SlideShare uma empresa Scribd logo
1 de 7
1 | P a g e
GERALD L. ADARLO
T. Aguila St. Bayanan San Pascual Batangas
Philippines 4204
Philippine No. +63 9985396165 & +63 9285590311
Malaysia No, +60 11 2914 1217
Email: geraldadarlo@gmail.com
gerald_adarlo@yahoo.com
Skype: gerald.adarlo
Position Applied : Senior Material Supervisor/Controller, FMCS Operator, Document Cont’r.
Admin Staff, Logistics Assistant & Purchaser
Objective : To attain fullest global competitiveness on professionalism and
Innovation with high aptitude towards technical knowhow and
Applications.
WORK EXPERIENCES SUMMARY
Company : Mitsubishi Heavy Industries, Ltd.
Position : Material Controller
Duration : Jan. 07, 2016 to Dec, 30, 2016
Project KVMRT Project
3A-13, 5 Menara Mudajaya, Jalan PJU 7/3 Mutiara Damansara
47810 Petaling Jaya Selangor
Brief Description of Relevant Job Experiences
 Supervision and control all incoming Material’s from different Suppliers.
 Receiving of track work’s material such as Conductor Rail, Fastening, Electrical and
Depot items ect.
 Physical and visual inspection of material/equipment received
 Comparison of material specification, qty. in the packing list vs. actual
Delivery.
 Inspection of all material with Q.A./Q.C. personnel and report
Discrepancies if any and issue OSID.
 Arrange proper storage/preservation of material as per manufacture’s
And climatic conditions.
2 | P a g e
 Computerized inventory (excel) and documentation of all materials stored
 Physical stock verification of all material on regular intervals.
 Maintain the issue stock record on Daily basis and report to Construction Manager
for the record.
 Report the status stock to the concerned department time to time.
 Responsible for the management of heavy equipment’s such as crane,
Forklift, etc. for material movement.
 Implement safety rules strictly in all activities of material handling.
 Maintain good housekeeping in all storage area.
 Give proper training to the co-workers to execute their jobs more easy, efficiency
and safe.
 Coordinate to procurement division for availability of project material as
Per delivery schedule.
 Monitor material control system for various sub-contractors
 Hand over 2 Years Spare Parts, Capital Spare, and Construction Spare to both
Owner (MRT) and construction team for the remaining works.
A. Company : Daelim Saudi Arabia Co. Ltd.
Position : Material Controller & Material Document Controller
(Laydown & Main Warehouse)
Duration : Mar, 10, 2013 to Nov. 24, 2015 (Finished Project)
Project EPC - Saudi Elastomers Project (Carbon Block, Utility Offsite, MTBE)
P.O. Box 1885, Jubail 31951
Kingdom of Saudi Arabia
Brief Description of Relevant Job Experiences:
 Receiving of project material such as Piping, Mechanical, Electrical, Instrumentation, Steel
structure, Building, etc.
 Making DMRR (Daily Material Receiving Report) for receiving material monitoring & report
to MCM (Material Control Manager) for the record.
 Checking all relevant documents at FMCS (Field Material Control System) like’s (MTC,
Inspection Release Note, Compliance Certificate, and Vendor/Supplier Approved by Client.
 Supervision and control of all incoming Material from different country.
 Comparison of material specification, qty. in the packing list vs. actual delivery.
 Physical and visual inspection of material/equipment received
 Arrange proper storage/preservation of material as per manufacture’s
And climatic conditions.
 Preparation of MRR prior for RFI QA/QC inspection.
3 | P a g e
 Inspection of all material with Q.A. /Q.C. personnel and report discrepancies if any.
 Physical stock verification of all material on regular intervals.
 Maintain the issue stock record on Daily basis.
 Report the status stock to the concerned department time to time.
 Responsible for the management of heavy equipment such as crane, forklift and etc. for
material movement.
 Implement safety rules strictly in all activities of material handling.
 Maintain good housekeeping in all storage area.
 Give proper training to the co-workers to execute their jobs more easy, efficiency and safe.
 Coordinate to procurement division for availability of project material as per delivery
schedule.
 Monitor material control system for various sub-contractors request.
 Schedules and deadlines are adhered.
 Communicate & Implement change as directed.
 Health & Safety compliance in accordance with company policy.
 Manageinventory accuracythrough monitoringof dailywarehouseactivities,cycle
counts, stock takes and audit of same to verify results.
 Provide leadership by establishing clear expectations and demonstrating high
standards of work practices and safety conscious behavior.
 Establish, maintain and promote high standards of customer service.
 Supervision of all staff under your direct or indirect control.
 Administration duties as required to ensure daily time sheet is up to date.
 Plan and coordinate with the worker (Approx. 40 employees)
 Train and monitor staff in standard operating procedures (SOPs) and safe work
practices, including new employee inductions and tool box talks.
 Continuously monitor the performance and activities of the warehouse with FMCS.
 Checking (FPR/LPO) of each Department for the priority items.
 E-mail to vendor for requesting Quotation. Preparing Comparison Table for 3 Vendor
 Sending e-mail to logistics for material schedule subject for delivery ASAP.
Other Works:
 Logistics Assistant
 Off-shore & On-shore Shipment Coordinator
 Laydown Equipment Coordinator
 Purchaser
4 | P a g e
B. Company : Mitsubishi Heavy Industries, Ltd.
Position : Material Controller (Laydown & Main Warehouse)
