URBAN WATER SECTOR REFORM- ADO-EKITI WATER SUPPLY PROJECT.
Project Implementation Unit (PIU): Staff Terms of Reference
Title: Project Coordinator (PC)
Reporting Responsibility: Project Management Committee, through the Chairman, EKSWC
The Project:
The primary objective of the reform project is to enhance the capacity of the state to provide economically and
sustainable water supply through institutional strengthening and optimal involvement of private partners in the
urban water supply.
The state government has demonstrated its commitment to the reform by initiating a state water and sanitation
policy in June 2012 while the draft law is awaiting passage into law by the state house of assembly. A major
outshoot of the law is the autonomy granted the corporation.
Duties:
The Project Coordinator is responsible for coordinating the implementation of the project and for its day-to-day
management. The Project Coordinator will also be responsible for the institutional and capacity building aspects
of project and provide overall management and coordination for all developmental agency sponsored projects in
the water sector in Ekiti State i.e. World Bank, EU (WSSRP 3), AfDB, EU, UNICEF – to be commonly referred
to as Developmental Agencies (DA).
Project Implementation
 Ensure the Project Development Objectives are met.
 Prepare the “Annual Implementation Plan” for the Project.
 Ensure timely implementation of the Project according to the Annual Implementation Plan.
 Overall Supervision and overseeing the activities of Consultants involved in Construction Supervision as
well as any other activities financed by the project.
 Ensure timely availability of funds, both foreign and local to avoid any delay in Project implementation.
. Serve as the main interlocutor with the Bank Task-team leader; in charge of requesting, receiving and
processing no-objection for the implementation of the Procurement Plan.
. Prepare quarterly advance reports to the World Bank
. Participate in the follow-up and coordination meetings with World Bank staff
. Serve as a linkage between the project and the senior State Management, including Special Advisers and the
Governor’s Office.
 Any other work that may be assigned by the Project Management Committee in relation to the project.
PIU Organization and Operation
 Establish the Project Implementation Unit (PIU) office.
 Assist the PMC in the selection and hiring of relevant PIU staff with appropriate qualifications and according
to DA guidelines. In the case of vacancies in the PIU, quickly identify and assist the PMC to find a replacement
 Ensure compliance with the existing DA approved staffing rules and the project implementation manual for
the guidance of PIU staff.
 Manage the PIU in all relevant aspects of the project to ensure efficient
and smooth implementation of the project activities.
 Promote teamwork and create an efficient and conducive working environment.
WB Safeguards
 Periodically inspect all financial accounts books to ensure all records and
www.ekitistate.gov.ng
accounts are kept up to date. Ensure all DA financial safeguards are met.
 Ensure Safeguard Implementation Program is carried out in a smooth, efficient and predictable manner.
Reporting
 Prepare and submit through the PMC, quarterly progress reports for the DA.
 Provide verbal and written updates to the PMC as required
 Ensure timely submission of Project Management Reports to DA.
 Assist in the preparation of Borrower’s portion of the Project Implementation Completion Report.
Qualifications:
 University degree in Engineering or other technical discipline.
 At least 15 years experience in the area of water and sewerage or similar field.
 Minimum seven years’ experience in a management/leadership capacity in similar projects.
 Good interpersonal, team building and capacity building skills.
 Experience as Project Director in WB, or other donor, financed Project will be an advantage
 Extensive knowledge of procedures and reporting requirements in WB financed projects will be an
advantage
 Good command of written and spoken English.
. Having a certification in project management would be an added advantage.
Salary: According to WB Guidelines
Performance Evaluation Criteria:
Project Implementation
 Achievement of “Outcome/Impact Indicators” and “Output Indicators” shown in the Project Appraisal
Document.
 Achieving targets in the Annual Implementation Plan.
 Ensuring the timely availability of funds to execute the Project.
PIU Organization & Operation
 Staff performance in the PIU.
 Ensuring all staff positions are filled.
 Efficient establishment and operation of the PIU Office.
WB Safeguards
 Satisfactory management of all PIU financial matters.
 Satisfactory execution of the Safeguard Implementation Program.
Reporting
 Timely submission of all required project reports to WB through the PMC.

