SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
ONE OF THE MAJOR PROBLEMS FACED BY THE INDIAN URBAN CITIES IS THE PROBLEM OF TRAFFIC CONGESTION. A BIG
CONCERN IS HOW TO SPEED UP THE TRAFFIC:PUTTING MORE BUSES ON THE ROAD WILL JAM THE ROADS EVEN WORSE
AND DETERIORATE THE AIR:BUILDING MORE SUBWAY IS COSTLY AND TIME CONSUMING. SO THERE IS A NEED TO DEVICE A
SYSTEM COMPATIBLE WITH EXISTING INFRASTRUCTRE TO REDUCE CONGESTION.
WITH THE INCREASING POPULATION OF URBAN CITIES AND GROWING DEFICIT
BETWEEN THE ROAD NETWORKS AND NUMBER OF VEHICLES THUS LEADING TO
POLLUTION AND WASTE OF RESOURCES, THERE IS A DEMAND FOR EFFICIENT PUBLIC
TRANSPORT SYSTEM
URBAN POPULATION :
377 MILLION(2011
CENSUS)
IN DELHI 13 PEOPLE
DIE EVERY DAY ON
ROAD
IN BANGALORE THE
AVERAGE TIME TAKEN
BY AN IT
PROFFESSIONAL TO
REACH WORK IS 2.5 Hrs
NUMBER OF VEHICLES ON
MUMBAI ROADS MULTIPLIED
33 TIMES IN 50 YERARS
WHILE THE ROAD NETWORK
LENGTH ONLY DOUBLED
PROPOSED SOLUTION
THE PROPOSED SOLUTION TO THE PROBLEM OF TRAFFIC CONGESTION IS INSTALLNG THE
STRADDLING BUSES ON ROADS.
THE MODEL LOOKS LIKE A SUBWAY
OR LIGHT-RAIL TRAIN BESTRIDING
THE ROAD
THE BUS CAN REDUCE THE TRAFFIC
JAMS BY 20-30%
4-4.5M HIGH WITH TWO LEVELS:
PASSENGER BOAT ON THE UPPER
LEVEL AND 6 M IN WIDTH WHILE
OTHER VEHICLES LOWER THAN
2M CAN GO
POWERED BY ELECTRICITY AND
SOLAR ENERGY.
REDUCE THE TRAFFIC JAMS BY
20-30%.
AVERAGE SPEED IS 40-
50Km/Hr CARRYING 1200-
1400 PASSENGERS AT A TIME
WITHOUT BLOCKING OTHER
VEHICLE’S WAY
COST IS ABOUT 5.36BILLION
RUPEES TO BUILD THE BUS
AND A 40 KM LONG PATH FOR
IT, APRROXIMATELY 7% OF
METRO SYSTEM.
LARGE WINDOWS ARE PROVIDED
ON THE BOTH LOWER SIDES
SO THAT THE ILLUSION OF CAR
MOVING BACK, IS NOT CREATED
MERITS OVER EXISTING PUBLIC TRANSPORT
SYSTEMS
THERE ARE 3 TYPES OF PUBLIC TRANSPORT SYSTEMS: METRO,BRTS AND NORMAL BUS.
DISADVANTAGES OF PRESENT
TRANSIT SYSTEMS
METRO COSTS A LOT AND TAKES LONG
TIME TO BUILD.
BRTS TAKES UP ROAD SPACES AND
PRODUCES NOISE AND POLLUTION.THUS
PRODUCING MORE CONGESTION ON
ROADS FOR OTHER VEHICLES.
NORMAL BUS SYSTEM IS NOT
SOPHISTICATED AND THE BUSES ARE
CONGESTED AND A LOT OF TIME IS
WASTED TRAVELLING WITH THESE BUSES.
MERITS OF STRADDLING BUS SYSTEM
IT IS CHEAPER AND CONSTRUCTION TAKES
LESS TIME
LARGE PARKING SPACES ARE
REQUIRED
LARGE PARKING SPACES ARE NO REQUIRED
AND CAN BE PARKED ON ROADS WITHOUT
AFFECTING THE PASSAGE OF CARS
IT SAVES ROAD SPACES, EFFICIENT AND HIGH
IN CAPACITY
TRAVELLING WITH THESE BUSES WILL
CONSUME LESS TIME AND HENCE IT IS
MORE SOPHISTICATED
KEY STEPS INVOLVED IN IMPLEMENTING THE
SOLUTION
REMODELLING OF THE ROAD
THERE ARE TWO WAYS OF REMODELLING THE ROADS: LAYING RAILS & PAINT WHITE LINES
THE RAILS WILL BE LAID ON BOTH SIDES OF THE ROAD AND THE BUS CAN RUN ON THE
RAILS AND SAVE 30% ENERGY.
THE OTHER METHOD IS BY PAINTING WHITE LINES ON BOTH SIDES OF THE ROAD AND
BUSES WILL HAVE AUTO PILOTS WHCH WILL FOLLOW THESE LINES AND RUN STABLE WHILE
MOVING.
BUILDING STATIONS:
THERE ARE TWO WAYS IN DEALING WITH STATION
PLATFORMS:
1.LOAD/UNLOAD THROUGH THE SIDES
2.USING THE BUILT-IN-LADDER SO THAT PASSENGERS CAN GO
UP AND OVER PASS THROUGH THE CEILING DOORS.
3.STATIONS CAN BE SET UP AT EVERY 2Km.
POWER SUPPLY TO BUSES
1.BUSES WILL BE COMPLETELY POWERED BY MUNICIPAL
ELECTRICITY AND SOLAR ENERGY SYSTEM.
2.THE SYSTEM IS RELAY DIRECT CURRENT ELECTRIFICATION.
3.TWO RAILS BUILT ON TOP TO ALLOW THE CHARGING
POST TO RUN ALONG WITH THE BUS, THE NEXT CHARGING
POST WILL BE ON THE RAILS BEFORE THE EARLIER ONE
