STAGES/PHASES IN SDLC
SYSTEMS INVESTIGATION – PHASE 1
-   Include preliminary study of proposed IS solutions to meet a
    company’s e-business priorities & opportunities.
-   Investigation stage:
       a.    determine how to address e-business   opportunities.
       b.    conducting feasibility study.
       c.    develop project management plan &     obtain
       management approval.
SYSTEM INVESTIGATION : PHASE 1

•   FEASIBILITY STUDY
    1.   Organizational feasibility
         Focuses on how well a proposed system         supports the e-
         business priorities of the organization.
    3.   Economic feasibility
            Focuses on whether expected cost savings, increased revenue,
            increased profits, and reductions in required investment, will
            exceed the costs of developing and operating a proposed
            system.
SYSTEM INVESTIGATION : PHASE 1

3. Technical feasibility
    Focus on the reliabilities/capabilities of the hardware and software to
    meet the needs of the proposed system.
4. Operational feasibility
    Focus on the willingness and ability of the management, employees,
    customers, suppliers, and others to operate, use, and support the
    proposed system.
5. Schedule feasibility
    Focus on the solution be designed & implemented within an acceptable
    time period.
SYSTEM ANALYSIS : PHASE 2
- Systems analysis is an in-depth study of end user information needs, which
   produces functional requirements that are used as the basis for the design
   of a new information system.
- Types of analysis:
   1. Organizational Analysis
         involves evaluating the organizational and environmental systems
   and subsystems           involved in any situation.
   2. Analysis of the Present Systems
         involves analyzing activities, resources
   (hardware/software/people), and the products.
SYSTEM ANALYSIS : PHASE 2
1.   Functional Requirement Analysis
     Determine the information processing capabilities required for each
     system activity (input, processing, output, storage, and control) to meet
     the information needs.
SYSTEM DESIGN: PHASE 3

 1. USER INTERFACE DESIGN
       Focuses on supporting the interactions between end users
       and their computer-based applications – EG: display
       screens, interactive user/computer dialogues, audio
       responses, forms, documents, and reports.
 2. DATA DESIGN
    - Physical View – the design shows how the database is
       arranged, stored and accessed on the storage devices of a
       computer system.
    - Logical View – conceptual design within an abstract model.
       Data elements and relationship are used in the model.
 3. PROCESS DESIGN
SYSTEM IMPLEMENTATION: PHASE 4

The activity includes:
• Acquisition of hardware, software and services.
• Software development or modification.
• Testing of programs, procedures, and hardware.
• System documentation.
• Conversion (parallel, pilot, phased, plunge).
• End User training.
SYSTEM IMPLEMENTATION: PHASE 4

CONVERSION METHODS
•   Parallel Conversion: - Both the old and the new system are operated until the
    project development team and end user management agrees to switch
    completely over to the new system.
•   Phased Conversion: - Only parts of a new application or only a few
    departments, branch offices, or plant locations at a time are converted. A
    phased conversion allows a gradual implementation process to take place within
    an organization.
•   Pilot Conversion: - Where one department or other work site serves as a test
    site. A new system can be tried out at this site until developers feel it can be
    implemented throughout the organization.
•   Plunge/Direct Cutover: - Use the system immediately and totally abandons the
    old system.
CONVERSION METHOD
SYSTEM MAINTENANCE / EVALUATION: PHASE 5

System Maintenance
   System maintenance is the monitoring, evaluating, and modifying of
   operational e-business systems to make desirable or necessary
   improvements.

System Evaluation
   Evaluate or judge the performance of a system over a longer time period
   than that just after immediate installation.
SYSTEM MAINTENANCE / EVALUATION: PHASE 5

     FOUR (4) PROBLEM AREAS CONTRIBUTE TO SYSTEM FAILURE

3.   DESIGN
     - System fail to capture essentials business requirements.
     - Poor format of the system – eg: represent wrong piece of data.
     - poor user interface – not user friendly. Hard to use by the user.
7.   COST
     - Cost to implement may be over budget.
     - System project may be too costly to complete.
SYSTEM MAINTENANCE / EVALUATION: PHASE 5

    FOUR (4) PROBLEM AREAS CONTRIBUTE TO SYSTEM FAILURE
3. Data
- Data inaccurate or inconsistent and not properly organised.
- Information in certain fields may be erroneous or ambiguous.
- Data incomplete – information may be inaccessible.
4. Operation
- System does not run well.
- Information is not available in a timely & efficient manner because computer
    breakdown.
- Response time may too long.
ALTERNATIVE TO THE SDLC
PROTOTYPING

    Prototyping is the rapid development and testing of working models, or
    prototypes, of new applications in an interactive, iterative process
    involving both IS specialists and business professionals.