Duration : May 29, 2008 to Aug. 20, 2012
Project Dubai Metro Project
P.O. Box 183357 Union Square, Dubai UAE
United Arab of Emirates
Brief Description of Relevant Job Experiences
 Making DMRR (Daily Material Receiving Report) for receiving material monitoring & report
to MCM (Material Control Manager) for the record.
 Coordinator of Gate passes for incoming deliveries from warehouse at DP world
Jebel Ali Free zone (UAE).
 Supervision and control of all incoming Material’s from different Suppliers.
 Receiving of project material such as Mechanical, Electrical, and Communication &
Depot items.
 Physical and visual inspection of material/equipment received
 Preparation of MRR report prior for inspection.
 Comparison of material specification, qty. in the packing list vs. actual
Delivery.
 Inspection of all material with Q.A./Q.C. personnel and report
Discrepancies if any and issue OSID.
 Arrange proper storage/preservation of material as per manufacture’s
And climatic conditions.
 Computerized inventory and documentation of all materials stored
 Physical stock verification of all material on regular intervals.
 Maintain the issue stock record on Daily basis and report to MCM for the record.
 Report the status stock to the concerned department time to time.
 Responsible for the management of heavy equipment’s such as crane,
Forklift, etc. for material movement.
 Implement safety rules strictly in all activities of material handling.
 Maintain good housekeeping in all storage area.
 Give proper training to the co-workers to execute their jobs more easy, efficiency
and safe.
 Coordinate to procurement division for availability of project material as
per delivery schedule.
 Monitor material control system for various sub-contractors
 Hand over 2 Years Spare Parts, Capital Spare, and Construction Spare to both
Owner (RTA) and construction team for the remaining works.
5 | P a g e
C. Company : Mitsubishi Heavy Industries, Ltd.
Position : Document Controller
Duration : June 09, 2006 to Apr. 23, 2008
Project Petro Rabigh Project
P.O. Box 11452, Jeddah 21453
Kingdom of Saudi Arabia
Brief Description of Relevant Job Experiences
 Assigned the project as Document Controller.
 In charge in uploading & searching of documents, drawings and all involve
documents in Power & Desalination Plant by PIMS system.
 Provides a full range support, both In-Kingdom office and Nagasaki (Japan) office
by organizing full documentation for IWSPP Project.
 Organizes filing system for Project Unit
 Maintains the filings of IFI & IFC drawings as well as Vendors drawings received
from different Contractors
 Consolidate Exception Item Lists for Erection Completion Certificate (ECC) &
Commissioning Completion Certificate (CCC) for signature of the Proponent and
Non Proponent
 Assists and coordinates with Project Manager, Business Administrator & All
Engineers in handling all correspondence & transmittal documents.
 Prepares all incoming and outgoing documents to ensured distribution in a timely
manner.
 Assisting the Site Engineersand all Site Concernedin preparationof theireveryday
documents & drawings received from Main office (Nagasaki).
 WeeklyProgress Reportandall PIMS task will bereportedin MainOffice(Nagasaki,
Japan) for their monitoring.
 Creates & maintains filing systems, records, indices including files of a confidential
nature.
 Keeps reference files and policy manuals.
D. Company : Mitsubishi Heavy Industries, Ltd.
Position : Document Controller
Duration : June 09, 2002 to June 09, 2006
Project :Ghazlan II Power Plant Preject
P.O. Box 31822, Al-Khobar 31952
Kingdom of Saudi Arabia
6 | P a g e
Brief Description of Relevant Job Experiences
 In charge in uploading & searching of documents, drawings and all involve
documents in Power & Desalination Plant by PIMS system.
 Maintains all the filings on IFI & IFC drawings as well as Vendors drawings received
from different Contractors.
 Consolidate Exception Item Lists for Erection Completion Certificate (ECC) &
Commissioning Completion Certificate (CCC) for signature of the Proponent and
Non Proponent.
 Assists the Administration, Project Manager, Engineers, Clients, and other
subcontractors pertaining out-going and in-coming documents of the project.
 Responsible in distribution of Drawings Transmittal & Correspondence documents
to all concerned person time to time.
 Responsible of Weekly/Monthly Progress Report.
 Creates & maintains filing systems, records, indices including files of a confidential
nature.
 Keeps reference files and policy manuals.
Qualification and Skills
 Computer literate
 Aggressive and achievement oriented
 Self-motivated with proactive attitude and excellent communication skills
 Highly trainable, flexiblewith excellent work attitude and to execute
responsibilities efficiency.
 Good Human supervisory Skills
 Knowledge in construction materials
Project Operated System
 Manual - by using Excel (MHI)
 FMCS – Field Material Control System (Daelim System)
 Manual - by using Excel (MHI)
 PIMS – Project Information Control System (MHI System)
 Documentum (Bechtel System)
 Info-works (Bechtel System)
PERSONAL INFORMATION
7 | P a g e
Educational Background
College : University of Batangas, Philippines
Course : Electronics Computer Technology
Year Graduated : March 1998
Secondary : Bayanan National High School
Location : Bayanan San Pascual Batangas, Philippines
Year Graduated : March 1992
Passport No. : EC1883828
Date of Issue : Aug. 13, 2014
Date of Expiration : Aug. 12, 2019
Place of Issue : DFA NCR Central Manila, Philippines
Date of Birth : Feb. 16,1975
Place of Birth : Batangas
Nationality : Filipino
Religion : Roman Catholic

