OCCUPATIONAL SAFETY AND HEALTH
       OSHA                ADMINISTRATION

              Subpart L - Scaffolds
          1926.451 General requirements

1926.451(a) Capacity. (1) “Except as provided in
paragraphs (a)(2), (a)(3), (a)(4), (a)(5), and (g) of this
section, each scaffold and scaffold component shall be
capable of supporting, without failure, its own weight
and at least 4 times the maximum intended load
applied or transmitted to it.”



                                                 2
OCCUPATIONAL SAFETY AND HEALTH
     OSHA                ADMINISTRATION

            Subpart L - Scaffolds
        1926.451 General requirements
1926.451(b)(5(i) “Each end of a platform 10 feet or
less in length shall not extend over its end support
more than 12 inches unless the platform is designed
and installed so that the cantilevered portion of the
platform is able to support employees and/or
materials without tipping, or has guardrails which
block employee access to the cantilevered end.”


                                             3
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

              Subpart L - Scaffolds
          1926.451 General requirements
1926.451(b)(7) “On scaffolds where platforms are
overlapped to create a long platform, the overlap shall
occur only over supports and shall not be less than 12
inches unless the platforms are nailed together or
otherwise restrained to prevent movement.”




                                              4
5
6
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

             Subpart L - Scaffolds
         1926.451 General requirements
1926.451(c)(2) “Supported scaffold poles, legs, posts,
frames, and uprights shall bear on base plates and
mud sills or other adequate firm foundation.”

1926.451(c)(2)(i) “Footings shall be level, sound,
rigid, and capable of supporting the loaded scaffold
without settling or displacement.”

1926.451(c)(2)(ii) “Unstable objects shall not be used
as working platforms.”
8
OCCUPATIONAL SAFETY AND HEALTH
      OSHA               ADMINISTRATION

            Subpart L - Scaffolds
         1926.451 General requirements
1926.451(e)(1) “When scaffold platforms are more
than 2 feet above or below a point of access, portable
ladders, hook-on ladders, attachable ladders, stair
tower (scaffold stairways/towers), stairway-type
ladders (such as ladder stands), ramps, walkways,
integral prefabricated scaffold access, or direct access
from another scaffold, structure, personnel hoist, or
similar surface shall be used. Crossbraces shall not be
used as a means of access.”
                                              9
OCCUPATIONAL SAFETY AND HEALTH
     OSHA               ADMINISTRATION

           Subpart L - Scaffolds
        1926.451 General requirements
1926.451(e)(2)(ii) “Hook-on and attachable ladders
shall be positioned so that their bottom rung is not
more than 24 inches above the scaffold supporting
level.”

1926.451(f)(2) “The use of shore or lean-to scaffolds is
prohibited.”


                                             11
OCCUPATIONAL SAFETY AND HEALTH
       OSHA                ADMINISTRATION

             Subpart L - Scaffolds
          1926.451 General requirements
1926.451(f)(6) “The clearance between scaffolds and
power lines shall be as follows: Scaffolds shall not be
erected, used, dismantled, altered, or moved such
that they or any conductive material handled on
them might come closer to exposed and energized
power lines than as follows:”



                                               13
OCCUPATIONAL SAFETY AND HEALTH
         OSHA                    ADMINISTRATION

                Subpart L - Scaffolds
            1926.451 General requirements

Insulated lines voltage    Minimum distance        alternatives
Less than 300 volts         3 feet (0.9 m).
300 volts to 50 kv         10 feet (31. m)
More than 50 kv            10 feet (3.1 m) plus   2 times the length
                           0.4 inches (1.0 cm)    of the line insulator,
                           each 1 kv over 50 kv   but never less than
                                                  10 feet (3.1 m).



                                                       14
OCCUPATIONAL SAFETY AND HEALTH
         OSHA               ADMINISTRATION

                  Subpart L - Scaffolds
            1926.451 General requirements

Uninsulated lines voltage Minimum distance         alternatives
Less than 50 kv         10 feet (3.1 m).
More than 50 kv         10 feet (3.1 m) plus   2 times the length
                        0.4 inches (1.0 cm)    of the line insulator,
                        for each 1 kv over     but never less than
                        50 kv.                 10 feet (3.1 m).



