Administration
3. Admin -
Only
Available
to Full
Licence -
Admin
users
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Locations & Sub-Locations
Locations are typically at the level of the site address
• Creating Location documents allow you to add a number of locations, to
help sort actions and documents.
Sub-Locations are at the level of the buildings within a site e.g.
“Building 1”
• Creating a Sub-Location for a Location allows you to further define areas
in your organisation and to help sort actions and documents.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Creating a Location
1. Click “Create New…”
2. Click “Admin”
3. A blank Location form opens in a
new window.
1. Click “Location”
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Configuring Location Data Entry:(The next slides show an example of a complete Location)
Location & ISO Management Systems Configurations:
• Title: Enter the title of the Location. This field is mandatory.
• Description: Enter a description of the location.
• Energy Manager/Health & Safety Manager/Environmental
Manager/Quality Manager:
• Click “Select” and choose the names for each of the above managers
for this location.
• Enter Phone and Email details for these functions.
• Document Types responsible for: Select the document types that are the
responsibility of this manager. This defines the person that new documents
will be submitted to for initial review and who can issue these types of
documents. The available list is defined in the DocumentType keyword
settings for the Document Management module (see related training
material.)
• Action Types responsible for: Select the nonconformities that are the
responsibility of this manager. This defines the person that nonconformities
will be submitted to for final approval for these Types of Nonconformities. The
Type list is defined in the Keyword settings for the Nonconformity
Management module (see related training material.)
NOTE: When finished creating a location click on Save in the top left corner and then close the
window. You’re new location will then appear on all new documents you create in the software.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Configuring a Location (Objectives & Targets)
Objectives & Targets:
• Target Savings – Electrical (number): Enter the overall electrical energy
savings target for this location. Enter in the default units that you have
specified in your System Settings document (see later slides.) This is then
displayed in the Objectives & Targets Dashboard. This field is a number
field.
• Target Savings – Thermal (number): Enter the overall thermal energy
savings target for this location. Enter in the default units that you have
specified in your System Settings document (see later slides.) This is then
displayed in the Objectives & Targets dashboard. This field is a number field
• Overall Location Objective: Enter statement outlining your objectives. This
is a text field. This will be displayed in the Objectives & Targets dashboard.
• Energy Efficiency Project Budget (number): Enter the budget that you
have allocated for energy efficiency projects. (This feature has not been
released yet. Please contact Enerit support if you are interested in finding out
more about this feature.)
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Configuring a Location (Default Chart Configurations)
• Enter the URL for the chart in the appropriate box that you want to appear in the position described in the images below.
Default Chart Configurations: Main Screen - Objectives & Targets Dashboard - Charts Dashboard Configurations:
Main screen
“Obj. & Targ.”
Main screen
“Reports/Chart”
Chart Dash.
Top LHS
Chart Dash.
Bottom LHS
Chart Dash.
Bottom RHS
Chart Dash.
Top RHS
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Configuring a Location (Energy Sources – Units and
Conversion Factors)
Specify the
unit that your
organisation
uses to
measure
this Energy
Source.
Enter the
Conversion
factor to
convert from
the “Unit of
Measure” to
the System
Unit
Specify the
cost that your
organisation
uses to
measure the
Energy
Source
Specify the
CO2 emission factor
related to the Energy
Source: used for
Improvement
Opportunities Estimated
Savings
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
1. Identifying Energy Sources
Specify the
unit that your
organisation
measures
that Energy
Source in
Enter the
Conversion
factor to convert
from the “Unit of
Measure” to the
System Unit
Specify the
unit that your
organisation
measures
that Energy
Source in
Specify the
CO2 emission factor
related to the Energy
Source: used for
Improvement
Opportunities Estimated
Savings
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Completed Location - Example
If you are satisfied with
the Location details,
click on “Save” or
“Save & Close”. This
will close and finalise
the Location details.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Creating a Sub-Location (1)