LEAVES.ELECTRICAL SET HERE IS SUPER CAPACITOR, WHICH
CAN CHARGE, DISCHARGE AND STORE ELECTRICITY
QUICKLY.
4.THE POWER IT STORES DURING THE STOP CAN SUPPORT
THE BUS TILL THE NEXT STOP WHERE ANOTHER ROUND OF
CHARGING TAKES PLACE, ACHIEVING ZERO TOXIC GAS
ENSURING SAFETY
USING LASER RAY TO SCAN, CARS GET TOO CLOSE TO THE PASSAGE WILL
ACTIVATE THE ALARM ON THE BUS AND INSIDE THE BUS THERE ARE TURNING
LIGHTS THAT INDICATE THE BUS IS INTENDING TO MAKE A TURN TO WARN THE
CARS INSIDE.
RADAR SCANNING SYSTEM IS EMBEDED ON THE WALLS TO WARN CARS FROM
GETTING TOO CLOSE TO THE BUS WHEELS.
ULTRASONIC WAVES WILL BE PUT FORTH FROM THE END OF BUS THAT IS TO KEEP
THOSE HIGH CARS OR TRUCKS AWAY FROM ENTERING THE TUNNEL.
• WHEN A BUS REACHES A CROSSING RED LIGHT ON THE OTHER SIDE OF THE
FORK WILL TURN ON AUTOMATICALLLY TO GIVE BUSES THE RIGHT OF THE WAY.
• THE CAR CAN MAKE THE TURN WITH THE BUS IF THAT IS THE DIRECTION IT
WANTS TO GO TOO;IF NOT
• THE RED LIGHT WILL BE ON TO STOP THE CAR BENEATH WHILE THE BUS TAKES
THE TURN.
IN CASE OF AN ACCIDENT , FIRE OR OTHER EMERGENCIES THE ESCAPING DOORS WILL
OPEN AUTOMATICALLY LIKE THE PLANES ARE EQUIPPED WITH INFLATED LADDER SO
PEOPLE CAN SLIDE DOWN.
EMERGENCY BRAKES ARE PROVIDED IN CAS OF URGENT STOPPAGE.
SOURCE OF FUNDING
THE ESTIMATED COST IS ABOUT 5.36BILLION RUPEES TO BUILD THE STRADDLING
BUS AND A 40 KM LONG PATH FOR IT, WHICH IS APRROXIMATELY 7% OF METRO
SYSTEM..
INITIAL COST OF A PHASE CAN BE CALCULATED.
THE TOTAL EXPENDITURE FOR THAT PHASE CAN BE DIVIDED AMONG CENTRAL
GOVERNMENT, STATE GOVERNMENT,SOFT LOAN AND PRIVATE PUBLIC PARTNERSHIP.
A JOINT VENTURE CAN BE SET UP BY THE STATE GOVERNMENT AND CENTRAL
GOVERNMENT.
SOME PART OF INVESTMENT FOR Ex. 30% CAN BE PROVIDED BY CENTRAL
GOVERNMENT, 30% BY STATE GOVERNMENT AND REST CAN BE RAISED BY PUBLIC
PRIVATE PARTNERSHIP OR SOFT LOANS.
THE REVENUE EARNED WILL BE USED FIRSTLY FOR MAINTENANCE SO THAT THE
PROJECT CAN RUN SUCCESSFULLY AND THE MONEY LEFT AFTER THIS CAN BE USED
TO PAY THE DEBT.
IMPACT OF THE SOLUTION
-MEASURING THE CONGESTION ON THE ROADS
COVERED.
-MEASUREMENT OF TRAVEL TIME BETWEEN TWO
POINTS.
-ANALYSING PEOPLES RESPONSE TO THE SYSTEM
-ESTIMATING THE COST OF TRAVEL
-MEASURING THE REDUCTION IN CARBON
EMISSIONS OF THE CITY
-BUSES CAN CARRY 1200-1400 PASSENGERS
AT A TIME.
-ECOFRIENDLY TRANSIT SYSTEM AND SAVES
860TON OF FUEL EVERY YEAR REDUCES
2640TON CARBON EMISSION.
-IT CAN PRODUCE MORE OUTPUT FROM
THE GIVEN RESOURCES
-IT DOSEN’T REQUIRE EXTRA SPACE FOR ITS
DEVELOPMENT AND RUNNING,LIKE OTHER
PUBLIC TRANSPORT SYSYTEM
THIS PROJECT IS SUSTAINABLE BECAUSE IT IS COMPATIBLE WITH THE
DECLINING RESOURCES BY DERIVING ITS ENERGY FROM RENEWABLE
SOURCES OF ENERGY, THUS IT CAN ACT AS A GOOD TRANSPORT SYSTEM IN A
WORLD WHICH IS SUFFERING FROM ENERGY CRISIS. ALSO IT PROVIDES A
LOW COST SOPHISTICATED AND COMFORTABLE TRAVEL. IN INDIA,MANY
URBAN CITIES ARE BEING PLANNED WITH METRO’S ANND BULLET TRAINS
WHICH COSTS A LOT. SO THIS SYSTEM CAN ACT AS BOON IN COMING FUTURE.
MEASURING IMPACT SCALABILITY OF SOLUTION
SUSTAINABILITY OF SOLUTION
1.THE STRADDLING BUS WAS FIRST EXHIBITED ON THE 13th BEIJING
INTERNATIONAL HIGH-TECH EXPO.
2.THE BASIC IDEA WAS PROPOSED BY SHENZHEN HASHI FUTURE PARKING
EQUIPMENT CO. LTD.
REFERENCES:
1. http://www.delhimetrorail.com/needformetro/metro-
need.aspx
2. http://www.delhimetrorail.com/projectsupdate/project_cost.a
spx
3. http://en.wikipedia.org/wiki/Delhi_Metro
4. http://en.wikipedia.org/wiki/3D_Express_Coach
5. morth.nic.in/writereaddata/mainlinkFile/File417.pdf