More Related Content

What's hot

Grafana overview deck - Tech - 2023 May v1.pdf
Grafana overview deck  - Tech - 2023 May v1.pdfGrafana overview deck  - Tech - 2023 May v1.pdf
Grafana overview deck - Tech - 2023 May v1.pdfBillySin5
 
High Performance Spatial-Temporal Trajectory Analysis with Spark
High Performance Spatial-Temporal Trajectory Analysis with Spark High Performance Spatial-Temporal Trajectory Analysis with Spark
High Performance Spatial-Temporal Trajectory Analysis with Spark DataWorks Summit/Hadoop Summit
 
Observabilidad: Todo lo que hay que ver
Observabilidad: Todo lo que hay que verObservabilidad: Todo lo que hay que ver
Observabilidad: Todo lo que hay que verSoftware Guru
 
Integrated Master Schedule
Integrated Master ScheduleIntegrated Master Schedule
Integrated Master Scheduleellefsonj
 
Logging and observability
Logging and observabilityLogging and observability
Logging and observabilityAnton Drukh
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2Chris Carson
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - TutorialRajeev Sharma
 
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosysJIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosysH2Kinfosys
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and schedulingadeel hamid
 
Project Auditing
Project AuditingProject Auditing
Project AuditingSalih Islam
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaEdureka!
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sAbhik Tushar Das
 
Planning and Scheduling Workshop
Planning and Scheduling WorkshopPlanning and Scheduling Workshop
Planning and Scheduling WorkshopProsygma
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management DashboardsBob Prieto
 
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022HostedbyConfluent
 
onditiemeting NEN 2767 4 Sheet 11.09.13 V7.0
onditiemeting NEN 2767 4 Sheet   11.09.13 V7.0onditiemeting NEN 2767 4 Sheet   11.09.13 V7.0
onditiemeting NEN 2767 4 Sheet 11.09.13 V7.0zivamit
 

What's hot (20)

How to do a Project Audit
How to do a Project AuditHow to do a Project Audit
How to do a Project Audit
 
Grafana overview deck - Tech - 2023 May v1.pdf
Grafana overview deck  - Tech - 2023 May v1.pdfGrafana overview deck  - Tech - 2023 May v1.pdf
Grafana overview deck - Tech - 2023 May v1.pdf
 
High Performance Spatial-Temporal Trajectory Analysis with Spark
High Performance Spatial-Temporal Trajectory Analysis with Spark High Performance Spatial-Temporal Trajectory Analysis with Spark
High Performance Spatial-Temporal Trajectory Analysis with Spark
 
Observabilidad: Todo lo que hay que ver
Observabilidad: Todo lo que hay que verObservabilidad: Todo lo que hay que ver
Observabilidad: Todo lo que hay que ver
 
IS Projects Failures and Recommendations
IS Projects Failures and Recommendations IS Projects Failures and Recommendations
IS Projects Failures and Recommendations
 
Integrated Master Schedule
Integrated Master ScheduleIntegrated Master Schedule
Integrated Master Schedule
 
Cisa domain 4
Cisa domain 4Cisa domain 4
Cisa domain 4
 
Logging and observability
Logging and observabilityLogging and observability
Logging and observability
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - Tutorial
 
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosysJIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner's
 
Planning and Scheduling Workshop
Planning and Scheduling WorkshopPlanning and Scheduling Workshop
Planning and Scheduling Workshop
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management Dashboards
 
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022
Azure Event Hubs - Behind the Scenes With Kasun Indrasiri | Current 2022
 
PERT
PERTPERT
PERT
 
onditiemeting NEN 2767 4 Sheet 11.09.13 V7.0
onditiemeting NEN 2767 4 Sheet   11.09.13 V7.0onditiemeting NEN 2767 4 Sheet   11.09.13 V7.0
onditiemeting NEN 2767 4 Sheet 11.09.13 V7.0
 

Similar to Project Coordinator (PC) - Staff Terms Of Reference Copy

Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...
Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...
Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...Government of Ekiti State, Nigeria
 
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Government of Ekiti State, Nigeria
 
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Government of Ekiti State, Nigeria
 
Saraj_Hameed_Sidiqi CV and Cover_Letter
Saraj_Hameed_Sidiqi CV and Cover_LetterSaraj_Hameed_Sidiqi CV and Cover_Letter
Saraj_Hameed_Sidiqi CV and Cover_LetterSaraj Hameed Sidiqi
 
CV of Md. Ziaur Rahman....
CV of Md. Ziaur Rahman....CV of Md. Ziaur Rahman....
CV of Md. Ziaur Rahman....Md. Ziaur rahman
 
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...MarivicPenarubia1
 
Jnaneshwari Basanna Resume Summary
Jnaneshwari Basanna Resume SummaryJnaneshwari Basanna Resume Summary
Jnaneshwari Basanna Resume SummaryJnaneshwari Basanna
 
E. Angevine_SIA_Sr. CAS_CV
E. Angevine_SIA_Sr. CAS_CVE. Angevine_SIA_Sr. CAS_CV
E. Angevine_SIA_Sr. CAS_CVEmily Angevine
 
Atal Bhujal Yojana: Roles and responsibilities
Atal Bhujal Yojana: Roles and responsibilitiesAtal Bhujal Yojana: Roles and responsibilities
Atal Bhujal Yojana: Roles and responsibilitiesIndia Water Portal
 
chandra Mohan Resume
chandra Mohan Resumechandra Mohan Resume
chandra Mohan ResumeChandra Mohan
 
