Where BPM and Change
Management meet
Paul Walsh | Oakton
8th September 2012
Agency Reform Consultancy -
Where BPM met OCM
• BPM Link September 2012
www.oakton.com
Agenda
• Background
• Oakton’s Brief
• Discovery
• Findings
• Recommendations
www.oakton.com.au 3
Background
• Medium sized agency
– Almost 1300 staff
– Responsible for budget >$4b (2010/11)
• Subject to numerous reviews the latest in April 2011
• Independent Review had 39 recommendations
• 38 of these accepted in Government’s response in July 2011.
• This led to over 120 individual action items to be finalised by
30 June 2012!
www.oakton.com.au 4
www.oakton.com.au 5
My first meeting at the Agency
From Independent Review (2011)
Recommendation 31: Corporate reform
efforts within the Agency should be
accelerated to promote a culture geared
towards delivering results and enhancing
productivity, especially by reducing staff
turnover, streamlining business processes
and reducing paperwork.
www.oakton.com.au 6
Oakton’s Brief
The Terms of Reference (TOR) included:
• Recommendations to improve business process reform
within the Agency , including current policy, guidelines and
tools.
• Development of a business process framework covering the
whole of the Agency
• A stocktake of Supporting (Enabling) processes and
Management processes (with a “light touch” approach to
core processes).
• Identification of five quick wins for streamlining processes.
www.oakton.com.au 7
Business Process Management
Initiate Assess
Continuous
Improvement
Streamline
Planning
Stakeholder Engagement and Ownership
Process Modeling and Management
Organisational Change Impact
Learning and Development
Initial BPM analysis and
definition documentation
Current state assessment
documentation
Streamlined process
documented and
implemented
Process measurements
and controls
documentation
Control
Build BPMI leadership,
understanding and
commitment
Understand all
dimensions of the current
business processes
Improve efficiency,
effectiveness and
adaptability of the
business processes
Implement a framework to
measure and control the
streamlined processes for
ongoing improvement
Implement continuous
improvement processes
Continuous improvement
documentation
Effective,efficientand
adaptableprocesses
Oakton’s BPM Framework
Business Process Development &
Management Policy
Developed in 2006 following a review.
— A vision
• This policy provides the context and rationale for the Agency’s new approach to
the development and management of business processes and the creation of new
quality control points which include testing, approval, release and reporting. It
explains the key elements of the governance regime, and the reasons for the
various components.
— Defined a minimum mandatory business processes
• Common Business Processes
— Accessibility of business processes – Instructions, Policies,
Guidelines, Tools
— Policy, business processes and knowledge sharing
— Accountability for business processes
— Effective and transparent management of business processes
www.oakton.com.au 9
Multi-lateral
agreements
Channels
Non-Gov
Organisations
Grant
schemes
Scholarships
Projects and
tenders
Business Architecture
www.oakton.com.au 12
1
2
3
4
Strategic Drivers
Purpose
Strategic
Goals Portfolio
Strategies
Plan
Design Deliver
Monitor
Program
Lifecycle
Delivered
Services
Business Transformation and Adaptability
People Finance Information Assets
Infra-
structure Systems
Business
Planning
Resource
Planning
Functions
Investment
Framework
Processes Governance
Example of a high level business architecture
Policies
5
External Stakeholders and Value Chain
Posts Comms
Channels
Strategic themes – stakeholder feedback
Many of the strategic opportunities and issues raised by Senior Executive appeared to
be symptomatic of rapid growth.
www.oakton.com.au 13
Planning – There is room to
improve the planning
process that links strategic
goals with investment
decisions
Proportionality – Current
initiatives are aligning
investment processes with
program value and risk.
Enabling processes and systems – Are geared
around old delivery modalities. System ownership
is an issue. BPM is not strategically aligned.
Workforce skills – There is
a requirement for more
program management and
delivery skills.
Program alignment –
There is room to better align
program planning and
design with country
strategies.
Governance – There is merit in
developing and communicating
an overarching governance
framework.
Corporate knowledge and information –not
as agile as it could be – this is partly about
process, partly about corporate knowledge and
management of information.
Business process maturity – An snapshot
Strategic
Alignment
Governance Methods Information
Technology
Culture People
Process
Improvement
Plan
Process
management
decision making
Process design &
modelling
Process design &
modelling
Process skills &
expertise
Responsiveness to
process change
Strategy & Process
Capability Link
Process roles &
responsibility
Process
implementation &
execution
Process
implementation &
execution
Process
management
knowledge
Process values &
belief
Process
Architecture
Process metrics &
performance
Process control &
measurement
Process control &
measurement
Process education &
learning