                                                    15
16
17
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

             Subpart L - Scaffolds
         1926.451 General requirements
1926.451(g) Fall protection. (1) “Each employee on a
scaffold more than 10 feet above a lower level shall be
protected from falling to that lower level. Paragraphs
(g)(1)(i) through (vii) of this section establish the types
of fall protection to be provided to the employees on
each type of scaffold. Paragraphs (g)(2) of this section
addresses fall protection for scaffold erectors and
dismantlers.”
                                                18
19
20
OCCUPATIONAL SAFETY AND HEALTH
      OSHA               ADMINISTRATION

            Subpart L - Scaffolds
         1926.451 General requirements
1926.451(g)(4)(xv) “Crossbracing is acceptable in place
of a midrail when the crossing point of two braces is
between 20 inches and 30 inches above the work
platform or as a toprail when the crossing point of two
braces is between 38 inches and 48 inches above the
work platform. The end points at each upright shall be
no more than 48 inches apart.”


                                            21
22
23
OCCUPATIONAL SAFETY AND HEALTH
       OSHA                ADMINISTRATION

              Subpart L - Scaffolds
                 1926.453 Aerial lifts
1926.453(a) General requirements. (1) Unless otherwise
provided in this section, aerial lifts acquired for use on
or after January 22, 1973 shall be designed and
constructed in conformance with applicable
requirements of the American National Standards for
“Vehicle Mounted Elevating and Rotating Work
Platforms, “ANSI A92.2-1969………………….


                                                24
25
26
27
28
OCCUPATIONAL SAFETY AND HEALTH
      OSHA               ADMINISTRATION

            Subpart L - Scaffolds
                1926.453 Aerial lifts
1926.453(b)(2)(ii) “Only authorized persons shall
operate an aerial lift.”

1926.453(b)(2)(iii) “ Belting off to an adjacent pole,
structure, or equipment while working from an aerial
lift shall not be permitted.”



                                            29
OCCUPATIONAL SAFETY AND HEALTH
      OSHA               ADMINISTRATION

            Subpart L - Scaffolds
               1926.453 Aerial lifts
1926.453(b)(2)(iv) “Employees shall always stand
firmly on the floor of the basket, and shall not sit or
climb on the edge of the basket or use planks, ladders,
or other devices for a work position.”

1926.453(b)(2)(v) “A body belt shall be worn and a
lanyard attached to the boom or basket when working
from an aerial lift.”

                                             30
31
32
Do We Have to Tie-Off on Scissor Lifts?




                                33
OCCUPATIONAL SAFETY AND HEALTH
     OSHA               ADMINISTRATION

            Subpart L - Scaffolds
        1926.454 Training requirements

1926.454(a) The employer shall have each employee
who performs work while on a scaffold trained by a
person qualified in the subject matter to recognize
the hazards associated with the type of scaffold being
used and to understand the procedures to control or
minimize those hazards……………


                                            34
OCCUPATIONAL SAFETY AND HEALTH
      OSHA              ADMINISTRATION

            Subpart L - Scaffolds
               1926.453 Aerial lifts
1926.454(b) The employer shall have each employee
who is involved in erecting, disassembling, moving,
operating, repairing, maintaining, or inspecting a
scaffold trained by a competent person to recognize
any hazards associated with the work in
question………….



                                           35
36
37
40
41
42
43
44
45
46
47
48
50
51
52
53
54
55
56
57
59
60
61
62
63
64
65
66
67
1910.28(c) “Tube & Coupler Scaffolds”
1910.28(d) "Fabricated frame scaffolds”
    (tubular welded frame scaffolds)
1910.28(e) "Outrigger scaffolds"
1910.28(g) "Two-point adjustable suspension
          scaffolds (swing stages)"
1910.28(h) "Multi-point adjustable “
suspension scaffolds, stone setters' multi-
  point adjustable suspension scaffolds,
   and masons' multi-point adjustable
           suspension scaffolds
1910.28(i) "Single-point adjustable
      suspension scaffolds"
1910.28(j)“Boatswains' chair”
1910.28(k) "Form scaffolds and
 carpenters' bracket scaffolds"
1910.28(l) "Bricklayers'
square scaffolds (squares)"
1910.28(m) "Horse scaffolds"
1910.28(n) "Needle beam scaffolds"
1910.28(p) "Interior hung scaffolds"
1926.452(q) "Ladder jack scaffolds"
1910.28(r) "Window jack scaffolds"
1910.28(s) "Roof bracket scaffolds"
1910.28(t) "Crawling boards” (chicken ladders)
1910.28(u) "Float (ship) scaffolds"
1910.29 "Mobile scaffolds"

