Improvement of Plant Layout by using 5S technique-An
industrial case study
Dinesh B. Shinde1
, Prashant N. Shende2
1
(Department Of Mechanical Engineering, DMIETR Wardha, India)
2
(Department Of Mechanical Engineering, YCCE Nagpur, India)
I. Introduction
5S – A simple, but effective, lean manufacturing methodology that helps organizations to simplify,
clean, and sustain a productive work environment.5S is a system to reduce waste and optimize productivity
through maintaining an orderly workplace and using visual cues to achieve more consistent operational results.
Implementation of this method "cleans up" and organizes the workplace basically in its existing configuration,
and it is typically the first lean method which organizations implement.The 5S pillars, Sort (Seiri), Set in Order
(Seiton), Shine (Seiso), Standardize (Seiketsu), and Sustain (Shitsuke), provide a methodology for organizing,
cleaning, developing, and sustaining a productive work environment. In the daily work of a company, routines
that maintain organization and orderliness are essential to a smooth and efficient flow of activities. This lean
method encourages workers to improve their working conditions and helps them to learn to reduce waste,
unplanned downtime, and in-process inventory.A typical 5S implementation would result in significant
reductions in the square footage of space needed for existing operations. It also would result in the organization
of tools and materials into labeled and color coded storage locations, as well as "kits" that contain just what is
needed to perform a task. 5S provides the foundation on which other lean methods, such as TPM, cellular
manufacturing, just-in-time production, and six sigma can be introduced.
II. Types of 5S
2.1 Sort
The first S, Sort, calls for the elimination of unnecessary items that have collected around work areas.
As debris and unused objects build up, productivity often takes a turn for the worse. In unproductive
workspaces, frustrations mount when workers find that they are unable to satisfactorily finish the task at hand.
Therefore, it is vital to implement a workplace sorting system. The effective visual method of identifying
unneeded items is called “Red Tagging”.
2.2 Set in order
Now that your workplace has been sorted, it is time to implement a more comprehensive system of
organization. While sorting is an effective method, used by it, it is only a preliminary measure. Set in Order
(Seiton) focuses on effective storage and organization methods, with the end goal of developing an environment
that resists clutter and aids long-term productivity.
2.3 Shine
Once you have eliminated the clutter in your work area, it is important to thoroughly clean that area and
the equipment in it. Leaks, squeals and vibrations involving clean equipment can often be easily detected, but a
Abstract: 5S is one of the most widely adopted techniques from the lean manufacturing toolbox. Along
with Standard Work and Total Productive Maintenance, 5S is considered a "foundational" lean concept, as
it establishes the operational stability required for making and sustaining continuous improvements. The
primary objective of 5S is to create a clean, orderly environment- an environment where there is a place for
everything and everything is in its place. Beyond this, many companies begin their lean transformation with
5S because it exposes some of the most visible examples of waste it also helps establish the framework and
discipline required to successfully pursue other continuous improvement initiatives.
Keywords: 5S, Continuous improvement, discipline, productivity.
Improvement of Plant Layout by using 5S technique-An industrial case study
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 142 |
dirty workplace tends to be distracting and equipment faults go unnoticed. Clean workplace conditions are also
important to employee health, morale, and safety.
2.4 Standardize
Cleaning and organization systems implemented without established standards tend to lose effectiveness
with time. Allow your employees to participate in the development of standards that improve workplace
conditions. Ask for feedback as you find the best way to balance employee morale with production concerns.
2.5 Sustain
This is by far the most difficult S to implement and achieve. People tend to resist change and even the
most well structured 5S plan will fail if not constantly reinforced. Fortunately, there are effective methods of
sustaining positive growth.
III. Company Information
Name of Industry:- Metalfab Hightech Private Limited,Nagpur.(unit II)
Address: L-2, M.I.D.C., Hingna road, Nagpur (M.S.)
Establishment:-Company was established in year 1981 as M/S.METALFAB INDUSTRIES up to 1995,
subsequently later known as M/s. METALFAB HIGHTECH PVT. LTD on Day 17th
April 1996. ISO-9001-
2000 certified company. The owner of this company is Mr. Hukumchand C. Jain.
Company Client:-BHEL-Bharat heavy electrical limited
L & T – Larson and Turbo
Company Product:-General Fabrication work “I section beam”
Raw Material: - M.S.Plate, M.S.Angle, M.S.Channel etc.
Labor:-50 (2 shift).
3.1 Plant Layout
Fig 1.Plant Layout
3.2. Process
This is small industry. In which M.S.Plate is used as raw material and this raw material is converted into the
finish good. The process for the I section beam is given below.
1) When raw material comes into the company, it is store in the storage by using fork left (Manually)
2) After stage of storing material the quality inspector check the raw material visually. If any problem found in
the raw material then these raw materials send back or salvage it.