1. Click “Create New…”
2. Click “Admin”
3. Click “Sub-Location”
4. A blank Sub-Location form opens
in a new window.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Creating a Sub-Location (2)
Data Entry:
Sub-Location Information:
• Location: Choose which location it will apply to. This field is mandatory.
• Title: Enter the title of the Sub-Location e.g. “Building 1”
• Description: Enter a description of the sub-location. e.g. boundary
information.
NOTE: When finished creating a Sub-Location click on Save in the top left
corner and then close the window. You’re new Sub-Location will then appear
on all new documents you create in the software.
If you are satisfied
with the Sub-Location
details, click on
“Save” or “Save &
Close”. This will close
and finalise the Sub-
Location details.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Enerit ISO 50001 Keywords
Keywords help you customise the Enerit software to work for your
organisation, to choose words and categories that have real meaning for
your organisation
For each type of item/document you can create in the Enerit software
there are configurable keywords on each to help sort and categorise
them.
The standard software comes with a default list, but you can create,
edit and delete any of these items yourself.
The next slide shows an example of the default list for each document
Improvement Opportunity Categories is expanded
The Sub-Categories for “HVAC” is then expanded
By clicking on any Category or sub-category you can edit or delete them
Further you can create your own Keywords (see following slide).
By thinking about these categories you can really present excellent
information e.g. in the Action Plan or in the Dashboard “Energy Savings”
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Enerit ISO 50001 Keywords
Choosing this list wisely is the key to powerful
reporting
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Creating a Keyword (1)
1. Click “Create New…”
2. Click “Admin”
3. A blank Keyword form opens in a
new window.
1. Click “Keyword”
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Creating a Keyword (2)
Keyword Details:
Keyword Details
• Document Type: Choose
• Field Name: Enter the title of the Sub-Location e.g. “Building 1”
• Keyword: Enter a description of the sub-location. e.g. boundary information.
• Keyword Description: Enter a description of the sub-location. e.g. boundary
information.
• Sub-Keywords:
NOTE: When finished creating a Keyword or Sub-Keyword click on Save in the top left
corner and then close the window. You’re new Keyword or Sub-Keyword will then appear
in the specified document type when you create a new one in the software.
If you are satisfied
with the Keyword or
Sub-Keyword details,
click on “Submit” or
“Save” button. This
will create the
Keyword and/or Sub-
Keyword. You can
view the Keywords in
The Administration
view
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
To add users to the Enerit
software or change licence
types, please contact your
energy manager or the Enerit
help desk
help_desk@enerit.com
Enerit ISO 50001 Users
Full Licence Admin users can enter this area of the software to view
users, their contact details and their licence types.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Enerit ISO 50001 Units & Settings
The Units document does not need to be created in the Enerit software.
Only edited as necessary.
Enter the Units and settings through the Settings Tab in Admin.
© 2007 Enerit Ltd.
© 2014 Enerit Ltd.
Editing Units and Settings (2) Data Entry:
Portal Information:
• Portal Title: Enter the information your organisation will see when
you log in to the software (at the top of the screen).
• Attach company logo: Add a company logo that appears in for
top RHS of all documents.
• Customer URL: Enter the Url for your company website. It will be
linked to your company logo.
• Partner URL: (not currently available)
• Partner Name: Enter the partner name, if applicable.
• Show League Tables: (not currently available).
Units:
• Units: Each unit type chosen here will be then utilised in the
various views and forms throughout the software.
Unit Conversion Factors:
• Electrical (Cost and Emission factor): Enter the cost of
electricity and the emission factor for electricity.
• Thermal (Cost and Emission factor): Enter the cost of thermal
energy and the emission factor for thermal energy.
NOTE:
• Some inputs in the form are not utilised in this version of Enerit ISO
50001 software.
• When finished editing the Units and settings document click on
Save in the top left corner and then close the window. You’re new
Unit settings will then appear throughout the system and on all
new documents you create in the software. Some old documents
need to be re-saved to see new units, if changed.
• The Enerit ISO 50001 Software “Unit Settings” allows users to
customise the software to their needs.

