1. CURRICULUM VITAE
Contractor: Petrovietnam Engineering Consultancy JSC
(PV ENGINEERING)
Full Name: DOAN THI HONG THU
Proposed Position: Safety Senior/Engineer
Date of Birth: May, 27th
1983
Nationality: Vietnamese
Years of Experience: 5 years
Membership of Professional Societies: N/A
Capabilities:
- Over 08 years experienced in Design Engineering Water And Drainage Supply System
and Waste Water Treatment and
- Over 05 years experienced Safety Engineering Design in industrial projects relating
offshore platforms.
- Fluently using PHAST software (flare modelling analysis and Pipenet software for fire
water system hydraulic analysis)
- Scriber on HAZOP/HAZID workshop
Education:
- MBA for Environmental Management in Institute of Environment and Resources
(from 2007-2010)
- Van Lang University for Environmental Technology (from 2001 to 2005)
Other trainings:
Certificate of Design for Water Supply And Drainage System
Certificate of Design for Wastewater Treatment System
Certificate of Training Course of Firefighting, University of Fire
Certificate of The Internal Auditor Training Course in accordance with ISO
14001:2004/Cor 1:2009 và ISO 19011:2002
Certificate of Training Course on Healthy Safety Environment Fundamentals in
accordance with the OHSA of USA
Certificate on Occupational Health, Safety and Enteprise Environment
Certificate of “English level C” issued by Van Lang University;
Certificate of Solid Waste Management issued by Van Lang University;
Certificate of “Evaluate Strategic Environment” issued by Ministry of Environment
and Resource;
Foreign Language:
DOAN THI HONG THU Page 1/11
2. CURRICULUM VITAE
- English
Employment record:
Duration Company Position
4/2011 -Present PVEngineering Joint Stock
Company
- Safety Engineer
- Senior For Water Supply – Drainage
Treatment Design
- Senior Environment Engineer For
Wastewater Treatment System Design
2010 – 3/2011 Van Tan Hoang
Architecture Corporation
Company
President for Water Design,
Environmental consultant and Fire
protection Design
Detail tasks assigned in project involved:
From 2011 to present: PVENGINEERING JOINT STOCK COMPANY
DETAILED ENGINEERING DESIGN SERVICE FOR BK-TNG WELLHEAD
PLATFORM
Client: VIETSOV PETRO (VIET NAM)
Consultant: PVEngineering cooperate with Technip Viet Nam
Design phase: Detail Design (2014-2015)
Scope of work:
Detail design for 01 Well head platform (BK-TNG) with minimum facilities
(including 12 wells) to be installed at Thien Ung Field, including Jacket, Topside,
Living Quarter (35 persons) and Helideck. Product from BK-TNG (after dehydration)
to be flowing at its own pressure via NCS-2 pipeline. Connecting piping of BK-TNG
to NCS2 pipeline (Pig launcher, Riser).Finalize detailed design deliverables
Detail design of process, utility, electrical, machenical, piping, structural,
architectural, control, protection, instrumentation, safety and communication system.
Revise and/or update project specification and datasheets
Prepare material requisition for procurement
Perform HAZID, HAZOP, QRA, and IPF reviews and incorporate findings.
Issue AFC documents.
Issue AFB requisitions, specification & datasheets.
Final documentation
Position: Safety Engineer
- Responsibilities:
o Fire water Demand Calculation
DOAN THI HONG THU Page 2/11
3. CURRICULUM VITAE
o Fire water system Hydraulic Report
o Flare Dispersion Modeling Report
o Passive Fire Protection Specification
o Passive Fire Protection Layout
o Deluge Water system Calculation Note
o UFD Fire fighting System
o P&ID Fire fighting System
o HSE Design Basis
o Project Safety Plan
o Safety and Loss Preventation philosophy
o Evacuation, Escape & Rescue (EER) Philosophy
DETAILED ENGINEERING DESIGN DAI HUNG GAS GATHERING PROJECT
Client: PVEP POC/VSP
Design phase: Detailed Design. (2014)
Scope of work:
On WHP-DH2: Gas Cooler, Gas Scrubber, Gas Engine Generator, Corrosion
Inhibitor Injection Skid, Electrical System, Instrumentation System, Fuel Gas System,
Fire Fighting System, Telecommunication System and other Utility Systems.