Mais conteúdo relacionado

Mais procurados

The Benefits Of Public Transport
The Benefits Of Public TransportThe Benefits Of Public Transport
The Benefits Of Public TransportGen Ndoci
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraWRI Ross Center for Sustainable Cities
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainabilityJill Berberich
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennaiedsley
 
Traffic at urban road junctions
Traffic at urban road junctionsTraffic at urban road junctions
Traffic at urban road junctionsDasun_Ransiri
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit SystemHimanshu Singh
 
IRJET- Public Transportation System
IRJET- Public Transportation SystemIRJET- Public Transportation System
IRJET- Public Transportation SystemIRJET Journal
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation SystemJasper Jasper
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbaiaziz khan
 
[Urban transportation policy program]city paper presentation shiraz
[Urban transportation policy program]city paper presentation shiraz[Urban transportation policy program]city paper presentation shiraz
[Urban transportation policy program]city paper presentation shirazshrdcinfo
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane Systemguestf2886b
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...BRTCoE
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system Aditya Gupta
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemAsjad Khuram
 

Mais procurados (20)

The Benefits Of Public Transport
The Benefits Of Public TransportThe Benefits Of Public Transport
The Benefits Of Public Transport
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
 
77 atanu
77 atanu77 atanu
77 atanu
 
Aqeeb seminar @ a.t.t
Aqeeb seminar @ a.t.tAqeeb seminar @ a.t.t
Aqeeb seminar @ a.t.t
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainability
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Traffic at urban road junctions
Traffic at urban road junctionsTraffic at urban road junctions
Traffic at urban road junctions
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit System
 