Mais conteúdo relacionado

Mais procurados

Enerit ISO 50001 User Guide
Enerit ISO 50001 User GuideEnerit ISO 50001 User Guide
Enerit ISO 50001 User GuideArantico Ltd
 
Oracle HRMS Accrual plan Setup
Oracle HRMS Accrual plan SetupOracle HRMS Accrual plan Setup
Oracle HRMS Accrual plan SetupFeras Ahmad
 
Oracle Financials R12 - GL STEP 3 - Journal Controls
 Oracle Financials R12 - GL STEP 3 - Journal Controls Oracle Financials R12 - GL STEP 3 - Journal Controls
Oracle Financials R12 - GL STEP 3 - Journal ControlsMohammed Raouf
 

Mais procurados (6)

Enerit ISO 50001 User Guide
Enerit ISO 50001 User GuideEnerit ISO 50001 User Guide
Enerit ISO 50001 User Guide
 
Projects Presentation
Projects PresentationProjects Presentation
Projects Presentation
 
Oracle HRMS Accrual plan Setup
Oracle HRMS Accrual plan SetupOracle HRMS Accrual plan Setup
Oracle HRMS Accrual plan Setup
 
News Presentation
News PresentationNews Presentation
News Presentation
 
Publications Presentation
Publications PresentationPublications Presentation
Publications Presentation
 
Oracle Financials R12 - GL STEP 3 - Journal Controls
 Oracle Financials R12 - GL STEP 3 - Journal Controls Oracle Financials R12 - GL STEP 3 - Journal Controls
Oracle Financials R12 - GL STEP 3 - Journal Controls
 

Semelhante a Enerit ISO 50001 Administration Training Presentation

Ad basic tech_workshop
Ad basic tech_workshopAd basic tech_workshop
Ad basic tech_workshopmanisherp084
 
KWizCom forms - introduction
KWizCom forms - introductionKWizCom forms - introduction
KWizCom forms - introductionNimrod Geva
 
Creating a data report in visual basic 6
Creating a data report in visual basic 6Creating a data report in visual basic 6
Creating a data report in visual basic 6mrgulshansharma
 
How to design a report with fine report reporting tool
How to design a report with  fine report reporting toolHow to design a report with  fine report reporting tool
How to design a report with fine report reporting toolFineReport Reporting Tool
 
Zero Cost Base Budgeting
Zero Cost Base BudgetingZero Cost Base Budgeting
Zero Cost Base Budgetingchestertrybus
 
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...Sami JAMMALI
 
Integration of-click-install-apps
Integration of-click-install-appsIntegration of-click-install-apps
Integration of-click-install-appsSwarup Hait
 
Bi publisher quickstartgudepaper
Bi publisher quickstartgudepaperBi publisher quickstartgudepaper
Bi publisher quickstartgudepapersadiqeds
 
Report exchange designer
Report exchange designerReport exchange designer
Report exchange designerrlsotto
 
Knowledge article-configuring key mapping in intercompany solution
Knowledge article-configuring key mapping in intercompany solutionKnowledge article-configuring key mapping in intercompany solution
Knowledge article-configuring key mapping in intercompany solutionwalldorf_share
 
Report exchange designer
Report exchange designerReport exchange designer
Report exchange designerBhushan Rajgure
 
Change windows owner
Change windows ownerChange windows owner
Change windows ownerteaywy
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018Helen Fisher
 
Bhadale group of companies - Org service module - Design doc
Bhadale group of companies - Org service module - Design docBhadale group of companies - Org service module - Design doc
Bhadale group of companies - Org service module - Design docVijayananda Mohire
 
Lsmw for master data upload simple explanation
Lsmw for master data upload simple explanationLsmw for master data upload simple explanation
Lsmw for master data upload simple explanationManoj Kumar
 
CRM Help Manual reference_Stephen Delissio
CRM Help Manual reference_Stephen DelissioCRM Help Manual reference_Stephen Delissio
CRM Help Manual reference_Stephen DelissioStephen Delissio
 
AuditGen: Technical Configuration Reports
AuditGen: Technical Configuration ReportsAuditGen: Technical Configuration Reports
AuditGen: Technical Configuration ReportsCC Expertise
 

Semelhante a Enerit ISO 50001 Administration Training Presentation (20)

Ad basic tech_workshop
Ad basic tech_workshopAd basic tech_workshop
Ad basic tech_workshop
 
KWizCom forms - introduction
KWizCom forms - introductionKWizCom forms - introduction
KWizCom forms - introduction
 
Creating a data report in visual basic 6
Creating a data report in visual basic 6Creating a data report in visual basic 6
Creating a data report in visual basic 6
 
How to design a report with fine report reporting tool
How to design a report with  fine report reporting toolHow to design a report with  fine report reporting tool
How to design a report with fine report reporting tool
 
KWizCom Forms
KWizCom FormsKWizCom Forms
KWizCom Forms
 
Zero Cost Base Budgeting
Zero Cost Base BudgetingZero Cost Base Budgeting
Zero Cost Base Budgeting
 
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...
Mr20 enus 05-Report Design in Management Reporter 2.0 for Microsoft Dynamics®...
 