Process attitudes &
behaviours
Process Output
Measurement
Process
management
standards
Process
improvement &
innovation
Process
improvement &
innovation
Process
collaboration &
communication
Leadership
attention to process
Process customers
& stakeholder
Process
management
controls
Process project &
program
management
Process project &
program
management
Process
management leader
Process
management social
networks
www.oakton.com.au 14
Adapted From Jeston & Nelis 2006 BPM: Practical Guidelines for Successful Implementations
In place
Partial or being developed
No evidence or only evident in one or two pockets
www.oakton.com.au 15
Process Stocktake
Level 1 process Confirm the description of the Level 1 process
Level 2 process Confirm what Level 2 processes are in scope of the Level 1 process
Process owner Who are the Level 1 and Level 2 owners?
Process health check What is the state of the current Level 2 processes? Effective, Could
be improved, major issues
System What key systems support the Level 2 processes? This includes IT,
excel spread sheets, access databases. If no system please state
manual process.
Process guidelines Do any process guidelines exist, are they being used and where are
they located?
Training What training, if any, is provided? How is this training delivered?
Why improve the process What are the main reasons why the process needs improving? E.g.
Deliver benefits/ mitigate risks/ optimise costs.
Current/planned improvements What are the current or planned process improvements? Triggered
by Effectiveness Review/ BP reform/ operational planning/ other.
Priority When are the desired improvements to be implemented? E.g.
Quick win, mid-term, long-term.
Performance Metrics Are there any metrics? Eg volumes, staff resources, error rates,
documented KPIs
The Findings
Recommendations to improve business process reform within
the Agency , including current policy, guidelines and tools.
• Development of a business process framework covering the
whole of the Agency
• A stocktake of Supporting (Enabling) processes and
Management processes (with a “light touch” approach to
core processes).
• Identification of five quick wins for streamlining processes.
www.oakton.com.au 16
Key Finding TOR #1
The current business process reform policy is a good document, but it was set
up before the Effectiveness Review, and now requires a new approach to
implementation to meet the Agency’s needs. This includes:
— A greater level of direction and control of business process reform.
— A more centralised approach to the planning, sequencing and delivery of
process improvements (i.e. the process lifecycle), supported by a
rebranded Rules & Tools.
— A collective approach to managing the impacts of the numerous changes
on the Agency’s operations.
— This approach is consistent with other organisations going through major
business change, and should see the Agency through this transformative
stage.
www.oakton.com.au 17
The Findings
Recommendations to improve business process reform within
the Agency , including current policy, guidelines and tools.
Development of a business process framework covering the
whole of the Agency
• A stocktake of Supporting (Enabling) processes and
Management processes (with a “light touch” approach to
core processes).
• Identification of five quick wins for streamlining processes.
www.oakton.com.au 18
www.oakton.com.au 19
2.0 Core Processes
Key Finding TOR #2
This framework can be refined over time and
provides a top-down view of processes across
the whole of the Agency. It supports the
Agency’s ability to identify the value of each
process, and any risks and gaps, with the view to
selecting key processes for detailed analysis and
redesign.
www.oakton.com.au 20
The Findings
Recommendations to improve business process reform within
the Agency , including current policy, guidelines and tools.
Development of a business process framework covering the
whole of the Agency
A stocktake of Supporting (Enabling) processes and
Management processes (with a “light touch” approach to core
processes).
• Identification of five quick wins for streamlining processes.
www.oakton.com.au 21
www.oakton.com.au 22
2.0 Core
processes
Supporting (Enabling) Processes – Level 1 Overall Rating
Manage finance 3
Manage human resources 2
Manage systems and technology 3/4
Manage legal services 3
Manage property 3
Manage security Not rated
Manage engagement with Minister & Parliament 3/4
Manage communications and media 3
www.oakton.com.au 23
Key Finding TOR #3
• Management processes – The Agency recently implemented several
management frameworks to support its business needs through to 2015-
16. There are still challenges, particularly for business planning and
information management. This is consistent with other Government
organisations.
• Core processes – There is an emerging view of the Agency’s top level
processes required through to 2015-16.
• Supporting (enabling) processes – Some processes are working well,
however there are key challenges in regard to quality, efficient use of
resources and better automation, particularly for some financial and
human resource processes. This is consistent with other Government
organisations.
www.oakton.com.au 24
