SlideShare uma empresa Scribd logo
1 de 32
Baixar para ler offline
INDONESIA’S EMERGING
   GOLD PRODUCER
        April 2012
   European Roadshow
Disclaimer

This document is prepared as a presenter‟s aid and support. It is not a
stand alone document. Best efforts have been taken to ensure the
accuracy of information contained at the time of presentation. In some
instances forward targets and/or assumptions have been included. All such
instances are indicative only and subject to alteration and/or cancellation
as and when the management of Sumatra Copper & Gold plc sees fit. All
information contained herein is general in nature.

Potential investors are cautioned against using the content of this
presentation in isolation for making investment decisions.

Research and the counsel of a qualified financial adviser or accountant are
strongly recommended to anyone considering investing in listed company
securities, including Sumatra Copper & Gold plc.

The information in this presentation that relates to Exploration Results,
Mineral Resources or Ore Reserves is based on information compiled by
Matthew Farmer, geologist, who is a Member of the Australasian Institute
of Mining and Metallurgy. Mr. Farmer is an employee of the Company who
has sufficient experience which is relevant to the styles of mineralization
and types of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2004
edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr. Farmer has consented to the
inclusion in this document of the matters based on his information in the
form and context in which they appear.
InvestmentHighlights


Tembang                                              Other Company Attributes
•   Value Investment                                 •   Newcrest a major shareholder (7%)
•   2013 Target production                               and JV partner
•   Low Risk Project – 2 Stage Dev.                  •   Significant greenfields to
     –   Combination of Open Pit & Underground
                                                         brownfields land holdings of more
                                                         than 3,200km²
     –   Low Strip Ratio - Open Pit - at Asmar
     –   High Grade Underground at Belinau           •   100% ownership of 7 exploration
     –   Brownfield Development                          permits (IUPs) across Sumatra
     –   Excellent Metallurgy                        •   Company has consistently
     –   Simple Process Flowsheet                        demonstrated an ability to navigate
•   Management Team                                      and manage new Indonesian
    Experienced Mining & Process Managers recently       Mining Laws
    appointed to take project into production




                                                                                             3
Corporate Overview
Corporate                                    12 months share price
Code                      SUM
                                             $0.40
Shares/CDIs issued*       190.6M             $0.35
  Unlisted options        22.8M              $0.30
  Fully diluted           213.4M             $0.25

52 wk high/low            A$0.395 - A$0.11   $0.20
                                             $0.15
Share price               A$0.12             $0.10
Market cap                ~$22M              $0.05
                                             $0.00
Cash                      $6.5M
Debt                      $5M
Avg daily vol             ~330,000

Top shareholders                              Board and management
Directors/Management               9.6%       Warwick Morris      Non-Exec Chairman
Macquarie Bank                     9.2%       Julian Ford         Managing Director
Newcrest                           7.0%       Adi Sjoekri         Executive Director
Rand Merchant Bank                 3.3%       Peter Nightingale   Non-Exec Director
                                              Jocelyn Waller      Non-Exec Director
  Updated 13 April 2013                                                                4
Development Strategy

2-Stage Development Strategy for Tembang Project


Stage 1 – Short Term Plan                          Stage 2: Long Term plan
Belinau (O/P & U/G) & Asmar (O/P)                  Other Tembang deposits


•    Low risk, small scale mine                    •   Commence production following
•    Belinau: High-grade vein system with strong
                                                       completion Stage 1
     exploration upside                            •   Larger mine and throughput
•    Reduced upfront capital costs
•    Asmar: Perfect Oxide Blend for Belinau with
                                                   •   Implement Energy Cost Reduction
     Low Strip Ratio                                   Strategy for Stage 2
•    Fund development and expansions from          •   Complete Deeper Exploration
     Cashflow                                          Campaign to target doubling of gold
•    Production targeted for Q3, 2013                  production.
•    Comprises 18% of total Tembang Resource




                                                                                             5
Sumatra’s Prolific Mineralisation

                    Miwah
                    3.14 Moz Au, 9.0 Moz Ag



                               Anjing Hitam
                               Zinc and Lead



                      MARTABE
           5.8 Moz Au, 62.2 Moz Ag
  G Resources - Mkt Cap. $970 mil
                                              Sontang
                            SIHAYO
                             1.4 Moz
         Sihayo - Mkt Cap. $120 mil
                                                               Tambang Sawah
                                                   Tandai
                                     1.4 Moz Au, 15 Moz Ag

                                                                 TEMBANG
                                                                 1.0 Moz Au 12.8 Moz Ag
                                                                 Sumatra Copper & Gold - Mkt Cap. $22 mil
                                                    Donok
                                     1.3 Moz Au, 7.4 Moz Ag
                                                                            Ojolali
                                                             WAY LINGGO
                                                 0.2 Moz Au, 0.3 Moz Ag
                                        Kingsrose - Mkt Cap. $360 mil
                                                                          Cibaliung       Pongkor
                                                                                          3.6 Moz Au, 26.3 Moz Ag
Project Portfolio

Tembang Project(100% SUM)
•   Advanced gold and silver project


Tandai Project (30% SUM, 70% Newcrest)
•   Exploration JV project with Newcrest


Sontang Project (100% SUM)
•   High-grade exploration project


Other greenfield projects(100% SUM)
•   Exploration IUPs covering more than 1,370km2


                                                   7
Tembang Project: Overview

  Production
                                    2013 – 2nd Half
  timeline

                                    513,000 oz gold
  Total Reserve
                                    5.6M oz silver (1)

  Total mine life                   10 years

                                    Brownfield from
  Infrastructure
                                    previous production

                                    Open pit and
  Mine type
                                    underground

                                    Numerous regional
  Upside
                                    targets                           Aerial view of Tembang Project


Note 1: refer to Appendix 1 for full Reserve and Resource Statement

                                                                                                       8
Tembang Project Location
& Infrastructure




                           9
Tembang Production Plan



                                             Asmar Open Pit Stage 1
 Berenai/Central Area
              Stage 2
                               6
                                   1
               7           3
                       4       2


Processing Plant   5
                                                                  11       Workshop
         Stage 1


       Proposed
      Tailings dam
        Stage 2                                                        8

                                                             Magazine


                                        10
                                                                 Haulage Road

                                       Camp Site               Belinau Underground     Belinau Open Pit
                                                                     Deposit Stage 1   Stage 1
Belinau Open Pit - Expansion