IRJET- Public Transportation System
IRJET- Public Transportation SystemIRJET- Public Transportation System
IRJET- Public Transportation System
 
public transport
public transportpublic transport
public transport
 
Public transport
Public transportPublic transport
Public transport
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbai
 
[Urban transportation policy program]city paper presentation shiraz
[Urban transportation policy program]city paper presentation shiraz[Urban transportation policy program]city paper presentation shiraz
[Urban transportation policy program]city paper presentation shiraz
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane System
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Metro rail
Metro railMetro rail
Metro rail
 

Destaque

Traffic Problems in Cities.
Traffic Problems in Cities. Traffic Problems in Cities.
Traffic Problems in Cities. Farooq Mian
 
Mercedes Benz - Suspensiones
Mercedes Benz - SuspensionesMercedes Benz - Suspensiones
Mercedes Benz - Suspensionesmarcosrgm
 
Transportation for make in india
Transportation for make in indiaTransportation for make in india
Transportation for make in indiaAr. Avitesh
 
The Major Challenges To Transportation Service
The Major Challenges To Transportation ServiceThe Major Challenges To Transportation Service
The Major Challenges To Transportation ServicePegasus Transit Inc.
 
urban heritage in indian cities
urban heritage in indian citiesurban heritage in indian cities
urban heritage in indian citiesPriyanka Rajani
 
The impact of consumer sales promotion on customer buying behavior with speci...
The impact of consumer sales promotion on customer buying behavior with speci...The impact of consumer sales promotion on customer buying behavior with speci...
The impact of consumer sales promotion on customer buying behavior with speci...Janith Chandranath
 
Heritage legislation [compatibility mode]
Heritage  legislation [compatibility mode]Heritage  legislation [compatibility mode]
Heritage legislation [compatibility mode]Puducheri Kumar
 
Airbus Ppt
Airbus PptAirbus Ppt
Airbus PptUmesh
 
Introduction to Cultural Heritage
Introduction to Cultural HeritageIntroduction to Cultural Heritage
Introduction to Cultural HeritageAli Haris
 
Cultural heritage & its importance
Cultural heritage & its importanceCultural heritage & its importance
Cultural heritage & its importanceTousif Raja
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemAlvin Niere
 
Cultural Heritage of India
Cultural Heritage of IndiaCultural Heritage of India
Cultural Heritage of IndiaSargun Kohli
 

Destaque (20)

Traffic Simulator
Traffic SimulatorTraffic Simulator
Traffic Simulator
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Piagam
PiagamPiagam
Piagam
 
Traffic Problems in Cities.
Traffic Problems in Cities. Traffic Problems in Cities.
Traffic Problems in Cities.
 
IT New
IT NewIT New
IT New
 
Mercedes Benz - Suspensiones
Mercedes Benz - SuspensionesMercedes Benz - Suspensiones
Mercedes Benz - Suspensiones
 
Transportation for make in india
Transportation for make in indiaTransportation for make in india
Transportation for make in india
 
The Major Challenges To Transportation Service
The Major Challenges To Transportation ServiceThe Major Challenges To Transportation Service
The Major Challenges To Transportation Service
 
urban heritage in indian cities
urban heritage in indian citiesurban heritage in indian cities
urban heritage in indian cities
 
The impact of consumer sales promotion on customer buying behavior with speci...
The impact of consumer sales promotion on customer buying behavior with speci...The impact of consumer sales promotion on customer buying behavior with speci...
The impact of consumer sales promotion on customer buying behavior with speci...
 
Heritage legislation [compatibility mode]
Heritage  legislation [compatibility mode]Heritage  legislation [compatibility mode]
Heritage legislation [compatibility mode]
 
Airbus Ppt
Airbus PptAirbus Ppt
Airbus Ppt
 
The Art of Asking Questions
The Art of Asking QuestionsThe Art of Asking Questions
The Art of Asking Questions
 
Introduction to Cultural Heritage
Introduction to Cultural HeritageIntroduction to Cultural Heritage
Introduction to Cultural Heritage
 
Cultural heritage & its importance
Cultural heritage & its importanceCultural heritage & its importance
Cultural heritage & its importance
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
Brts
BrtsBrts
Brts
 
Sales Promotion
Sales Promotion Sales Promotion
Sales Promotion
 
Cultures of india
Cultures of indiaCultures of india
Cultures of india
 
Cultural Heritage of India
Cultural Heritage of IndiaCultural Heritage of India
Cultural Heritage of India
 

Semelhante a CIVICCRUSADERS

Urban traffic problems and solutions
Urban traffic problems and solutionsUrban traffic problems and solutions
Urban traffic problems and solutionseSAT Journals
 