The Findings
Recommendations to improve business process reform within
the Agency , including current policy, guidelines and tools.
Development of a business process framework covering the
whole of the Agency
A stocktake of Supporting (Enabling) processes and
Management processes (with a “light touch” approach to core
processes).
Identification of five quick wins for streamlining processes.
www.oakton.com.au 25
Quick wins
Stakeholder consultations and review of various documents has revealed some common quick
win themes:
• Travel (note: under development, updated Travel Policy)
• Acquittals;
• Movement requisitions;
• Contracts (note: under development)
• Improve administration of small value agreements
• Delegations
• Contracts
• Procurement
• Resource Allocations
• Procurement
• Automate
• Communicate process and the why
• Proportionality Project impact
• Grants
• Streamline process
• Resource allocations
• Faster, clearer delineation of approvals
• Salaries & conditions for O-based staff
• Strategic Planning
• Link between business unit planning and departmental budget
• Corporate Governance
• Unclear how the various committees interact and areas of responsibilities
www.oakton.com.au 26
Some points for consideration:
What are the “knock-on” effects of changing
processes?
Are these really quick wins?
Or are they the first steps of strategic
initiatives or systems investment?
What does quick win mean for the Agency?
• Time
• Cost
• Resource effort.
Key Finding TOR #4
Transformative change in the Agency has generated, and will continue to
generate, numerous business improvement initiatives.
• The 2011/12 program of improvements will strengthen processes. Early
results in key processes should be communicated to staff.
• The Agency has implemented several “quick wins” over the last six months
that will have a major, positive impact on staff.
However, the goal of business process improvement is not always about
efficiency or less paper work. In assessing improvement opportunities in the
future, the Agency should consider its objectives i.e. will process
improvement lead to:
• More effective programs
• Better quality and timeliness of decisions and deliverables
• Mitigation of risks around key investments
www.oakton.com.au 27
Recommendations
 Approach to Business Process Reform
 The Agency should refine its BPD&M Policy and implementation approaches
to meet business needs through to 2015-16.
 Rules & Tools
 The Agency should align Rules & Tools to the updated BPD&M Policy
 Change Management
 The Agency should develop a Change Charter and Schedule that establishes an
enterprise-view of changes, including timing and sequencing.
 Business Process Framework
 The Agency should further develop and then apply and maintain the business
process framework as part of its broader approach to business process reform.
www.oakton.com.au 28
Recommendations (cont’d)
 Early Results from Improvements Implemented in
2011/12
 The Agency should focus attention on achieving and communicating early
results on recent improvement initiatives relating to travel processes,
procurement (small value contracts) and workforce planning.
www.oakton.com.au 29
Recommendations (cont’d)
 Early Priorities (< 6 months)
— The Agency should implement the following early priorities:
• Scope and plan process improvements and workflow automations across core
HR processes. (This would lead to a mid-long term HR improvement project.)
• Communicate and apply the results of the training needs analysis to establish
the baseline for further workforce development and recruitment activities.
• Develop a draft Change Charter and Schedule that provides a view of the
impacts of key policy and process changes on operations.
• Reduce the duplication and customisation of Senior Executive Briefings
through more consistent use of new standard guidelines and templates.
• Deliver staff training and better guidelines for internal budgeting and general
accounting reporting processes.
www.oakton.com.au 30
Recommendations (cont’d)
 Other Improvements (6-24 months)
• The Agency should address the issues raised in Supporting (Enabling)
processes and Management processes (Rating 1 or 2) over the next 6-
24 months.
• The Business Improvement Office (outlined in Recommendation 1)
should work closely with process owners and the Program
Management Office to scope and plan key processes for automation
as part of the upgrade of key systems and financial/human resource
systems.
www.oakton.com.au 31
www.oakton.com.au 32
BPM meets Change Management
—BPM is often used to assist in business
transformation
—Change Management should be used to assist
in business transformation
—In business transformation you need to do
both!
www.oakton.com.au 33
www.oakton.com.au 34
Consulting Technology
Thank you and Q&A
Strategic partners
Microsoft
Oracle
SAP
IBM
Melbourne
Sydney
Canberra
Brisbane
Hyderabad
23 years
9 key industry sectors
800 plus clients
10,000 plus projects
Whatproblemdoyouwantdefined?
Thank you and Q&A
Strategic partners
Microsoft
Oracle
SAP
IBM
Melbourne
Sydney
Canberra
Brisbane
Hyderabad
23 years
9 key industry sectors
800 plus clients
10,000 plus projects
Whatproblemdoyouwantdefined?
www.oakton.com.au