3) Then this raw material comes in CNC department where cutting operation perform as per requirement.
4) Built-up Machine fit the beam as per dimension.
5) After that Process next stage is welding for that submerged arc welding is used for welding purpose.
6) After that this product going to straitening department where straitening the beam operation are performed
7) After that this product is going to grinding machine where cleaning the beam is perform.
8) After that this product is going to sand blasting machine where super finishing is done.
9) After that Painting the beam and finally goes to the Final product store area.
Improvement of Plant Layout by using 5S technique-An industrial case study
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 143 |
3.3 Material flow of I section beam (Before improvement)
Fig 2. Material flow of I section beam
3.4. Department area
Table 1. Department area Table 2. Machine area
3.5 Operation Process chart (Before improvement)
Table 3. Operation process chart
Improvement of Plant Layout by using 5S technique-An industrial case study
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 144 |
IV. Area Of Study
1) Proper utilization of storage space more prominently.
2) Arrangement of departments in desired sequence.
4.1. Objective of study
Objectives of improve the plant layout are,
1) Minimize waiting time between straitening and grinding the beam .
2) Minimum material handling and related travelling cost.
3) Minimizing travelling distance in material flow.
4) Minimizing total time in process.
5) No backtracking moves.
6) Standard material flow pattern.
7) Better utilization of available space.
4.2 Problem Identification
1) More waiting time between straitening and grinding the beam .
2) More travelling distance and related time in material flow.
3) Material flow pattern is not standard.
4) Backtracking moves.
5) Scrap storage bins are located inside the industry which occupies extra space and material flow become
difficult.
V. Comparison Of Existing Layout And Improved Layout
Fig 3 a. Existing material flow Fig 3 b. Proposed material flow
1. Raw material 2. Built-up machine 3. SAW machine 4.Sand blasting machine 5.Staritening 6. Painting
7.Grinding 8. Drilling machine 9. CNC Machine 10. Product storage
5.1 performances Measure of Material Flow Sequence
Fig 4a. Before Implementation Fig 4 b. After Implementation
Improvement of Plant Layout by using 5S technique-An industrial case study
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 145 |
VI. Implementation of 5s Techniques
6.1 Sorting Out: Separate the necessary from the unnecessary and get rid of unnecessary
All unneeded tools, parts and supplies are removed from the area. The company layout is fixed
according to process but the company does not consist of a systematic arrangement for various material handling
and storage.
6.2 Set in Order: A place for everything and everything is in its place.
Fig 5. Set in order
66..33 SShhiinnee:: The area is cleaned as the work is performed.
Fig 6. Shine
6.4 Standardize: Cleaning and identification methods are consistently applied.
Fig 7. Standardize
6.5 Sustain: 5S is a habit and is continually improved the company culture.
VII. Benefits
1. The production rate will increase due to systematic arrangement.
2. The space utilization will increase.
3. The atmospheric conditions will improve.
4. Clean and hygienic condition is achieved.
5. It is convenient to handle and operate each and every material.
6. Moral support of the operators and workmen’s are improved.
Improvement of Plant Layout by using 5S technique-An industrial case study
| IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 146 |
7. Storage space is increased within the same area.
VIII. Conclusion
By using “5s”technique improved visibility of problem conditions, improved safety, reduced waste,
improved morale, an increased sense of ownership of the workspace, improved productivity, improved quality,
improved maintenance, shorter lead times, and a better impression on customers. More fundamentally, a well-
implemented 5S program helps the culture develop a new sense of discipline and order that carries over into all
activities.
REFERENCES
[1] Mohd Nizam Ab Rahman, Nor Kamaliana Khamis, Rosmaizura Mohd Zain,Baba Md Deros and Wan Hasrulnizzam
Wan Mahmood.“Implementation of 5S Practices in the Manufacturing Companies: A Case Study”. “American
Journal of Applied Sciences 7 (8): 1182-1189, 2010 ISSN 1546-9239”
[2] R.T. Salunkhe, G.S. Kamble, Prasad Malage. “Inventory Control and Spare Part Management through 5S, KANBAN
and Kaizen at ABC Industry “. “IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN:2278-
1684,PP:43-47”
[3] Boca D. Gratiela. “Study case: yellow tag vs quality management” Procedia - Social and Behavioral Sciences 62 (
2012 ) 313 – 318.
[4] Alireza Anvari.ed “Evaluation of Approaches to Safety in Lean Manufacturing and Safety Management Systems and
Clarification of the Relationship Between Them” World Applied Sciences Journal 15 (1): 19-26, 2011 ISSN 1818-
4952.
[5] Marko Milosevic.ed. “implementation of the 5s system as a factor for improving the quality management” 7th
International Quality Conference May 24th 2013 Center for Quality, Faculty of Engineering, University of
Kragujevac.
[6] Raid A. Al-Aomar “Applying 5S Lean technology: An infrasture for continuous process improvement” World
academy of science ,Engineering and Technology 59 2011
[7] Alireza Anvari ed. “Evaluation of Approaches to safety in lean manufacturing and safety management system and
clarification of the Relationship between them” World Applied science journal 15(1); 19-26, 2011 ISSN 1818-4952.

