DCS Capabilities
Branch Locations


LSI is a system integrator that started in 1985
that now employs 85 people located in 5
offices around the U.S and in the People’s
Republic of China

   • Bartlett, TN (Headquarters)
   • Jackson, TN
   • Rossville, GA
   • Golden, CO
   • Guangzhou, PRC
Company Capabilities

• Process Controls Design             • Project Management**
• S88 Batch Implementation**          • Electrical Engineering**
• P&ID Creation, Loop Sheets, Logic   • Electrical Panel Design**
  Diagrams                            • UL Panel Fabrication**
• Process Safety Analysis             • Microstation/ACAD
• User Specification Development**    • MES Systems (OEE, etc.)
• DCS Definition, Design, and         • Technical Training
  Configuration**                     • Advanced Process Control Boiler
• Instrumentation Specification         & Powerhouse Applications**
• Control Loop Design and Tuning      • Drive Systems
• PLC/RTU Programming**               • Motion Systems
• HMI and SQL Implementation**        • Fieldbus implementation (FF, As-
• ARC Flash and Short Circuit           I, Profibus, etc.)**
  Coordination Studies
• Drives and Drive Systems
Industries Served



• Food and Beverage
• Oil and Gas
• Specialty Chemicals
• Pulp and Paper
• Power Generation
• Mobile Power Units
• Plastics
• Nuclear (Non Reactor)
• Metals
Platform Expertise

DCS Platforms
   • Emerson Delta V
   • Foxboro
   • ABB
   • Bailey
   • Honeywell
PLC/PAC Platforms
   • Rockwell Automation/Allen Bradley
   • Siemens
   • GE
HMI Platforms
   • Rockwell Automation/Allen Bradley
   • Wonderware
   • Intellution
   • Iconics
Completed Projects Using DCS
  Systems in the last 5 years
Completed Project 1 – Major
        Brewery

                 Project Details
                 • Wort Cooling Process
                 • 8 month project
                 • $2.3M project
                 • Bailey Net90 Conversion

                  Project Scope
                  • Complete Project Execution
                  • P&ID’s
                  • Procurement
                  • Project Management
                  • Panel Design and Fabrication
                  • Delta V Configuration
                  • Construction Management
                  • Commissioning
                  • S88 Methodology Used
Completed Project 2 – Nuclear
     Waste Treatment

                  Project Details
                  • Nuclear Waste Treatment
                  • 14 month project
                  • $2.3M project in design and
                  configuration, plus $1.2M in
                  panel fabrication
                  • ABB AC-460 Series Controllers
                   Project Scope
                   • DCS Configuration
                   • Graphics Development
                   • Process Simulation
                   • Operator Training
                   • Commissioning
                   • FAT Testing and Simulation
                   (Cape Software)
                   • Commissioning and Startup
                   • ASME NQA-1-2000 Quality
                   Compliant Project for software
                   and simulation
                   • Panel fabrication and testing
                   per NQA-1-2000
Completed Project 3 – Kiln and
 Caustic areas in a Paper Mill

                  Project Details
                  • Kiln #1 and common equipment
                  for the Kilns in the caustic area
                  (Foxboro to DeltaV conversion)
                  • 6 month project
                  • $350k project
                  • 260 DST’s and 175 CM’s
                  • 4 DeltaV controllers
                   Project Scope
                   • Power drawings,
                   communication drawings, and
                   individual card drawings (275
                   total drawings created or
                   modified)
                   • DCS configuration
                   • Simulation and testing
                   • Commissioning
Completed Project 4 – Major
  Brewery Greenfield Site

                 Project Details
                 • Complete Greenfield Plant –
                 Basic Process
                 • 2.5 Year project
                 • $8M project
                 • 63 Controllers
                 • 15,000 I/O

                  Project Scope
                  • DCS Configuration
                  • Commissioning
                  • Simulation and Testing
Completed Project 5 – Major
        Brewery

                 Project Details
                 •Blend/Finish Operations
                 • 20 month project
                 • $3M project
                 • 12 Controllers