Mais conteúdo relacionado

Mais procurados

Business process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontBusiness process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontYehia Elzont
 
Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Cathy Kirch
 
8 Omega Business
8 Omega Business8 Omega Business
8 Omega Businessmubarak2009
 
Introduction to Business Processes - Part I
Introduction to Business Processes - Part IIntroduction to Business Processes - Part I
Introduction to Business Processes - Part Icommandeleven
 
Improving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineImproving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineNathaniel Palmer
 
Measuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelMeasuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelNathaniel Palmer
 
Bpr 04 Benchmarking
Bpr 04 BenchmarkingBpr 04 Benchmarking
Bpr 04 Benchmarkingmsq2004
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity ModelNoel Hatch
 
Framework for a business process management competency centre
Framework for a business process management competency centreFramework for a business process management competency centre
Framework for a business process management competency centreMartin Moore
 
Introduction to Business Processes - Part II
Introduction to Business Processes - Part IIIntroduction to Business Processes - Part II
Introduction to Business Processes - Part IIcommandeleven
 
Calculating roi for_bpm ---
Calculating roi for_bpm ---Calculating roi for_bpm ---
Calculating roi for_bpm ---kfeldhus
 
2011 business process management
2011 business process management2011 business process management
2011 business process managementAreté Partners
 
Business process management
Business process managementBusiness process management
Business process managementDavid Stoffel
 
IMBOK Business Process
IMBOK Business ProcessIMBOK Business Process
IMBOK Business ProcessStephen Cloete
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering Building Engines
 
Business Process Management - Synergy Computer Solution
Business Process Management - Synergy Computer SolutionBusiness Process Management - Synergy Computer Solution
Business Process Management - Synergy Computer SolutionSynergy Computer Solutions
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineeringrajatiipm
 

Mais procurados (20)

Business process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontBusiness process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zont
 
Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1Enterprise Roleout Change-Kirch Final-compress 2.1
Enterprise Roleout Change-Kirch Final-compress 2.1
 
8 Omega Business
8 Omega Business8 Omega Business
8 Omega Business
 
Introduction to Business Processes - Part I
Introduction to Business Processes - Part IIntroduction to Business Processes - Part I
Introduction to Business Processes - Part I
 
Improving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineImproving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement Discipline
 
Measuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelMeasuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity Model
 
Bpr 04 Benchmarking
Bpr 04 BenchmarkingBpr 04 Benchmarking
Bpr 04 Benchmarking
 
Public Service Partnership Maturity Model
Public Service Partnership Maturity ModelPublic Service Partnership Maturity Model
Public Service Partnership Maturity Model
 
Framework for a business process management competency centre
Framework for a business process management competency centreFramework for a business process management competency centre
Framework for a business process management competency centre
 
Introduction to Business Processes - Part II
Introduction to Business Processes - Part IIIntroduction to Business Processes - Part II
Introduction to Business Processes - Part II
 
Calculating roi for_bpm ---
Calculating roi for_bpm ---Calculating roi for_bpm ---
Calculating roi for_bpm ---
 
Process Management
Process ManagementProcess Management
Process Management
 
Dimensions Of Change
Dimensions Of ChangeDimensions Of Change
Dimensions Of Change
 
2011 business process management
2011 business process management2011 business process management
2011 business process management
 
Business process management
Business process managementBusiness process management
Business process management
 
IMBOK Business Process
IMBOK Business ProcessIMBOK Business Process
IMBOK Business Process
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 
Business Process Management - Synergy Computer Solution
Business Process Management - Synergy Computer SolutionBusiness Process Management - Synergy Computer Solution
Business Process Management - Synergy Computer Solution
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineering
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 

Destaque

Project One Overview
Project One OverviewProject One Overview
Project One Overviewguest0012d3
 
generative communication in Linda and tuplespace
generative communication in Linda and tuplespacegenerative communication in Linda and tuplespace
generative communication in Linda and tuplespaceSheng Tian
 
Designing learning; Focusing learning; Framing content; Collaborating for Fee...
Designing learning; Focusing learning; Framing content; Collaborating for Fee...Designing learning; Focusing learning; Framing content; Collaborating for Fee...
Designing learning; Focusing learning; Framing content; Collaborating for Fee...Judith Boettcher
 
Prueba Para Slidershare
Prueba Para SlidersharePrueba Para Slidershare
Prueba Para Slidersharead ads
 
Fiu customizing.coddling f2.ss
Fiu customizing.coddling f2.ssFiu customizing.coddling f2.ss
Fiu customizing.coddling f2.ssJudith Boettcher
 
Prueba Para Slidershare
Prueba Para SlidersharePrueba Para Slidershare
Prueba Para Slidersharead ads
 