    Tools for prototyping
•   Screen generators (screen painters)
•   Graphics
•   Report generators (report writers)
ALTERNATIVE TO THE SDLC
Categories of Prototypes
2. Non-working prototypes
3. Partially working prototypes.
4. Pilot prototypes
5. Staged prototypes
Four Steps in the Prototyping Process

• Identify the user’s basic requirements – the system designer works
  with the user to capture the user’s basic information needs.
• Develop an initial prototype – the system designer creates a working
  prototype quickly, using tools for rapidly generating software.
• Use the prototype – the user is encouraged, to work with the system
  to determine how well the prototype meets the requirement and
  make suggestions for improving the prototype.
• Revise and enhance the prototype – System builder notes all changes
  the user requests and refines the prototype accordingly.
Advantages of Using Prototyping
• Prototyping makes the development process
  faster and easier for IS specialists and business
  professionals.
• Prototyping involve end-user development
  throughout the systems development life
  cycle.

Mais conteúdo relacionado

Mais procurados

Management Information Systems
Management  Information  SystemsManagement  Information  Systems
Management Information Systems
Ram Dutt Shukla
 
Logical design vs physical design
Logical design vs physical designLogical design vs physical design
Logical design vs physical design
Md. Mahedi Mahfuj
 
Client computing evolution ppt11
Client computing evolution ppt11Client computing evolution ppt11
Client computing evolution ppt11
Tech_MX
 

Mais procurados (20)

Performance appraisal topics
Performance appraisal topicsPerformance appraisal topics
Performance appraisal topics
 
Mis planning
Mis planningMis planning
Mis planning
 
Input design and output design
Input design and output designInput design and output design
Input design and output design
 
System analysis and design
System analysis and designSystem analysis and design
System analysis and design
 
Modern Information Systems
Modern Information SystemsModern Information Systems
Modern Information Systems
 
Knowledge management system
Knowledge management systemKnowledge management system
Knowledge management system
 
7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt
 
Management Information Systems
Management  Information  SystemsManagement  Information  Systems
Management Information Systems
 
Information system
Information systemInformation system
Information system
 
Logical design vs physical design
Logical design vs physical designLogical design vs physical design
Logical design vs physical design
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
 
MIS-CH05: IT Infrastructure and Emerging Technologies
MIS-CH05: IT Infrastructure and Emerging TechnologiesMIS-CH05: IT Infrastructure and Emerging Technologies
MIS-CH05: IT Infrastructure and Emerging Technologies
 
Generic process model
Generic process modelGeneric process model
Generic process model
 
STRUCTURED ANALYSIS (Software Engg.)
STRUCTURED ANALYSIS (Software Engg.)STRUCTURED ANALYSIS (Software Engg.)
STRUCTURED ANALYSIS (Software Engg.)
 
Information System and MIS
Information System and MISInformation System and MIS
Information System and MIS
 
Client computing evolution ppt11
Client computing evolution ppt11Client computing evolution ppt11
Client computing evolution ppt11
 
ERP And Enterprise Architecture
ERP And Enterprise ArchitectureERP And Enterprise Architecture
ERP And Enterprise Architecture
 
Management Information Systems - Chapter 2
Management Information Systems - Chapter 2Management Information Systems - Chapter 2
Management Information Systems - Chapter 2
 
An overview - Enterprise
An overview - EnterpriseAn overview - Enterprise
An overview - Enterprise
 
Software architecture design ppt
Software architecture design pptSoftware architecture design ppt
Software architecture design ppt
 

Destaque

System Development Life Cycle & Implementation of MIS
System Development Life Cycle & Implementation of MISSystem Development Life Cycle & Implementation of MIS
System Development Life Cycle & Implementation of MIS
George V James
 

Destaque (7)

MIS 17 Cross-Functional Enterprise Systems
MIS 17 Cross-Functional Enterprise SystemsMIS 17 Cross-Functional Enterprise Systems
MIS 17 Cross-Functional Enterprise Systems
 
dimensions of information system
dimensions of information systemdimensions of information system
dimensions of information system
 
Implementation of MIS and its methods
Implementation of MIS and its methodsImplementation of MIS and its methods
Implementation of MIS and its methods
 
Three dimensions of information systems
Three dimensions of information systemsThree dimensions of information systems
Three dimensions of information systems
 
System Development Life Cycle & Implementation of MIS
System Development Life Cycle & Implementation of MISSystem Development Life Cycle & Implementation of MIS
System Development Life Cycle & Implementation of MIS
 
Strategic information system planning
Strategic information system planningStrategic information system planning
Strategic information system planning
 
Functional level strategies
Functional level strategiesFunctional level strategies
Functional level strategies
 