Mais conteúdo relacionado

Mais procurados (19)

Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
QA Weld
QA WeldQA Weld
QA Weld
 
GCGUICO_RESUME
GCGUICO_RESUMEGCGUICO_RESUME
GCGUICO_RESUME
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
Kailash cv
Kailash cvKailash cv
Kailash cv
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Neel CV_Updated
Neel CV_UpdatedNeel CV_Updated
Neel CV_Updated
 
Chris_du_Plessis - CV
Chris_du_Plessis - CVChris_du_Plessis - CV
Chris_du_Plessis - CV
 
LastNew CV
LastNew CVLastNew CV
LastNew CV
 

Destaque

PráCtica PresentacióN
PráCtica PresentacióNPráCtica PresentacióN
PráCtica PresentacióNmontsebf
 
Sample Basic Presentations Class
Sample Basic Presentations ClassSample Basic Presentations Class
Sample Basic Presentations ClassBart Alvarez
 
Tasuta WordPressi teema nurjab su kodulehe edu
Tasuta WordPressi teema nurjab su kodulehe eduTasuta WordPressi teema nurjab su kodulehe edu
Tasuta WordPressi teema nurjab su kodulehe eduMeedia Disain
 
Evolution of Campus Food
Evolution of Campus FoodEvolution of Campus Food
Evolution of Campus FoodTwyla Campbell
 
Silverado Option B #3
Silverado Option B #3Silverado Option B #3
Silverado Option B #3jardenton
 
Empreendedorismo (parte 3), David Stephen
Empreendedorismo (parte 3), David StephenEmpreendedorismo (parte 3), David Stephen
Empreendedorismo (parte 3), David StephenDavid Stephen
 
Declaración de bienes de Domingo González Arroyo
Declaración de bienes de Domingo González ArroyoDeclaración de bienes de Domingo González Arroyo
Declaración de bienes de Domingo González ArroyoFuerteventura Limpia
 

Destaque (13)

PráCtica PresentacióN
PráCtica PresentacióNPráCtica PresentacióN
PráCtica PresentacióN
 