Enothe Presentation Rotterdam University for applied science
Enothe Presentation Rotterdam University for applied scienceEnothe Presentation Rotterdam University for applied science
Enothe Presentation Rotterdam University for applied scienceMerel van der Sar
 
Structured web apps
Structured web appsStructured web apps
Structured web appsSheng Tian
 

Destaque (8)

Project One Overview
Project One OverviewProject One Overview
Project One Overview
 
generative communication in Linda and tuplespace
generative communication in Linda and tuplespacegenerative communication in Linda and tuplespace
generative communication in Linda and tuplespace
 
Designing learning; Focusing learning; Framing content; Collaborating for Fee...
Designing learning; Focusing learning; Framing content; Collaborating for Fee...Designing learning; Focusing learning; Framing content; Collaborating for Fee...
Designing learning; Focusing learning; Framing content; Collaborating for Fee...
 
Prueba Para Slidershare
Prueba Para SlidersharePrueba Para Slidershare
Prueba Para Slidershare
 
Fiu customizing.coddling f2.ss
Fiu customizing.coddling f2.ssFiu customizing.coddling f2.ss
Fiu customizing.coddling f2.ss
 
Prueba Para Slidershare
Prueba Para SlidersharePrueba Para Slidershare
Prueba Para Slidershare
 
Enothe Presentation Rotterdam University for applied science
Enothe Presentation Rotterdam University for applied scienceEnothe Presentation Rotterdam University for applied science
Enothe Presentation Rotterdam University for applied science
 
Structured web apps
Structured web appsStructured web apps
Structured web apps
 

Semelhante a Connecting Process Professionals: Where BPM and Change Management meet

Suaju Company Presentation
Suaju Company PresentationSuaju Company Presentation
Suaju Company PresentationSuaju Ltd
 
Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Nathaniel Palmer
 
Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Nathaniel Palmer
 
Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chainStephen Depoe
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0Gavin Berry
 
Intro process-centric-organizations
Intro process-centric-organizationsIntro process-centric-organizations
Intro process-centric-organizationsStephen Depoe
 
Doug Groves Shell S O A Symposium
Doug  Groves    Shell  S O A  SymposiumDoug  Groves    Shell  S O A  Symposium
Doug Groves Shell S O A SymposiumSOA Symposium
 
Practical Steps for Insurers to Get Started with Digital Execution
Practical Steps for Insurers to Get Started with Digital ExecutionPractical Steps for Insurers to Get Started with Digital Execution
Practical Steps for Insurers to Get Started with Digital ExecutionMendix
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng
 
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...European SharePoint Conference
 
Introduction to business process management
Introduction to business process managementIntroduction to business process management
Introduction to business process managementmoh2000amed
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process ManagementMourad Jennane
 
Estimating your Process Projects presented at FSOkx BPM Forum
Estimating your Process Projects presented at FSOkx BPM ForumEstimating your Process Projects presented at FSOkx BPM Forum
Estimating your Process Projects presented at FSOkx BPM ForumProlifics
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering Dilawar Abbas
 
Lima visit Oct 20 2016
Lima visit Oct 20 2016Lima visit Oct 20 2016
Lima visit Oct 20 2016Paul Monus
 
Fail to prepare - Softworld 2011
Fail to prepare -  Softworld 2011Fail to prepare -  Softworld 2011
Fail to prepare - Softworld 2011Sageukofficial
 
Fail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systemsFail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systemsSageukofficial
 

Semelhante a Connecting Process Professionals: Where BPM and Change Management meet (20)

Suaju Company Presentation
Suaju Company PresentationSuaju Company Presentation
Suaju Company Presentation
 
Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)
 
Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)Department of the Interior’s Methodology for Business Transformation (MBT)
Department of the Interior’s Methodology for Business Transformation (MBT)
 
Six sigma-and-supply-chain
Six sigma-and-supply-chainSix sigma-and-supply-chain
Six sigma-and-supply-chain
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0
 
Intro process-centric-organizations
Intro process-centric-organizationsIntro process-centric-organizations
Intro process-centric-organizations
 
Doug Groves Shell S O A Symposium
Doug  Groves    Shell  S O A  SymposiumDoug  Groves    Shell  S O A  Symposium
Doug Groves Shell S O A Symposium
 
Practical Steps for Insurers to Get Started with Digital Execution
Practical Steps for Insurers to Get Started with Digital ExecutionPractical Steps for Insurers to Get Started with Digital Execution
Practical Steps for Insurers to Get Started with Digital Execution
 
Standard operating procedures
Standard operating proceduresStandard operating procedures
Standard operating procedures
 
Create a Winning BPI Playbook
Create a Winning BPI PlaybookCreate a Winning BPI Playbook
Create a Winning BPI Playbook
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photo
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photo
 
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...
Why Are We Still Talking About SharePoint Governance? presented by Anders Skj...
 
