GROUNDWATER ENGINEERING

Technology Data Sheet

Construction Dewatering
Construction projects that extend below groundwater level present particular challenges. If groundwater is
not adequately controlled then excavations may flood or become unstable, and the efficiency of
construction operations will be reduced, wasting time and money.
Construction dewatering is the range of techniques used to control groundwater to allow excavations,
shafts, tunnels and other structures to be constructed below groundwater level in workably dry, stable and
safe conditions. If a planned programme of construction dewatering is implemented, a construction project
will typically see several benefits, including:


Improved geotechnical stability and safety, including allowing steeper side slopes and preventing
the softening or disruption of the excavation formation level due to upward groundwater pressures
or uncontrolled seepage.



More efficient excavation and construction conditions, including firmer excavation conditions less
prone to rutting or bogging down of plant and machinery. The drier working conditions created by
dewatering will improve the efficiency of construction operations such as excavation, concreting or
pipe laying.



Less risk of adverse environmental impacts because correctly engineered dewatering systems
produce ‘clean’ water with very little suspended solids, reducing the risk of water pollution.

Successful dewatering requires that the techniques used are appropriate to the type of excavation and
hydrogeological conditions at the construction site. Dewatering techniques must be selected carefully, as
the various techniques are not interchangeable and are only effective within certain conditions. The figure
below provides useful initial guidance on the selection of dewatering techniques in relation to permeability
(hydraulic conductivity) of the ground and the required drawdown of groundwater levels.

Range of application of pumped well groundwater control techniques (from CIRIA Report C515 Groundwater Control –
Design and Practice (Preene et al., 2000), reproduced by permission of CIRIA, www.ciria.org)

Want to find out more? For Further details contact:
enquires@groundwaterinternational.com;

Page 1 of 4

www.groundwaterinternational.com
GROUNDWATER ENGINEERING

There are two main types of groundwater control techniques:


Methods that use cut-off walls and other barriers to exclude water from the excavation (known as
exclusion techniques).



Methods that deal with groundwater by pumping.

Groundwater Control by Exclusion

Example of groundwater control by exclusion

Groundwater can be excluded from the working area by a very low permeability physical cut-off wall or
barrier installed around the perimeter of the excavation. Most commonly, the cut-off is vertical and ideally
penetrates down to a very low permeability stratum (such as a clay or unfractured bedrock) that forms a
basal seal for the excavation. There will still be a requirement for some groundwater pumping, to remove
water trapped inside the area enclosed by the barrier, and to deal with any leakage through the wall.
Methods used to form cut-off walls include:








Steel sheet-piling
Slurry trench walls (soilConcrete diaphragm walls
Bored pile walls (secant pile walls, contiguous pile walls)
Grout barriers (permeation grouting, rock grouting, jet grouting)
Mix-in-place barriers
Artificial ground freezing

The selection of the most appropriate exclusion method to form a cut-off barrier will depend on the
conditions and constraints on a given project. Primary constraints are desired depth of wall, ground
conditions, geometry of wall (some methods can be used horizontally or inclined to the vertical, while
others are limited to vertical applications), and whether the barrier is intended to be permanent or
temporary.
Page 2 of 4

www.groundwaterinternational.com
GROUNDWATER ENGINEERING

Groundwater Control by Pumping

Example of groundwater control by pumping using deep wells with submersible pumps

Pumping can locally lower groundwater levels in the vicinity of the excavation. It can be used as an
alternative to, or in combination with, cut-off walls to exclude groundwater.
The simplest form of dewatering is sump pumping, where groundwater enters the excavation and is then
collected in a sump and pumped away by robust solids handling pumps. This can be an effective method,
but seepage into the excavation can create the risk of instability and other construction problems.
Alternatively ‘pre-drainage’ methods can be used to lower groundwater levels in advance of excavation.
This will minimise groundwater seepage and ensure stability of excavation side slopes. Commonly used predrainage methods include:
Deep wells: These are bored wells pumped by submersible pumps; because it does not rely on the suction
principle this technique can be used to generate large drawdowns for deep excavations. Wells are normally
spaced around the perimeter of the excavation and work in combination to lower groundwater levels over
a wide area.
Wellpoints: This method uses lines or rings of closely spaced shallow wells (known as ‘wellpoints’) installed
around the excavation and connected to a common header pipe which is pumped by a wellpoint pump
capable of pumping both air and water. This technique is very flexible and is widely used for pipeline
trenches and shallow excavations. Suction limitations mean that the maximum drawdown that can
generated by wellpoint systems is typically 5 to 6 m.
Eductors: This is a specialist technique used to depressurise and stabilise poorly draining fine-grained soils
such as silts, silty sands and clays with permeable fabric. The system works by circulating high pressure
water (from a tank and supply pumps at ground level) to a small-diameter nozzle and venturi located in the
eductor in each well. This generates a vacuum directly in the well.
Horizontal wells: Specialist trenching machines can be used to lay a horizontal flexible perforated pipe,
which is pumped by a wellpoint pump. This method can be very effective for dewatering long pipeline
excavations. Horizontally directionally drilled (HDD) wells can also be used for dewatering below
inaccessible areas or in areas where the disruption associated with surface drilling is undesirable.
Page 3 of 4