Mais conteúdo relacionado

Mais procurados

5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
Pranav B. Gujjar
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
dottinger
 
5S Warehouse Implementation Success Story
5S Warehouse Implementation Success Story5S Warehouse Implementation Success Story
5S Warehouse Implementation Success Story
Jason Woods, CPA
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
Isidro Sid Calayag
 
5S_Implementation_Guide
5S_Implementation_Guide5S_Implementation_Guide
5S_Implementation_Guide
Selvakumar K
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels
Ben Geck
 

Mais procurados (20)

5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
5s
5s5s
5s
 
5 S Manual
5 S Manual5 S Manual
5 S Manual
 
5 S Basic Training
5 S Basic Training5 S Basic Training
5 S Basic Training
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
 
5S Warehouse Implementation Success Story
5S Warehouse Implementation Success Story5S Warehouse Implementation Success Story
5S Warehouse Implementation Success Story
 
5 s
5 s5 s
5 s
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
 
5S_Implementation_Guide
5S_Implementation_Guide5S_Implementation_Guide
5S_Implementation_Guide
 
5S: Definition and Benefits
5S: Definition and Benefits5S: Definition and Benefits
5S: Definition and Benefits
 
5 S
5 S5 S
5 S
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
 
Presentation on 5S workplace management
Presentation on 5S workplace management Presentation on 5S workplace management
Presentation on 5S workplace management
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels
 
The 5S Store 5S Training Presentation
The 5S Store 5S Training PresentationThe 5S Store 5S Training Presentation
The 5S Store 5S Training Presentation
 

Destaque

5 s powerpoint presentation
5 s powerpoint presentation5 s powerpoint presentation
5 s powerpoint presentation
marigold-cherie
 