Introduction to business process management
Introduction to business process managementIntroduction to business process management
Introduction to business process management
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process Management
 
Estimating your Process Projects presented at FSOkx BPM Forum
Estimating your Process Projects presented at FSOkx BPM ForumEstimating your Process Projects presented at FSOkx BPM Forum
Estimating your Process Projects presented at FSOkx BPM Forum
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 
Lima visit Oct 20 2016
Lima visit Oct 20 2016Lima visit Oct 20 2016
Lima visit Oct 20 2016
 
Fail to prepare - Softworld 2011
Fail to prepare -  Softworld 2011Fail to prepare -  Softworld 2011
Fail to prepare - Softworld 2011
 
Fail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systemsFail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systems
 

Último

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Último (20)

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Connecting Process Professionals: Where BPM and Change Management meet

  • 1. Connecting Process Professionals 1 Where BPM and Change Management meet Paul Walsh | Oakton 8th September 2012
  • 2. Agency Reform Consultancy - Where BPM met OCM • BPM Link September 2012 www.oakton.com
  • 3. Agenda • Background • Oakton’s Brief • Discovery • Findings • Recommendations www.oakton.com.au 3
  • 4. Background • Medium sized agency – Almost 1300 staff – Responsible for budget >$4b (2010/11) • Subject to numerous reviews the latest in April 2011 • Independent Review had 39 recommendations • 38 of these accepted in Government’s response in July 2011. • This led to over 120 individual action items to be finalised by 30 June 2012! www.oakton.com.au 4
  • 5. www.oakton.com.au 5 My first meeting at the Agency
  • 6. From Independent Review (2011) Recommendation 31: Corporate reform efforts within the Agency should be accelerated to promote a culture geared towards delivering results and enhancing productivity, especially by reducing staff turnover, streamlining business processes and reducing paperwork. www.oakton.com.au 6
  • 7. Oakton’s Brief The Terms of Reference (TOR) included: • Recommendations to improve business process reform within the Agency , including current policy, guidelines and tools. • Development of a business process framework covering the whole of the Agency • A stocktake of Supporting (Enabling) processes and Management processes (with a “light touch” approach to core processes). • Identification of five quick wins for streamlining processes. www.oakton.com.au 7
  • 8. Business Process Management Initiate Assess Continuous Improvement Streamline Planning Stakeholder Engagement and Ownership Process Modeling and Management Organisational Change Impact Learning and Development Initial BPM analysis and definition documentation Current state assessment documentation Streamlined process documented and implemented Process measurements and controls documentation Control Build BPMI leadership, understanding and commitment Understand all dimensions of the current business processes Improve efficiency, effectiveness and adaptability of the business processes Implement a framework to measure and control the streamlined processes for ongoing improvement Implement continuous improvement processes Continuous improvement documentation Effective,efficientand adaptableprocesses Oakton’s BPM Framework
  • 9. Business Process Development & Management Policy Developed in 2006 following a review. — A vision • This policy provides the context and rationale for the Agency’s new approach to the development and management of business processes and the creation of new quality control points which include testing, approval, release and reporting. It explains the key elements of the governance regime, and the reasons for the various components. — Defined a minimum mandatory business processes • Common Business Processes — Accessibility of business processes – Instructions, Policies, Guidelines, Tools — Policy, business processes and knowledge sharing — Accountability for business processes — Effective and transparent management of business processes www.oakton.com.au 9
  • 10. Multi-lateral agreements Channels Non-Gov Organisations Grant schemes Scholarships Projects and tenders Business Architecture www.oakton.com.au 12 1 2 3 4 Strategic Drivers Purpose Strategic Goals Portfolio Strategies Plan Design Deliver Monitor Program Lifecycle Delivered Services Business Transformation and Adaptability People Finance Information Assets Infra- structure Systems Business Planning Resource Planning Functions Investment Framework Processes Governance Example of a high level business architecture Policies 5 External Stakeholders and Value Chain Posts Comms Channels
  • 11. Strategic themes – stakeholder feedback Many of the strategic opportunities and issues raised by Senior Executive appeared to be symptomatic of rapid growth. www.oakton.com.au 13 Planning – There is room to improve the planning process that links strategic goals with investment decisions Proportionality – Current initiatives are aligning investment processes with program value and risk. Enabling processes and systems – Are geared around old delivery modalities. System ownership is an issue. BPM is not strategically aligned. Workforce skills – There is a requirement for more program management and delivery skills. Program alignment – There is room to better align program planning and design with country strategies. Governance – There is merit in developing and communicating an overarching governance framework. Corporate knowledge and information –not as agile as it could be – this is partly about process, partly about corporate knowledge and management of information.
