Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
current C.V. 19.03.2015 (2)
1. GARY GRATTON
57 Orchard Brow, Rixton, Warrington WA3 6JL
Phone: 0161 776 1420; Mob: +44 (0) 7749216178; Email: gratton_gary@yahoo.com
Highly accomplished, experienced and commercially astute Construction Contracts / Project
Management professional with extensive and varied experience in delivering large-scale, high priority
construction, fit out, new build and maintenance projects on time, within budget and to outstanding
standards of quality. A widely experienced and knowledgeable manager in all aspects of construction,
complete with a proven ability to effectively manage all Health and Safety aspects and to manage the
financial and contractual elements. Seeks out opportunities for corporate profitability. Consummate
professional, highly qualified and skilled complete with excellent client relations skills determined to
apply abilities and experience to a new and challenging position.Construction Planning & Leadership•
Quality Management Systems Commercially Astute, Skilled in Health and Safety management and
development Program & Project Management• Staff Training Development• Extensive Building Expertise•
Cost Control
KEY ACHIEVEMENTS & ATTRIBUTES
Generated Financial Savings of Approximately 20% Per Property to the Client and
Connaught while Project/Contract Manager on large-scale local authority housing
maintenance projects.
Produces and compiles Health and Safety policies for all projects including CDM.
Programmes and plans all types of Construction works.
Delivered a £70 Million Regeneration Project Involving: Affordable housing
Structural, External and Refurbishment Work to An Expansive Area of Social
Housing (Within Time and Budget)
PROFESSIONAL EXPERIENCE
The Flanagan Group
Contracts Manager (August 2014 – Current)
Key Contributions:
Planning, Project Management running of overall contracts, current contracts involving
environmental schemes and full refurbishment both internally and externally of social
housing.
Full control of management of planned maintenance works
Overseeing five Site Managers
Reporting monthly to Directors and supplying weekly progress reports.
Delivering total exterior inclusive of EWI/IWI and interior refurbishment to occupied Social
Housing dwellings.
New build properties and daily office duties
New roofing
Environmental works inclusive of fences, wall, paths, gates, trees and foliage removal,
painting and replanting.
Organising and planning regular meeting
Overseeing budget control.
Mears Group
Curriculum Vitae of Gary Gratton / Page 1 of 5
2. Project Manager (April 2014) (Contract Completed)
Key Contributions:
Delivering total exterior inclusive of EWI and interior refurbishment to occupied Social
Housing dwellings on the Brunswick Estate in Manchester.
Supervising a team of assessors, ensuring that they are properly equipped to conduct
assessments and are checking every relevant aspect of the properties to ensure their ability
to support the technology being installed.
Checking whether assessed buildings are southerly facing, and are not shaded by trees thus
guaranteeing that all buildings are suitable and structurally sound as to support the extra
weight of solar panels and wind shearing effects.
Ensuring that all houses electrics are adequate and updated to 17th
edition regulations.
This is a 300 Million PFI contract over five year, consisting of low rise properties and high
rise properties. Undergoing major refurbishment works in line with Local Authority plans to
regenerate the area along with new housing and roads.
Blackpool Coastal Housing
Project Manager (Sept 2013) (Contract Completed)
Key Contributions:
Working within the Aids and Adaptations Department of a Local Housing Authority
Dealing with Installation, repairs and Maintenance of Aids and Adaptations to Local Housing
Authority
Accommodations and Housing Stock, day to day repairs and void properties.
. Kinlan Construction (Brickwork specialist)
Contracts Manager (July 2013 – Sept 2013) (Contract Completed)
Key Contributions:
Delivering the stone/brickwork and block work to external and internals of commercial
properties
throughout seven ALDI stores in the north west of the UK.
Converting and developing apartments in the Victoria Road area of the Wirral.
Monitoring progress, carrying out quality control and identifying extra works to all projects
Wates Living Space
Project Manager (Jan 2013 – May 2013) (Contract Completed)
Key Contributions:
Delivering total exterior inclusive of EWI and interior refurbishment to occupied Social
Housing dwellings on the Rose Bank estate Oldham
Documentation and preparation of Health & Safety Plan and Construction Design
Management.
Planning and programming PFI works within the £600 a week penalty clause, time specific
programmes to clients and company acceptance
Compiling tracking programme of all planned works.
Resourcing and structuring the project by the employment of various sub contract elements.
Overseeing Site managers and Tenant liaison officers daily.
Supporting the new build element, affordable housing of the PFI.
Liaising with independent C O W
Steering the project through time constraints and resource issues to comply with all
drawings and specific PFI documentation.
Curriculum Vitae of Gary Gratton / Page 2 of 5
3. F T Finley Ltd
Contracts Manager (July 2012 – Dec 2012) (Contract Completed)
Key Contributions:
Refurbishment works to three social housing sites in Gorton Manchester 80 properties and
one site in Swinton 40 properties comprising of the fitting of new kitchen facilities,
bathrooms new windows and doors.
Refurbishment works to the toilets of St Anne’s primary school Sale.