                                    Optimised Belinau Pit Design




                   Existing Pit

                    New Pit

                              The Two Stage Belinau Open Pit
                              Cut Back provides for 18 months
                              ore supply before underground high
                              grade feed is required for the mill.
Tembang PFS & Optimisation
Key Points to Note
•Well defined Reserve: 150,000 metres drilling              PFS Optimisation Update (April 2012)
•High Grade Ore & Excellent Metallurgy means simple
standard process circuit
                                                              Gold Equivalent                     40,000 - 45,000 oz Au
                                                                  Production                         equivalent(1)pa
•Brown Field Project: RecommissionTSF & Old Plant Site
                                                              C1- Target Cash                           US$350 to
•Combination of O/P and U/G – Flexible Production Options
                                                              Operating Costs                        US$450 per Oz Au
•12 months ore supply before U/G required ore required       (including silver credits)

                                                               Stage 1 - Target
                                                                                                    218,000 oz Au Eq(1)
                                                              Production LOM

                                                                             Mine life                5 years (stage 1)

                                                                                                     400,000 tpa @
                                                               Production rate
                                                                                                 2.5 g/t Au and 30 g/tAg

                                                                Gold Recovery                                    90%
                                                               Silver Recovery                                   80%

                                                            Reserve in Stage 1
                                                                                                      18% of Resource
                                                              Production Plan

                                                             Note 1: Please refer to Appendix 1 for gold equivalent calculation

                                                                                                                                  12
Tembang 2012 Milestones
                                             PERMITTING                          Forestry
                                                                                 •In-principle
                                                                                 Approval
AMDAL ✔               Mining        ✔            Operational                     •Borrow and Use
•Environmental                                   • Technical Head                - Pinjam Pakai
Management Plan       Licence                    • Masterlists
                                                                                 Manpower
                                                                                                       Decision
•Environmental        • Conversion of IUP        • Electricity Generation
                                                                                 •Collaborative        to Mine
Impact                  from exploration         • Explosives
                                                                                 Agreement
Assessment              to mining                • Local Permitting



    Q1 2012              Q1/Q2 2012                   Q2/Q3 2012                      Q3 2012            Q4 2012


           Q1 2012                     Q2 2012                        Q3 2012



                                                                                              “Sumatra has met all
                                  Resource to
         Pre- ✔                    Reserve ✔                       Definitive                 its target milestones
        Feasibility                                                Feasibility                in 2012”
                                  Optimisation                      Stage 1
         Stage 1
                                    Report ✔

                                                 TECHNICAL
                                                                                                                   13
Epithermals –
Long Life from Brownfield Exploration


  “The Indonesian mine (Gosowong) is a very rich mine. We currently
  have a five year reserve life. We had a five year reserve life ten years
  ago, we had a five year reserve life five years ago and I am anticipating
  that where we are going with exploration we will have another five year
  reserve life in another five years.”

                               Greg Robinson, Managing Director - Newcrest Limited
                                    Melbourne Mining Club Address, February 2012




                                                                                     14
Tembang Exploration: Near Mine Targets




                                     ASMAR DEEP
                                     4.15m @ 15.2 g/t Au, 24.0 g/t Ag




                                                                 BELINAU DEEP
                                                                 1.95m @ 81.92 g/t Au, 208.0 g/t Ag


               BERENAI DEEP
               15.15m @ 4.94 g/t Au, 5.0 g/t Ag
                                                                                                      15
Valuation of ASX Listed Gold Companies(1)
(EV / Resource Oz)


                                                            “With Sumatra moving into production, there           KRM is >350 $/Oz
                                                350
                                                            is a opportunity for a major re-rating of the
   Valuation (EV/Resource Oz Gold Equivalent)




                                                            companies valuation over the next 2 years”
                                                                                                                                MML is
                                                300                                                                             320 $/Oz


                                                250                        25%                    50                      75%
                                                                                                  %
                                                                                                                          AR is
                                                200                                                                       244 $/Oz



                                                150



                                                100

                                                          SUM is                                             Sihayo
                                                50        25 $/Oz                                            103 $/Oz


                                                 0
                                                      0       20      40         60     80      100         120     140       160          180     200
                                                                       Gold Resources - Million's of Ounces Au Equivalent
                                                                                                                                                         16
Note: Anglo Gold, Newcrest and Eldorado Gold & Gold One have been removed from the Goldnerds Database. Database is based in April 1, 2012 Update
Valuation of ASX Listed Gold Companies(1)
  (EV / Reserve Oz)




                                                                                                                 Archipelago(1)
                                                                                                                   382 $/oz

                                                                                                    G-Resources
                                                                                                     217 $/oz




Note:
Archipelago is based on their Mineral Inventory, not Reserve,                                                                             17
Anglo Gold, Newcrest, Eldorado Gold & Gold One have been removed from the Goldnerds Database. Database is based in April 1, 2012 Update
Valuation of ASX Listed Gold Companies(1)
(Net Cash Costs)


                           1,800       “Sumatra’s target cash costs is to be in the
                                       1st Quartile. The high grade under ground
                           1,600       BelinauResoure (8 g/t Au and 70 g/t Ag) and
                                       low strip ratio of Asmar, < 1:3 should be
                                       major contributors to achieving a low cash
                           1,400
                                       cost
                                                       25%                  50%                      75%
  Cash Costs ($/oz Gold)




                           1,200


                           1,000

                                       SUM Target
                            800        350 to 450 $/Oz
                                       C1 Costs

                            600

                                                                       G Resources -350 $/Oz
                            400                                        Archipelago-580 $/Oz

                                                  MML & KRM
                            200
                                                  200 to 250 $/Oz C1

                              0
                                   0      500        1,000    1,500     2,000    2,500     3,000   3,500   4,000   4,500   5,000

                                                Cumulative Gold Production - Million's of Ounces Au Equivalent
                                                                                                                                   18
Valuation and Re-rating Potential




                                    19
Tandai JV: Exploration Success

Newcrest JV
•   JV Terms
    –   Newcrest to spend US$12 million to earn
        70% interest in the Project within 5 years
    –   Newcrest has already met minimum
        expenditure of US$1.8 million
    –   Sumatra currently managing project

•   2011/12
    –   Budget of A$4.3 million
    –   2011: Heli-supported drill program
        targeting existing known epithermal
        systems
    –   Target is to drill out one new mineralised
        vein system in 2012
    –   Identify one new greenfield discovery in
        2012 and drill test it