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptvdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptSagarSb9
 
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptvdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptSagarSb9
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane SystemNaveen Chandra
 
HSH Dublin Regional Elevated Rail System 72km 15 April 2021
HSH Dublin Regional Elevated Rail System 72km 15 April 2021HSH Dublin Regional Elevated Rail System 72km 15 April 2021
HSH Dublin Regional Elevated Rail System 72km 15 April 2021Justin Sutton
 
congestion pricing
congestion pricingcongestion pricing
congestion pricingtransalt
 
HSH ERS PreLimPro Bangkok 248km 22feb2022
HSH ERS PreLimPro Bangkok 248km 22feb2022HSH ERS PreLimPro Bangkok 248km 22feb2022
HSH ERS PreLimPro Bangkok 248km 22feb2022Justin Sutton
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Paromita Roy
 
HSH-California 101 25Sept2021.pdf
HSH-California 101 25Sept2021.pdfHSH-California 101 25Sept2021.pdf
HSH-California 101 25Sept2021.pdfJustin Sutton
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic CongestionZaid Kayani
 
BUS Rapid Transist System
BUS Rapid Transist SystemBUS Rapid Transist System
BUS Rapid Transist Systemnitheshkumarj1
 
HSH London & Toronto MSM 02Nov2021s.pdf
HSH London & Toronto MSM 02Nov2021s.pdfHSH London & Toronto MSM 02Nov2021s.pdf
HSH London & Toronto MSM 02Nov2021s.pdfJustin Sutton
 
Craighead 415
Craighead 415Craighead 415
Craighead 415speedbeef
 
HSH Ireland 235km Dublin to Shannon 13 April 2021-lr
HSH Ireland 235km Dublin to Shannon 13 April 2021-lrHSH Ireland 235km Dublin to Shannon 13 April 2021-lr
HSH Ireland 235km Dublin to Shannon 13 April 2021-lrJustin Sutton
 
DESIGNING_THE_HIGHWAY.pptx
DESIGNING_THE_HIGHWAY.pptxDESIGNING_THE_HIGHWAY.pptx
DESIGNING_THE_HIGHWAY.pptxElvinHasanov3
 

Semelhante a CIVICCRUSADERS (20)

Urban traffic problems and solutions
Urban traffic problems and solutionsUrban traffic problems and solutions
Urban traffic problems and solutions
 
Public Transportation
Public TransportationPublic Transportation
Public Transportation
 
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptvdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
 
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.pptvdocument.in_traffic-congestion-55d6c813dfce5.ppt
vdocument.in_traffic-congestion-55d6c813dfce5.ppt
 
Traffic congestion
Traffic congestionTraffic congestion
Traffic congestion
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane System
 
HSH Dublin Regional Elevated Rail System 72km 15 April 2021
HSH Dublin Regional Elevated Rail System 72km 15 April 2021HSH Dublin Regional Elevated Rail System 72km 15 April 2021
HSH Dublin Regional Elevated Rail System 72km 15 April 2021
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
congestion pricing
congestion pricingcongestion pricing
congestion pricing
 
HSH ERS PreLimPro Bangkok 248km 22feb2022
HSH ERS PreLimPro Bangkok 248km 22feb2022HSH ERS PreLimPro Bangkok 248km 22feb2022
HSH ERS PreLimPro Bangkok 248km 22feb2022
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
 
Info about ST3
Info about ST3Info about ST3
Info about ST3
 
HSH-California 101 25Sept2021.pdf
HSH-California 101 25Sept2021.pdfHSH-California 101 25Sept2021.pdf
HSH-California 101 25Sept2021.pdf
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic Congestion
 
BUS Rapid Transist System
BUS Rapid Transist SystemBUS Rapid Transist System
BUS Rapid Transist System
 
HSH London & Toronto MSM 02Nov2021s.pdf
HSH London & Toronto MSM 02Nov2021s.pdfHSH London & Toronto MSM 02Nov2021s.pdf
HSH London & Toronto MSM 02Nov2021s.pdf
 
Subway
SubwaySubway
Subway
 
Craighead 415
Craighead 415Craighead 415
Craighead 415
 
HSH Ireland 235km Dublin to Shannon 13 April 2021-lr
HSH Ireland 235km Dublin to Shannon 13 April 2021-lrHSH Ireland 235km Dublin to Shannon 13 April 2021-lr
HSH Ireland 235km Dublin to Shannon 13 April 2021-lr
 