Mop up refurbishment to High Rise social housing flats in Denton, houses in Sale and
Denton
Preparing all procurement and H & S documentation for all projects inclusive of CDM.
Compiling all work stream programmes and tracking of work programmes for all project
streams.
Overseeing the daily operations of site managers, planning and coordinating all aspects of
resource procurement, labour and operational scheduling throughout the project lifecycle.
Working with three site managers and receiving daily reports, aiming to find timely and
effective resolutions to any problems or issues that arise and formulating strategies to deal
with recurrent issues and their resolution.
Organising and procuring labour and material orders for equipment and site welfare for all
project sites, ensuring staff and operatives are fully trained and appropriately equipped to
guarantee the smooth running of all planned and maintenance works.
Setting up site welfare amenities, storage and emplacing environmental policies in
accordance with the Health & Safety plan.
Approximate value of all carried out works £2.5 million
Forrest Ltd
Contracts/Project Manager (Feb 2012 – May 2012) (Contract Completed)
Key Contributions:
Working across a total of six planned internal kitchen bathroom and external door
refurbishment sites in the fitting of new kitchen and bathroom facilities and planned
external door replacement to local authority housing projects in Moss Side, Partington,
Maccasfield, Stockport, Accrington and Burnley.
Preparation of Health & Safety plans and CDM documents.
Site set up, environmental facilitation and welfare provision for all sites.
Compiling all project programmes and tracking programmes for the project streams.
Overseeing the daily operations of site managers, planning and coordinating all aspects of
resource procurement, labour and operational scheduling throughout the project lifecycle.
Working with 4 site managers and receiving daily reports, aiming to find timely and
effective resolutions to any problems or issues that arise and formulating strategies to deal
with recurrent issues and resolve them altogether.
Organising and procuring materials and equipment for project sites, ensuring staff and
operatives are trained and fully equipped to guarantee the smooth running of all planned
works.
Approximate value of works £1.5 million.
Kier Maintenance (NW)
Surveyor (June 2011 – Dec 2011)
Key Contributions:
Assessing the suitability of an approximate 2000 local authority houses for the
implementation of solar energy cells and technology, visiting homes and conducting
comprehensive evaluations.
Supervising a team of assessors, ensuring that they are properly equipped to conduct
assessments and are checking every relevant aspect of the properties to ensure their ability
to support the technology being installed.
Checking whether assessed buildings are southerly facing, and are not shaded by trees thus
guaranteeing that all buildings are suitable and structurally sound as to support the extra
weight of solar panels and wind shearing effects.
Ensuring that all houses electrics are adequate and updated to 17th
edition regulations.
Curriculum Vitae of Gary Gratton / Page 3 of 5
4. Connaught Plc. (UK)
Contracts/Project Manager (Nov 2007 – Sep 2010)
Key Contributions:
Project management of social housing initiatives to conduct full external and internal works
in the localities of Bolton, Oldham, Lancashire, Liverpool and throughout the northwest.
Preparing programmes and tracking systems of work for all individual work streams
inclusive of CDM, Health and Safety Files for each individual works stream.
Ensuring Site set up, environmental issues and the welfare facilities are maintained and fit
for purpose on a daily basis.
Managing the structural, brickwork repairs, U P V C soffit, facia and rain water goods
replacement, roof replacements and chimney repairs, EWI replacing timbers & cladding and
the removal of asbestos in a safe method whenever necessary.
The replacement of old external doors and windows with UPVC windows and doors to FENSA
standards.
Ensuring all work was conducted in a safe and proper manner. and initiating and managing
various structural works that including high quality wall tie replacement, external rendering
and insulation, applying crack ties, lateral and floor-to-wall restraints, fixing horizontal floor-
to-wall restraints and concrete repair works in accordance with regulations, on-time and in
budget.
The complete fit out including new flooring and roofing and full refurbishment of offices to
portal framed units.
Ensuring all materials is delivered to the highest quality standard both in finish and time
within budget.
Overseeing refurbishments of listed buildings and conserved buildings, including external
and structural works, ensuring adherence to rigorous local authority listed building
standards.
Having worked on the large-scale £75 million Sefton social housing refurbishment project,
and being tasked with the development of site operatives and staff. By identifying key
training needs and providing the correct training necessary to develop both staff and
operatives.
Oversaw ten staff inclusive of managers, assistants and TLO’s, thirty sub contractors and a
similar number of in house operatives
Liaising with clients and senior management on a daily basis, listening to all staff and
residents and cascading information to them by delivering monthly comprehensive reports
and weekly progress reports to key individuals to maintain lines of communication and to
receive feedback on key priorities and performance evaluation and chairing all on-site
meetings and contract meetings to discuss progress with clients and senior management
personnel.
Manchester City Council
Project Manager (May 1986 – Nov 2007)
Key Contributions:
Tasked with the management of a wide variety of private and public sector inclusive of new
build, planned maintenance, day to day repairs and refurbishment projects, including;
environmental facelift schemes, streetscape schemes, listed building and ground restoration
works, DDA streetscapes and conservation scheme works, supplied and fitted new shop
frontages to all Lansdowne Road, Crumpsall, shops.