More Related Content

What's hot

Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyFall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyAtlantic Training, LLC.
 
Subpart F - Fire Protection
Subpart F -  Fire ProtectionSubpart F -  Fire Protection
Subpart F - Fire ProtectionFFSafety
 
Subpart G - Signs and Signals
Subpart G - Signs and SignalsSubpart G - Signs and Signals
Subpart G - Signs and SignalsFFSafety
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works Shaik Mohsin
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...Ahmad Nazib
 
Racking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCLRacking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCLJulian Kalac P.Eng
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment Nidhin Sajeevan
 
Trabalho em altura
Trabalho em alturaTrabalho em altura
Trabalho em alturaIvon Pereira
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paintMinh Bui Si
 
Method statement painting
Method statement painting Method statement painting
Method statement painting Daniel SLSA CLA
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02Minh Bui Si
 
CH: 8 Safety measures
CH: 8 Safety measuresCH: 8 Safety measures
CH: 8 Safety measuresjigar sonani
 
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdf
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdfMANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdf
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdfAmanda263946
 

What's hot (20)

Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyFall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
 
Subpart F - Fire Protection
Subpart F -  Fire ProtectionSubpart F -  Fire Protection
Subpart F - Fire Protection
 
Subpart G - Signs and Signals
Subpart G - Signs and SignalsSubpart G - Signs and Signals
Subpart G - Signs and Signals
 
Arc Flash Safety by BLR
Arc Flash Safety by BLRArc Flash Safety by BLR
Arc Flash Safety by BLR
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Racking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCLRacking Safety Audit Report -CSCL
Racking Safety Audit Report -CSCL
 
2
22
2
 
Fall Protection by Osha
Fall Protection by Osha Fall Protection by Osha
Fall Protection by Osha
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
Helicopter rescue areas
Helicopter rescue areasHelicopter rescue areas
Helicopter rescue areas
 
Trabalho em altura
Trabalho em alturaTrabalho em altura
Trabalho em altura
 
Scaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&IScaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&I
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
Method statement painting
Method statement painting Method statement painting
Method statement painting
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
Scaffolding by UTK
Scaffolding by UTKScaffolding by UTK
Scaffolding by UTK
 
CH: 8 Safety measures
CH: 8 Safety measuresCH: 8 Safety measures
CH: 8 Safety measures
 
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdf
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdfMANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdf
MANUAL DE INSTUÇÕES E CATÁLOGO DE PEÇAS BGR 1300 HI.pdf
 

Viewers also liked

OSHA Eye and Face Protection
OSHA Eye and Face ProtectionOSHA Eye and Face Protection
OSHA Eye and Face ProtectionJo Woolery
 
Subpart N - Cranes
Subpart N - CranesSubpart N - Cranes
Subpart N - CranesFFSafety
 
Subpart K - Electrical
Subpart K - ElectricalSubpart K - Electrical
Subpart K - ElectricalFFSafety
 
S A F E T Y P H O T O S P R E S E N T A T I O N
S A F E T Y  P H O T O S  P R E S E N T A T I O NS A F E T Y  P H O T O S  P R E S E N T A T I O N
S A F E T Y P H O T O S P R E S E N T A T I O NFFSafety
 
Subpart P - Excavations
Subpart P - ExcavationsSubpart P - Excavations
Subpart P - ExcavationsFFSafety
 
Subpart T - Demolition
Subpart T -  DemolitionSubpart T -  Demolition
Subpart T - DemolitionFFSafety
 
Subpart J - Welding
Subpart J  - WeldingSubpart J  - Welding
Subpart J - WeldingFFSafety
 
Subpart E - PPE
Subpart E  - PPESubpart E  - PPE
Subpart E - PPEFFSafety
 
Subpart I - Tools
Subpart I - ToolsSubpart I - Tools
Subpart I - ToolsFFSafety
 
OSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityOSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityAtlantic Training, LLC.
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncAtlantic Training, LLC.
 