Integrating digital mindmapping in psychology vvob vietnam
Integrating digital mindmapping in psychology vvob vietnamIntegrating digital mindmapping in psychology vvob vietnam
Integrating digital mindmapping in psychology vvob vietnam
thytranvietnam
 

Destaque (20)

5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
 
5 s powerpoint presentation
5 s powerpoint presentation5 s powerpoint presentation
5 s powerpoint presentation
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Visuel 5 Briefing[1]
Visuel 5 Briefing[1]Visuel 5 Briefing[1]
Visuel 5 Briefing[1]
 
Week 5 jackets & layout
Week 5   jackets & layoutWeek 5   jackets & layout
Week 5 jackets & layout
 
Green textile production
Green textile productionGreen textile production
Green textile production
 
SHIRTS, GARMENT FACTORY AT BHIVANDI FOR LEASE - 90043 93173
SHIRTS, GARMENT FACTORY AT BHIVANDI FOR LEASE - 90043 93173SHIRTS, GARMENT FACTORY AT BHIVANDI FOR LEASE - 90043 93173
SHIRTS, GARMENT FACTORY AT BHIVANDI FOR LEASE - 90043 93173
 
Felted carpets & textile floor coverings
Felted carpets & textile floor coveringsFelted carpets & textile floor coverings
Felted carpets & textile floor coverings
 
Denim indutry
Denim indutryDenim indutry
Denim indutry
 
E-Services TP2 ISI by Ettaieb Abdessattar
E-Services TP2 ISI by Ettaieb AbdessattarE-Services TP2 ISI by Ettaieb Abdessattar
E-Services TP2 ISI by Ettaieb Abdessattar
 
Users of interlining
Users of interliningUsers of interlining
Users of interlining
 
ISI Institute E-Services TP 3
ISI Institute E-Services TP 3 ISI Institute E-Services TP 3
ISI Institute E-Services TP 3
 
Aet pow isi_2017_chp1
Aet pow isi_2017_chp1Aet pow isi_2017_chp1
Aet pow isi_2017_chp1
 
Industrial training in Hi-Tech Castings & ANSYS Software Training
Industrial training in Hi-Tech Castings & ANSYS Software TrainingIndustrial training in Hi-Tech Castings & ANSYS Software Training
Industrial training in Hi-Tech Castings & ANSYS Software Training
 
Aet pow isi_2017_chp3
Aet pow isi_2017_chp3Aet pow isi_2017_chp3
Aet pow isi_2017_chp3
 
Integrating digital mindmapping in psychology vvob vietnam
Integrating digital mindmapping in psychology vvob vietnamIntegrating digital mindmapping in psychology vvob vietnam
Integrating digital mindmapping in psychology vvob vietnam
 
Aet pow isi_2017_chp2
Aet pow isi_2017_chp2Aet pow isi_2017_chp2
Aet pow isi_2017_chp2
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
ISI Institute E-Services Chapter 4
ISI Institute E-Services Chapter 4ISI Institute E-Services Chapter 4
ISI Institute E-Services Chapter 4
 
E-Services course Chapter II ISI by Ettaieb Abdessattar
E-Services course Chapter II ISI by Ettaieb AbdessattarE-Services course Chapter II ISI by Ettaieb Abdessattar
E-Services course Chapter II ISI by Ettaieb Abdessattar
 

Semelhante a Improvement of Plant Layout by using 5S technique-An industrial case study

IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931
Ansari Noor
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
Guddu Ali
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
Arpan Mahato
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
eSAT Publishing House
 

Semelhante a Improvement of Plant Layout by using 5S technique-An industrial case study (20)

Analysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S TechniqueAnalysis of Productivity Improvement And Safety Measures By 5-S Technique
Analysis of Productivity Improvement And Safety Measures By 5-S Technique
 