Integration of-click-install-apps
Integration of-click-install-appsIntegration of-click-install-apps
Integration of-click-install-apps
 
Bi publisher quickstartgudepaper
Bi publisher quickstartgudepaperBi publisher quickstartgudepaper
Bi publisher quickstartgudepaper
 
Report exchange designer
Report exchange designerReport exchange designer
Report exchange designer
 
Knowledge article-configuring key mapping in intercompany solution
Knowledge article-configuring key mapping in intercompany solutionKnowledge article-configuring key mapping in intercompany solution
Knowledge article-configuring key mapping in intercompany solution
 
Report designer
Report designerReport designer
Report designer
 
Report exchange designer
Report exchange designerReport exchange designer
Report exchange designer
 
Change windows owner
Change windows ownerChange windows owner
Change windows owner
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018
 
Bhadale group of companies - Org service module - Design doc
Bhadale group of companies - Org service module - Design docBhadale group of companies - Org service module - Design doc
Bhadale group of companies - Org service module - Design doc
 
SysInfoTools EML to NSF Converter
SysInfoTools EML to NSF ConverterSysInfoTools EML to NSF Converter
SysInfoTools EML to NSF Converter
 
Lsmw for master data upload simple explanation
Lsmw for master data upload simple explanationLsmw for master data upload simple explanation
Lsmw for master data upload simple explanation
 
CRM Help Manual reference_Stephen Delissio
CRM Help Manual reference_Stephen DelissioCRM Help Manual reference_Stephen Delissio
CRM Help Manual reference_Stephen Delissio
 
AuditGen: Technical Configuration Reports
AuditGen: Technical Configuration ReportsAuditGen: Technical Configuration Reports
AuditGen: Technical Configuration Reports
 

Mais de Arantico Ltd

Association of Energy Engineers WEEC Poster - Closing the Gap for Optimal Bu...
Association of Energy Engineers WEEC Poster  - Closing the Gap for Optimal Bu...Association of Energy Engineers WEEC Poster  - Closing the Gap for Optimal Bu...
Association of Energy Engineers WEEC Poster - Closing the Gap for Optimal Bu...Arantico Ltd
 
Energy Management Bureau - Udaras na Gaeltachta - case study
Energy Management Bureau -  Udaras na Gaeltachta - case studyEnergy Management Bureau -  Udaras na Gaeltachta - case study
Energy Management Bureau - Udaras na Gaeltachta - case studyArantico Ltd
 
Closing the gap in building energy performance using ISO 50001 Energy Managem...
Closing the gap in building energy performance using ISO 50001 Energy Managem...Closing the gap in building energy performance using ISO 50001 Energy Managem...
Closing the gap in building energy performance using ISO 50001 Energy Managem...Arantico Ltd
 
ISO 50001 & The Hotel Industry
ISO 50001 & The Hotel IndustryISO 50001 & The Hotel Industry
ISO 50001 & The Hotel IndustryArantico Ltd
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyArantico Ltd
 
EU H2020 HIT2GAP - SmarTABCD’15 Workshop - VERYSchool Navigator
EU H2020 HIT2GAP -  SmarTABCD’15 Workshop - VERYSchool NavigatorEU H2020 HIT2GAP -  SmarTABCD’15 Workshop - VERYSchool Navigator
EU H2020 HIT2GAP - SmarTABCD’15 Workshop - VERYSchool NavigatorArantico Ltd
 
ESOS in Processing - (Energy Audit Scheme & ISO 50001)
ESOS in Processing - (Energy Audit Scheme & ISO 50001)ESOS in Processing - (Energy Audit Scheme & ISO 50001)
ESOS in Processing - (Energy Audit Scheme & ISO 50001)Arantico Ltd
 