CV Homayoun WAFA new
CV Homayoun WAFA newCV Homayoun WAFA new
CV Homayoun WAFA newHomayoun Wafa
 
Lwanda Vuyisile Bam CV (Latest version)
Lwanda Vuyisile Bam CV (Latest version)Lwanda Vuyisile Bam CV (Latest version)
Lwanda Vuyisile Bam CV (Latest version)Lwanda Bam
 
chandra Mohan Resume
chandra Mohan Resumechandra Mohan Resume
chandra Mohan ResumeChandra Mohan
 
Resume - Dalia Alsaiid Abdelbaki
Resume - Dalia Alsaiid AbdelbakiResume - Dalia Alsaiid Abdelbaki
Resume - Dalia Alsaiid AbdelbakiDalia Al- Saiid AWC
 
Curriculum vita Mr. Kendor All
Curriculum vita Mr. Kendor AllCurriculum vita Mr. Kendor All
Curriculum vita Mr. Kendor AllMichael Kendor
 

Similar to Project Coordinator (PC) - Staff Terms Of Reference Copy (20)

Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...
Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...
Procurement Specialist & Head Of Procurement Department - Staff Terms Of Refe...
 
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
 
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
 
Saraj_Hameed_Sidiqi CV and Cover_Letter
Saraj_Hameed_Sidiqi CV and Cover_LetterSaraj_Hameed_Sidiqi CV and Cover_Letter
Saraj_Hameed_Sidiqi CV and Cover_Letter
 
CV of Md. Ziaur Rahman....
CV of Md. Ziaur Rahman....CV of Md. Ziaur Rahman....
CV of Md. Ziaur Rahman....
 
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
 
Jnaneshwari Basanna Resume Summary
Jnaneshwari Basanna Resume SummaryJnaneshwari Basanna Resume Summary
Jnaneshwari Basanna Resume Summary
 
E. Angevine_SIA_Sr. CAS_CV
E. Angevine_SIA_Sr. CAS_CVE. Angevine_SIA_Sr. CAS_CV
E. Angevine_SIA_Sr. CAS_CV
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
Atal Bhujal Yojana: Roles and responsibilities
Atal Bhujal Yojana: Roles and responsibilitiesAtal Bhujal Yojana: Roles and responsibilities
Atal Bhujal Yojana: Roles and responsibilities
 
CV Sultan Mohammad Sultani
CV Sultan Mohammad SultaniCV Sultan Mohammad Sultani
CV Sultan Mohammad Sultani
 
chandra Mohan Resume
chandra Mohan Resumechandra Mohan Resume
chandra Mohan Resume
 
Iktimed minutes inglese
Iktimed minutes ingleseIktimed minutes inglese
Iktimed minutes inglese
 
CV Homayoun WAFA new
CV Homayoun WAFA newCV Homayoun WAFA new
CV Homayoun WAFA new
 
Seth CV
Seth CVSeth CV
Seth CV
 
Lwanda Vuyisile Bam CV (Latest version)
Lwanda Vuyisile Bam CV (Latest version)Lwanda Vuyisile Bam CV (Latest version)
Lwanda Vuyisile Bam CV (Latest version)
 
chandra Mohan Resume
chandra Mohan Resumechandra Mohan Resume
chandra Mohan Resume
 
Resume - Dalia Alsaiid Abdelbaki
Resume - Dalia Alsaiid AbdelbakiResume - Dalia Alsaiid Abdelbaki
Resume - Dalia Alsaiid Abdelbaki
 
Curriculum vita Mr. Kendor All
Curriculum vita Mr. Kendor AllCurriculum vita Mr. Kendor All
Curriculum vita Mr. Kendor All
 
My CV
My CVMy CV
My CV
 

More from Government of Ekiti State, Nigeria

2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti StateGovernment of Ekiti State, Nigeria
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Government of Ekiti State, Nigeria
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Government of Ekiti State, Nigeria
 

More from Government of Ekiti State, Nigeria (20)

Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget DetailsEkiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget Details
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
 
Scholarship for Post Graduate Ng
Scholarship for Post Graduate NgScholarship for Post Graduate Ng
Scholarship for Post Graduate Ng
 
Scholarship for Overseas Students
Scholarship for Overseas StudentsScholarship for Overseas Students
Scholarship for Overseas Students
 
Scholarsrhip for Undergraduate
Scholarsrhip for UndergraduateScholarsrhip for Undergraduate
Scholarsrhip for Undergraduate
 
Physically Challenged
Physically ChallengedPhysically Challenged
Physically Challenged
 
Busary form 1
Busary form 1Busary form 1
Busary form 1
 
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
 
Bursary Award 2012/2013
Bursary Award 2012/2013Bursary Award 2012/2013
Bursary Award 2012/2013
 