The 16” subsea gas pipeline (approximately 20 km) from existing 10” riser at WHP-
DH2 to BK-TNG Platform and 16” Y-Tee for future connection.
On BK-TNG Platform: 16” Riser, Slug Catcher, DH Gas Custody Metering System,
DH Gas Compressor Suction Scrubber, DH Gas Compressor Package, DH Gas
Compressor After Cooler, Fuel Gas System, Piping System, Instrumentation System,
Telecommunication System, Open/ Closed Drain System, and other Utility Systems.
Position: Safety Engineer Senior
Responsibilities:
Contact Point of Safety Discipline to:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports and HAZOD/HAZID
closeout reports
Communicate to CA [ Lloyds (on DH platform) and DNV (on BK.TNG)] to close
comments or clarify technical issues
Directly done the following documents:
- Fire water Demand Calculation
- Fire water system Hydraulic Report
DOAN THI HONG THU Page 3/11
4. CURRICULUM VITAE
- UFD Fire fighting System
- P&ID Fire fighting System
- HSE Design Basis
- Hazardous Area Classification Philosophy
- Hazardous Area Classification Schedule and Report
DETAILED DESIGN FOR BK-4A PLATFORM
Client: VIETSOVPETRO
Design phase: Detailed Design. (2014)
Scope of work:
- Perform detailed design for the topside BK-4A platform and detailed design for
linking bridge 40 meters between BK-4A and BK-4 platforms.
Position: Safety Engineer Senior
Responsibilities:
Contact Point of Safety Discipline to:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports
Communicate to CA to close comments or clarify technical issues
Directly done the following documents:
- P&ID Fire fighting System
- MTO for fire fighting & Safety System
- HSE Design Basis
- Project Safety Plan
- Safety and Loss Preventation philosophy
- Evacuation, Escape & Rescue (EER) Philosophy
- Hazardous Area Classification Philosophy
- Hazardous Area Classification Schedule and Report
- Hazardous Area Classification
- Specification for Fire fighting Equipment
- Specification for Safety Equipment
- Datasheets for Safety & Fire fighting Equipment
- Fire water Calculation – Fire water system Hydraulic Report
- Escape Route & Safety Signal Layout
- Safety & Fire fighting Equipment layout
DOAN THI HONG THU Page 4/11
5. CURRICULUM VITAE
- Scope of Work for HAZOP/HAZID/SIL Studies
- HAZOP/HAZID Close-out Report
DETAILED DESIGN SERVICE FOR THAI BINH – HAM RONG GAS
DISTRIBUTION AND GATHERING SYSTEM PROJECT, BLOCK 102&106 –
PHASE 1.
Client: PV Gas
Design phase: Detailed Design. (2014)
Position: Safety Engineer
Responsibilities:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports
Directly done the following documents:
- Fire fighting system design
- MTO for fire fighting & Safety System
- HSE philosophy and Basis of Design
- Specification for Fire fighting Equipment
- Specification for Safety Equipment
- Datasheets for Safety & Fire fighting Equipment
- Oily wastewater treatment system (UFD, P&ID, Detail Drawings)
- Scope of Work for HAZOP/HAZID/SIL Studies
- HAZOP/HAZID Close-out Report
NAM CON SON 2 GAS PIPELINE PROJECT – PHASE 1
Client: PVGAS (CĐT) - VSP ( EPC)
Design phase: Detailed Design. (2014)
Scope of work:
Provision of detail design for Nam Con Son 2 gas pipeline phase 1 project (from Thien
Ung platform to PLEM connecting to Nam Con Son 2 - Bach Ho gas pipeline)
Position: Safety Senior
Responsibilities:
Contact Point of Safety Discipline to:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports
- Scope of Work for HAZOP/HAZID/SIL Studies
- HAZOP/HAZID/SIL Study Report
DOAN THI HONG THU Page 5/11
6. CURRICULUM VITAE
- HAZOP/HAZID Close-out Report
UPGRADING CAPACITY OF LPG STORAGE DINH VU - HAI PHONG -
DETAILED DESIGN
Client: PVGas/DAK
Design phase: Detailed Design. (2014)
Scope of work:
- Detail design includes survey work and engineering design (not include 2 LPG
tanks).