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015Arantico Ltd
 
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...Arantico Ltd
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)Arantico Ltd
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...Arantico Ltd
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)Arantico Ltd
 
ICT for Energy Efficient Airports
ICT for Energy Efficient AirportsICT for Energy Efficient Airports
ICT for Energy Efficient AirportsArantico Ltd
 
The use of software in achieving ISO 50001
The use of software in achieving ISO 50001The use of software in achieving ISO 50001
The use of software in achieving ISO 50001Arantico Ltd
 
Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software Arantico Ltd
 
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience Ireland Leading the way in Energy Management: ISO 50001- Irish Experience
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience Arantico Ltd
 
Automation of energy action in accordance with ISO 50001 Standard
Automation of energy action in accordance with ISO 50001 Standard Automation of energy action in accordance with ISO 50001 Standard
Automation of energy action in accordance with ISO 50001 Standard Arantico Ltd
 
ISO 50001 "on fire": Enerit P.g. 5
ISO 50001 "on fire": Enerit P.g. 5ISO 50001 "on fire": Enerit P.g. 5
ISO 50001 "on fire": Enerit P.g. 5Arantico Ltd
 
Ireland leading the way in Energy Management
Ireland leading the way in Energy ManagementIreland leading the way in Energy Management
Ireland leading the way in Energy ManagementArantico Ltd
 
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage Arantico Ltd
 

Mais de Arantico Ltd (20)

Association of Energy Engineers WEEC Poster - Closing the Gap for Optimal Bu...
Association of Energy Engineers WEEC Poster  - Closing the Gap for Optimal Bu...Association of Energy Engineers WEEC Poster  - Closing the Gap for Optimal Bu...
Association of Energy Engineers WEEC Poster - Closing the Gap for Optimal Bu...
 
Energy Management Bureau - Udaras na Gaeltachta - case study
Energy Management Bureau -  Udaras na Gaeltachta - case studyEnergy Management Bureau -  Udaras na Gaeltachta - case study
Energy Management Bureau - Udaras na Gaeltachta - case study
 
Closing the gap in building energy performance using ISO 50001 Energy Managem...
Closing the gap in building energy performance using ISO 50001 Energy Managem...Closing the gap in building energy performance using ISO 50001 Energy Managem...
Closing the gap in building energy performance using ISO 50001 Energy Managem...
 
ISO 50001 & The Hotel Industry
ISO 50001 & The Hotel IndustryISO 50001 & The Hotel Industry
ISO 50001 & The Hotel Industry
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management Journey
 
EU H2020 HIT2GAP - SmarTABCD’15 Workshop - VERYSchool Navigator
EU H2020 HIT2GAP -  SmarTABCD’15 Workshop - VERYSchool NavigatorEU H2020 HIT2GAP -  SmarTABCD’15 Workshop - VERYSchool Navigator
EU H2020 HIT2GAP - SmarTABCD’15 Workshop - VERYSchool Navigator
 
ESOS in Processing - (Energy Audit Scheme & ISO 50001)
ESOS in Processing - (Energy Audit Scheme & ISO 50001)ESOS in Processing - (Energy Audit Scheme & ISO 50001)
ESOS in Processing - (Energy Audit Scheme & ISO 50001)
 
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015
 
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...
Lessons Learned: Guidance based on Early Experiences of Implementing ISO 5000...
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 3 of 3)
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 1 of 3)
 
ICT for Energy Efficient Airports
ICT for Energy Efficient AirportsICT for Energy Efficient Airports
ICT for Energy Efficient Airports
 
The use of software in achieving ISO 50001
The use of software in achieving ISO 50001The use of software in achieving ISO 50001
The use of software in achieving ISO 50001
 
Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software
 
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience Ireland Leading the way in Energy Management: ISO 50001- Irish Experience
Ireland Leading the way in Energy Management: ISO 50001- Irish Experience
 
Automation of energy action in accordance with ISO 50001 Standard
Automation of energy action in accordance with ISO 50001 Standard Automation of energy action in accordance with ISO 50001 Standard
Automation of energy action in accordance with ISO 50001 Standard
 