IRJET- Implementation of 5S in the Manufacturing Industry
IRJET-  	  Implementation of 5S in the Manufacturing IndustryIRJET-  	  Implementation of 5S in the Manufacturing Industry
IRJET- Implementation of 5S in the Manufacturing Industry
 
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
IRJET- Implementation of 5’s to Improve Work Ethic and Overall Performance of...
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931IJSETR-VOL-4-ISSUE-4-927-931
IJSETR-VOL-4-ISSUE-4-927-931
 
Eb4301774779
Eb4301774779Eb4301774779
Eb4301774779
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing IndustryIRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
 
Knowledge management
Knowledge managementKnowledge management
Knowledge management
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
Slides 2015 for contact 7
Slides 2015 for contact 7Slides 2015 for contact 7
Slides 2015 for contact 7
 

Mais de IJMER

Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
IJMER
 
Intrusion Detection and Forensics based on decision tree and Association rule...
Intrusion Detection and Forensics based on decision tree and Association rule...Intrusion Detection and Forensics based on decision tree and Association rule...
Intrusion Detection and Forensics based on decision tree and Association rule...
IJMER
 
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
Material Parameter and Effect of Thermal Load on Functionally Graded CylindersMaterial Parameter and Effect of Thermal Load on Functionally Graded Cylinders
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
IJMER
 

Mais de IJMER (20)

A Study on Translucent Concrete Product and Its Properties by Using Optical F...
A Study on Translucent Concrete Product and Its Properties by Using Optical F...A Study on Translucent Concrete Product and Its Properties by Using Optical F...
A Study on Translucent Concrete Product and Its Properties by Using Optical F...
 
Developing Cost Effective Automation for Cotton Seed Delinting
Developing Cost Effective Automation for Cotton Seed DelintingDeveloping Cost Effective Automation for Cotton Seed Delinting
Developing Cost Effective Automation for Cotton Seed Delinting
 
Study & Testing Of Bio-Composite Material Based On Munja Fibre
Study & Testing Of Bio-Composite Material Based On Munja FibreStudy & Testing Of Bio-Composite Material Based On Munja Fibre
Study & Testing Of Bio-Composite Material Based On Munja Fibre
 
Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)
Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)
Hybrid Engine (Stirling Engine + IC Engine + Electric Motor)
 
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
Fabrication & Characterization of Bio Composite Materials Based On Sunnhemp F...
 
Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...
Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...
Geochemistry and Genesis of Kammatturu Iron Ores of Devagiri Formation, Sandu...
 
Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...
Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...
Experimental Investigation on Characteristic Study of the Carbon Steel C45 in...
 
Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...
Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...
Non linear analysis of Robot Gun Support Structure using Equivalent Dynamic A...
 
Static Analysis of Go-Kart Chassis by Analytical and Solid Works Simulation
Static Analysis of Go-Kart Chassis by Analytical and Solid Works SimulationStatic Analysis of Go-Kart Chassis by Analytical and Solid Works Simulation
Static Analysis of Go-Kart Chassis by Analytical and Solid Works Simulation
 
High Speed Effortless Bicycle
High Speed Effortless BicycleHigh Speed Effortless Bicycle
High Speed Effortless Bicycle
 
Integration of Struts & Spring & Hibernate for Enterprise Applications
Integration of Struts & Spring & Hibernate for Enterprise ApplicationsIntegration of Struts & Spring & Hibernate for Enterprise Applications
Integration of Struts & Spring & Hibernate for Enterprise Applications
 
Microcontroller Based Automatic Sprinkler Irrigation System
Microcontroller Based Automatic Sprinkler Irrigation SystemMicrocontroller Based Automatic Sprinkler Irrigation System
Microcontroller Based Automatic Sprinkler Irrigation System
 
On some locally closed sets and spaces in Ideal Topological Spaces
On some locally closed sets and spaces in Ideal Topological SpacesOn some locally closed sets and spaces in Ideal Topological Spaces
On some locally closed sets and spaces in Ideal Topological Spaces
 
Intrusion Detection and Forensics based on decision tree and Association rule...
Intrusion Detection and Forensics based on decision tree and Association rule...Intrusion Detection and Forensics based on decision tree and Association rule...
Intrusion Detection and Forensics based on decision tree and Association rule...
 
