural, architectural and system projects; • Construction management, testing and start of production. Critical aspects  Slow Cadaster (Land register) process;  Local grid operator connection process (many requests of additional documents); Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Sremska Mitrovica S • ADMINISTRATIVE EFFICIENCY OF THE MUNICIPALITY • CONNECTIONS: Beograd airport - Nikola Tesla, Close to Beograd Town W • LACK OF HIGHLY - SKILLED LABOUR O • COMMERCIAL RELATIONS WITH NEAR VOJVODINA REGION • B2B OPPORTUNITIES T Optimized management of 12 subcontractors
  • 7. Building Experiences - Serbia 2010.-2015. Cooper Standard project GANTT 20.000 SQMT
  • 8. Building Experiences - Serbia 2010.-2015. Credentials Cooper Standard Factory Building Process Images Municipality of Sremska Mitrovica, Serbia 2013./2014.
  • 9. Credentials : PMC Automotive Outcome • Feasibility Study and selection of the land with FIAT staff; • Project time scheduling; • Definition of the preliminary project to start bureaucratic process; • Relationship management with Authorities and Municipalities; • Obtaining of preliminary and generic permits; • Draft of structural, architectural and system projects; • Construction management, testing and start of production. Critical aspects  Harsh weather conditions (-20° and snow) caused works to be stopped for days;  The customer has changed the final design of the project several times (extra costs & time) Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Kragujevac S • ALREADY HIGHLY INDUSTRIALIZED AREA (F.A.S.+ INDUCED) • PRESENCE OF ENGINEERING COLLEGES (professional training) • PLENTY OF HIGHLY-SKILLED LABOUR (AUTOMOTIVE) W • RAW/MANUFACTURING/SERVICES HIGH COSTS • MORE EXPENSIVE THAN OTHER LOCATIONS • MUCH HIGHER SALARY • LOCAL SPECULATION EVENTS O • VIRTUOUS CYCLE OF DEVELOPMENT IN THE AREA T • INFLATION AND SALARY INCREASE Optimized management of 20 subcontractors
  • 10. Building Experiences - Serbia 2010.-2015. Credentials PMC Automotive Factory Building Process Images Municipality of Kragujevac, Serbia 2011.
  • 11. Credentials : CLN Group Outcome • Feasibility Study for ‘’special foundations’’; • Draft of structural and executive projects; • Construction management and testing. Critical aspects  Financial instability of local subcontractors: we were constantly requested for pre-payments and advances on the work. Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Kostolac S • GOOD LINKS TO THE MAIN ROADS W • LIMITED SIZE OF THE INDUSTRIAL AREA • LIMITED NUMBER OF INDUSTRIAL PLAYERS • LACK OF HIGHLY - SKILLED LABOUR O • PRESENCE OF A DISTRIC HEATING SYSTEM T • LOCAL CRIME Optimized management of 3 subcontractors
  • 12. Credentials : Dytech F&F Serbia Outcome • Feasibility Study and selection of the land; • Project time scheduling; • Definition of the preliminary project to start bureaucratic process; • Relationship management with Authorities and Municipalities; • Obtaining of preliminary and generic permits; • Draft of structural, architectural and system projects; • Construction management. Critical aspects  Dytech still did not start production;  Obtaining Incentives VS Strategic market approach (short-term choice) (long-term choice) Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Niš S • FREE ZONE OPPORTUNITIES; • LOW LABOUR COST • CONNECTIONS: Konstantin Veliki Airport, HIGHWAY E-75 NIS-BEOGRAD W • AVAILABILITY OF PUBLIC INDUSTRIAL URBANIZED AREAS O • PRESENCE OF MAJOR INDUSTRIAL PLAYERS • B2B OPPORTUNITIES • PLENTY OF HIGHLY - SKILLED LABOUR T • BUREAUCRACY PROCESS Optimized management of 10 subcontractors
  • 13. Building Experiences - Serbia 2010.-2015. Credentials Dythech F&F Serbia Factory Building Process Images Municipality of Niš, Serbia 2010.
  • 14. Credentials : ContiTech Fluid Serbia Outcome • Project time scheduling; • Draft of executive systems installation projects; • Construction management, testing and start of production Critical aspects  Designers nominated by the customer uncooperative: we were requested to deliver technical files and maintenance manuals in Serbian language (even if original documentation issued by the manufacturer did not include that language). Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Subotica S • LARGE INDUSTRIALIZED AREAS • CLOSE WITH HUNGARY BORDERS (Market opportunities) • FREE ZONE OPPORTUNITIES W • LIMITED SIZE OF THE INDUSTRIAL AREAS • LIMITED NUMBER OF INDUSTRIAL PLAYERS • UNPROFESSIONAL LOCAL ENGINEERING COMPANY O • ADMINISTRATIVE EFFICIENCY OF THE MUNICIPALITY • NEW INDUSTRIAL INVESTORS ARE WELCOME T Optimized management of 8 subcontractors
  • 15. Building Experiences - Serbia 2010.-2015. Credentials ContiTech Fluid Serbia Factory Building Process Images Municipality of Subotica, Serbia 2012.
  • 16. Credentials : Plados Telma Outcome • Renovation of the “Brownfield” • Project time scheduling; • Relationship management with Authorities and Municipalities; • Mechanical systems projects with validation under Serbian standards; • Obtaining permits from municipality; • Fire protection project and permit Critical aspects  Difficulties in respecting all current fire protection prescriptions when dealing with a “brownfield” built under outdated standards Building Experiences - Serbia 2010.-2015. SWOT ANALYSIS in the municipality of Nova Pazova S • ASSISTENCE FROM VOJVODINA INVESTMENT PROMOTION - VIP • FREE ZONE OPPORTUNITIES W • LIMITED SIZE OF THE INDUSTRIAL AREAS • LIMITED NUMBER OF IAVAILABLE “BROWNFIELDS” O • FAST BUILDING PERMIT PROCEDURE FROM THE MUNICIPALITY • NEW INDUSTRIAL INVESTORS ARE WELCOME T Optimized management of 5 subcontractors
  • 17. Building Experiences - Serbia 2010.-2015. Banking Experience Cooper Standard project Financial provision Total real estate investment 13.3 MLN€ Equity ratio 30% Debt ratio 70% Financial partner UniCredit Bank Type of loan 7-year mortgage loan Cooper Standard d.o.o. in Sremska Mitrovica Inveco I.B.C. Cooper Standard Automotive D.o.o 2. Build and deliver1. Build to-lease INVECO I.B.C. INVECO I.B.C. Cooper Standard Automotive D.o.o mortgage loan build to deliver mortgage loan lease Client’s final choice
  • 18. INVECO I.B.C. Organization Chart CFO Dott. Gabriele Salciarini PRESIDENT Fernando Barbetti DIRECTOR Filippo Barbetti PROJECT MANAGER Ing. Raffaele Urbani ACCOUNT MANAGER Ing. Andrea Girelli FISCAL CONSULTANT FERTIST D.o.o. Vladimir ACCOUNTANT Marija Savić CIVIL ENGINEER Ing. Željko Murić OFFICE CHIEF Arh. Milica Čakić MECHANICAL ENGINEER Ing. Danilo Babić MARKETING DEPT. Aleksandar Bakšunović ELECTRICAL ENGINEER Ing. Stevan Simeunović SUPPLIERS SUB CONTRACTORS