Viewers also liked (14)

OSHA Eye and Face Protection
OSHA Eye and Face ProtectionOSHA Eye and Face Protection
OSHA Eye and Face Protection
 
Subpart N - Cranes
Subpart N - CranesSubpart N - Cranes
Subpart N - Cranes
 
Subpart K - Electrical
Subpart K - ElectricalSubpart K - Electrical
Subpart K - Electrical
 
Occupational Noise Exposure and Hearing Conservation
Occupational Noise Exposure and Hearing ConservationOccupational Noise Exposure and Hearing Conservation
Occupational Noise Exposure and Hearing Conservation
 
S A F E T Y P H O T O S P R E S E N T A T I O N
S A F E T Y  P H O T O S  P R E S E N T A T I O NS A F E T Y  P H O T O S  P R E S E N T A T I O N
S A F E T Y P H O T O S P R E S E N T A T I O N
 
Subpart P - Excavations
Subpart P - ExcavationsSubpart P - Excavations
Subpart P - Excavations
 
Subpart T - Demolition
Subpart T -  DemolitionSubpart T -  Demolition
Subpart T - Demolition
 
Subpart J - Welding
Subpart J  - WeldingSubpart J  - Welding
Subpart J - Welding
 
Subpart E - PPE
Subpart E  - PPESubpart E  - PPE
Subpart E - PPE
 
Eye and Face Protection
Eye and Face ProtectionEye and Face Protection
Eye and Face Protection
 
Subpart I - Tools
Subpart I - ToolsSubpart I - Tools
Subpart I - Tools
 
OSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityOSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State University
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, Inc
 
Blasting
BlastingBlasting
Blasting
 

Similar to Subpart L - Scaffolding

Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - LaddersFFSafety
 
Subpart H - Material Handling
Subpart H -  Material HandlingSubpart H -  Material Handling
Subpart H - Material HandlingFFSafety
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015John Newquist
 
Subpart Q Concrete Written
Subpart Q   Concrete   WrittenSubpart Q   Concrete   Written
Subpart Q Concrete WrittenFFSafety
 
Osha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicOsha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicJames Rhoad
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction GtechFFSafety
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction GtechFFSafety
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction GtechFFSafety
 
Fall Protection 511 2017
Fall Protection 511 2017Fall Protection 511 2017
Fall Protection 511 2017John Newquist
 
Excavation and Trenching Onsite Wastewater Systems by L&I
Excavation and Trenching Onsite Wastewater Systems by L&IExcavation and Trenching Onsite Wastewater Systems by L&I
Excavation and Trenching Onsite Wastewater Systems by L&IAtlantic Training, LLC.
 
Fall Protection, Gtech
Fall Protection, GtechFall Protection, Gtech
Fall Protection, GtechFFSafety
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 
Is.3696.2.1991 0
Is.3696.2.1991 0Is.3696.2.1991 0
Is.3696.2.1991 0vikasism1
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppthossam74752
 

Similar to Subpart L - Scaffolding (20)

Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - Ladders
 
Subpart H - Material Handling
Subpart H -  Material HandlingSubpart H -  Material Handling
Subpart H - Material Handling
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015
 
Subpart Q Concrete Written
Subpart Q   Concrete   WrittenSubpart Q   Concrete   Written
Subpart Q Concrete Written
 
Osha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicOsha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographic
 
Highlights of OSHA’s scaffolding standard 1926
Highlights of OSHA’s scaffolding standard 1926 Highlights of OSHA’s scaffolding standard 1926
Highlights of OSHA’s scaffolding standard 1926
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction Gtech
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction Gtech
 
Fall Construction Gtech
Fall Construction GtechFall Construction Gtech
Fall Construction Gtech
 