                  Project Scope
                  • Functional Description
                  Development
                  • Process Control Design
                  • Delta V Configuration
                  • PLC5 to Delta V Conversion
                  • Process Simulation and Testing
                  • Commissioning
                  • S88 Methodology Used
Completed Project 6 – New Product
 Line/Process into Major Brewery

                   Project Details
                   • New Product Line into existing
                   plant
                   • 9 month project to first
                   production runs, 18 months total
                   • 16 man years worth of effort in
                   9 months, 21.5 man years for the
                   total project
                   • 1100 drawings completed in 6
                   weeks
                   • 64 People contributed to the
                   project from LSI and
                   subcontractors, including all 5
                   LSI offices
                   • Supported the plant 24X7

                    Project Scope
                   • Design (P&ID, Electrical, and
                   Controls)
                   • Procurement
                   • Installation/Construction
                   management
                   • DCS Configuration
                   • Simulation and Testing
                   • Commissioning
Completed Project 7 – DCS and Safety
                                          Interlock System Conversion in a Major
                                                       MMA Facility

 Project Details
• Project was originally Planned for 2006 major overhaul, but rescheduled for 2009/2010 overhaul of the plant
• DCS Conversion from Honeywell to DeltaV
• Safety PLC conversion from Honeywell/TI to redundant Controllogix SIL 2 system
• 1730 DST’s and 400 PLC I/O for the entire project
• Designed conversion panels and interconnecting cabling system to allow for complete plant conversion in 20 man-days
• Managed construction 24/7 throughout the overhaul and through interlock verification
• Designed plant simulation system for operator training and validation (Mynah MimiC)
• Assisted plant with class based module structure, implementing ASM (Abnormal Situation Management) graphics, and alarm
management
• Integrated Hart (SMART) instrumentation into AMS
• Commissioned all FF instruments and Allen Bradley Intellicenters
• Integrated Ethernet/IP communications between safety PLC system and DCS

  Project Scope
 • Design (Electrical, controls, all networks and field busses (FF, Devicenet)
 • Logic Diagrams and Loop sheets
 • Hardware Specification
 • Installation and Construction Management
 • Control Room Design (Wright Line products)
Completed Project 8 – DCS and Safety
                                          Interlock System Conversion in a Major
                                                    Acrylic Sheet Facility

 Project Details
• DCS conversion from Provox to DeltaV
• Safety PLC system - SIL 2 Controllogix system
• 1200 DST’s and 200 PLC I/O for the entire project
• Designed marshalling system to allow for conversion using the existing cabinets and infrastructure
• Batching system – developed the S88 model and recipe structure to allow operations management to create and adjust
batches
• Designed and integrated first FF segments for the plant site

 Project Scope
 • Design (Electrical, controls, all networks and field busses (FF, Devicenet)
 • Logic and Loop sheets
 • Hardware Specification
 • Installation and Construction Management
 • Control Room Design (Wright Line)
Other Miscellaneous Projects
                 Completed


• PolyMeg for Acrylics
• Hydrogen Reformer
• 2 stage Steam Reforming
• Fluidized Bed Reactors
• Recovery Boilers
• Brewing, Fermenting, and Aging
processes
• Numerous other batch and
continuous processes

Mais conteúdo relacionado

Mais procurados

Atomic Rules - Arkville DPDK Acceleration 20.08
Atomic Rules - Arkville DPDK Acceleration 20.08Atomic Rules - Arkville DPDK Acceleration 20.08
Atomic Rules - Arkville DPDK Acceleration 20.08Atomic Rules LLC
 
DPDK FPGA with Atomic Rules Arkville
DPDK FPGA with Atomic Rules ArkvilleDPDK FPGA with Atomic Rules Arkville
DPDK FPGA with Atomic Rules ArkvilleShepard Siegel
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expRashesh Shah
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsAVEVA Group plc
 
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?DMC, Inc.
 