Position: Safety Engineer
Responsibilities:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports
- Scope of Work for HAZOP/HAZID/SIL Studies
- HAZOP/HAZID Close-out Report
SUPPLEMENT/UPGRADING INFRASTRUCTURE AT BACH HO FIELD
Client:VSP
Design phase: FEED Design. (2014)
Scope of work:
Provision of Front-end engineering design (FEED) and cost estimation
Position: Safety Senior
Responsibilities:
Discuss to clients to clarify technical issues/ close comments
Communicate to third party for HAZOP/HAZID study reports
- Scope of Work for HAZOP/HAZID/SIL Studies
- HAZOP/HAZID Close-out Report
CONSTRUCTION TRAINING CENTER FIRE AND RESCUE IN OIL
REFINERY
Client: Binh Son Refinery And Petrochemical Company
Position: Safety Engineer
Responsibilities:
- Fire fighting system design
- MTO for fire fighting system
DOAN THI HONG THU Page 6/11
7. CURRICULUM VITAE
PROVISION OF DETAILED ENGINEERING SERVICE FOR DMDP-A
DRILLING PLATFORM FOR PC VIETNAM LIMITED
Client: PC Vietnam Limited (PCVL). EPCC Main Contractor: PVC-MS. Engineering
Main Contractor: RNZ
Design phase: Detail Design, post-AFC Stage (2013)
Scope of work:
- Further develop all Detailed Engineering phase from "Approved for Construction
(AFC)" drawings to "Post AFC" status so that PVC-MS can develop "shop drawing"
for the construction, fabrication, Hook up of the Diamond Platform.
Position: Safety Engineer
Responsibilities:
- HAZOP Close-out Report.
TEMPORARY OFFICES BUILDING - NGHI SON REFINERY AND
PETROCHEMICAL COMPLEX PROJECT
Client: JGCS Consortium
Design phase: Detail Design
Scope of work:
- Fire fighting system design
- MTO for fire fighting system
SU TU TRANG WHP PRODUCTION DEBOTTELENECKING
Client: Cuu Long Joint Operating Company
Time for work: 03/2013 – 05/2013
Position: Safety Engineer
Responsibilities:
- HAZOP Close-out Report
PROCESS BYPASS TBVN FPSO
Client: Cuu Long Joint Operating Company
Time for work: 02/2013 – 03/2013
Position: Safety Engineer
Responsibilities:
- HAZOP Close-out Report
BLOCK B – O MON GAS PIPELINE PROJECT
Client: PVGAS /BPOC
DOAN THI HONG THU Page 7/11
8. CURRICULUM VITAE
Design phase: FEED and Detailed Design
Scope of work: Detail engineering for all project including 246 km 28" subsea pipeline,
the 30" onshore pipeline system, LBVs, Ca Mau GDS, O Mon GDC...
Position: Safety Engineer
Responsibilities:
- HAZOP Close-out Report
PRODUCTION AND CONSUMPTION OF NATURAL GAS FOR VEHICLES IN
VIETNAM
Client: Gazprom Vniizgaz
Design phase: Feasibility Study Report
Scope of work: Provision of FS Report for project "Production and Consumption of
Natural Gas for Vehicles in Viet Nam".