Natural Language Ambiguity and its Effect on Machine Learning
Natural Language Ambiguity and its Effect on Machine LearningNatural Language Ambiguity and its Effect on Machine Learning
Natural Language Ambiguity and its Effect on Machine Learning
 
Evolvea Frameworkfor SelectingPrime Software DevelopmentProcess
Evolvea Frameworkfor SelectingPrime Software DevelopmentProcessEvolvea Frameworkfor SelectingPrime Software DevelopmentProcess
Evolvea Frameworkfor SelectingPrime Software DevelopmentProcess
 
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
Material Parameter and Effect of Thermal Load on Functionally Graded CylindersMaterial Parameter and Effect of Thermal Load on Functionally Graded Cylinders
Material Parameter and Effect of Thermal Load on Functionally Graded Cylinders
 
Studies On Energy Conservation And Audit
Studies On Energy Conservation And AuditStudies On Energy Conservation And Audit
Studies On Energy Conservation And Audit
 
An Implementation of I2C Slave Interface using Verilog HDL
An Implementation of I2C Slave Interface using Verilog HDLAn Implementation of I2C Slave Interface using Verilog HDL
An Implementation of I2C Slave Interface using Verilog HDL
 
Discrete Model of Two Predators competing for One Prey
Discrete Model of Two Predators competing for One PreyDiscrete Model of Two Predators competing for One Prey
Discrete Model of Two Predators competing for One Prey
 

Último

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Último (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