Fall Protection 511 2017
Fall Protection 511 2017Fall Protection 511 2017
Fall Protection 511 2017
 
Excavation and Trenching Onsite Wastewater Systems by L&I
Excavation and Trenching Onsite Wastewater Systems by L&IExcavation and Trenching Onsite Wastewater Systems by L&I
Excavation and Trenching Onsite Wastewater Systems by L&I
 
510 trenching 2018
510 trenching 2018510 trenching 2018
510 trenching 2018
 
510 trenching 2015
510 trenching 2015510 trenching 2015
510 trenching 2015
 
Personnel liftingad
Personnel liftingadPersonnel liftingad
Personnel liftingad
 
Fall Protection, Gtech
Fall Protection, GtechFall Protection, Gtech
Fall Protection, Gtech
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
Is.3696.2.1991 0
Is.3696.2.1991 0Is.3696.2.1991 0
Is.3696.2.1991 0
 
21 Pump Jack Scaffolding
21 Pump Jack Scaffolding21 Pump Jack Scaffolding
21 Pump Jack Scaffolding
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppt
 

More from FFSafety

Site Photos, 0608
Site Photos, 0608Site Photos, 0608
Site Photos, 0608FFSafety
 
00999 Focus Four 131
00999 Focus Four 13100999 Focus Four 131
00999 Focus Four 131FFSafety
 
Recordkeeping 00150 22
Recordkeeping 00150 22Recordkeeping 00150 22
Recordkeeping 00150 22FFSafety
 
Subpart D - Health & Environment
Subpart D - Health & EnvironmentSubpart D - Health & Environment
Subpart D - Health & EnvironmentFFSafety
 
Subpart C Safety And Health
Subpart C   Safety And HealthSubpart C   Safety And Health
Subpart C Safety And HealthFFSafety
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four PppFFSafety
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Scaffolds C
Scaffolds CScaffolds C
Scaffolds CFFSafety
 
Safetyorient
SafetyorientSafetyorient
SafetyorientFFSafety
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5FFSafety
 

More from FFSafety (12)

Site Photos, 0608
Site Photos, 0608Site Photos, 0608
Site Photos, 0608
 
00999 Focus Four 131
00999 Focus Four 13100999 Focus Four 131
00999 Focus Four 131
 
Recordkeeping 00150 22
Recordkeeping 00150 22Recordkeeping 00150 22
Recordkeeping 00150 22
 
Subpart D - Health & Environment
Subpart D - Health & EnvironmentSubpart D - Health & Environment
Subpart D - Health & Environment
 
Subpart C Safety And Health
Subpart C   Safety And HealthSubpart C   Safety And Health
Subpart C Safety And Health
 
Article
ArticleArticle
Article
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four Ppp
 
Ppe C
Ppe CPpe C
Ppe C
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Scaffolds C
Scaffolds CScaffolds C
Scaffolds C
 
Safetyorient
SafetyorientSafetyorient
Safetyorient
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5
 