Jornada
JornadaJornada
Jornada
 
Sample Basic Presentations Class
Sample Basic Presentations ClassSample Basic Presentations Class
Sample Basic Presentations Class
 
Tasuta WordPressi teema nurjab su kodulehe edu
Tasuta WordPressi teema nurjab su kodulehe eduTasuta WordPressi teema nurjab su kodulehe edu
Tasuta WordPressi teema nurjab su kodulehe edu
 
Grills Gone Wild0001
Grills Gone Wild0001Grills Gone Wild0001
Grills Gone Wild0001
 
Media
MediaMedia
Media
 
cv
cvcv
cv
 
Evolution of Campus Food
Evolution of Campus FoodEvolution of Campus Food
Evolution of Campus Food
 
Silverado Option B #3
Silverado Option B #3Silverado Option B #3
Silverado Option B #3
 
Empreendedorismo (parte 3), David Stephen
Empreendedorismo (parte 3), David StephenEmpreendedorismo (parte 3), David Stephen
Empreendedorismo (parte 3), David Stephen
 
Declaración de bienes de Domingo González Arroyo
Declaración de bienes de Domingo González ArroyoDeclaración de bienes de Domingo González Arroyo
Declaración de bienes de Domingo González Arroyo
 
Big data big rewards
Big data big rewardsBig data big rewards
Big data big rewards
 
Jeruk
JerukJeruk
Jeruk
 

Semelhante a Gerald L. Adarlo CV

Semelhante a Gerald L. Adarlo CV (20)

randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
M.I.KHAN RESUME.
M.I.KHAN RESUME.M.I.KHAN RESUME.
M.I.KHAN RESUME.
 
AVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resumeAVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resume
 
CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)
 
JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016
 
CV MUCHLIS.SREGAR
CV  MUCHLIS.SREGARCV  MUCHLIS.SREGAR
CV MUCHLIS.SREGAR
 
KIM CV jan2015
KIM CV jan2015KIM CV jan2015
KIM CV jan2015
 
CV
CVCV
CV
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CV
 
RHYAN CASTANEDA
RHYAN CASTANEDARHYAN CASTANEDA
RHYAN CASTANEDA
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
Latest Revised Resume
Latest Revised ResumeLatest Revised Resume
Latest Revised Resume
 
Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015
 
Ariel Pantaleon - CV
Ariel Pantaleon - CVAriel Pantaleon - CV
Ariel Pantaleon - CV
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
 
Santosh_Paul_OCCPL 04
Santosh_Paul_OCCPL 04Santosh_Paul_OCCPL 04
Santosh_Paul_OCCPL 04
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 