                                                     20
Tandai: Ulukau Prospect - New Discovery




             Newly discovered
           Epithermal Stockwork

                                          21
Summary

• Soon to be “self funded explorer”
   –   Emerging Producer - Gold and silver production targeted for 2013
   –   Two-stage development allows for relatively small initial capex
• Tembang
   – Relatively low capital intensity
   – Production costs targeted for 1stquartile
   – Brownfields project means relatively low technical risk
• Major competitive advantage in Sumatra
   – Large tenement position
   – Demonstrated capacity and ability to acquire projects, attract quality JV partners
• News flow in 2012
   – Tembang development milestones
   – Newcrest funded exploration at Tandai JV


                                                                                      22
Appendices




             23
1A: Tembang Project Resource

 Tembang Mineral Resource August 2011 Reported to JORC Code Standards
            Belinau Vein Above 2.78g/t Au Underground Cut-Off
            Category       Ktonnes     Au g/t     Ag g/t    Au koz              Ag koz
            Measured          149        7.22      75.5        35                361
  BELINAU Indicated           266        8.02      67.9        69                580
    VEIN    Inferred           72       10.50      81.4        24                188         The information in this report that relates to Mineral
                                                                                             Resources is based on information compiled by Mr David
            Sub-Total         487        8.14      72.2       127               1,130
                                                                                             Stock MAusIMM who is an independent Geological
            All Veins Excluding Belinau Above 0.5g/t Au Open Pit Cut-Off                     Consultant to the Company and is a Competent Person as
            Category       Ktonnes     Au g/t     Ag g/t    Au koz              Ag koz       defined by the Australasian Code for the reporting of
            Measured         2,598       2.27      37.8       190               3,156        Exploration Results, Mineral Resources and Ore Reserves
            Indicated        4,423       1.80      25.6       256               3,637        (the JORC Code 2004 Edition) and has consented to the
OTHER VEINS                                                                                  inclusion in this report of the matters based on his information
            Inferred         3,554       1.80      20.3       202               2,319
                                                                                             in the form and context in which they appear. In addition, the
            Sub-Total       10,575       1.91      26.8       648               9,112
                                                                                             Mineral Resource Estimates were reviewed by Mr. Robert
            PSV Material Above 0.3g/t Au Open Pit Cut-Off                                    Spiers who is a member of AIG and a full time employee of
            Category       Ktonnes     Au g/t     Ag g/t    Au koz              Ag koz       Hellman & Schofield Pty Ltd. Mr. Spiers has sufficient
            Measured            -          -         -          -                  -         experience which is relevant to the style of mineralisation and
            Indicated       11,323       0.54       6.9       198               2,523        type of deposit under consideration and to the activity which
    PSV                                                                                      he is undertaking to qualify as a Competent Person as
            Inferred          194        0.50       4.6        3                  29
                                                                                             defined in the 2004 Edition of the „Australasian Code for
            Sub-Total       11,517       0.54       6.9       201               2,552
                                                                                             Reporting of Exploration Results, Mineral Resources and Ore
            Combined Total Resource Open Pit + Underground                                   Reserves‟. Mr. Spiers has consented to the inclusion in this
            Category       Ktonnes     Au g/t     Ag g/t    Au koz              Ag koz       report of the matters based on their information in the form
            Measured         2,747       2.54      39.9       224                3,517       and context in which it appears.
            Indicated       16,012       1.02      13.1       522                6,741
    ALL
            Inferred         3,820       1.90      20.7       229                2,536
            Total           22,579       1.35      17.6       976               12,794
             Note: Rounding errors may occur, reporting cut-offs as indicated, significant
             figures do not imply any added level of precision.


                                                                                                                                                                24
1B: Tembang Project Reserve

             Reserve       Tonnes         Grade     Contained         Grade     Contained
Deposit
             Category        (kt)        Au (g/t)    Gold (oz)       Ag (g/t)   Silver (oz)

                 Proven         650        1.7          35,000         24.0         498,000
Asmar
               Probable       1,230        1.3          49,000         20.5         808,000

                 Proven         910        2.0          60,000         40.8       1,195,000
Berenai
               Probable         980        2.1          67,000         23.6         740,000
                 Proven         560        2.5          45,000         40.9         735,000
Buluh
               Probable         400        2.0          26,000         29.0         374,000
                 Proven              -       -                   -      -                     -
Aidit
               Probable             20     3.1            2,000        44.6          30,000
                 Proven         140        4.2          19,000         52.1         238,000
Bujang
               Probable             50     2.3            4,000        26.0          40,000
                 Proven             90     5.5          16,000         68.4         196,000
Belinau_OP
               Probable             60     3.4            6,000        53.2          97,000
                 Proven             50     8.7          15,000         74.1         130,000
Belinau_UG
               Probable         360        5.0          59,000         39.3         458,000

                 Proven       2,400        2.5         190,000         38.7       2,991,000

Total          Probable       3,090        2.1         213,000         25.6       2,547,000

                   Total      5,490        2.3         403,000         31.4       5,539,000


                                                                                                  25
2. Sumatra Board

Warwick Morris             Mr Morris and has more than 30 years experience in the resources industry.
                           He was recently a director of Macquarie Bank Ltd, where he was Chairman
BSc (Hons), MSc, MAusIMM   of the Metals and Energy Capital Division and head of Metals and Mining.
Non-Executive Chairman     Appointed to the Board in 2008

Julian Ford                Mr Ford has more than 25 years within the global resources industry. He has
BSc(Eng), BCom, Grad Dip   held senior positions within several major resource companies and co-
(Bus. Mgt)                 founded Zambezi Resources in 2004
Managing Director          Appointed to the Board in 2012

                           Mr Nightingale has over 20 years senior financial experience and is
Peter Nightingale          Chairman of ASX-listed Callabonna Uranium and Director of Augur
BEc, CA                    Resources, Cockatoo Coal, Planet Gas and unlisted Equus Resources and
Non-Executive Director     Nickel Mines.
                           Appointed to the Board in 2010
                           Mr Waller co-founded Sumatra Copper & Gold in 2006. Prior to this was
Jocelyn Waller             CEO of Trans Siberian Gold plc, an AIM listed company which Mr Waller
MA (Hons) (Cantab)         established in 2000. He currently serves as a Non-Executive Director of
Non-Executive Director     RusAnt Ltd.
                           Appointed to the Board in 2006
Richard Edwards            Mr Edwards spent eight years as an owner/manager of his own business,
BComm, CPA, A Fin          and subsequently spent the past nine years providing financial reporting
CFO and Company            and company secretarial services to a range of publicly listed companies. He
                                                                                                    26
Secretary                  is also CFO and Company Secretary of ASX listed Callabonna Uranium Ltd.
3.Tembang Project Management Team

Adi Sjoekri
                                     Mr Sjoekri has over 17 years corporate experience, working for
BSc ,MSc, MBA (Management)
                                     major companies such as CSR and Newmont. More recently he
Director (Govt                       was a consultant for the mining industry.
Liaison, Permitting, Forestry)
Don Harper                           Mr Harper is qualified mining engineer with more than 21 years‟
B.Eng (Mining Engineering), B.Surv   industry experience, Don has a strong track-record of project
(Surveying)                          management and taking resources projects from pre-feasibility
Mine Manager                         stage into production.