Improvement of Plant Layout by using 5S technique-An industrial case study

  • 1. International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 141 | Improvement of Plant Layout by using 5S technique-An industrial case study Dinesh B. Shinde1 , Prashant N. Shende2 1 (Department Of Mechanical Engineering, DMIETR Wardha, India) 2 (Department Of Mechanical Engineering, YCCE Nagpur, India) I. Introduction 5S – A simple, but effective, lean manufacturing methodology that helps organizations to simplify, clean, and sustain a productive work environment.5S is a system to reduce waste and optimize productivity through maintaining an orderly workplace and using visual cues to achieve more consistent operational results. Implementation of this method "cleans up" and organizes the workplace basically in its existing configuration, and it is typically the first lean method which organizations implement.The 5S pillars, Sort (Seiri), Set in Order (Seiton), Shine (Seiso), Standardize (Seiketsu), and Sustain (Shitsuke), provide a methodology for organizing, cleaning, developing, and sustaining a productive work environment. In the daily work of a company, routines that maintain organization and orderliness are essential to a smooth and efficient flow of activities. This lean method encourages workers to improve their working conditions and helps them to learn to reduce waste, unplanned downtime, and in-process inventory.A typical 5S implementation would result in significant reductions in the square footage of space needed for existing operations. It also would result in the organization of tools and materials into labeled and color coded storage locations, as well as "kits" that contain just what is needed to perform a task. 5S provides the foundation on which other lean methods, such as TPM, cellular manufacturing, just-in-time production, and six sigma can be introduced. II. Types of 5S 2.1 Sort The first S, Sort, calls for the elimination of unnecessary items that have collected around work areas. As debris and unused objects build up, productivity often takes a turn for the worse. In unproductive workspaces, frustrations mount when workers find that they are unable to satisfactorily finish the task at hand. Therefore, it is vital to implement a workplace sorting system. The effective visual method of identifying unneeded items is called “Red Tagging”. 2.2 Set in order Now that your workplace has been sorted, it is time to implement a more comprehensive system of organization. While sorting is an effective method, used by it, it is only a preliminary measure. Set in Order (Seiton) focuses on effective storage and organization methods, with the end goal of developing an environment that resists clutter and aids long-term productivity. 2.3 Shine Once you have eliminated the clutter in your work area, it is important to thoroughly clean that area and the equipment in it. Leaks, squeals and vibrations involving clean equipment can often be easily detected, but a Abstract: 5S is one of the most widely adopted techniques from the lean manufacturing toolbox. Along with Standard Work and Total Productive Maintenance, 5S is considered a "foundational" lean concept, as it establishes the operational stability required for making and sustaining continuous improvements. The primary objective of 5S is to create a clean, orderly environment- an environment where there is a place for everything and everything is in its place. Beyond this, many companies begin their lean transformation with 5S because it exposes some of the most visible examples of waste it also helps establish the framework and discipline required to successfully pursue other continuous improvement initiatives. Keywords: 5S, Continuous improvement, discipline, productivity.
  • 2. Improvement of Plant Layout by using 5S technique-An industrial case study | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 142 | dirty workplace tends to be distracting and equipment faults go unnoticed. Clean workplace conditions are also important to employee health, morale, and safety. 2.4 Standardize Cleaning and organization systems implemented without established standards tend to lose effectiveness with time. Allow your employees to participate in the development of standards that improve workplace conditions. Ask for feedback as you find the best way to balance employee morale with production concerns. 2.5 Sustain This is by far the most difficult S to implement and achieve. People tend to resist change and even the most well structured 5S plan will fail if not constantly reinforced. Fortunately, there are effective methods of sustaining positive growth. III. Company Information Name of Industry:- Metalfab Hightech Private Limited,Nagpur.(unit II) Address: L-2, M.I.D.C., Hingna road, Nagpur (M.S.) Establishment:-Company was established in year 1981 as M/S.METALFAB INDUSTRIES up to 1995, subsequently later known as M/s. METALFAB HIGHTECH PVT. LTD on Day 17th April 1996. ISO-9001- 2000 certified company. The owner of this company is Mr. Hukumchand C. Jain. Company Client:-BHEL-Bharat heavy electrical limited L & T – Larson and Turbo Company Product:-General Fabrication work “I section beam” Raw Material: - M.S.Plate, M.S.Angle, M.S.Channel etc. Labor:-50 (2 shift). 3.1 Plant Layout Fig 1.Plant Layout 3.2. Process This is small industry. In which M.S.Plate is used as raw material and this raw material is converted into the finish good. The process for the I section beam is given below. 1) When raw material comes into the company, it is store in the storage by using fork left (Manually) 2) After stage of storing material the quality inspector check the raw material visually. If any problem found in the raw material then these raw materials send back or salvage it. 3) Then this raw material comes in CNC department where cutting operation perform as per requirement. 4) Built-up Machine fit the beam as per dimension. 5) After that Process next stage is welding for that submerged arc welding is used for welding purpose. 6) After that this product going to straitening department where straitening the beam operation are performed 7) After that this product is going to grinding machine where cleaning the beam is perform. 8) After that this product is going to sand blasting machine where super finishing is done. 9) After that Painting the beam and finally goes to the Final product store area.
