3. PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 3
Main Findings
• The Separator B, oily water level control valve LDV31160B shall be increased
in the port size diameter flow capacity from CV=56 to a New valve CV= 150, in
order to cover the de-rating pressure to 22.5 Barg.
• A new set point was provided to be 32 barg for the PSV’s of separator B, New
Datasheet has been calculated (IFR) and the results are pointing out a change
in the following items:
3 New PSV’s (1,2,3) Type according API526 is: 8T10
Inlet pipeline reducer: 12”x8”
Outlet full bore block valve: 10”
Outlet pipeline expander 20”x10”
4. PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 4
Main Findings
• The Separator B, Pressure Control valve gas to Flare header PV31111B shall
be increased in the port size diameter flow capacity from CV=260 to a New
valve CV= 900, in order to cover the de-rating pressure to 22.5 Barg.
• The Separator B, Oil level control valve LV31105B and the Flow control valve
FV31113B do not need a change/replacement for the de-rating pressure to
22.5 Barg.
• Separator B capacity Datasheet (IFR) shows the separator capacity suitable
for the de-rating pressure to 22.5 barg.
7. PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 7
Separator B de-rating
1
2 Hydrocarbon Gas and Liquid
3 N/A
4 m³ N/A
5 barg Note 6
6 barg 93/FV
7 ºC 51
8 ºC 93 / -20
9 ENGINEERING DATA DESIGN
10 Inside diameter mm 4408 NOTE 1 & NOTE 2
11 Height tan/tan mm 15816.304.1 APPLIED SEE
12 Elevation mm CALC. SHEET
13 Corrosion allowance mm
14 Insulation mm
15 Personal Protection
16 PROCESS CASE Note 1
17 RATING
18 Operating Pressure barg 22.5 22.5
19 Hydrocarbon Liquid
20 Flow Rate kg/hr kg/hr(bbopd) 361790 (69127) bbopd 74996
21 Density at T & P kg / m3
779.3
22 Viscosity cP 0.8045
23 Surface Tension dyn / cm 18.78
24 API 47.42
25 Gas / Vapour
26 Flow Rate kg / hr (MMscfd) kg/hr(MMscfd) 195796(261.3) MMscfd 627
27 Molecular Weight 15.04
28 Density at T & P kg / m3
13.96
29 Viscosity cP 0.0103
30 Water
31 Flow Rate kg/hr kg/hr(bbwpd) 100775(15243) bbwpd 15666
32 Specific Gravity @ 15.6 °C N/A
33 Density at T & P kg / m3
988.2
34 Viscosity cP 0.5353
35 Notes 1, 2, 3, 4 and 7
167000.00
N/A
1005
0.36
76
237000 (227.7)
20.85
66.67
0.015
79
53600.00
681.0
1.10
-
Design temperature
4,400
15,800
DESIGN
55850.0
3
YES
N/A
MAX IMUM CAPACITY
Max. spec. Gravity @ 15.6 °C
Operating volume
Operating pressure 22.5
Design pressure
Operating temperature
DESIGN DATA
Contents
8. PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 8
CONCLUSIONS
• Separator B capacity check DATASHEET (IFR) at 22.5 barg, shows no
limitation for a maximum of 4 lines from loops 10, 20 and 30, reservoir A.
• PSV 1,2,3 on Separator B, have been designed to protect the vessel for a
block outlet scenario with Set Point=93 barg. The request change in Set
Point to 32 barg, needs the following equipment list to change/replace :
• 3 New PSV’s (1,2,3) Type according API526 is: 8T10.
• Inlet pipeline reducer: 12”x8”
• Outlet full bore block valve: 10”
• Outlet pipeline expander 20”x10”
9. PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 9
CONCLUSION CONT…
• The Separator B, PV31111B and LDV31160B shall be increased in the port
size diameter flow to cover the de-rating pressure at 22.5 Barg.
• The Separator B, LV31105B and FV31113B do not need a
change/replacement for the de-rating pressure at 22.5 Barg.