Grant Harding                        Mr Harding is a qualified extractive metallurgist with more than 25
                                     years experience in the mining industry. He has extensive senior
B.AppSc, FAusIMM                     operational, engineering and project management experience;
Project Manager                      most of this in Indonesia.

Matthew Farmer                       Mr Farmer has over 27 years experience in exploration and mining
BSc (Hons) Geology, MAusIMM, FGS     mostly focused in South East Asia. His experience spans a mix of
Exploration Manager                  major and junior companies including BP Minerals and Newmont




                                                                                                     27
4. Positive PFS outcome – March 2012

  Stage 1 Development Plan: Belinau                                        PFS - Key outcomes for Belinau
  Deposit
                                                                                      Total revenue $175 million

  •Pre-Feasibility Study (PFS) confirmed                                           Operating costs,
                                                                              royalties & sustaining $75 million
  Belinau as a robust and profitable standalone
                                                                                             capital
  project
                                                                           Pre-tax project operating
                                                                                                     $100 million
                                                                                           cash flow
  •Belinau comprises ~13% of Tembang
  resource                                                                   Pre-production capital $48 million

                                                                             Internal Rate of Return 31%
  •Optimisation studies ongoing
                                                                           C1 cash operating costs
  •Evaluating open pit opportunities                                         (including silver credits)
                                                                                                        US$511


 •Definitive Feasibility Study (DFS) has                                                   Mine life 3 years (stage 1)
 commenced
 Note:                                                                              Production rate 200,000 tpa
 The Belinau Underground PFS was published on the [xx] and included only
 the Belinau Underground Study.
 Updates based on Optimisations will be posted by SCG. The 1 st Update
 was posted on the 12th March 2012.
                                                                                                                    28
5. Sontang Project: Overview

                         •   Polymetallic discovery
                         •   Located in Pasaman regency West Sumatra
                             province
                         •   Best intersection of 11.9 metres @ 6.5 g/t
                             Au, 33 g/t Ag, 8.0 % Zn
                         •   Mineralisation over +150 metre strike length
                             depth to 75 metres




                                                                            29
6. Sontang East Drilling Results




                                   30
7. Sumatra Peer Comparisons
  Notes, Please see next page for notes and     Sumatra        Intrepid      Kingrose     Medusa       Sihayo       G Resources     Archi-
  details on the values quoted in this table.
                                                Copper &        Mines         Mining      Mining        Gold                        pelago
                                                  Gold
                                                                                                       Sihayo                         Toka
                                                Tembang      Tujuh Project   Way Linggo   Co-O Mine                    Martabe
                                                                                                      Pungkut                       Tindung

Market cap                                                                                                                 1,000†    630†
(AUD M)
                                                   25            477†           363†       1,100†       109†

Gold Equivalent Resource*
EV ($/ Oz Au Resource)
                                                   19             16           1093         2019         97                 167      244

JORC resource                                      1.0           25*           0.39*        2.6*        1.42*                9#      2.58#
(M oz)

Resourcegrade                                     1.35          0.46*           11*         9.6*        2.75*              1.34#     1.53#
(g/t)

Est Capital Cost                                   32##          155*                       225*        82.9*              576#
(AUD M)

Annual Production                               38,000##       114,000*       43,000*      77,000*     88,000*         250,000#     61,191#
(oz Au pa)

Cash costs production                           350 to 450       376*           145*        206*        678*               350#      579#
(AUD / oz)

Est Mine Life                                      10                           4+#                     10+#                8+#       9+#
(Years)

Production/(Forecast)                             2013                         2010#       2007 #      [2014] #            2012#     2011#
(Year)

Project ownership                                 100%          80%*           85%*        100%*        75%*               100%#     95%#

 Sources: *Gold Nerds March 2011; #Company presentations; †Yahoo Finance 14 March 2012: ## SUM March Optimisation Update                31
For Of Fire: Information – ASX:SUM
8. RIMFurtherProlific mineralisation
 •   World’s Largest Gold Deposit – Grasberg
 •   Lowest Costs Producers – Gosowong, Co-O, Way Linggo                                                                                     Sumatra projects
                                                                                                                                             Au deposit
                                                                                                                                             Cu-Au deposit
                                                                                              Atlas
                                                                                                           Placer
        MIWAH                                                  KELIAN                                       Siana
        3.14 Moz Au, 8.9 Moz Ag                                                       Bulawan
                                                 3.56 Moz Au, 1.44 Moz Ag
                                                                                                               Kingking                           500 Kms
              MARTABE                                    MT.MURO
              6.49 Moz Au, 66.2 Moz Ag     1.25 Moz Au, 34.6 Moz Ag         Mamut

                                                                                                       TOKA TINDUNG
                                                                                    Gn.Pani            1.75 Moz Au
                            TEMBANG
                            1.0Moz Au 12.8 Moz Ag
                                                                                                                       GOSOWONG
                                                                                                                       2.8 Moz Au                 Wabu
                                                                                                      MESEL
                                                                                                      1.83 Moz Au
        SIHAYO
         1.4 Moz
           Sontang                                                                               Tombulilato
                                  Ojolali                               AWAK MAS
                                                                        1.92 Moz Au
                                  Way Linggo
                   TANDAI
      1.4 Moz Au, 15 Moz Ag
                                                                            ELANG
                                                                            25.0 Moz Au, 16.0 lb Cu            Wetar
                                                                                                                                             GRASBERG
                     DONOK Cibaliung                                                                                                38.5 Moz Au, 35.6 lb Cu
       1.34 Moz Au, 7.4 Moz Ag
                              PONGKOR                                                                               Note: The resources shown on this page are
                     3.6 Moz Au, 26.3 Moz Ag         TUJUH BUKIT        BATU HIJAU                                  historical resources that have been published. The
                                               14.0 Moz Au, 8.8 lb Cu   17.2 Moz Au, 14.1 lb Cu                     detailed Tembang Resource is shown in Appendix 1