  • 12. Business process maturity – An snapshot Strategic Alignment Governance Methods Information Technology Culture People Process Improvement Plan Process management decision making Process design & modelling Process design & modelling Process skills & expertise Responsiveness to process change Strategy & Process Capability Link Process roles & responsibility Process implementation & execution Process implementation & execution Process management knowledge Process values & belief Process Architecture Process metrics & performance Process control & measurement Process control & measurement Process education & learning Process attitudes & behaviours Process Output Measurement Process management standards Process improvement & innovation Process improvement & innovation Process collaboration & communication Leadership attention to process Process customers & stakeholder Process management controls Process project & program management Process project & program management Process management leader Process management social networks www.oakton.com.au 14 Adapted From Jeston & Nelis 2006 BPM: Practical Guidelines for Successful Implementations In place Partial or being developed No evidence or only evident in one or two pockets
  • 13. www.oakton.com.au 15 Process Stocktake Level 1 process Confirm the description of the Level 1 process Level 2 process Confirm what Level 2 processes are in scope of the Level 1 process Process owner Who are the Level 1 and Level 2 owners? Process health check What is the state of the current Level 2 processes? Effective, Could be improved, major issues System What key systems support the Level 2 processes? This includes IT, excel spread sheets, access databases. If no system please state manual process. Process guidelines Do any process guidelines exist, are they being used and where are they located? Training What training, if any, is provided? How is this training delivered? Why improve the process What are the main reasons why the process needs improving? E.g. Deliver benefits/ mitigate risks/ optimise costs. Current/planned improvements What are the current or planned process improvements? Triggered by Effectiveness Review/ BP reform/ operational planning/ other. Priority When are the desired improvements to be implemented? E.g. Quick win, mid-term, long-term. Performance Metrics Are there any metrics? Eg volumes, staff resources, error rates, documented KPIs
  • 14. The Findings Recommendations to improve business process reform within the Agency , including current policy, guidelines and tools. • Development of a business process framework covering the whole of the Agency • A stocktake of Supporting (Enabling) processes and Management processes (with a “light touch” approach to core processes). • Identification of five quick wins for streamlining processes. www.oakton.com.au 16
  • 15. Key Finding TOR #1 The current business process reform policy is a good document, but it was set up before the Effectiveness Review, and now requires a new approach to implementation to meet the Agency’s needs. This includes: — A greater level of direction and control of business process reform. — A more centralised approach to the planning, sequencing and delivery of process improvements (i.e. the process lifecycle), supported by a rebranded Rules & Tools. — A collective approach to managing the impacts of the numerous changes on the Agency’s operations. — This approach is consistent with other organisations going through major business change, and should see the Agency through this transformative stage. www.oakton.com.au 17
  • 16. The Findings Recommendations to improve business process reform within the Agency , including current policy, guidelines and tools. Development of a business process framework covering the whole of the Agency • A stocktake of Supporting (Enabling) processes and Management processes (with a “light touch” approach to core processes). • Identification of five quick wins for streamlining processes. www.oakton.com.au 18
  • 18. Key Finding TOR #2 This framework can be refined over time and provides a top-down view of processes across the whole of the Agency. It supports the Agency’s ability to identify the value of each process, and any risks and gaps, with the view to selecting key processes for detailed analysis and redesign. www.oakton.com.au 20
  • 19. The Findings Recommendations to improve business process reform within the Agency , including current policy, guidelines and tools. Development of a business process framework covering the whole of the Agency A stocktake of Supporting (Enabling) processes and Management processes (with a “light touch” approach to core processes). • Identification of five quick wins for streamlining processes. www.oakton.com.au 21
  • 21. Supporting (Enabling) Processes – Level 1 Overall Rating Manage finance 3 Manage human resources 2 Manage systems and technology 3/4 Manage legal services 3 Manage property 3 Manage security Not rated Manage engagement with Minister & Parliament 3/4 Manage communications and media 3 www.oakton.com.au 23