CGC As-Built And Intelligent Modelling
CGC As-Built And Intelligent ModellingCGC As-Built And Intelligent Modelling
CGC As-Built And Intelligent ModellingPaul Timola
 

Mais procurados (6)

Atomic Rules - Arkville DPDK Acceleration 20.08
Atomic Rules - Arkville DPDK Acceleration 20.08Atomic Rules - Arkville DPDK Acceleration 20.08
Atomic Rules - Arkville DPDK Acceleration 20.08
 
DPDK FPGA with Atomic Rules Arkville
DPDK FPGA with Atomic Rules ArkvilleDPDK FPGA with Atomic Rules Arkville
DPDK FPGA with Atomic Rules Arkville
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
 
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
Improving and Scaling SCADA Systems: Is WinCC OA Right for Me?
 
CGC As-Built And Intelligent Modelling
CGC As-Built And Intelligent ModellingCGC As-Built And Intelligent Modelling
CGC As-Built And Intelligent Modelling
 

Destaque

I know what your packet did last hop using packet histories to troubleshoot...
I know what your packet did last hop  using  packet histories to troubleshoot...I know what your packet did last hop  using  packet histories to troubleshoot...
I know what your packet did last hop using packet histories to troubleshoot...承達 蔡
 
Enterasys Networks for Higher Education
Enterasys Networks for Higher EducationEnterasys Networks for Higher Education
Enterasys Networks for Higher EducationRobert Nilsson
 
Wonderware InTouch
Wonderware InTouchWonderware InTouch
Wonderware InTouchOmair Tariq
 
Enterasys Networks Corporate Presentation
Enterasys Networks Corporate PresentationEnterasys Networks Corporate Presentation
Enterasys Networks Corporate PresentationRobert Nilsson
 
switch Rn 8177 26
switch Rn 8177 26switch Rn 8177 26
switch Rn 8177 26guest7b26
 
White paper - Actionable Alarming - Wonderware-Schneider Electric
White paper - Actionable Alarming - Wonderware-Schneider ElectricWhite paper - Actionable Alarming - Wonderware-Schneider Electric
White paper - Actionable Alarming - Wonderware-Schneider ElectricSuman Singh
 
Technical note Miro automatic ftp uploads - r 30 sep 16
Technical note   Miro automatic ftp uploads - r 30 sep 16Technical note   Miro automatic ftp uploads - r 30 sep 16
Technical note Miro automatic ftp uploads - r 30 sep 16Ajeesh Joseph
 
Zero Day Response: Strategies for Cyber Security Defense
Zero Day Response: Strategies for Cyber Security DefenseZero Day Response: Strategies for Cyber Security Defense
Zero Day Response: Strategies for Cyber Security DefenseTripwire
 
Vala Afshar - The Power of Collaboration
Vala Afshar - The Power of CollaborationVala Afshar - The Power of Collaboration
Vala Afshar - The Power of CollaborationCore Networks, LLC
 
Каталог Adder
Каталог AdderКаталог Adder
Каталог AdderKVM Tech
 
Extreme_Networks_Loyola_High_School
Extreme_Networks_Loyola_High_SchoolExtreme_Networks_Loyola_High_School
Extreme_Networks_Loyola_High_SchoolKevin Behnke
 
Upcoming Event: Wonderware Next Generation Conference
Upcoming Event: Wonderware Next Generation ConferenceUpcoming Event: Wonderware Next Generation Conference
Upcoming Event: Wonderware Next Generation Conferenceshannon fisk
 

Destaque (20)

Kitura swift IBM
Kitura swift IBMKitura swift IBM
Kitura swift IBM
 
Introduction to InTouch Machine Edition (ITME)
Introduction to InTouch Machine Edition (ITME)Introduction to InTouch Machine Edition (ITME)
Introduction to InTouch Machine Edition (ITME)
 
I know what your packet did last hop using packet histories to troubleshoot...
I know what your packet did last hop  using  packet histories to troubleshoot...I know what your packet did last hop  using  packet histories to troubleshoot...
I know what your packet did last hop using packet histories to troubleshoot...
 