Mais conteúdo relacionado

Mais procurados

AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011aldridgeminerals
 
Symposium resources roadshow dampier gold richard hay
Symposium resources roadshow dampier gold richard haySymposium resources roadshow dampier gold richard hay
Symposium resources roadshow dampier gold richard haySymposium
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011aldridgeminerals
 
Max Resource March 2012 Presentation
Max Resource March 2012 PresentationMax Resource March 2012 Presentation
Max Resource March 2012 PresentationCompany Spotlight
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American Gold
 
1640 morrie goodz
1640 morrie goodz1640 morrie goodz
1640 morrie goodzSymposium
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American Gold
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedSymposium
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Max resourcefeb13presentation
Max resourcefeb13presentationMax resourcefeb13presentation
Max resourcefeb13presentationCompany Spotlight
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutionalAdnet Communications
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfaldridgeminerals
 

Mais procurados (18)

AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011
 
Symposium resources roadshow dampier gold richard hay
Symposium resources roadshow dampier gold richard haySymposium resources roadshow dampier gold richard hay
Symposium resources roadshow dampier gold richard hay
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011
 
Max Resource March 2012 Presentation
Max Resource March 2012 PresentationMax Resource March 2012 Presentation
Max Resource March 2012 Presentation
 
Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Aa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdfAa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdf
 
1640 morrie goodz
1640 morrie goodz1640 morrie goodz
1640 morrie goodz
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Magellan Minerals February
Magellan Minerals FebruaryMagellan Minerals February
Magellan Minerals February
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Aa ggold 10 20-10
Aa ggold 10 20-10Aa ggold 10 20-10
Aa ggold 10 20-10
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Max resourcefeb13presentation
Max resourcefeb13presentationMax resourcefeb13presentation
Max resourcefeb13presentation
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdf
 

Semelhante a INDONESIA'S EMERGING GOLD PRODUCER

1630 mark mcconnel
1630 mark mcconnel1630 mark mcconnel
1630 mark mcconnelSymposium
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...Symposium
 
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedGold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedSymposium
 
GBM Resources- Symposium Resources Roadshow
GBM Resources- Symposium Resources RoadshowGBM Resources- Symposium Resources Roadshow
GBM Resources- Symposium Resources RoadshowSymposium
 

Semelhante a INDONESIA'S EMERGING GOLD PRODUCER (20)

1630 mark mcconnel
1630 mark mcconnel1630 mark mcconnel
1630 mark mcconnel
 
Orezone feb13presentation
Orezone feb13presentationOrezone feb13presentation
Orezone feb13presentation
 
Orezone apr13presentation
Orezone apr13presentationOrezone apr13presentation
Orezone apr13presentation
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
 
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedGold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
 
Corporate Presentation March 2011
Corporate Presentation March 2011Corporate Presentation March 2011
Corporate Presentation March 2011
 
GBM Resources- Symposium Resources Roadshow
GBM Resources- Symposium Resources RoadshowGBM Resources- Symposium Resources Roadshow
GBM Resources- Symposium Resources Roadshow
 
Corporate Presentation February 2011
Corporate Presentation February 2011Corporate Presentation February 2011
Corporate Presentation February 2011
 
Corporate Presentation April 2011
Corporate Presentation April 2011Corporate Presentation April 2011
Corporate Presentation April 2011
 
Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11
 
NEW
NEWNEW
NEW
 
Aa ggold presentation 01 01-11
Aa ggold presentation 01 01-11Aa ggold presentation 01 01-11
Aa ggold presentation 01 01-11
 
Copper exploration in Oman and Turkey
Copper exploration in Oman and TurkeyCopper exploration in Oman and Turkey
Copper exploration in Oman and Turkey
 
03052012 mgg-ppt
03052012 mgg-ppt03052012 mgg-ppt
03052012 mgg-ppt
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
03052012 mgg-ppt
03052012 mgg-ppt03052012 mgg-ppt
03052012 mgg-ppt
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 