Gerald L. Adarlo CV

  • 1. 1 | P a g e GERALD L. ADARLO T. Aguila St. Bayanan San Pascual Batangas Philippines 4204 Philippine No. +63 9985396165 & +63 9285590311 Malaysia No, +60 11 2914 1217 Email: geraldadarlo@gmail.com gerald_adarlo@yahoo.com Skype: gerald.adarlo Position Applied : Senior Material Supervisor/Controller, FMCS Operator, Document Cont’r. Admin Staff, Logistics Assistant & Purchaser Objective : To attain fullest global competitiveness on professionalism and Innovation with high aptitude towards technical knowhow and Applications. WORK EXPERIENCES SUMMARY Company : Mitsubishi Heavy Industries, Ltd. Position : Material Controller Duration : Jan. 07, 2016 to Dec, 30, 2016 Project KVMRT Project 3A-13, 5 Menara Mudajaya, Jalan PJU 7/3 Mutiara Damansara 47810 Petaling Jaya Selangor Brief Description of Relevant Job Experiences  Supervision and control all incoming Material’s from different Suppliers.  Receiving of track work’s material such as Conductor Rail, Fastening, Electrical and Depot items ect.  Physical and visual inspection of material/equipment received  Comparison of material specification, qty. in the packing list vs. actual Delivery.  Inspection of all material with Q.A./Q.C. personnel and report Discrepancies if any and issue OSID.  Arrange proper storage/preservation of material as per manufacture’s And climatic conditions.
  • 2. 2 | P a g e  Computerized inventory (excel) and documentation of all materials stored  Physical stock verification of all material on regular intervals.  Maintain the issue stock record on Daily basis and report to Construction Manager for the record.  Report the status stock to the concerned department time to time.  Responsible for the management of heavy equipment’s such as crane, Forklift, etc. for material movement.  Implement safety rules strictly in all activities of material handling.  Maintain good housekeeping in all storage area.  Give proper training to the co-workers to execute their jobs more easy, efficiency and safe.  Coordinate to procurement division for availability of project material as Per delivery schedule.  Monitor material control system for various sub-contractors  Hand over 2 Years Spare Parts, Capital Spare, and Construction Spare to both Owner (MRT) and construction team for the remaining works. A. Company : Daelim Saudi Arabia Co. Ltd. Position : Material Controller & Material Document Controller (Laydown & Main Warehouse) Duration : Mar, 10, 2013 to Nov. 24, 2015 (Finished Project) Project EPC - Saudi Elastomers Project (Carbon Block, Utility Offsite, MTBE) P.O. Box 1885, Jubail 31951 Kingdom of Saudi Arabia Brief Description of Relevant Job Experiences:  Receiving of project material such as Piping, Mechanical, Electrical, Instrumentation, Steel structure, Building, etc.  Making DMRR (Daily Material Receiving Report) for receiving material monitoring & report to MCM (Material Control Manager) for the record.  Checking all relevant documents at FMCS (Field Material Control System) like’s (MTC, Inspection Release Note, Compliance Certificate, and Vendor/Supplier Approved by Client.  Supervision and control of all incoming Material from different country.  Comparison of material specification, qty. in the packing list vs. actual delivery.  Physical and visual inspection of material/equipment received  Arrange proper storage/preservation of material as per manufacture’s And climatic conditions.  Preparation of MRR prior for RFI QA/QC inspection.
  • 3. 3 | P a g e  Inspection of all material with Q.A. /Q.C. personnel and report discrepancies if any.  Physical stock verification of all material on regular intervals.  Maintain the issue stock record on Daily basis.  Report the status stock to the concerned department time to time.  Responsible for the management of heavy equipment such as crane, forklift and etc. for material movement.  Implement safety rules strictly in all activities of material handling.  Maintain good housekeeping in all storage area.  Give proper training to the co-workers to execute their jobs more easy, efficiency and safe.  Coordinate to procurement division for availability of project material as per delivery schedule.  Monitor material control system for various sub-contractors request.  Schedules and deadlines are adhered.  Communicate & Implement change as directed.  Health & Safety compliance in accordance with company policy.  Manageinventory accuracythrough monitoringof dailywarehouseactivities,cycle counts, stock takes and audit of same to verify results.  Provide leadership by establishing clear expectations and demonstrating high standards of work practices and safety conscious behavior.  Establish, maintain and promote high standards of customer service.  Supervision of all staff under your direct or indirect control.  Administration duties as required to ensure daily time sheet is up to date.  Plan and coordinate with the worker (Approx. 40 employees)  Train and monitor staff in standard operating procedures (SOPs) and safe work practices, including new employee inductions and tool box talks.  Continuously monitor the performance and activities of the warehouse with FMCS.  Checking (FPR/LPO) of each Department for the priority items.  E-mail to vendor for requesting Quotation. Preparing Comparison Table for 3 Vendor  Sending e-mail to logistics for material schedule subject for delivery ASAP. Other Works:  Logistics Assistant  Off-shore & On-shore Shipment Coordinator  Laydown Equipment Coordinator  Purchaser