Enterasys Networks for Higher Education
Enterasys Networks for Higher EducationEnterasys Networks for Higher Education
Enterasys Networks for Higher Education
 
Wonderware InTouch
Wonderware InTouchWonderware InTouch
Wonderware InTouch
 
Enterasys Networks Corporate Presentation
Enterasys Networks Corporate PresentationEnterasys Networks Corporate Presentation
Enterasys Networks Corporate Presentation
 
switch Rn 8177 26
switch Rn 8177 26switch Rn 8177 26
switch Rn 8177 26
 
Web Based Reporting
Web Based ReportingWeb Based Reporting
Web Based Reporting
 
White paper - Actionable Alarming - Wonderware-Schneider Electric
White paper - Actionable Alarming - Wonderware-Schneider ElectricWhite paper - Actionable Alarming - Wonderware-Schneider Electric
White paper - Actionable Alarming - Wonderware-Schneider Electric
 
Technical note Miro automatic ftp uploads - r 30 sep 16
Technical note   Miro automatic ftp uploads - r 30 sep 16Technical note   Miro automatic ftp uploads - r 30 sep 16
Technical note Miro automatic ftp uploads - r 30 sep 16
 
Zero Day Response: Strategies for Cyber Security Defense
Zero Day Response: Strategies for Cyber Security DefenseZero Day Response: Strategies for Cyber Security Defense
Zero Day Response: Strategies for Cyber Security Defense
 
Vala Afshar - The Power of Collaboration
Vala Afshar - The Power of CollaborationVala Afshar - The Power of Collaboration
Vala Afshar - The Power of Collaboration
 
5915
59155915
5915
 
Best practices in dcs migration webcast
Best practices in dcs migration webcastBest practices in dcs migration webcast
Best practices in dcs migration webcast
 
Invensys / Triconex
Invensys / TriconexInvensys / Triconex
Invensys / Triconex
 
Каталог Adder
Каталог AdderКаталог Adder
Каталог Adder
 
Extreme_Networks_Loyola_High_School
Extreme_Networks_Loyola_High_SchoolExtreme_Networks_Loyola_High_School
Extreme_Networks_Loyola_High_School
 
Technical Note - ITME: Running StADOSvr.exe as a Service
Technical Note - ITME: Running StADOSvr.exe as a ServiceTechnical Note - ITME: Running StADOSvr.exe as a Service
Technical Note - ITME: Running StADOSvr.exe as a Service
 
OCS LIA
OCS LIAOCS LIA
OCS LIA
 
Upcoming Event: Wonderware Next Generation Conference
Upcoming Event: Wonderware Next Generation ConferenceUpcoming Event: Wonderware Next Generation Conference
Upcoming Event: Wonderware Next Generation Conference
 

Semelhante a LSI's DCS Capabilities and Project Experience

Cgc general profile
Cgc general profileCgc general profile
Cgc general profilePaul Timola
 
DevOps for Big Data - Data 360 2014 Conference
DevOps for Big Data - Data 360 2014 ConferenceDevOps for Big Data - Data 360 2014 Conference
DevOps for Big Data - Data 360 2014 ConferenceGrid Dynamics
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineermsh_shaban
 
Tech 2 Tech - My network refresh
Tech 2 Tech - My network refreshTech 2 Tech - My network refresh
Tech 2 Tech - My network refreshJisc
 
Vinoth_Perumal_Datawarehousing
Vinoth_Perumal_DatawarehousingVinoth_Perumal_Datawarehousing
Vinoth_Perumal_Datawarehousingvinoth perumal
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...IBM Danmark
 
Deployment of Juniper Contrail in AVG Technologies
Deployment of Juniper Contrail in AVG TechnologiesDeployment of Juniper Contrail in AVG Technologies
Deployment of Juniper Contrail in AVG TechnologiesMarketingArrowECS_CZ
 
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...MongoDB
 
Control Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsControl Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsMichael Holan
 
Journey from on prem to the cloud with kubernetes
Journey from on prem to the cloud with kubernetesJourney from on prem to the cloud with kubernetes
Journey from on prem to the cloud with kubernetesLibbySchulze
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2GreenData.IO
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
 
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceWastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceIntelligentManufacturingInstitute
 
Robert Williams Work Experience
Robert Williams Work ExperienceRobert Williams Work Experience
Robert Williams Work ExperienceRobert Williams
 