INDONESIA'S EMERGING GOLD PRODUCER

  • 1. INDONESIA’S EMERGING GOLD PRODUCER April 2012 European Roadshow
  • 2. Disclaimer This document is prepared as a presenter‟s aid and support. It is not a stand alone document. Best efforts have been taken to ensure the accuracy of information contained at the time of presentation. In some instances forward targets and/or assumptions have been included. All such instances are indicative only and subject to alteration and/or cancellation as and when the management of Sumatra Copper & Gold plc sees fit. All information contained herein is general in nature. Potential investors are cautioned against using the content of this presentation in isolation for making investment decisions. Research and the counsel of a qualified financial adviser or accountant are strongly recommended to anyone considering investing in listed company securities, including Sumatra Copper & Gold plc. The information in this presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Matthew Farmer, geologist, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Farmer is an employee of the Company who has sufficient experience which is relevant to the styles of mineralization and types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Farmer has consented to the inclusion in this document of the matters based on his information in the form and context in which they appear.
  • 3. InvestmentHighlights Tembang Other Company Attributes • Value Investment • Newcrest a major shareholder (7%) • 2013 Target production and JV partner • Low Risk Project – 2 Stage Dev. • Significant greenfields to – Combination of Open Pit & Underground brownfields land holdings of more than 3,200km² – Low Strip Ratio - Open Pit - at Asmar – High Grade Underground at Belinau • 100% ownership of 7 exploration – Brownfield Development permits (IUPs) across Sumatra – Excellent Metallurgy • Company has consistently – Simple Process Flowsheet demonstrated an ability to navigate • Management Team and manage new Indonesian Experienced Mining & Process Managers recently Mining Laws appointed to take project into production 3
  • 4. Corporate Overview Corporate 12 months share price Code SUM $0.40 Shares/CDIs issued* 190.6M $0.35 Unlisted options 22.8M $0.30 Fully diluted 213.4M $0.25 52 wk high/low A$0.395 - A$0.11 $0.20 $0.15 Share price A$0.12 $0.10 Market cap ~$22M $0.05 $0.00 Cash $6.5M Debt $5M Avg daily vol ~330,000 Top shareholders Board and management Directors/Management 9.6% Warwick Morris Non-Exec Chairman Macquarie Bank 9.2% Julian Ford Managing Director Newcrest 7.0% Adi Sjoekri Executive Director Rand Merchant Bank 3.3% Peter Nightingale Non-Exec Director Jocelyn Waller Non-Exec Director Updated 13 April 2013 4
  • 5. Development Strategy 2-Stage Development Strategy for Tembang Project Stage 1 – Short Term Plan Stage 2: Long Term plan Belinau (O/P & U/G) & Asmar (O/P) Other Tembang deposits • Low risk, small scale mine • Commence production following • Belinau: High-grade vein system with strong completion Stage 1 exploration upside • Larger mine and throughput • Reduced upfront capital costs • Asmar: Perfect Oxide Blend for Belinau with • Implement Energy Cost Reduction Low Strip Ratio Strategy for Stage 2 • Fund development and expansions from • Complete Deeper Exploration Cashflow Campaign to target doubling of gold • Production targeted for Q3, 2013 production. • Comprises 18% of total Tembang Resource 5
  • 6. Sumatra’s Prolific Mineralisation Miwah 3.14 Moz Au, 9.0 Moz Ag Anjing Hitam Zinc and Lead MARTABE 5.8 Moz Au, 62.2 Moz Ag G Resources - Mkt Cap. $970 mil Sontang SIHAYO 1.4 Moz Sihayo - Mkt Cap. $120 mil Tambang Sawah Tandai 1.4 Moz Au, 15 Moz Ag TEMBANG 1.0 Moz Au 12.8 Moz Ag Sumatra Copper & Gold - Mkt Cap. $22 mil Donok 1.3 Moz Au, 7.4 Moz Ag Ojolali WAY LINGGO 0.2 Moz Au, 0.3 Moz Ag Kingsrose - Mkt Cap. $360 mil Cibaliung Pongkor 3.6 Moz Au, 26.3 Moz Ag
  • 7. Project Portfolio Tembang Project(100% SUM) • Advanced gold and silver project Tandai Project (30% SUM, 70% Newcrest) • Exploration JV project with Newcrest Sontang Project (100% SUM) • High-grade exploration project Other greenfield projects(100% SUM) • Exploration IUPs covering more than 1,370km2 7
  • 8. Tembang Project: Overview Production 2013 – 2nd Half timeline 513,000 oz gold Total Reserve 5.6M oz silver (1) Total mine life 10 years Brownfield from Infrastructure previous production Open pit and Mine type underground Numerous regional Upside targets Aerial view of Tembang Project Note 1: refer to Appendix 1 for full Reserve and Resource Statement 8
  • 9. Tembang Project Location & Infrastructure 9
  • 10. Tembang Production Plan Asmar Open Pit Stage 1 Berenai/Central Area Stage 2 6 1 7 3 4 2 Processing Plant 5 11 Workshop Stage 1 Proposed Tailings dam Stage 2 8 Magazine 10 Haulage Road Camp Site Belinau Underground Belinau Open Pit Deposit Stage 1 Stage 1
  • 11. Belinau Open Pit - Expansion Optimised Belinau Pit Design Existing Pit New Pit The Two Stage Belinau Open Pit Cut Back provides for 18 months ore supply before underground high grade feed is required for the mill.
  • 12. Tembang PFS & Optimisation Key Points to Note •Well defined Reserve: 150,000 metres drilling PFS Optimisation Update (April 2012) •High Grade Ore & Excellent Metallurgy means simple standard process circuit Gold Equivalent 40,000 - 45,000 oz Au Production equivalent(1)pa •Brown Field Project: RecommissionTSF & Old Plant Site C1- Target Cash US$350 to •Combination of O/P and U/G – Flexible Production Options Operating Costs US$450 per Oz Au •12 months ore supply before U/G required ore required (including silver credits) Stage 1 - Target 218,000 oz Au Eq(1) Production LOM Mine life 5 years (stage 1) 400,000 tpa @ Production rate 2.5 g/t Au and 30 g/tAg Gold Recovery 90% Silver Recovery 80% Reserve in Stage 1 18% of Resource Production Plan Note 1: Please refer to Appendix 1 for gold equivalent calculation 12
  • 13. Tembang 2012 Milestones PERMITTING Forestry •In-principle Approval AMDAL ✔ Mining ✔ Operational •Borrow and Use •Environmental • Technical Head - Pinjam Pakai Management Plan Licence • Masterlists Manpower Decision •Environmental • Conversion of IUP • Electricity Generation •Collaborative to Mine Impact from exploration • Explosives Agreement Assessment to mining • Local Permitting Q1 2012 Q1/Q2 2012 Q2/Q3 2012 Q3 2012 Q4 2012 Q1 2012 Q2 2012 Q3 2012 “Sumatra has met all Resource to Pre- ✔ Reserve ✔ Definitive its target milestones Feasibility Feasibility in 2012” Optimisation Stage 1 Stage 1 Report ✔ TECHNICAL 13