ISO 50001 "on fire": Enerit P.g. 5
ISO 50001 "on fire": Enerit P.g. 5ISO 50001 "on fire": Enerit P.g. 5
ISO 50001 "on fire": Enerit P.g. 5
 
Ireland leading the way in Energy Management
Ireland leading the way in Energy ManagementIreland leading the way in Energy Management
Ireland leading the way in Energy Management
 
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage
Enerit to Enable Rome and Milan Airports to Reduce Overall Energy Usage
 

Último

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Último (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Enerit ISO 50001 Administration Training Presentation

  • 1. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Enerit ISO Software Administration Best viewed in slideshow mode Best viewed in slideshow mode
  • 2. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Administration 3. Admin - Only Available to Full Licence - Admin users
  • 3. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Locations & Sub-Locations Locations are typically at the level of the site address • Creating Location documents allow you to add a number of locations, to help sort actions and documents. Sub-Locations are at the level of the buildings within a site e.g. “Building 1” • Creating a Sub-Location for a Location allows you to further define areas in your organisation and to help sort actions and documents.
  • 4. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Creating a Location 1. Click “Create New…” 2. Click “Admin” 3. A blank Location form opens in a new window. 1. Click “Location”
  • 5. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Configuring Location Data Entry:(The next slides show an example of a complete Location) Location & ISO Management Systems Configurations: • Title: Enter the title of the Location. This field is mandatory. • Description: Enter a description of the location. • Energy Manager/Health & Safety Manager/Environmental Manager/Quality Manager: • Click “Select” and choose the names for each of the above managers for this location. • Enter Phone and Email details for these functions. • Document Types responsible for: Select the document types that are the responsibility of this manager. This defines the person that new documents will be submitted to for initial review and who can issue these types of documents. The available list is defined in the DocumentType keyword settings for the Document Management module (see related training material.) • Action Types responsible for: Select the nonconformities that are the responsibility of this manager. This defines the person that nonconformities will be submitted to for final approval for these Types of Nonconformities. The Type list is defined in the Keyword settings for the Nonconformity Management module (see related training material.) NOTE: When finished creating a location click on Save in the top left corner and then close the window. You’re new location will then appear on all new documents you create in the software.
  • 6. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Configuring a Location (Objectives & Targets) Objectives & Targets: • Target Savings – Electrical (number): Enter the overall electrical energy savings target for this location. Enter in the default units that you have specified in your System Settings document (see later slides.) This is then displayed in the Objectives & Targets Dashboard. This field is a number field. • Target Savings – Thermal (number): Enter the overall thermal energy savings target for this location. Enter in the default units that you have specified in your System Settings document (see later slides.) This is then displayed in the Objectives & Targets dashboard. This field is a number field • Overall Location Objective: Enter statement outlining your objectives. This is a text field. This will be displayed in the Objectives & Targets dashboard. • Energy Efficiency Project Budget (number): Enter the budget that you have allocated for energy efficiency projects. (This feature has not been released yet. Please contact Enerit support if you are interested in finding out more about this feature.)
  • 7. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Configuring a Location (Default Chart Configurations) • Enter the URL for the chart in the appropriate box that you want to appear in the position described in the images below. Default Chart Configurations: Main Screen - Objectives & Targets Dashboard - Charts Dashboard Configurations: Main screen “Obj. & Targ.” Main screen “Reports/Chart” Chart Dash. Top LHS Chart Dash. Bottom LHS Chart Dash. Bottom RHS Chart Dash. Top RHS
  • 8. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Configuring a Location (Energy Sources – Units and Conversion Factors) Specify the unit that your organisation uses to measure this Energy Source. Enter the Conversion factor to convert from the “Unit of Measure” to the System Unit Specify the cost that your organisation uses to measure the Energy Source Specify the CO2 emission factor related to the Energy Source: used for Improvement Opportunities Estimated Savings
  • 9. © 2007 Enerit Ltd. © 2014 Enerit Ltd. 1. Identifying Energy Sources Specify the unit that your organisation measures that Energy Source in Enter the Conversion factor to convert from the “Unit of Measure” to the System Unit Specify the unit that your organisation measures that Energy Source in Specify the CO2 emission factor related to the Energy Source: used for Improvement Opportunities Estimated Savings