DESIGNING_THE_HIGHWAY.pptx
DESIGNING_THE_HIGHWAY.pptxDESIGNING_THE_HIGHWAY.pptx
DESIGNING_THE_HIGHWAY.pptx
 

Mais de Citizens for Accountable Governance (20)

Only5
Only5Only5
Only5
 
Pegasus
PegasusPegasus
Pegasus
 
Boosting_skillsetsteamnbd
Boosting_skillsetsteamnbdBoosting_skillsetsteamnbd
Boosting_skillsetsteamnbd
 
Manthan iitm team
Manthan iitm teamManthan iitm team
Manthan iitm team
 
Christite2_2
Christite2_2Christite2_2
Christite2_2
 
Christite1 1
Christite1 1Christite1 1
Christite1 1
 
Vision transparent india
Vision transparent indiaVision transparent india
Vision transparent india
 
Manthan
ManthanManthan
Manthan
 
Sanitation pdf
Sanitation pdfSanitation pdf
Sanitation pdf
 
TechFidos
TechFidosTechFidos
TechFidos
 
samanvaya
samanvayasamanvaya
samanvaya
 
Women_ppt
Women_pptWomen_ppt
Women_ppt
 
Tourism_and_Border_Trade
Tourism_and_Border_TradeTourism_and_Border_Trade
Tourism_and_Border_Trade
 
Striving_towards_a_cleaner_nation
Striving_towards_a_cleaner_nationStriving_towards_a_cleaner_nation
Striving_towards_a_cleaner_nation
 
Stri_Shakti
Stri_ShaktiStri_Shakti
Stri_Shakti
 
sahas1
sahas1sahas1
sahas1
 
REIN
REINREIN
REIN
 
Reducing_malnutrition
Reducing_malnutritionReducing_malnutrition
Reducing_malnutrition
 
Pahal
PahalPahal
Pahal
 
public_distribution_system
public_distribution_systempublic_distribution_system
public_distribution_system
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 

