SlideShare uma empresa Scribd logo
1 de 30
[object Object],[object Object],[object Object]
[object Object],Opening Statement
Infrastructure Impacts   Passenger Concern Poor Infrastructure Good Infrastructure 1. Access Time Hard / long time to get to bus stop Easy and quick 2. Waiting Time Unpleasant surroundings, high perceived waiting time Pleasant surroundings, low perceived waiting time 3. In-Vehicle Travel Time Slow journey and long travel time Fast journey and short travel time 4. Egress Time Hard / long time to get from bus stop Easy and quick Time Long travel times    services are unattractive Short times    services are attractive
[object Object],[object Object],[object Object],[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],1. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],[object Object],2.Infrastructure to Reduce Passenger Waiting Time
[object Object],[object Object],[object Object],[object Object],2. Infrastructure to Reduce Perceived Passenger Waiting Time
[object Object],[object Object],[object Object],[object Object],2. Infrastructure to Reduce  Actual  Passenger Waiting Time
[object Object],2. Infrastructure to Reduce  Perceived  Passenger Waiting Time   Weather protection Lighting Visibility Seating Route and Timetable Information Bus Stop ID and Route Information
[object Object],2. Infrastructure to Reduce Perceived Passenger Waiting Time
[object Object],2. Infrastructure to Reduce Perceived Passenger Waiting Time
2. Infrastructure to Reduce Perceived Passenger Waiting Time
2. Infrastructure to Reduce Perceived Passenger Waiting Time
[object Object],[object Object],[object Object],3. Infrastructure to Reduce In-vehicle Travel Time
3. Infrastructure to Reduce In-vehicle Travel Time Bus accelerating area
3. Infrastructure to Reduce In-vehicle Travel Time Bus stop extended out from kerb so buses do not have to pull in to stop
3. Infrastructure to Reduce In-vehicle Travel Time Bus stop extended out from kerb so buses do not have to pull in to stop
3. Infrastructure to Reduce In-vehicle Travel Time ,[object Object],[object Object],[object Object],[object Object]
3. Infrastructure to Reduce In-vehicle Travel Time
3. Infrastructure to Reduce In-vehicle Travel Time ,[object Object],[object Object]
3. Infrastructure to Reduce In-vehicle Travel Time ,[object Object],[object Object],[object Object],[object Object]
3. Infrastructure to Reduce In-vehicle Travel Time ,[object Object],[object Object],[object Object]
[object Object],[object Object],4. Infrastructure to Reduce Passenger Access Time
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Impact of Speed on Operating Costs
Closing Comments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Semelhante a Session ii the roles of physical infrastructure to achieve successful brt david overington

FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAYFORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
ijiert bestjournal
 
Presentation2
Presentation2Presentation2
Presentation2
Aman Haz
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
BRTCoE
 
Bus Service Problems
Bus Service Problems Bus Service Problems
Bus Service Problems
Saeed Badeli
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
Norma Nun
 

Semelhante a Session ii the roles of physical infrastructure to achieve successful brt david overington (20)

Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Consideration travel time in development plan
Consideration travel time in development planConsideration travel time in development plan
Consideration travel time in development plan
 
FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAYFORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
FORESEEING BUS ARRIVAL TIME IN VIEW OF TRAFFIC MODELING AND REAL-TIME DELAY
 
Presentation2
Presentation2Presentation2
Presentation2
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
 
BUS Rapid Transist System
BUS Rapid Transist SystemBUS Rapid Transist System
BUS Rapid Transist System
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
 
Bus Service Problems
Bus Service Problems Bus Service Problems
Bus Service Problems
 
Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)
 
Operation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxOperation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptx
 
Secondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary NotesSecondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary Notes
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
 
Unit 4 package 6
Unit 4 package 6Unit 4 package 6
Unit 4 package 6
 
IRJET- Real Time Intelligent City Bus Management System
IRJET- Real Time Intelligent City Bus Management SystemIRJET- Real Time Intelligent City Bus Management System
IRJET- Real Time Intelligent City Bus Management System
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
BRT Workshop - Intro
BRT Workshop - IntroBRT Workshop - Intro
BRT Workshop - Intro
 

Mais de Indonesia Infrastructure Initiative

Mais de Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Session ii the roles of physical infrastructure to achieve successful brt david overington

  • 1.
  • 2.
  • 3. Infrastructure Impacts Passenger Concern Poor Infrastructure Good Infrastructure 1. Access Time Hard / long time to get to bus stop Easy and quick 2. Waiting Time Unpleasant surroundings, high perceived waiting time Pleasant surroundings, low perceived waiting time 3. In-Vehicle Travel Time Slow journey and long travel time Fast journey and short travel time 4. Egress Time Hard / long time to get from bus stop Easy and quick Time Long travel times  services are unattractive Short times  services are attractive
  • 4.
  • 5. 1. Infrastructure to Reduce Passenger Access Time
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. 2. Infrastructure to Reduce Perceived Passenger Waiting Time
  • 18. 2. Infrastructure to Reduce Perceived Passenger Waiting Time
  • 19.
  • 20. 3. Infrastructure to Reduce In-vehicle Travel Time Bus accelerating area
  • 21. 3. Infrastructure to Reduce In-vehicle Travel Time Bus stop extended out from kerb so buses do not have to pull in to stop
  • 22. 3. Infrastructure to Reduce In-vehicle Travel Time Bus stop extended out from kerb so buses do not have to pull in to stop
  • 23.
  • 24. 3. Infrastructure to Reduce In-vehicle Travel Time
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.