Real-Time Engineering Simulators
Real-Time Engineering SimulatorsReal-Time Engineering Simulators
Real-Time Engineering SimulatorsGSE Systems, Inc.
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016Tahir Khan
 

Semelhante a LSI's DCS Capabilities and Project Experience (20)

Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 
Cgc general profile
Cgc general profileCgc general profile
Cgc general profile
 
DevOps for Big Data - Data 360 2014 Conference
DevOps for Big Data - Data 360 2014 ConferenceDevOps for Big Data - Data 360 2014 Conference
DevOps for Big Data - Data 360 2014 Conference
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
James Bullen CV
James Bullen CVJames Bullen CV
James Bullen CV
 
Tech 2 Tech - My network refresh
Tech 2 Tech - My network refreshTech 2 Tech - My network refresh
Tech 2 Tech - My network refresh
 
Vinoth_Perumal_Datawarehousing
Vinoth_Perumal_DatawarehousingVinoth_Perumal_Datawarehousing
Vinoth_Perumal_Datawarehousing
 
Sdlc
Sdlc Sdlc
Sdlc
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
 
Deployment of Juniper Contrail in AVG Technologies
Deployment of Juniper Contrail in AVG TechnologiesDeployment of Juniper Contrail in AVG Technologies
Deployment of Juniper Contrail in AVG Technologies
 
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...
MongoDB World 2019: From Traditional Oil and Gas to Sustainable Energy OR Fro...
 
Control Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutionsControl Panels USA - custom industiral control solutions
Control Panels USA - custom industiral control solutions
 
Journey from on prem to the cloud with kubernetes
Journey from on prem to the cloud with kubernetesJourney from on prem to the cloud with kubernetes
Journey from on prem to the cloud with kubernetes
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
 
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceWastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
 
Robert Williams Work Experience
Robert Williams Work ExperienceRobert Williams Work Experience
Robert Williams Work Experience
 
Real-Time Engineering Simulators
Real-Time Engineering SimulatorsReal-Time Engineering Simulators
Real-Time Engineering Simulators
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 

Último

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 

Último (20)