Último (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 

CIVICCRUSADERS

  • 1.
  • 2.
  • 3. ONE OF THE MAJOR PROBLEMS FACED BY THE INDIAN URBAN CITIES IS THE PROBLEM OF TRAFFIC CONGESTION. A BIG CONCERN IS HOW TO SPEED UP THE TRAFFIC:PUTTING MORE BUSES ON THE ROAD WILL JAM THE ROADS EVEN WORSE AND DETERIORATE THE AIR:BUILDING MORE SUBWAY IS COSTLY AND TIME CONSUMING. SO THERE IS A NEED TO DEVICE A SYSTEM COMPATIBLE WITH EXISTING INFRASTRUCTRE TO REDUCE CONGESTION. WITH THE INCREASING POPULATION OF URBAN CITIES AND GROWING DEFICIT BETWEEN THE ROAD NETWORKS AND NUMBER OF VEHICLES THUS LEADING TO POLLUTION AND WASTE OF RESOURCES, THERE IS A DEMAND FOR EFFICIENT PUBLIC TRANSPORT SYSTEM URBAN POPULATION : 377 MILLION(2011 CENSUS) IN DELHI 13 PEOPLE DIE EVERY DAY ON ROAD IN BANGALORE THE AVERAGE TIME TAKEN BY AN IT PROFFESSIONAL TO REACH WORK IS 2.5 Hrs NUMBER OF VEHICLES ON MUMBAI ROADS MULTIPLIED 33 TIMES IN 50 YERARS WHILE THE ROAD NETWORK LENGTH ONLY DOUBLED
  • 4. PROPOSED SOLUTION THE PROPOSED SOLUTION TO THE PROBLEM OF TRAFFIC CONGESTION IS INSTALLNG THE STRADDLING BUSES ON ROADS. THE MODEL LOOKS LIKE A SUBWAY OR LIGHT-RAIL TRAIN BESTRIDING THE ROAD THE BUS CAN REDUCE THE TRAFFIC JAMS BY 20-30% 4-4.5M HIGH WITH TWO LEVELS: PASSENGER BOAT ON THE UPPER LEVEL AND 6 M IN WIDTH WHILE OTHER VEHICLES LOWER THAN 2M CAN GO POWERED BY ELECTRICITY AND SOLAR ENERGY. REDUCE THE TRAFFIC JAMS BY 20-30%. AVERAGE SPEED IS 40- 50Km/Hr CARRYING 1200- 1400 PASSENGERS AT A TIME WITHOUT BLOCKING OTHER VEHICLE’S WAY COST IS ABOUT 5.36BILLION RUPEES TO BUILD THE BUS AND A 40 KM LONG PATH FOR IT, APRROXIMATELY 7% OF METRO SYSTEM. LARGE WINDOWS ARE PROVIDED ON THE BOTH LOWER SIDES SO THAT THE ILLUSION OF CAR MOVING BACK, IS NOT CREATED
  • 5. MERITS OVER EXISTING PUBLIC TRANSPORT SYSTEMS THERE ARE 3 TYPES OF PUBLIC TRANSPORT SYSTEMS: METRO,BRTS AND NORMAL BUS. DISADVANTAGES OF PRESENT TRANSIT SYSTEMS METRO COSTS A LOT AND TAKES LONG TIME TO BUILD. BRTS TAKES UP ROAD SPACES AND PRODUCES NOISE AND POLLUTION.THUS PRODUCING MORE CONGESTION ON ROADS FOR OTHER VEHICLES. NORMAL BUS SYSTEM IS NOT SOPHISTICATED AND THE BUSES ARE CONGESTED AND A LOT OF TIME IS WASTED TRAVELLING WITH THESE BUSES. MERITS OF STRADDLING BUS SYSTEM IT IS CHEAPER AND CONSTRUCTION TAKES LESS TIME LARGE PARKING SPACES ARE REQUIRED LARGE PARKING SPACES ARE NO REQUIRED AND CAN BE PARKED ON ROADS WITHOUT AFFECTING THE PASSAGE OF CARS IT SAVES ROAD SPACES, EFFICIENT AND HIGH IN CAPACITY TRAVELLING WITH THESE BUSES WILL CONSUME LESS TIME AND HENCE IT IS MORE SOPHISTICATED
  • 6. KEY STEPS INVOLVED IN IMPLEMENTING THE SOLUTION REMODELLING OF THE ROAD THERE ARE TWO WAYS OF REMODELLING THE ROADS: LAYING RAILS & PAINT WHITE LINES THE RAILS WILL BE LAID ON BOTH SIDES OF THE ROAD AND THE BUS CAN RUN ON THE RAILS AND SAVE 30% ENERGY. THE OTHER METHOD IS BY PAINTING WHITE LINES ON BOTH SIDES OF THE ROAD AND BUSES WILL HAVE AUTO PILOTS WHCH WILL FOLLOW THESE LINES AND RUN STABLE WHILE MOVING.
  • 7. BUILDING STATIONS: THERE ARE TWO WAYS IN DEALING WITH STATION PLATFORMS: 1.LOAD/UNLOAD THROUGH THE SIDES 2.USING THE BUILT-IN-LADDER SO THAT PASSENGERS CAN GO UP AND OVER PASS THROUGH THE CEILING DOORS. 3.STATIONS CAN BE SET UP AT EVERY 2Km. POWER SUPPLY TO BUSES 1.BUSES WILL BE COMPLETELY POWERED BY MUNICIPAL ELECTRICITY AND SOLAR ENERGY SYSTEM. 2.THE SYSTEM IS RELAY DIRECT CURRENT ELECTRIFICATION. 3.TWO RAILS BUILT ON TOP TO ALLOW THE CHARGING POST TO RUN ALONG WITH THE BUS, THE NEXT CHARGING POST WILL BE ON THE RAILS BEFORE THE EARLIER ONE LEAVES.ELECTRICAL SET HERE IS SUPER CAPACITOR, WHICH CAN CHARGE, DISCHARGE AND STORE ELECTRICITY QUICKLY. 4.THE POWER IT STORES DURING THE STOP CAN SUPPORT THE BUS TILL THE NEXT STOP WHERE ANOTHER ROUND OF CHARGING TAKES PLACE, ACHIEVING ZERO TOXIC GAS