Effective service delivery
Effective service deliveryEffective service delivery
Effective service delivery
 
Prof. ade ajayi ad. approved
Prof. ade ajayi ad. approvedProf. ade ajayi ad. approved
Prof. ade ajayi ad. approved
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
 
Champion Newspapers' Governor of the year
Champion Newspapers' Governor of the yearChampion Newspapers' Governor of the year
Champion Newspapers' Governor of the year
 
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
 
One Year After...Moremi Lives on
One Year After...Moremi Lives onOne Year After...Moremi Lives on
One Year After...Moremi Lives on
 
Overview of 2014 Budget
Overview of 2014 BudgetOverview of 2014 Budget
Overview of 2014 Budget
 

Project Coordinator (PC) - Staff Terms Of Reference Copy

  • 1. www.ekitistate.gov.ng THE WORLD BANK 3 RD URBAN WATER SECTOR REFORM- ADO-EKITI WATER SUPPLY PROJECT. Project Implementation Unit (PIU): Staff Terms of Reference Title: Project Coordinator (PC) Reporting Responsibility: Project Management Committee, through the Chairman, EKSWC The Project: The primary objective of the reform project is to enhance the capacity of the state to provide economically and sustainable water supply through institutional strengthening and optimal involvement of private partners in the urban water supply. The state government has demonstrated its commitment to the reform by initiating a state water and sanitation policy in June 2012 while the draft law is awaiting passage into law by the state house of assembly. A major outshoot of the law is the autonomy granted the corporation. Duties: The Project Coordinator is responsible for coordinating the implementation of the project and for its day-to-day management. The Project Coordinator will also be responsible for the institutional and capacity building aspects of project and provide overall management and coordination for all developmental agency sponsored projects in the water sector in Ekiti State i.e. World Bank, EU (WSSRP 3), AfDB, EU, UNICEF – to be commonly referred to as Developmental Agencies (DA). Project Implementation  Ensure the Project Development Objectives are met.  Prepare the “Annual Implementation Plan” for the Project.  Ensure timely implementation of the Project according to the Annual Implementation Plan.  Overall Supervision and overseeing the activities of Consultants involved in Construction Supervision as well as any other activities financed by the project.  Ensure timely availability of funds, both foreign and local to avoid any delay in Project implementation. . Serve as the main interlocutor with the Bank Task-team leader; in charge of requesting, receiving and processing no-objection for the implementation of the Procurement Plan. . Prepare quarterly advance reports to the World Bank . Participate in the follow-up and coordination meetings with World Bank staff . Serve as a linkage between the project and the senior State Management, including Special Advisers and the Governor’s Office.  Any other work that may be assigned by the Project Management Committee in relation to the project. PIU Organization and Operation  Establish the Project Implementation Unit (PIU) office.  Assist the PMC in the selection and hiring of relevant PIU staff with appropriate qualifications and according to DA guidelines. In the case of vacancies in the PIU, quickly identify and assist the PMC to find a replacement  Ensure compliance with the existing DA approved staffing rules and the project implementation manual for the guidance of PIU staff.  Manage the PIU in all relevant aspects of the project to ensure efficient and smooth implementation of the project activities.  Promote teamwork and create an efficient and conducive working environment. WB Safeguards  Periodically inspect all financial accounts books to ensure all records and
  • 2. www.ekitistate.gov.ng accounts are kept up to date. Ensure all DA financial safeguards are met.  Ensure Safeguard Implementation Program is carried out in a smooth, efficient and predictable manner. Reporting  Prepare and submit through the PMC, quarterly progress reports for the DA.  Provide verbal and written updates to the PMC as required  Ensure timely submission of Project Management Reports to DA.  Assist in the preparation of Borrower’s portion of the Project Implementation Completion Report. Qualifications:  University degree in Engineering or other technical discipline.  At least 15 years experience in the area of water and sewerage or similar field.  Minimum seven years’ experience in a management/leadership capacity in similar projects.  Good interpersonal, team building and capacity building skills.  Experience as Project Director in WB, or other donor, financed Project will be an advantage  Extensive knowledge of procedures and reporting requirements in WB financed projects will be an advantage  Good command of written and spoken English. . Having a certification in project management would be an added advantage. Salary: According to WB Guidelines Performance Evaluation Criteria: Project Implementation  Achievement of “Outcome/Impact Indicators” and “Output Indicators” shown in the Project Appraisal Document.  Achieving targets in the Annual Implementation Plan.  Ensuring the timely availability of funds to execute the Project. PIU Organization & Operation  Staff performance in the PIU.  Ensuring all staff positions are filled.  Efficient establishment and operation of the PIU Office. WB Safeguards  Satisfactory management of all PIU financial matters.  Satisfactory execution of the Safeguard Implementation Program. Reporting  Timely submission of all required project reports to WB through the PMC.