  • 14. Epithermals – Long Life from Brownfield Exploration “The Indonesian mine (Gosowong) is a very rich mine. We currently have a five year reserve life. We had a five year reserve life ten years ago, we had a five year reserve life five years ago and I am anticipating that where we are going with exploration we will have another five year reserve life in another five years.” Greg Robinson, Managing Director - Newcrest Limited Melbourne Mining Club Address, February 2012 14
  • 15. Tembang Exploration: Near Mine Targets ASMAR DEEP 4.15m @ 15.2 g/t Au, 24.0 g/t Ag BELINAU DEEP 1.95m @ 81.92 g/t Au, 208.0 g/t Ag BERENAI DEEP 15.15m @ 4.94 g/t Au, 5.0 g/t Ag 15
  • 16. Valuation of ASX Listed Gold Companies(1) (EV / Resource Oz) “With Sumatra moving into production, there KRM is >350 $/Oz 350 is a opportunity for a major re-rating of the Valuation (EV/Resource Oz Gold Equivalent) companies valuation over the next 2 years” MML is 300 320 $/Oz 250 25% 50 75% % AR is 200 244 $/Oz 150 100 SUM is Sihayo 50 25 $/Oz 103 $/Oz 0 0 20 40 60 80 100 120 140 160 180 200 Gold Resources - Million's of Ounces Au Equivalent 16 Note: Anglo Gold, Newcrest and Eldorado Gold & Gold One have been removed from the Goldnerds Database. Database is based in April 1, 2012 Update
  • 17. Valuation of ASX Listed Gold Companies(1) (EV / Reserve Oz) Archipelago(1) 382 $/oz G-Resources 217 $/oz Note: Archipelago is based on their Mineral Inventory, not Reserve, 17 Anglo Gold, Newcrest, Eldorado Gold & Gold One have been removed from the Goldnerds Database. Database is based in April 1, 2012 Update
  • 18. Valuation of ASX Listed Gold Companies(1) (Net Cash Costs) 1,800 “Sumatra’s target cash costs is to be in the 1st Quartile. The high grade under ground 1,600 BelinauResoure (8 g/t Au and 70 g/t Ag) and low strip ratio of Asmar, < 1:3 should be major contributors to achieving a low cash 1,400 cost 25% 50% 75% Cash Costs ($/oz Gold) 1,200 1,000 SUM Target 800 350 to 450 $/Oz C1 Costs 600 G Resources -350 $/Oz 400 Archipelago-580 $/Oz MML & KRM 200 200 to 250 $/Oz C1 0 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 Cumulative Gold Production - Million's of Ounces Au Equivalent 18
  • 19. Valuation and Re-rating Potential 19
  • 20. Tandai JV: Exploration Success Newcrest JV • JV Terms – Newcrest to spend US$12 million to earn 70% interest in the Project within 5 years – Newcrest has already met minimum expenditure of US$1.8 million – Sumatra currently managing project • 2011/12 – Budget of A$4.3 million – 2011: Heli-supported drill program targeting existing known epithermal systems – Target is to drill out one new mineralised vein system in 2012 – Identify one new greenfield discovery in 2012 and drill test it 20
  • 21. Tandai: Ulukau Prospect - New Discovery Newly discovered Epithermal Stockwork 21
  • 22. Summary • Soon to be “self funded explorer” – Emerging Producer - Gold and silver production targeted for 2013 – Two-stage development allows for relatively small initial capex • Tembang – Relatively low capital intensity – Production costs targeted for 1stquartile – Brownfields project means relatively low technical risk • Major competitive advantage in Sumatra – Large tenement position – Demonstrated capacity and ability to acquire projects, attract quality JV partners • News flow in 2012 – Tembang development milestones – Newcrest funded exploration at Tandai JV 22
  • 24. 1A: Tembang Project Resource Tembang Mineral Resource August 2011 Reported to JORC Code Standards Belinau Vein Above 2.78g/t Au Underground Cut-Off Category Ktonnes Au g/t Ag g/t Au koz Ag koz Measured 149 7.22 75.5 35 361 BELINAU Indicated 266 8.02 67.9 69 580 VEIN Inferred 72 10.50 81.4 24 188 The information in this report that relates to Mineral Resources is based on information compiled by Mr David Sub-Total 487 8.14 72.2 127 1,130 Stock MAusIMM who is an independent Geological All Veins Excluding Belinau Above 0.5g/t Au Open Pit Cut-Off Consultant to the Company and is a Competent Person as Category Ktonnes Au g/t Ag g/t Au koz Ag koz defined by the Australasian Code for the reporting of Measured 2,598 2.27 37.8 190 3,156 Exploration Results, Mineral Resources and Ore Reserves Indicated 4,423 1.80 25.6 256 3,637 (the JORC Code 2004 Edition) and has consented to the OTHER VEINS inclusion in this report of the matters based on his information Inferred 3,554 1.80 20.3 202 2,319 in the form and context in which they appear. In addition, the Sub-Total 10,575 1.91 26.8 648 9,112 Mineral Resource Estimates were reviewed by Mr. Robert PSV Material Above 0.3g/t Au Open Pit Cut-Off Spiers who is a member of AIG and a full time employee of Category Ktonnes Au g/t Ag g/t Au koz Ag koz Hellman & Schofield Pty Ltd. Mr. Spiers has sufficient Measured - - - - - experience which is relevant to the style of mineralisation and Indicated 11,323 0.54 6.9 198 2,523 type of deposit under consideration and to the activity which PSV he is undertaking to qualify as a Competent Person as Inferred 194 0.50 4.6 3 29 defined in the 2004 Edition of the „Australasian Code for Sub-Total 11,517 0.54 6.9 201 2,552 Reporting of Exploration Results, Mineral Resources and Ore Combined Total Resource Open Pit + Underground Reserves‟. Mr. Spiers has consented to the inclusion in this Category Ktonnes Au g/t Ag g/t Au koz Ag koz report of the matters based on their information in the form Measured 2,747 2.54 39.9 224 3,517 and context in which it appears. Indicated 16,012 1.02 13.1 522 6,741 ALL Inferred 3,820 1.90 20.7 229 2,536 Total 22,579 1.35 17.6 976 12,794 Note: Rounding errors may occur, reporting cut-offs as indicated, significant figures do not imply any added level of precision. 24