Recently uploaded

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 

Recently uploaded (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 

Subpart L - Scaffolding

  • 1. 1
  • 2. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(a) Capacity. (1) “Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5), and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.” 2
  • 3. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(b)(5(i) “Each end of a platform 10 feet or less in length shall not extend over its end support more than 12 inches unless the platform is designed and installed so that the cantilevered portion of the platform is able to support employees and/or materials without tipping, or has guardrails which block employee access to the cantilevered end.” 3
  • 4. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(b)(7) “On scaffolds where platforms are overlapped to create a long platform, the overlap shall occur only over supports and shall not be less than 12 inches unless the platforms are nailed together or otherwise restrained to prevent movement.” 4
  • 5. 5
  • 6. 6
  • 7. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(c)(2) “Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.” 1926.451(c)(2)(i) “Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.” 1926.451(c)(2)(ii) “Unstable objects shall not be used as working platforms.”
  • 8. 8
  • 9. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(e)(1) “When scaffold platforms are more than 2 feet above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair tower (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.” 9
  • 10.
  • 11. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(e)(2)(ii) “Hook-on and attachable ladders shall be positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level.” 1926.451(f)(2) “The use of shore or lean-to scaffolds is prohibited.” 11
  • 12.
  • 13. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(f)(6) “The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:” 13
  • 14. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements Insulated lines voltage Minimum distance alternatives Less than 300 volts 3 feet (0.9 m). 300 volts to 50 kv 10 feet (31. m) More than 50 kv 10 feet (3.1 m) plus 2 times the length 0.4 inches (1.0 cm) of the line insulator, each 1 kv over 50 kv but never less than 10 feet (3.1 m). 14
  • 15. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements Uninsulated lines voltage Minimum distance alternatives Less than 50 kv 10 feet (3.1 m). More than 50 kv 10 feet (3.1 m) plus 2 times the length 0.4 inches (1.0 cm) of the line insulator, for each 1 kv over but never less than 50 kv. 10 feet (3.1 m). 15
  • 16. 16
  • 17. 17
  • 18. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(g) Fall protection. (1) “Each employee on a scaffold more than 10 feet above a lower level shall be protected from falling to that lower level. Paragraphs (g)(1)(i) through (vii) of this section establish the types of fall protection to be provided to the employees on each type of scaffold. Paragraphs (g)(2) of this section addresses fall protection for scaffold erectors and dismantlers.” 18
  • 19. 19
  • 20. 20
  • 21. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.451 General requirements 1926.451(g)(4)(xv) “Crossbracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches and 30 inches above the work platform or as a toprail when the crossing point of two braces is between 38 inches and 48 inches above the work platform. The end points at each upright shall be no more than 48 inches apart.” 21
  • 22. 22
  • 23. 23
  • 24. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.453 Aerial lifts 1926.453(a) General requirements. (1) Unless otherwise provided in this section, aerial lifts acquired for use on or after January 22, 1973 shall be designed and constructed in conformance with applicable requirements of the American National Standards for “Vehicle Mounted Elevating and Rotating Work Platforms, “ANSI A92.2-1969…………………. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.453 Aerial lifts 1926.453(b)(2)(ii) “Only authorized persons shall operate an aerial lift.” 1926.453(b)(2)(iii) “ Belting off to an adjacent pole, structure, or equipment while working from an aerial lift shall not be permitted.” 29
  • 30. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.453 Aerial lifts 1926.453(b)(2)(iv) “Employees shall always stand firmly on the floor of the basket, and shall not sit or climb on the edge of the basket or use planks, ladders, or other devices for a work position.” 1926.453(b)(2)(v) “A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift.” 30
  • 31. 31
  • 32. 32
  • 33. Do We Have to Tie-Off on Scissor Lifts? 33
  • 34. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.454 Training requirements 1926.454(a) The employer shall have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards…………… 34
  • 35. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart L - Scaffolds 1926.453 Aerial lifts 1926.454(b) The employer shall have each employee who is involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question…………. 35
  • 36. 36
  • 37. 37
  • 38.
  • 39.
  • 40. 40
  • 41. 41
  • 42. 42
  • 43. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47. 47
  • 48. 48
  • 49.
  • 50. 50
  • 51. 51
  • 52. 52
  • 53. 53
  • 54. 54
  • 55. 55
  • 56. 56
  • 57. 57
  • 58.
  • 59. 59
  • 60. 60
  • 61. 61
  • 62. 62
  • 63. 63
  • 64. 64
  • 65. 65
  • 66. 66
  • 67. 67
  • 68. 1910.28(c) “Tube & Coupler Scaffolds”
  • 69. 1910.28(d) "Fabricated frame scaffolds” (tubular welded frame scaffolds)
  • 71. 1910.28(g) "Two-point adjustable suspension scaffolds (swing stages)"
  • 72. 1910.28(h) "Multi-point adjustable “ suspension scaffolds, stone setters' multi- point adjustable suspension scaffolds, and masons' multi-point adjustable suspension scaffolds
  • 73. 1910.28(i) "Single-point adjustable suspension scaffolds"
  • 75. 1910.28(k) "Form scaffolds and carpenters' bracket scaffolds"
  • 83. 1910.28(t) "Crawling boards” (chicken ladders)