Position: Safety Engineer
Responsibilities:
- HAZOP Close-out Report
HYDROGEN PEROXIDE PRODUCTION PLANT PROJECT. (2012)
Client: PVFCCo.
Scope of work:
- Design 01 plant: Hydrogen Peroxide Production Plant. Capacity:
• 90 tons / day (Concentration 27.5% kl)
• 47 tons / day (Concentration 50% kl)
• 70 tons / day (Concentration 35% kl)
Position: Environmental Senior
Responsibilities:
- Design for Wastewater Treatment System
NAM DINH NPK FERTILIZER PLANT. (2012)
Client: PVFCCo.
Scope of work: Design 01 plant: Nam Dinh NPK Fertilizer Plant. Capacity: 100.000 tons /
year
Position: Environmental Senior
Responsibilities:
- Design for Wastewater Treatment System
DOAN THI HONG THU Page 8/11
9. CURRICULUM VITAE
VERIFICATION OF DETAILED ENGINEERING SERVICE AND COST
ESTIMATE OF SOUTHERN AIR PETROL LOGISTICS PHASE 1 (50.000M3)
AND PERFORM THE DETAILED ENGINEERING AND COST ESTIMATE FOR
PHASE 2 (180.000M3)
Client : Southern Air Petrol Logistics Join Stock Company (SAPL)
Scope of Work: Verification of Detailed Engineering and Cost Estimate of Southern Air
Petrol Logistics Phase 1 (50.000m3) and carry out Detail Engineering and Cost Estimate for
Phase 2 (180.000m3)
Position: Infrastructure Senior
Responsibilities:
- Water Supply – Drainage System Design And Wastewater Treatment System
- Evaluate Strategic Environment for plot plan with detail design scale 1/500 of project.
PROJECT: PLANT OF PRODUCT GAS
Scope of Work: Detail Design
Position: Infrastructure Senior
Responsibilities:
Water Supply – Drainage System Design
CNG NHON TRACH – DONG NAI PLANT
Client : CNG Viet Nam
Scope of Work: Preparation of Investment Report and Basic Design
Position: Infrastructure Senior
Responsibilities:
Water Supply – Drainage System Design
PROJECT: QUANG TRACH 1 TPP
Client : PVN
Scope of Work: FEED Design
Position: Infrastructure Senior
Responsibilities: Water Supply – Drainage System Design
PROJECT: LONG AN LPG TERMINAL
Scope of Work: FEED Design
Position: Infrastructure Senior
Responsibilities:
Water Supply – Drainage System Design
PROJECT: PETROL STATIONS OF QUANG NGAI
DOAN THI HONG THU Page 9/11
10. CURRICULUM VITAE
Client : PV Oil
Scope of Work: Preparation of Investment Report and Basic Design
Position: Infrastructure Senior
Responsibilities:
Water Supply – Drainage System Design
From 2010 To 2011 : VAN TAN HOANG ARCHITECTURE CORPORATION
COMPANY
PROJECT OF SAI GON CO.OP MART STAFF HOUSING
Scope of Work: Detail Design
Position: Infrastructure and Environemtal Senior
Position: Water Supply System Design – Waste Water Treatment System
PROJECT: HAI SAN BIEN DONG OFFICE
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
HEPA CONSULTING – ROOM
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
PERTRUS KY SCHOOL
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
PROJECT: CO.OP MART CA MAU
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
DOAN THI HONG THU Page 10/11
11. CURRICULUM VITAE
PROJECT: 217 NAM KY KHOI NGHIA WORKING OFFICE
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
PROJECT: PUBLISHING HOUSE’S OFFICE
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
PROJECT: SADACO HOTEL
Scope of Work: Detail Design
Responsibilities:
Water Supply System Design – Waste Water Treatment System
Certification:
The undersigned certifies the above information is true and correct and will be responsible
for any false statement discovered.
HCM city, Date Month Year 2015
Prepare by
DOAN THI HONG THU
DOAN THI HONG THU Page 11/11