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 

LSI's DCS Capabilities and Project Experience

  • 2. Branch Locations LSI is a system integrator that started in 1985 that now employs 85 people located in 5 offices around the U.S and in the People’s Republic of China • Bartlett, TN (Headquarters) • Jackson, TN • Rossville, GA • Golden, CO • Guangzhou, PRC
  • 3. Company Capabilities • Process Controls Design • Project Management** • S88 Batch Implementation** • Electrical Engineering** • P&ID Creation, Loop Sheets, Logic • Electrical Panel Design** Diagrams • UL Panel Fabrication** • Process Safety Analysis • Microstation/ACAD • User Specification Development** • MES Systems (OEE, etc.) • DCS Definition, Design, and • Technical Training Configuration** • Advanced Process Control Boiler • Instrumentation Specification & Powerhouse Applications** • Control Loop Design and Tuning • Drive Systems • PLC/RTU Programming** • Motion Systems • HMI and SQL Implementation** • Fieldbus implementation (FF, As- • ARC Flash and Short Circuit I, Profibus, etc.)** Coordination Studies • Drives and Drive Systems
  • 4. Industries Served • Food and Beverage • Oil and Gas • Specialty Chemicals • Pulp and Paper • Power Generation • Mobile Power Units • Plastics • Nuclear (Non Reactor) • Metals
  • 5. Platform Expertise DCS Platforms • Emerson Delta V • Foxboro • ABB • Bailey • Honeywell PLC/PAC Platforms • Rockwell Automation/Allen Bradley • Siemens • GE HMI Platforms • Rockwell Automation/Allen Bradley • Wonderware • Intellution • Iconics
  • 6. Completed Projects Using DCS Systems in the last 5 years
  • 7. Completed Project 1 – Major Brewery Project Details • Wort Cooling Process • 8 month project • $2.3M project • Bailey Net90 Conversion Project Scope • Complete Project Execution • P&ID’s • Procurement • Project Management • Panel Design and Fabrication • Delta V Configuration • Construction Management • Commissioning • S88 Methodology Used
  • 8. Completed Project 2 – Nuclear Waste Treatment Project Details • Nuclear Waste Treatment • 14 month project • $2.3M project in design and configuration, plus $1.2M in panel fabrication • ABB AC-460 Series Controllers Project Scope • DCS Configuration • Graphics Development • Process Simulation • Operator Training • Commissioning • FAT Testing and Simulation (Cape Software) • Commissioning and Startup • ASME NQA-1-2000 Quality Compliant Project for software and simulation • Panel fabrication and testing per NQA-1-2000
  • 9. Completed Project 3 – Kiln and Caustic areas in a Paper Mill Project Details • Kiln #1 and common equipment for the Kilns in the caustic area (Foxboro to DeltaV conversion) • 6 month project • $350k project • 260 DST’s and 175 CM’s • 4 DeltaV controllers Project Scope • Power drawings, communication drawings, and individual card drawings (275 total drawings created or modified) • DCS configuration • Simulation and testing • Commissioning
  • 10. Completed Project 4 – Major Brewery Greenfield Site Project Details • Complete Greenfield Plant – Basic Process • 2.5 Year project • $8M project • 63 Controllers • 15,000 I/O Project Scope • DCS Configuration • Commissioning • Simulation and Testing
  • 11. Completed Project 5 – Major Brewery Project Details •Blend/Finish Operations • 20 month project • $3M project • 12 Controllers Project Scope • Functional Description Development • Process Control Design • Delta V Configuration • PLC5 to Delta V Conversion • Process Simulation and Testing • Commissioning • S88 Methodology Used
  • 12. Completed Project 6 – New Product Line/Process into Major Brewery Project Details • New Product Line into existing plant • 9 month project to first production runs, 18 months total • 16 man years worth of effort in 9 months, 21.5 man years for the total project • 1100 drawings completed in 6 weeks • 64 People contributed to the project from LSI and subcontractors, including all 5 LSI offices • Supported the plant 24X7 Project Scope • Design (P&ID, Electrical, and Controls) • Procurement • Installation/Construction management • DCS Configuration • Simulation and Testing • Commissioning
  • 13. Completed Project 7 – DCS and Safety Interlock System Conversion in a Major MMA Facility Project Details • Project was originally Planned for 2006 major overhaul, but rescheduled for 2009/2010 overhaul of the plant • DCS Conversion from Honeywell to DeltaV • Safety PLC conversion from Honeywell/TI to redundant Controllogix SIL 2 system • 1730 DST’s and 400 PLC I/O for the entire project • Designed conversion panels and interconnecting cabling system to allow for complete plant conversion in 20 man-days • Managed construction 24/7 throughout the overhaul and through interlock verification • Designed plant simulation system for operator training and validation (Mynah MimiC) • Assisted plant with class based module structure, implementing ASM (Abnormal Situation Management) graphics, and alarm management • Integrated Hart (SMART) instrumentation into AMS • Commissioned all FF instruments and Allen Bradley Intellicenters • Integrated Ethernet/IP communications between safety PLC system and DCS Project Scope • Design (Electrical, controls, all networks and field busses (FF, Devicenet) • Logic Diagrams and Loop sheets • Hardware Specification • Installation and Construction Management • Control Room Design (Wright Line products)
  • 14. Completed Project 8 – DCS and Safety Interlock System Conversion in a Major Acrylic Sheet Facility Project Details • DCS conversion from Provox to DeltaV • Safety PLC system - SIL 2 Controllogix system • 1200 DST’s and 200 PLC I/O for the entire project • Designed marshalling system to allow for conversion using the existing cabinets and infrastructure • Batching system – developed the S88 model and recipe structure to allow operations management to create and adjust batches • Designed and integrated first FF segments for the plant site Project Scope • Design (Electrical, controls, all networks and field busses (FF, Devicenet) • Logic and Loop sheets • Hardware Specification • Installation and Construction Management • Control Room Design (Wright Line)
  • 15. Other Miscellaneous Projects Completed • PolyMeg for Acrylics • Hydrogen Reformer • 2 stage Steam Reforming • Fluidized Bed Reactors • Recovery Boilers • Brewing, Fermenting, and Aging processes • Numerous other batch and continuous processes