www.groundwaterinternational.com
GROUNDWATER ENGINEERING

COMPANY PROFILE
Groundwater Engineering is an international company specializing in dewatering, groundwater control and
water well engineering for clients in the construction, mining and oil & gas industries. Backed by decades
of industry experience and technical expertise we are committed to providing our clients with high quality
and cost-effective solutions to their groundwater problems.
We pride ourselves on providing safe, technically sound and environmentally sensitive designs, and
delivering them in the field, on time and on budget. Our teams combine geotechnical, hydrogeological,
engineering and construction management skills, a strong supply chain, quality equipment and materials
and skilled operatives to meet our client’s needs.

Contracting
Groundwater Engineering provides a specialist contracting and construction service to design, install,
commission, operate and maintain specialist groundwater, geotechnical and water supply systems,
including:






Construction dewatering and groundwater control
Mine dewatering

Water wells and water supply
Geothermal systems

Consultancy
Groundwater Engineering offers a comprehensive design and consultancy service in the dewatering,
groundwater control, water well, geothermal and groundwater remediation markets. We are able to
provide robust, cost effective designs, and to innovate where it will benefit our clients.

Equipment sales and rental
Groundwater Engineering sells and rents a wide range of materials and equipment in the dewatering and
water well fields:



Dewatering pumps and equipment
Pipework and pump controls

Contact us:




Water well materials and pumps
Well rehabilitation supplies

Groundwater Engineering
enquiries@groundwaterinternational.com;
Mobile: +65 9727 7164

TDS1: Construction Dewatering

Version 3

November 2013

Page 4 of 4

www.groundwaterinternational.com

Mais conteúdo relacionado

Mais procurados

Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Terry Aylward
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Dewatering System
Dewatering SystemDewatering System
Dewatering Systemnik kin
 
Groundwater improvement techniques
Groundwater improvement techniques Groundwater improvement techniques
Groundwater improvement techniques my-will
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingMartin Preene
 
Control of ground water in excavation
Control of ground water in excavation Control of ground water in excavation
Control of ground water in excavation Aamir Patni
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasMartin Preene
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sitesMartin Preene
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installationtoverwater
 
AHS H2O Mgmt Forum Vancouver 2-15
AHS H2O Mgmt Forum Vancouver 2-15AHS H2O Mgmt Forum Vancouver 2-15
AHS H2O Mgmt Forum Vancouver 2-15Sherry Gaddy
 
The Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing TechniqueThe Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing TechniqueDarwin Jayson Mariano
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 

Mais procurados (20)

Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Dewatering System
Dewatering SystemDewatering System
Dewatering System
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
Unit2 hbn
Unit2 hbnUnit2 hbn
Unit2 hbn
 
Groundwater improvement techniques
Groundwater improvement techniques Groundwater improvement techniques
Groundwater improvement techniques
 
Ch 44 subsoil drainage
Ch 44   subsoil drainageCh 44   subsoil drainage
Ch 44 subsoil drainage
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft Sinking
 
Control of ground water in excavation
Control of ground water in excavation Control of ground water in excavation
Control of ground water in excavation
 
Dewatering
DewateringDewatering
Dewatering
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Dewatering
DewateringDewatering
Dewatering
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areas
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
 
Drainage
DrainageDrainage
Drainage
 
AHS H2O Mgmt Forum Vancouver 2-15
AHS H2O Mgmt Forum Vancouver 2-15AHS H2O Mgmt Forum Vancouver 2-15
AHS H2O Mgmt Forum Vancouver 2-15
 
The Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing TechniqueThe Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing Technique
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 

Semelhante a Construction dewatering technology data sheet

Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingVacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingTec
 
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdf
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdfHydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdf
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdfTec
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
Lec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.pptLec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.ppthassanakhar
 
VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration Patrick McPartland, E.I.T.
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY MD AMANULLAH
 
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdftrenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdfpawankumar491710
 
Dewatering methods for excavations at construction sites
Dewatering methods for excavations at construction sitesDewatering methods for excavations at construction sites
Dewatering methods for excavations at construction sitesAbhay Shrivastava
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
trenchless technology
trenchless technologytrenchless technology
trenchless technologyHemish Patel
 