  • 25. 1B: Tembang Project Reserve Reserve Tonnes Grade Contained Grade Contained Deposit Category (kt) Au (g/t) Gold (oz) Ag (g/t) Silver (oz) Proven 650 1.7 35,000 24.0 498,000 Asmar Probable 1,230 1.3 49,000 20.5 808,000 Proven 910 2.0 60,000 40.8 1,195,000 Berenai Probable 980 2.1 67,000 23.6 740,000 Proven 560 2.5 45,000 40.9 735,000 Buluh Probable 400 2.0 26,000 29.0 374,000 Proven - - - - - Aidit Probable 20 3.1 2,000 44.6 30,000 Proven 140 4.2 19,000 52.1 238,000 Bujang Probable 50 2.3 4,000 26.0 40,000 Proven 90 5.5 16,000 68.4 196,000 Belinau_OP Probable 60 3.4 6,000 53.2 97,000 Proven 50 8.7 15,000 74.1 130,000 Belinau_UG Probable 360 5.0 59,000 39.3 458,000 Proven 2,400 2.5 190,000 38.7 2,991,000 Total Probable 3,090 2.1 213,000 25.6 2,547,000 Total 5,490 2.3 403,000 31.4 5,539,000 25
  • 26. 2. Sumatra Board Warwick Morris Mr Morris and has more than 30 years experience in the resources industry. He was recently a director of Macquarie Bank Ltd, where he was Chairman BSc (Hons), MSc, MAusIMM of the Metals and Energy Capital Division and head of Metals and Mining. Non-Executive Chairman Appointed to the Board in 2008 Julian Ford Mr Ford has more than 25 years within the global resources industry. He has BSc(Eng), BCom, Grad Dip held senior positions within several major resource companies and co- (Bus. Mgt) founded Zambezi Resources in 2004 Managing Director Appointed to the Board in 2012 Mr Nightingale has over 20 years senior financial experience and is Peter Nightingale Chairman of ASX-listed Callabonna Uranium and Director of Augur BEc, CA Resources, Cockatoo Coal, Planet Gas and unlisted Equus Resources and Non-Executive Director Nickel Mines. Appointed to the Board in 2010 Mr Waller co-founded Sumatra Copper & Gold in 2006. Prior to this was Jocelyn Waller CEO of Trans Siberian Gold plc, an AIM listed company which Mr Waller MA (Hons) (Cantab) established in 2000. He currently serves as a Non-Executive Director of Non-Executive Director RusAnt Ltd. Appointed to the Board in 2006 Richard Edwards Mr Edwards spent eight years as an owner/manager of his own business, BComm, CPA, A Fin and subsequently spent the past nine years providing financial reporting CFO and Company and company secretarial services to a range of publicly listed companies. He 26 Secretary is also CFO and Company Secretary of ASX listed Callabonna Uranium Ltd.
  • 27. 3.Tembang Project Management Team Adi Sjoekri Mr Sjoekri has over 17 years corporate experience, working for BSc ,MSc, MBA (Management) major companies such as CSR and Newmont. More recently he Director (Govt was a consultant for the mining industry. Liaison, Permitting, Forestry) Don Harper Mr Harper is qualified mining engineer with more than 21 years‟ B.Eng (Mining Engineering), B.Surv industry experience, Don has a strong track-record of project (Surveying) management and taking resources projects from pre-feasibility Mine Manager stage into production. Grant Harding Mr Harding is a qualified extractive metallurgist with more than 25 years experience in the mining industry. He has extensive senior B.AppSc, FAusIMM operational, engineering and project management experience; Project Manager most of this in Indonesia. Matthew Farmer Mr Farmer has over 27 years experience in exploration and mining BSc (Hons) Geology, MAusIMM, FGS mostly focused in South East Asia. His experience spans a mix of Exploration Manager major and junior companies including BP Minerals and Newmont 27
  • 28. 4. Positive PFS outcome – March 2012 Stage 1 Development Plan: Belinau PFS - Key outcomes for Belinau Deposit Total revenue $175 million •Pre-Feasibility Study (PFS) confirmed Operating costs, royalties & sustaining $75 million Belinau as a robust and profitable standalone capital project Pre-tax project operating $100 million cash flow •Belinau comprises ~13% of Tembang resource Pre-production capital $48 million Internal Rate of Return 31% •Optimisation studies ongoing C1 cash operating costs •Evaluating open pit opportunities (including silver credits) US$511 •Definitive Feasibility Study (DFS) has Mine life 3 years (stage 1) commenced Note: Production rate 200,000 tpa The Belinau Underground PFS was published on the [xx] and included only the Belinau Underground Study. Updates based on Optimisations will be posted by SCG. The 1 st Update was posted on the 12th March 2012. 28
  • 29. 5. Sontang Project: Overview • Polymetallic discovery • Located in Pasaman regency West Sumatra province • Best intersection of 11.9 metres @ 6.5 g/t Au, 33 g/t Ag, 8.0 % Zn • Mineralisation over +150 metre strike length depth to 75 metres 29
  • 30. 6. Sontang East Drilling Results 30
  • 31. 7. Sumatra Peer Comparisons Notes, Please see next page for notes and Sumatra Intrepid Kingrose Medusa Sihayo G Resources Archi- details on the values quoted in this table. Copper & Mines Mining Mining Gold pelago Gold Sihayo Toka Tembang Tujuh Project Way Linggo Co-O Mine Martabe Pungkut Tindung Market cap 1,000† 630† (AUD M) 25 477† 363† 1,100† 109† Gold Equivalent Resource* EV ($/ Oz Au Resource) 19 16 1093 2019 97 167 244 JORC resource 1.0 25* 0.39* 2.6* 1.42* 9# 2.58# (M oz) Resourcegrade 1.35 0.46* 11* 9.6* 2.75* 1.34# 1.53# (g/t) Est Capital Cost 32## 155* 225* 82.9* 576# (AUD M) Annual Production 38,000## 114,000* 43,000* 77,000* 88,000* 250,000# 61,191# (oz Au pa) Cash costs production 350 to 450 376* 145* 206* 678* 350# 579# (AUD / oz) Est Mine Life 10 4+# 10+# 8+# 9+# (Years) Production/(Forecast) 2013 2010# 2007 # [2014] # 2012# 2011# (Year) Project ownership 100% 80%* 85%* 100%* 75%* 100%# 95%# Sources: *Gold Nerds March 2011; #Company presentations; †Yahoo Finance 14 March 2012: ## SUM March Optimisation Update 31
  • 32. For Of Fire: Information – ASX:SUM 8. RIMFurtherProlific mineralisation • World’s Largest Gold Deposit – Grasberg • Lowest Costs Producers – Gosowong, Co-O, Way Linggo Sumatra projects Au deposit Cu-Au deposit Atlas Placer MIWAH KELIAN Siana 3.14 Moz Au, 8.9 Moz Ag Bulawan 3.56 Moz Au, 1.44 Moz Ag Kingking 500 Kms MARTABE MT.MURO 6.49 Moz Au, 66.2 Moz Ag 1.25 Moz Au, 34.6 Moz Ag Mamut TOKA TINDUNG Gn.Pani 1.75 Moz Au TEMBANG 1.0Moz Au 12.8 Moz Ag GOSOWONG 2.8 Moz Au Wabu MESEL 1.83 Moz Au SIHAYO 1.4 Moz Sontang Tombulilato Ojolali AWAK MAS 1.92 Moz Au Way Linggo TANDAI 1.4 Moz Au, 15 Moz Ag ELANG 25.0 Moz Au, 16.0 lb Cu Wetar GRASBERG DONOK Cibaliung 38.5 Moz Au, 35.6 lb Cu 1.34 Moz Au, 7.4 Moz Ag PONGKOR Note: The resources shown on this page are 3.6 Moz Au, 26.3 Moz Ag TUJUH BUKIT BATU HIJAU historical resources that have been published. The 14.0 Moz Au, 8.8 lb Cu 17.2 Moz Au, 14.1 lb Cu detailed Tembang Resource is shown in Appendix 1

Notas do Editor

  1. add missing data