  • 22. Key Finding TOR #3 • Management processes – The Agency recently implemented several management frameworks to support its business needs through to 2015- 16. There are still challenges, particularly for business planning and information management. This is consistent with other Government organisations. • Core processes – There is an emerging view of the Agency’s top level processes required through to 2015-16. • Supporting (enabling) processes – Some processes are working well, however there are key challenges in regard to quality, efficient use of resources and better automation, particularly for some financial and human resource processes. This is consistent with other Government organisations. www.oakton.com.au 24
  • 23. The Findings Recommendations to improve business process reform within the Agency , including current policy, guidelines and tools. Development of a business process framework covering the whole of the Agency A stocktake of Supporting (Enabling) processes and Management processes (with a “light touch” approach to core processes). Identification of five quick wins for streamlining processes. www.oakton.com.au 25
  • 24. Quick wins Stakeholder consultations and review of various documents has revealed some common quick win themes: • Travel (note: under development, updated Travel Policy) • Acquittals; • Movement requisitions; • Contracts (note: under development) • Improve administration of small value agreements • Delegations • Contracts • Procurement • Resource Allocations • Procurement • Automate • Communicate process and the why • Proportionality Project impact • Grants • Streamline process • Resource allocations • Faster, clearer delineation of approvals • Salaries & conditions for O-based staff • Strategic Planning • Link between business unit planning and departmental budget • Corporate Governance • Unclear how the various committees interact and areas of responsibilities www.oakton.com.au 26 Some points for consideration: What are the “knock-on” effects of changing processes? Are these really quick wins? Or are they the first steps of strategic initiatives or systems investment? What does quick win mean for the Agency? • Time • Cost • Resource effort.
  • 25. Key Finding TOR #4 Transformative change in the Agency has generated, and will continue to generate, numerous business improvement initiatives. • The 2011/12 program of improvements will strengthen processes. Early results in key processes should be communicated to staff. • The Agency has implemented several “quick wins” over the last six months that will have a major, positive impact on staff. However, the goal of business process improvement is not always about efficiency or less paper work. In assessing improvement opportunities in the future, the Agency should consider its objectives i.e. will process improvement lead to: • More effective programs • Better quality and timeliness of decisions and deliverables • Mitigation of risks around key investments www.oakton.com.au 27
  • 26. Recommendations  Approach to Business Process Reform  The Agency should refine its BPD&M Policy and implementation approaches to meet business needs through to 2015-16.  Rules & Tools  The Agency should align Rules & Tools to the updated BPD&M Policy  Change Management  The Agency should develop a Change Charter and Schedule that establishes an enterprise-view of changes, including timing and sequencing.  Business Process Framework  The Agency should further develop and then apply and maintain the business process framework as part of its broader approach to business process reform. www.oakton.com.au 28
  • 27. Recommendations (cont’d)  Early Results from Improvements Implemented in 2011/12  The Agency should focus attention on achieving and communicating early results on recent improvement initiatives relating to travel processes, procurement (small value contracts) and workforce planning. www.oakton.com.au 29
  • 28. Recommendations (cont’d)  Early Priorities (< 6 months) — The Agency should implement the following early priorities: • Scope and plan process improvements and workflow automations across core HR processes. (This would lead to a mid-long term HR improvement project.) • Communicate and apply the results of the training needs analysis to establish the baseline for further workforce development and recruitment activities. • Develop a draft Change Charter and Schedule that provides a view of the impacts of key policy and process changes on operations. • Reduce the duplication and customisation of Senior Executive Briefings through more consistent use of new standard guidelines and templates. • Deliver staff training and better guidelines for internal budgeting and general accounting reporting processes. www.oakton.com.au 30
  • 29. Recommendations (cont’d)  Other Improvements (6-24 months) • The Agency should address the issues raised in Supporting (Enabling) processes and Management processes (Rating 1 or 2) over the next 6- 24 months. • The Business Improvement Office (outlined in Recommendation 1) should work closely with process owners and the Program Management Office to scope and plan key processes for automation as part of the upgrade of key systems and financial/human resource systems. www.oakton.com.au 31
  • 31. BPM meets Change Management —BPM is often used to assist in business transformation —Change Management should be used to assist in business transformation —In business transformation you need to do both! www.oakton.com.au 33
  • 33. Consulting Technology Thank you and Q&A Strategic partners Microsoft Oracle SAP IBM Melbourne Sydney Canberra Brisbane Hyderabad 23 years 9 key industry sectors 800 plus clients 10,000 plus projects Whatproblemdoyouwantdefined? Thank you and Q&A Strategic partners Microsoft Oracle SAP IBM Melbourne Sydney Canberra Brisbane Hyderabad 23 years 9 key industry sectors 800 plus clients 10,000 plus projects Whatproblemdoyouwantdefined? www.oakton.com.au