Safe and Sustainable Waste, Energy, and Water Management
Safe and Sustainable Waste, Energy, and Water ManagementSafe and Sustainable Waste, Energy, and Water Management
Safe and Sustainable Waste, Energy, and Water ManagementAussie Hydro-Vac Services
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE Akhil Prabhakar
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyRemya Rajeev
 

Semelhante a Construction dewatering technology data sheet (20)

Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingVacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
 
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdf
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdfHydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdf
Hydrovac Contractors Bay Area Unleashing the Power of Hydro Excavation.pdf
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Lec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.pptLec-Groundwater_control-Dr AJK - Copy.ppt
Lec-Groundwater_control-Dr AJK - Copy.ppt
 
5. Dewatering F1.pdf
5. Dewatering F1.pdf5. Dewatering F1.pdf
5. Dewatering F1.pdf
 
VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
 
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdftrenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
trenchlesstechnologybymdamanullah-150920165545-lva1-app6892 (3).pdf
 
Dewatering methods for excavations at construction sites
Dewatering methods for excavations at construction sitesDewatering methods for excavations at construction sites
Dewatering methods for excavations at construction sites
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
5. Dewatering.pdf
5. Dewatering.pdf5. Dewatering.pdf
5. Dewatering.pdf
 
Project Dewatering Ltd 2016
Project Dewatering Ltd 2016Project Dewatering Ltd 2016
Project Dewatering Ltd 2016
 
trenchless technology
trenchless technologytrenchless technology
trenchless technology
 
Safe and Sustainable Waste, Energy, and Water Management
Safe and Sustainable Waste, Energy, and Water ManagementSafe and Sustainable Waste, Energy, and Water Management
Safe and Sustainable Waste, Energy, and Water Management
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 

Mais de Groundwater Engineering Ltd

Mais de Groundwater Engineering Ltd (6)

Groundwater Engineering self-priming centrifugal jetting pump
Groundwater Engineering self-priming centrifugal jetting pumpGroundwater Engineering self-priming centrifugal jetting pump
Groundwater Engineering self-priming centrifugal jetting pump
 
Emergency Drinking Water Treatment System
Emergency Drinking Water Treatment SystemEmergency Drinking Water Treatment System
Emergency Drinking Water Treatment System
 
Borehole treatment
Borehole treatmentBorehole treatment
Borehole treatment
 
Solar pv installation systems
Solar pv installation systemsSolar pv installation systems
Solar pv installation systems
 
Solar water pumping systems
Solar water pumping systemsSolar water pumping systems
Solar water pumping systems
 
Water treatment systems
Water treatment systemsWater treatment systems
Water treatment systems
 

Último

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified Binance Account
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfDerekIwanaka1
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 

Último (20)