Semelhante a Planning, design and implementation of information systems

McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docxMcGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
andreecapon
 
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptxSAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
JakeariesMacarayo
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
Rahul Hedau
 
System Analysis And Design Management Information System
System Analysis And Design Management Information SystemSystem Analysis And Design Management Information System
System Analysis And Design Management Information System
nayanav
 

Semelhante a Planning, design and implementation of information systems (20)

Sdlc1
Sdlc1Sdlc1
Sdlc1
 
Online hostel management_system
Online hostel management_systemOnline hostel management_system
Online hostel management_system
 
software engineering
software engineering software engineering
software engineering
 
lake city institute of technology
lake city institute of technology lake city institute of technology
lake city institute of technology
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
 
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docxMcGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
 
Week 10
Week 10Week 10
Week 10
 
Week 10
Week 10Week 10
Week 10
 
SDET UNIT 1.pptx
SDET UNIT 1.pptxSDET UNIT 1.pptx
SDET UNIT 1.pptx
 
Presentation2
Presentation2Presentation2
Presentation2
 
SDLC
SDLCSDLC
SDLC
 
Software Development Life Cycle
Software Development Life CycleSoftware Development Life Cycle
Software Development Life Cycle
 
Sdlc 4
Sdlc 4Sdlc 4
Sdlc 4
 
Software Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptxSoftware Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptx
 
SAD_SDLC.pptx
SAD_SDLC.pptxSAD_SDLC.pptx
SAD_SDLC.pptx
 
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptxSAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
 
System Development Proecess
System Development ProecessSystem Development Proecess
System Development Proecess
 
SAD 1st PPT
SAD 1st PPTSAD 1st PPT
SAD 1st PPT
 
System Analysis And Design Management Information System
System Analysis And Design Management Information SystemSystem Analysis And Design Management Information System
System Analysis And Design Management Information System
 

Mais de Online

Mais de Online (20)

Philosophy of early childhood education 3
Philosophy of early childhood education 3Philosophy of early childhood education 3
Philosophy of early childhood education 3
 
Philosophy of early childhood education 2
Philosophy of early childhood education 2Philosophy of early childhood education 2
Philosophy of early childhood education 2
 
Philosophy of early childhood education 1
Philosophy of early childhood education 1Philosophy of early childhood education 1
Philosophy of early childhood education 1
 
Philosophy of early childhood education 4
Philosophy of early childhood education 4Philosophy of early childhood education 4
Philosophy of early childhood education 4
 
Operation and expression in c++
Operation and expression in c++Operation and expression in c++
Operation and expression in c++
 
Functions
FunctionsFunctions
Functions
 
Formatted input and output
Formatted input and outputFormatted input and output
Formatted input and output
 
Control structures selection
Control structures   selectionControl structures   selection
Control structures selection
 
Control structures repetition
Control structures   repetitionControl structures   repetition
Control structures repetition
 
Introduction to problem solving in c++
Introduction to problem solving in c++Introduction to problem solving in c++
Introduction to problem solving in c++
 
Optical transmission technique
Optical transmission techniqueOptical transmission technique
Optical transmission technique
 
Multi protocol label switching (mpls)
Multi protocol label switching (mpls)Multi protocol label switching (mpls)
Multi protocol label switching (mpls)
 
Lan technologies
Lan technologiesLan technologies
Lan technologies
 
Introduction to internet technology
Introduction to internet technologyIntroduction to internet technology
Introduction to internet technology
 
Internet standard routing protocols
Internet standard routing protocolsInternet standard routing protocols
Internet standard routing protocols
 
Internet protocol
Internet protocolInternet protocol
Internet protocol
 
Application protocols
Application protocolsApplication protocols
Application protocols
 
Addressing
AddressingAddressing
Addressing
 
Transport protocols
Transport protocolsTransport protocols
Transport protocols
 
Leadership
LeadershipLeadership
Leadership
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Planning, design and implementation of information systems