Instrumental at every stage of the projects lifecycle, maintaining a close watch on all on-
going schemes and regularly checking progress and performance on both direct labour and
sub contractors.
Key projects included refurbishment initiatives for external facades inclusive of streetscape
work, alley gating installation, interior refurbishment and repair works that involved gas
boiler and fire, electrical rewires, new kitchens and bathrooms to hundreds of dilapidated
old terraced houses within the Cheetham Hill, Crumpsall and Harpurhey areas of
Manchester.
Managed the complete renewal of whole street surfacing, these included cobbled setts,
tarmac surfaces, drainage replacement, concrete flagging and concrete to main road ways.
Installed steel DDA compliant hand rails, street lighting and tree planting.
Managed MCC void housing projects on 1 - 3 day and 7 day turnaround basis.
Curriculum Vitae of Gary Gratton / Page 4 of 5
5. Overseen the building of two affordable housing projects in Gorton and Eastlands.
Built DDA compliant extensions to both public and social housing sectors.
Project management of minor and major repair works to schools, libraries, clinics and other
Manchester Council buildings along with conservation works including housing
refurbishment and street repairs
Managing insulation, structural repairs and foundation underpinning projects with a total
value of £1.5 million throughout social housing in Manchester, along with construction
projects that included EWI 300 properties and the building of seven six bedroom hostels,
completed in budget and on time with a £750k value per building.
Managed the new build of affordable housing to properties throughout Manchester.
All regeneration projects completed under budget of £20 million annually.
PREVIOUS WORK HISTORY
Manager - United Shop Fitters ( full fit outs to shops, hotels, offices and public houses)
Supervisor / Instructor – Trafford Youth Training (Training youths in carpentry & joinery techniques)
Combat Engineer – British Army Royal Engineers
Apprentice Joiner – Manchester Direct Works Department
EDUCATION & PROFESSIONAL MEMBERSHIPS
BSc (Hons) – Construction Project Management – University of Salford (2005)
Diploma – Site Management – Central Manchester College of Technology (1991)
Certificate – Site Management – Central Manchester College of Technology (1990)
Corporate Member: The Chartered Institute of Building (M.C.I.O.B.)
TRAINING & CERTIFICATIONS
Level 2 Award in Team Leading (ILM) (2010)
Asbestos Awareness (2013)
Construction Site Manager's Safety Certificate (2013)
Professionally Qualified Person Design Health and Safety CSCS (2013)
First Aid at Work (2012)
Scaffold Awareness (2008)
Fire Marshall Course (2008)
PASMA (2008)
Respect & Diversity Trainer to Train course (2008)
Damp Proofing and Timber Infestation Surveyors Course (2000)
Project Management Overview (2000)
Microsoft Project 2000: (2005)
Project Management Handbook Course Training Certificate (2006)
CPD Certificate on applying HHSRS (2006) Excellent References Available on Request -
Curriculum Vitae of Gary Gratton / Page 5 of 5
6. Overseen the building of two affordable housing projects in Gorton and Eastlands.
Built DDA compliant extensions to both public and social housing sectors.
Project management of minor and major repair works to schools, libraries, clinics and other
Manchester Council buildings along with conservation works including housing
refurbishment and street repairs
Managing insulation, structural repairs and foundation underpinning projects with a total
value of £1.5 million throughout social housing in Manchester, along with construction
projects that included EWI 300 properties and the building of seven six bedroom hostels,
completed in budget and on time with a £750k value per building.
Managed the new build of affordable housing to properties throughout Manchester.
All regeneration projects completed under budget of £20 million annually.
PREVIOUS WORK HISTORY
Manager - United Shop Fitters ( full fit outs to shops, hotels, offices and public houses)
Supervisor / Instructor – Trafford Youth Training (Training youths in carpentry & joinery techniques)
Combat Engineer – British Army Royal Engineers
Apprentice Joiner – Manchester Direct Works Department
EDUCATION & PROFESSIONAL MEMBERSHIPS
BSc (Hons) – Construction Project Management – University of Salford (2005)
Diploma – Site Management – Central Manchester College of Technology (1991)
Certificate – Site Management – Central Manchester College of Technology (1990)
Corporate Member: The Chartered Institute of Building (M.C.I.O.B.)
TRAINING & CERTIFICATIONS
Level 2 Award in Team Leading (ILM) (2010)
Asbestos Awareness (2013)
Construction Site Manager's Safety Certificate (2013)
Professionally Qualified Person Design Health and Safety CSCS (2013)
First Aid at Work (2012)
Scaffold Awareness (2008)
Fire Marshall Course (2008)
PASMA (2008)
Respect & Diversity Trainer to Train course (2008)
Damp Proofing and Timber Infestation Surveyors Course (2000)
Project Management Overview (2000)
Microsoft Project 2000: (2005)
Project Management Handbook Course Training Certificate (2006)
CPD Certificate on applying HHSRS (2006) Excellent References Available on Request -
Curriculum Vitae of Gary Gratton / Page 5 of 5