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 

Construction dewatering technology data sheet

  • 1. GROUNDWATER ENGINEERING Technology Data Sheet Construction Dewatering Construction projects that extend below groundwater level present particular challenges. If groundwater is not adequately controlled then excavations may flood or become unstable, and the efficiency of construction operations will be reduced, wasting time and money. Construction dewatering is the range of techniques used to control groundwater to allow excavations, shafts, tunnels and other structures to be constructed below groundwater level in workably dry, stable and safe conditions. If a planned programme of construction dewatering is implemented, a construction project will typically see several benefits, including:  Improved geotechnical stability and safety, including allowing steeper side slopes and preventing the softening or disruption of the excavation formation level due to upward groundwater pressures or uncontrolled seepage.  More efficient excavation and construction conditions, including firmer excavation conditions less prone to rutting or bogging down of plant and machinery. The drier working conditions created by dewatering will improve the efficiency of construction operations such as excavation, concreting or pipe laying.  Less risk of adverse environmental impacts because correctly engineered dewatering systems produce ‘clean’ water with very little suspended solids, reducing the risk of water pollution. Successful dewatering requires that the techniques used are appropriate to the type of excavation and hydrogeological conditions at the construction site. Dewatering techniques must be selected carefully, as the various techniques are not interchangeable and are only effective within certain conditions. The figure below provides useful initial guidance on the selection of dewatering techniques in relation to permeability (hydraulic conductivity) of the ground and the required drawdown of groundwater levels. Range of application of pumped well groundwater control techniques (from CIRIA Report C515 Groundwater Control – Design and Practice (Preene et al., 2000), reproduced by permission of CIRIA, www.ciria.org) Want to find out more? For Further details contact: enquires@groundwaterinternational.com; Page 1 of 4 www.groundwaterinternational.com
  • 2. GROUNDWATER ENGINEERING There are two main types of groundwater control techniques:  Methods that use cut-off walls and other barriers to exclude water from the excavation (known as exclusion techniques).  Methods that deal with groundwater by pumping. Groundwater Control by Exclusion Example of groundwater control by exclusion Groundwater can be excluded from the working area by a very low permeability physical cut-off wall or barrier installed around the perimeter of the excavation. Most commonly, the cut-off is vertical and ideally penetrates down to a very low permeability stratum (such as a clay or unfractured bedrock) that forms a basal seal for the excavation. There will still be a requirement for some groundwater pumping, to remove water trapped inside the area enclosed by the barrier, and to deal with any leakage through the wall. Methods used to form cut-off walls include:        Steel sheet-piling Slurry trench walls (soilConcrete diaphragm walls Bored pile walls (secant pile walls, contiguous pile walls) Grout barriers (permeation grouting, rock grouting, jet grouting) Mix-in-place barriers Artificial ground freezing The selection of the most appropriate exclusion method to form a cut-off barrier will depend on the conditions and constraints on a given project. Primary constraints are desired depth of wall, ground conditions, geometry of wall (some methods can be used horizontally or inclined to the vertical, while others are limited to vertical applications), and whether the barrier is intended to be permanent or temporary. Page 2 of 4 www.groundwaterinternational.com
  • 3. GROUNDWATER ENGINEERING Groundwater Control by Pumping Example of groundwater control by pumping using deep wells with submersible pumps Pumping can locally lower groundwater levels in the vicinity of the excavation. It can be used as an alternative to, or in combination with, cut-off walls to exclude groundwater. The simplest form of dewatering is sump pumping, where groundwater enters the excavation and is then collected in a sump and pumped away by robust solids handling pumps. This can be an effective method, but seepage into the excavation can create the risk of instability and other construction problems. Alternatively ‘pre-drainage’ methods can be used to lower groundwater levels in advance of excavation. This will minimise groundwater seepage and ensure stability of excavation side slopes. Commonly used predrainage methods include: Deep wells: These are bored wells pumped by submersible pumps; because it does not rely on the suction principle this technique can be used to generate large drawdowns for deep excavations. Wells are normally spaced around the perimeter of the excavation and work in combination to lower groundwater levels over a wide area. Wellpoints: This method uses lines or rings of closely spaced shallow wells (known as ‘wellpoints’) installed around the excavation and connected to a common header pipe which is pumped by a wellpoint pump capable of pumping both air and water. This technique is very flexible and is widely used for pipeline trenches and shallow excavations. Suction limitations mean that the maximum drawdown that can generated by wellpoint systems is typically 5 to 6 m. Eductors: This is a specialist technique used to depressurise and stabilise poorly draining fine-grained soils such as silts, silty sands and clays with permeable fabric. The system works by circulating high pressure water (from a tank and supply pumps at ground level) to a small-diameter nozzle and venturi located in the eductor in each well. This generates a vacuum directly in the well. Horizontal wells: Specialist trenching machines can be used to lay a horizontal flexible perforated pipe, which is pumped by a wellpoint pump. This method can be very effective for dewatering long pipeline excavations. Horizontally directionally drilled (HDD) wells can also be used for dewatering below inaccessible areas or in areas where the disruption associated with surface drilling is undesirable. Page 3 of 4 www.groundwaterinternational.com
  • 4. GROUNDWATER ENGINEERING COMPANY PROFILE Groundwater Engineering is an international company specializing in dewatering, groundwater control and water well engineering for clients in the construction, mining and oil & gas industries. Backed by decades of industry experience and technical expertise we are committed to providing our clients with high quality and cost-effective solutions to their groundwater problems. We pride ourselves on providing safe, technically sound and environmentally sensitive designs, and delivering them in the field, on time and on budget. Our teams combine geotechnical, hydrogeological, engineering and construction management skills, a strong supply chain, quality equipment and materials and skilled operatives to meet our client’s needs. Contracting Groundwater Engineering provides a specialist contracting and construction service to design, install, commission, operate and maintain specialist groundwater, geotechnical and water supply systems, including:     Construction dewatering and groundwater control Mine dewatering Water wells and water supply Geothermal systems Consultancy Groundwater Engineering offers a comprehensive design and consultancy service in the dewatering, groundwater control, water well, geothermal and groundwater remediation markets. We are able to provide robust, cost effective designs, and to innovate where it will benefit our clients. Equipment sales and rental Groundwater Engineering sells and rents a wide range of materials and equipment in the dewatering and water well fields:   Dewatering pumps and equipment Pipework and pump controls Contact us:   Water well materials and pumps Well rehabilitation supplies Groundwater Engineering enquiries@groundwaterinternational.com; Mobile: +65 9727 7164 TDS1: Construction Dewatering Version 3 November 2013 Page 4 of 4 www.groundwaterinternational.com