  • 4. 4 | P a g e B. Company : Mitsubishi Heavy Industries, Ltd. Position : Material Controller (Laydown & Main Warehouse) Duration : May 29, 2008 to Aug. 20, 2012 Project Dubai Metro Project P.O. Box 183357 Union Square, Dubai UAE United Arab of Emirates Brief Description of Relevant Job Experiences  Making DMRR (Daily Material Receiving Report) for receiving material monitoring & report to MCM (Material Control Manager) for the record.  Coordinator of Gate passes for incoming deliveries from warehouse at DP world Jebel Ali Free zone (UAE).  Supervision and control of all incoming Material’s from different Suppliers.  Receiving of project material such as Mechanical, Electrical, and Communication & Depot items.  Physical and visual inspection of material/equipment received  Preparation of MRR report prior for inspection.  Comparison of material specification, qty. in the packing list vs. actual Delivery.  Inspection of all material with Q.A./Q.C. personnel and report Discrepancies if any and issue OSID.  Arrange proper storage/preservation of material as per manufacture’s And climatic conditions.  Computerized inventory and documentation of all materials stored  Physical stock verification of all material on regular intervals.  Maintain the issue stock record on Daily basis and report to MCM for the record.  Report the status stock to the concerned department time to time.  Responsible for the management of heavy equipment’s such as crane, Forklift, etc. for material movement.  Implement safety rules strictly in all activities of material handling.  Maintain good housekeeping in all storage area.  Give proper training to the co-workers to execute their jobs more easy, efficiency and safe.  Coordinate to procurement division for availability of project material as per delivery schedule.  Monitor material control system for various sub-contractors  Hand over 2 Years Spare Parts, Capital Spare, and Construction Spare to both Owner (RTA) and construction team for the remaining works.
  • 5. 5 | P a g e C. Company : Mitsubishi Heavy Industries, Ltd. Position : Document Controller Duration : June 09, 2006 to Apr. 23, 2008 Project Petro Rabigh Project P.O. Box 11452, Jeddah 21453 Kingdom of Saudi Arabia Brief Description of Relevant Job Experiences  Assigned the project as Document Controller.  In charge in uploading & searching of documents, drawings and all involve documents in Power & Desalination Plant by PIMS system.  Provides a full range support, both In-Kingdom office and Nagasaki (Japan) office by organizing full documentation for IWSPP Project.  Organizes filing system for Project Unit  Maintains the filings of IFI & IFC drawings as well as Vendors drawings received from different Contractors  Consolidate Exception Item Lists for Erection Completion Certificate (ECC) & Commissioning Completion Certificate (CCC) for signature of the Proponent and Non Proponent  Assists and coordinates with Project Manager, Business Administrator & All Engineers in handling all correspondence & transmittal documents.  Prepares all incoming and outgoing documents to ensured distribution in a timely manner.  Assisting the Site Engineersand all Site Concernedin preparationof theireveryday documents & drawings received from Main office (Nagasaki).  WeeklyProgress Reportandall PIMS task will bereportedin MainOffice(Nagasaki, Japan) for their monitoring.  Creates & maintains filing systems, records, indices including files of a confidential nature.  Keeps reference files and policy manuals. D. Company : Mitsubishi Heavy Industries, Ltd. Position : Document Controller Duration : June 09, 2002 to June 09, 2006 Project :Ghazlan II Power Plant Preject P.O. Box 31822, Al-Khobar 31952 Kingdom of Saudi Arabia
  • 6. 6 | P a g e Brief Description of Relevant Job Experiences  In charge in uploading & searching of documents, drawings and all involve documents in Power & Desalination Plant by PIMS system.  Maintains all the filings on IFI & IFC drawings as well as Vendors drawings received from different Contractors.  Consolidate Exception Item Lists for Erection Completion Certificate (ECC) & Commissioning Completion Certificate (CCC) for signature of the Proponent and Non Proponent.  Assists the Administration, Project Manager, Engineers, Clients, and other subcontractors pertaining out-going and in-coming documents of the project.  Responsible in distribution of Drawings Transmittal & Correspondence documents to all concerned person time to time.  Responsible of Weekly/Monthly Progress Report.  Creates & maintains filing systems, records, indices including files of a confidential nature.  Keeps reference files and policy manuals. Qualification and Skills  Computer literate  Aggressive and achievement oriented  Self-motivated with proactive attitude and excellent communication skills  Highly trainable, flexiblewith excellent work attitude and to execute responsibilities efficiency.  Good Human supervisory Skills  Knowledge in construction materials Project Operated System  Manual - by using Excel (MHI)  FMCS – Field Material Control System (Daelim System)  Manual - by using Excel (MHI)  PIMS – Project Information Control System (MHI System)  Documentum (Bechtel System)  Info-works (Bechtel System) PERSONAL INFORMATION
  • 7. 7 | P a g e Educational Background College : University of Batangas, Philippines Course : Electronics Computer Technology Year Graduated : March 1998 Secondary : Bayanan National High School Location : Bayanan San Pascual Batangas, Philippines Year Graduated : March 1992 Passport No. : EC1883828 Date of Issue : Aug. 13, 2014 Date of Expiration : Aug. 12, 2019 Place of Issue : DFA NCR Central Manila, Philippines Date of Birth : Feb. 16,1975 Place of Birth : Batangas Nationality : Filipino Religion : Roman Catholic