MAPEiG: Planning and monitoring system of inspections of the electrical network
1. MAPEiG: MAPa de Electricidad y Gas
Planning and monitoring system of inspections of the
electrical network
Josep Maria de Juan Capdevila
HEAD OF THE SERVICE OF INSPECTION AND
CONTROL OF ELECTRICAL FACILITIES
General Direction of Energy, Mines and
Industrial Security
2. INDEX
• The origin
• Action of the Government
• TIC utilisation
• TIC in inspection procedure
• MAPEiG construction
• Working with MAPEiG
• Physical Architecture (Pro. environment)
• Technologies Schema
• General Schema
• Several numbers about MAPEiG
• MAPEiG in the future
• Final considerations
• Contacts
2
4. THE ORIGIN
BLACKOUT OF BARCELONA
CITY
23.07.2007
(COSTUMERS AFECTED: 350.000)
(BARCELONA POPULATION: 1,5 Mhab)
4
5. ACTION OF THE GOVERNMENT
IN LAWS
• Law 18/2008,
December 23th, of
guarantee and quality
of the electrical
supply
(DOGC 31.12.08)
Decree.... about
procedures of control
of security conditions
of the electrical
network (in progress)
5
6. ACTION OF THE GOVERNMENT
IN LAWS IN ORGANIZATION
• Law 18/2008, • Decree 194/2008, of 7
December 23th, of October 7th, of partial
guarantee and quality restructuring of the
of the electrical Department of Economy and
supply Finances. Creation of the
(DOGC 31.12.08) Service of Inspection and
• Decree.... about Control of Electrical Facilities
procedures of control (DOGC 09.10.08).
of security conditions • Selection of inspector staff.
of the electrical • Acquisition of material
network (in progress) supplies for inspection.
6
7. ACTION OF THE GOVERNMENT
IN LAWS IN ORGANIZATION IN PROCEDURES
• Law 18/2008, • Decree 194/2008, of 7 • Design criteria for the
december 23th, of October 7th, of partial Inspection Planning of the
guarantee and quality restructuring of the Electrical Network of
of the electrical Department of Economy and Catalonia (2008-2009)
supply Finances. Creation of the • New inspection guides.
(DOGC 31.12.08) Service of Inspection and (2008-2009)
• Decree.... about Control of Electrical Facilities • New inspection protocols.
procedures of control (DOGC 09.10.08). (2008-2009)
of security conditions • Selection of inspector staff. • TIC use for the
of the electrical • Acquisition of material management of Catalonia
network (in progress) supplies for inspection. energetic facilities (2008...)
7
9. TIC UTILISATION
ELECTRONIC MINUTES
• Intelligent PDFs made with Adobe
Acrobat Professional.
• Data extraction in XML format.
ELECTRONIC SIGNATURE
• Digital identity card supplied by the
Platform CatCert of the Catalan
Agency of Certification.
9
10. TIC UTILISATION
ELECTRONIC MINUTES COMMUNICATIONS
• Intelligent PDFs made with Adobe • E-mail communications with people
Acrobat Professional. involved in inspection procedure.
• Data extraction in XML format. • New mail-box only for the
inspection activity.
ELECTRONIC SIGNATURE
• Digital identity card supplied by the
Platform CatCert of the Catalan
Agency of Certification.
10
11. TIC UTILISATION
ELECTRONIC MINUTES COMMUNICATIONS
• Intelligent PDFs made with Adobe • E-mail communications with people
Acrobat Professional. involved in inspection procedure.
• Data extraction in XML format. • New mail-box only for the
inspection activity.
ELECTRONIC SIGNATURE NETWORK MANAGEMENT
• Digital identity card supplied by the • GIS and application in web page
Platform CatCert of the Catalan portal. MAPEiG.
Agency of Certification.
11
38. General Schema
Client desktop Web Client Oracle BI
Client
Inspections Invest-
Map Control Control Reporting Alerts Admin
ArcEditor
ArcCatalog
ESRI Flex API
GIS Server Application Server
ArcGIS Server 9.2
Report modul Web Alert Data Upload &
Server Modul Integrate Electrical Comp. Data
( ENDESA, REESA, …)
Srv Oracle BI
Base de Dades 38
40. General Schema
Web Client
Inspections Invest-
Map Control Control Reporting Alerts Admin
ESRI Flex API
GIS Server Application Server
ArcGIS Server 9.2
Report modul Web Alert Data Upload &
Server Modul Integrate Electrical Comp. Data
( ENDESA, REESA, …)
40
41. General Schema
Web Client
Inspections Invest-
Map Control Control Reporting Alerts Admin
ESRI Flex API
GIS Server Application Server
ArcGIS Server 9.2
Report modul Web Alert Data Upload &
Server Modul Integrate Electrical Comp. Data
( ENDESA, REESA, …)
41
42. General Schema
Oracle BI
Client
Report Catalog Report Parameters
Srv Oracle BI
42
43. SEVERAL NUMBERS ABOUT MAPEiG
DEFINITION AND CONSTRUCTION COST 310.000,- €
DIRECTION PROJECT MEETINGS 3
FOLLOW-UP PROJECT MEETINGS 18
MEETINGS WITH ELECTRICAL COMPANY 3
FACILITIES TO MANAGE 80 ± 100 mil
PERIODICITY BETWEEN LOADING DATA MENSUAL
POTENTIAL USERS 20 ± 30
USERS AT THE SAME TIME 10
OWN ANNUAL INSPECTIONS 2.500 ± 3.000
43
44. MAPEiG IN THE FUTURE
IN THE SHORT TERM
• Fill the application with the electrical transport grid and the final 5% of
electrical distribution grid.
• Final development of CPI module: Control of Inversion Planning.
IN THE MEDIUM TERM
• Information coming from the authorization of new electrical facilities.
• Incorporation of other energetic services.
• Interaction studies between several services.
•Availability “on line” the view of transport and distribution grids (like the
cartographic basis of the ICC)
44
45. FINAL CONSIDERATIONS
• Collaboration with the owner companies of the
energetic grids. The Administration have to convince them that it’s
necessary that energetic grid have to be in perfect use and
conservation.
• Elimination of paper procedure and substitute it for
computer procedures.
•Computer pedagogy before the actors in procedures
carried out by the Administration, with special emphasis in the
documental validation with recognized electronic signature.
45