  • 8. ENSURING SAFETY USING LASER RAY TO SCAN, CARS GET TOO CLOSE TO THE PASSAGE WILL ACTIVATE THE ALARM ON THE BUS AND INSIDE THE BUS THERE ARE TURNING LIGHTS THAT INDICATE THE BUS IS INTENDING TO MAKE A TURN TO WARN THE CARS INSIDE. RADAR SCANNING SYSTEM IS EMBEDED ON THE WALLS TO WARN CARS FROM GETTING TOO CLOSE TO THE BUS WHEELS. ULTRASONIC WAVES WILL BE PUT FORTH FROM THE END OF BUS THAT IS TO KEEP THOSE HIGH CARS OR TRUCKS AWAY FROM ENTERING THE TUNNEL. • WHEN A BUS REACHES A CROSSING RED LIGHT ON THE OTHER SIDE OF THE FORK WILL TURN ON AUTOMATICALLLY TO GIVE BUSES THE RIGHT OF THE WAY. • THE CAR CAN MAKE THE TURN WITH THE BUS IF THAT IS THE DIRECTION IT WANTS TO GO TOO;IF NOT • THE RED LIGHT WILL BE ON TO STOP THE CAR BENEATH WHILE THE BUS TAKES THE TURN. IN CASE OF AN ACCIDENT , FIRE OR OTHER EMERGENCIES THE ESCAPING DOORS WILL OPEN AUTOMATICALLY LIKE THE PLANES ARE EQUIPPED WITH INFLATED LADDER SO PEOPLE CAN SLIDE DOWN. EMERGENCY BRAKES ARE PROVIDED IN CAS OF URGENT STOPPAGE.
  • 9. SOURCE OF FUNDING THE ESTIMATED COST IS ABOUT 5.36BILLION RUPEES TO BUILD THE STRADDLING BUS AND A 40 KM LONG PATH FOR IT, WHICH IS APRROXIMATELY 7% OF METRO SYSTEM.. INITIAL COST OF A PHASE CAN BE CALCULATED. THE TOTAL EXPENDITURE FOR THAT PHASE CAN BE DIVIDED AMONG CENTRAL GOVERNMENT, STATE GOVERNMENT,SOFT LOAN AND PRIVATE PUBLIC PARTNERSHIP. A JOINT VENTURE CAN BE SET UP BY THE STATE GOVERNMENT AND CENTRAL GOVERNMENT. SOME PART OF INVESTMENT FOR Ex. 30% CAN BE PROVIDED BY CENTRAL GOVERNMENT, 30% BY STATE GOVERNMENT AND REST CAN BE RAISED BY PUBLIC PRIVATE PARTNERSHIP OR SOFT LOANS. THE REVENUE EARNED WILL BE USED FIRSTLY FOR MAINTENANCE SO THAT THE PROJECT CAN RUN SUCCESSFULLY AND THE MONEY LEFT AFTER THIS CAN BE USED TO PAY THE DEBT.
  • 10. IMPACT OF THE SOLUTION -MEASURING THE CONGESTION ON THE ROADS COVERED. -MEASUREMENT OF TRAVEL TIME BETWEEN TWO POINTS. -ANALYSING PEOPLES RESPONSE TO THE SYSTEM -ESTIMATING THE COST OF TRAVEL -MEASURING THE REDUCTION IN CARBON EMISSIONS OF THE CITY -BUSES CAN CARRY 1200-1400 PASSENGERS AT A TIME. -ECOFRIENDLY TRANSIT SYSTEM AND SAVES 860TON OF FUEL EVERY YEAR REDUCES 2640TON CARBON EMISSION. -IT CAN PRODUCE MORE OUTPUT FROM THE GIVEN RESOURCES -IT DOSEN’T REQUIRE EXTRA SPACE FOR ITS DEVELOPMENT AND RUNNING,LIKE OTHER PUBLIC TRANSPORT SYSYTEM THIS PROJECT IS SUSTAINABLE BECAUSE IT IS COMPATIBLE WITH THE DECLINING RESOURCES BY DERIVING ITS ENERGY FROM RENEWABLE SOURCES OF ENERGY, THUS IT CAN ACT AS A GOOD TRANSPORT SYSTEM IN A WORLD WHICH IS SUFFERING FROM ENERGY CRISIS. ALSO IT PROVIDES A LOW COST SOPHISTICATED AND COMFORTABLE TRAVEL. IN INDIA,MANY URBAN CITIES ARE BEING PLANNED WITH METRO’S ANND BULLET TRAINS WHICH COSTS A LOT. SO THIS SYSTEM CAN ACT AS BOON IN COMING FUTURE. MEASURING IMPACT SCALABILITY OF SOLUTION SUSTAINABILITY OF SOLUTION
  • 11.
  • 12. 1.THE STRADDLING BUS WAS FIRST EXHIBITED ON THE 13th BEIJING INTERNATIONAL HIGH-TECH EXPO. 2.THE BASIC IDEA WAS PROPOSED BY SHENZHEN HASHI FUTURE PARKING EQUIPMENT CO. LTD. REFERENCES: 1. http://www.delhimetrorail.com/needformetro/metro- need.aspx 2. http://www.delhimetrorail.com/projectsupdate/project_cost.a spx 3. http://en.wikipedia.org/wiki/Delhi_Metro 4. http://en.wikipedia.org/wiki/3D_Express_Coach 5. morth.nic.in/writereaddata/mainlinkFile/File417.pdf