  • 1. PLANNING, DESIGN AND IMPLEMENTATION OF INFORMATION SYSTEMS
  • 2. STAGES/PHASES IN SDLC SYSTEMS INVESTIGATION – PHASE 1 - Include preliminary study of proposed IS solutions to meet a company’s e-business priorities & opportunities. - Investigation stage: a. determine how to address e-business opportunities. b. conducting feasibility study. c. develop project management plan & obtain management approval.
  • 3. SYSTEM INVESTIGATION : PHASE 1 • FEASIBILITY STUDY 1. Organizational feasibility Focuses on how well a proposed system supports the e- business priorities of the organization. 3. Economic feasibility Focuses on whether expected cost savings, increased revenue, increased profits, and reductions in required investment, will exceed the costs of developing and operating a proposed system.
  • 4. SYSTEM INVESTIGATION : PHASE 1 3. Technical feasibility Focus on the reliabilities/capabilities of the hardware and software to meet the needs of the proposed system. 4. Operational feasibility Focus on the willingness and ability of the management, employees, customers, suppliers, and others to operate, use, and support the proposed system. 5. Schedule feasibility Focus on the solution be designed & implemented within an acceptable time period.
  • 5. SYSTEM ANALYSIS : PHASE 2 - Systems analysis is an in-depth study of end user information needs, which produces functional requirements that are used as the basis for the design of a new information system. - Types of analysis: 1. Organizational Analysis involves evaluating the organizational and environmental systems and subsystems involved in any situation. 2. Analysis of the Present Systems involves analyzing activities, resources (hardware/software/people), and the products.
  • 6. SYSTEM ANALYSIS : PHASE 2 1. Functional Requirement Analysis Determine the information processing capabilities required for each system activity (input, processing, output, storage, and control) to meet the information needs.
  • 7. SYSTEM DESIGN: PHASE 3 1. USER INTERFACE DESIGN Focuses on supporting the interactions between end users and their computer-based applications – EG: display screens, interactive user/computer dialogues, audio responses, forms, documents, and reports. 2. DATA DESIGN - Physical View – the design shows how the database is arranged, stored and accessed on the storage devices of a computer system. - Logical View – conceptual design within an abstract model. Data elements and relationship are used in the model. 3. PROCESS DESIGN
  • 8. SYSTEM IMPLEMENTATION: PHASE 4 The activity includes: • Acquisition of hardware, software and services. • Software development or modification. • Testing of programs, procedures, and hardware. • System documentation. • Conversion (parallel, pilot, phased, plunge). • End User training.
  • 9. SYSTEM IMPLEMENTATION: PHASE 4 CONVERSION METHODS • Parallel Conversion: - Both the old and the new system are operated until the project development team and end user management agrees to switch completely over to the new system. • Phased Conversion: - Only parts of a new application or only a few departments, branch offices, or plant locations at a time are converted. A phased conversion allows a gradual implementation process to take place within an organization. • Pilot Conversion: - Where one department or other work site serves as a test site. A new system can be tried out at this site until developers feel it can be implemented throughout the organization. • Plunge/Direct Cutover: - Use the system immediately and totally abandons the old system.
  • 11. SYSTEM MAINTENANCE / EVALUATION: PHASE 5 System Maintenance System maintenance is the monitoring, evaluating, and modifying of operational e-business systems to make desirable or necessary improvements. System Evaluation Evaluate or judge the performance of a system over a longer time period than that just after immediate installation.
  • 12. SYSTEM MAINTENANCE / EVALUATION: PHASE 5 FOUR (4) PROBLEM AREAS CONTRIBUTE TO SYSTEM FAILURE 3. DESIGN - System fail to capture essentials business requirements. - Poor format of the system – eg: represent wrong piece of data. - poor user interface – not user friendly. Hard to use by the user. 7. COST - Cost to implement may be over budget. - System project may be too costly to complete.
  • 13. SYSTEM MAINTENANCE / EVALUATION: PHASE 5 FOUR (4) PROBLEM AREAS CONTRIBUTE TO SYSTEM FAILURE 3. Data - Data inaccurate or inconsistent and not properly organised. - Information in certain fields may be erroneous or ambiguous. - Data incomplete – information may be inaccessible. 4. Operation - System does not run well. - Information is not available in a timely & efficient manner because computer breakdown. - Response time may too long.
  • 14. ALTERNATIVE TO THE SDLC PROTOTYPING Prototyping is the rapid development and testing of working models, or prototypes, of new applications in an interactive, iterative process involving both IS specialists and business professionals. Tools for prototyping • Screen generators (screen painters) • Graphics • Report generators (report writers)
  • 15. ALTERNATIVE TO THE SDLC Categories of Prototypes 2. Non-working prototypes 3. Partially working prototypes. 4. Pilot prototypes 5. Staged prototypes
  • 16. Four Steps in the Prototyping Process • Identify the user’s basic requirements – the system designer works with the user to capture the user’s basic information needs. • Develop an initial prototype – the system designer creates a working prototype quickly, using tools for rapidly generating software. • Use the prototype – the user is encouraged, to work with the system to determine how well the prototype meets the requirement and make suggestions for improving the prototype. • Revise and enhance the prototype – System builder notes all changes the user requests and refines the prototype accordingly.
  • 17. Advantages of Using Prototyping • Prototyping makes the development process faster and easier for IS specialists and business professionals. • Prototyping involve end-user development throughout the systems development life cycle.