  • 3. Improvement of Plant Layout by using 5S technique-An industrial case study | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 143 | 3.3 Material flow of I section beam (Before improvement) Fig 2. Material flow of I section beam 3.4. Department area Table 1. Department area Table 2. Machine area 3.5 Operation Process chart (Before improvement) Table 3. Operation process chart
  • 4. Improvement of Plant Layout by using 5S technique-An industrial case study | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 144 | IV. Area Of Study 1) Proper utilization of storage space more prominently. 2) Arrangement of departments in desired sequence. 4.1. Objective of study Objectives of improve the plant layout are, 1) Minimize waiting time between straitening and grinding the beam . 2) Minimum material handling and related travelling cost. 3) Minimizing travelling distance in material flow. 4) Minimizing total time in process. 5) No backtracking moves. 6) Standard material flow pattern. 7) Better utilization of available space. 4.2 Problem Identification 1) More waiting time between straitening and grinding the beam . 2) More travelling distance and related time in material flow. 3) Material flow pattern is not standard. 4) Backtracking moves. 5) Scrap storage bins are located inside the industry which occupies extra space and material flow become difficult. V. Comparison Of Existing Layout And Improved Layout Fig 3 a. Existing material flow Fig 3 b. Proposed material flow 1. Raw material 2. Built-up machine 3. SAW machine 4.Sand blasting machine 5.Staritening 6. Painting 7.Grinding 8. Drilling machine 9. CNC Machine 10. Product storage 5.1 performances Measure of Material Flow Sequence Fig 4a. Before Implementation Fig 4 b. After Implementation
  • 5. Improvement of Plant Layout by using 5S technique-An industrial case study | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 145 | VI. Implementation of 5s Techniques 6.1 Sorting Out: Separate the necessary from the unnecessary and get rid of unnecessary All unneeded tools, parts and supplies are removed from the area. The company layout is fixed according to process but the company does not consist of a systematic arrangement for various material handling and storage. 6.2 Set in Order: A place for everything and everything is in its place. Fig 5. Set in order 66..33 SShhiinnee:: The area is cleaned as the work is performed. Fig 6. Shine 6.4 Standardize: Cleaning and identification methods are consistently applied. Fig 7. Standardize 6.5 Sustain: 5S is a habit and is continually improved the company culture. VII. Benefits 1. The production rate will increase due to systematic arrangement. 2. The space utilization will increase. 3. The atmospheric conditions will improve. 4. Clean and hygienic condition is achieved. 5. It is convenient to handle and operate each and every material. 6. Moral support of the operators and workmen’s are improved.
  • 6. Improvement of Plant Layout by using 5S technique-An industrial case study | IJMER | ISSN: 2249–6645 | www.ijmer.com | Vol. 4 | Iss. 2 | Feb. 2014 | 146 | 7. Storage space is increased within the same area. VIII. Conclusion By using “5s”technique improved visibility of problem conditions, improved safety, reduced waste, improved morale, an increased sense of ownership of the workspace, improved productivity, improved quality, improved maintenance, shorter lead times, and a better impression on customers. More fundamentally, a well- implemented 5S program helps the culture develop a new sense of discipline and order that carries over into all activities. REFERENCES [1] Mohd Nizam Ab Rahman, Nor Kamaliana Khamis, Rosmaizura Mohd Zain,Baba Md Deros and Wan Hasrulnizzam Wan Mahmood.“Implementation of 5S Practices in the Manufacturing Companies: A Case Study”. “American Journal of Applied Sciences 7 (8): 1182-1189, 2010 ISSN 1546-9239” [2] R.T. Salunkhe, G.S. Kamble, Prasad Malage. “Inventory Control and Spare Part Management through 5S, KANBAN and Kaizen at ABC Industry “. “IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN:2278- 1684,PP:43-47” [3] Boca D. Gratiela. “Study case: yellow tag vs quality management” Procedia - Social and Behavioral Sciences 62 ( 2012 ) 313 – 318. [4] Alireza Anvari.ed “Evaluation of Approaches to Safety in Lean Manufacturing and Safety Management Systems and Clarification of the Relationship Between Them” World Applied Sciences Journal 15 (1): 19-26, 2011 ISSN 1818- 4952. [5] Marko Milosevic.ed. “implementation of the 5s system as a factor for improving the quality management” 7th International Quality Conference May 24th 2013 Center for Quality, Faculty of Engineering, University of Kragujevac. [6] Raid A. Al-Aomar “Applying 5S Lean technology: An infrasture for continuous process improvement” World academy of science ,Engineering and Technology 59 2011 [7] Alireza Anvari ed. “Evaluation of Approaches to safety in lean manufacturing and safety management system and clarification of the Relationship between them” World Applied science journal 15(1); 19-26, 2011 ISSN 1818-4952.