  • 10. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Completed Location - Example If you are satisfied with the Location details, click on “Save” or “Save & Close”. This will close and finalise the Location details.
  • 11. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Creating a Sub-Location (1) 1. Click “Create New…” 2. Click “Admin” 3. Click “Sub-Location” 4. A blank Sub-Location form opens in a new window.
  • 12. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Creating a Sub-Location (2) Data Entry: Sub-Location Information: • Location: Choose which location it will apply to. This field is mandatory. • Title: Enter the title of the Sub-Location e.g. “Building 1” • Description: Enter a description of the sub-location. e.g. boundary information. NOTE: When finished creating a Sub-Location click on Save in the top left corner and then close the window. You’re new Sub-Location will then appear on all new documents you create in the software. If you are satisfied with the Sub-Location details, click on “Save” or “Save & Close”. This will close and finalise the Sub- Location details.
  • 13. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Enerit ISO 50001 Keywords Keywords help you customise the Enerit software to work for your organisation, to choose words and categories that have real meaning for your organisation For each type of item/document you can create in the Enerit software there are configurable keywords on each to help sort and categorise them. The standard software comes with a default list, but you can create, edit and delete any of these items yourself. The next slide shows an example of the default list for each document Improvement Opportunity Categories is expanded The Sub-Categories for “HVAC” is then expanded By clicking on any Category or sub-category you can edit or delete them Further you can create your own Keywords (see following slide). By thinking about these categories you can really present excellent information e.g. in the Action Plan or in the Dashboard “Energy Savings”
  • 14. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Enerit ISO 50001 Keywords Choosing this list wisely is the key to powerful reporting
  • 15. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Creating a Keyword (1) 1. Click “Create New…” 2. Click “Admin” 3. A blank Keyword form opens in a new window. 1. Click “Keyword”
  • 16. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Creating a Keyword (2) Keyword Details: Keyword Details • Document Type: Choose • Field Name: Enter the title of the Sub-Location e.g. “Building 1” • Keyword: Enter a description of the sub-location. e.g. boundary information. • Keyword Description: Enter a description of the sub-location. e.g. boundary information. • Sub-Keywords: NOTE: When finished creating a Keyword or Sub-Keyword click on Save in the top left corner and then close the window. You’re new Keyword or Sub-Keyword will then appear in the specified document type when you create a new one in the software. If you are satisfied with the Keyword or Sub-Keyword details, click on “Submit” or “Save” button. This will create the Keyword and/or Sub- Keyword. You can view the Keywords in The Administration view
  • 17. © 2007 Enerit Ltd. © 2014 Enerit Ltd. To add users to the Enerit software or change licence types, please contact your energy manager or the Enerit help desk help_desk@enerit.com Enerit ISO 50001 Users Full Licence Admin users can enter this area of the software to view users, their contact details and their licence types.
  • 18. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Enerit ISO 50001 Units & Settings The Units document does not need to be created in the Enerit software. Only edited as necessary. Enter the Units and settings through the Settings Tab in Admin.
  • 19. © 2007 Enerit Ltd. © 2014 Enerit Ltd. Editing Units and Settings (2) Data Entry: Portal Information: • Portal Title: Enter the information your organisation will see when you log in to the software (at the top of the screen). • Attach company logo: Add a company logo that appears in for top RHS of all documents. • Customer URL: Enter the Url for your company website. It will be linked to your company logo. • Partner URL: (not currently available) • Partner Name: Enter the partner name, if applicable. • Show League Tables: (not currently available). Units: • Units: Each unit type chosen here will be then utilised in the various views and forms throughout the software. Unit Conversion Factors: • Electrical (Cost and Emission factor): Enter the cost of electricity and the emission factor for electricity. • Thermal (Cost and Emission factor): Enter the cost of thermal energy and the emission factor for thermal energy. NOTE: • Some inputs in the form are not utilised in this version of Enerit ISO 50001 software. • When finished editing the Units and settings document click on Save in the top left corner and then close the window. You’re new Unit settings will then appear throughout the system and on all new documents you create in the software. Some old documents need to be re-saved to see new units, if changed. • The Enerit ISO 50001 Software “Unit Settings” allows users to customise the software to their needs.