Engineers need to make sure that their engineering
projects are planned out perfectly in order to ensure that
everything is produced quickly and inexpensively. The
planning engineer determines the best possible method
and sequence of engineering a particular project, whether
it be a civil engineering project or a new type of
machinery. During the developmental part of the
engineering project, the planning engineer determines
which techniques will be appropriate; determines the
logistics of moving equipment and materials from location
to location; draws up plans or communicates with technical
illustrators to draw up plans; and estimates the price of the
project.
This engineer oversees all stages of the project and makes
recommendations when last minute changes must be
made to the project. They must also make sure that all
safety standards are followed. During the manufacturing
process, the planning engineer is responsible for
determining the most efficient and effective methods of
manufacturing the product. Planning engineers must be
able to foresee the labor, technical, equipment and
material demands that will be placed on the project.
Planning engineers can be under a great deal of stress
since there are often penalties within the contract for not
completing the project on time.
This certification program is a professional credential for
individual to be recognized as a Certified Planning
Engineer, and those seeking a rewarding career and
compensation package as a Certified Planning Engineer.
American Academy of Project
Management AAPM®
The American Academy of Project Management
International Board of Standards (IBS) issues the
CPE® Certified Planning Engineer to qualified
applicants who have met our requirements of:
Education, Training, Experience, Industry
Knowledge, Ethics, and Continuing Education.
Target Participant
Individual who is currently holding an engineer position
in oil and gas, manufacturing, construction, engineering
consultancy services, utilities, telecommunications, and
any other engineering based industry.
Project Engineers, Construction Engineers, Mechanical
Engineers, Process Engineers & Operators, Chemical
Engineers, Pipeline and Piping Engineers, Materials,
Coating & Corrosion Engineers, Electrical Engineers, Civil
& Structural Engineers, Instrumentation & Control
Engineers, Rotating Equipment Engineers, Maintenance
and Asset Integrity Engineers, Subsea Engineers and
Welding Engineers.
© Copyright AAPM® SYSENEG Academy of Project Management
International Board of Standards
AAPM ® Board of Standards has been Accredited by
the TÜV Technischer Überwachungs-Verein Österreich,
a 140 years old EU/Austrian Technical Inspection
Association) which works to validate the quality of
products and services of all kinds to protect the public
and for safety. Our AAPM and Board of Standards
Makes History and Becomes First EU/US Based
Certification Body to Achieve Training Accreditation as
an: ISO 29990 Certified for Non Formal Training .
Module 1: Role of a Planning Engineer
Describe the roles and responsibilities of a Planning Engineer during the various phases of project planning and schedule
development, management and control.
Module 2: Project Management Life Cycle
Planning Engineer need to know the five phases of a project management life cycle which includes Initiation phase, Planning phase,
Execution phase, Monitoring and Control phase, and Closeout phase.
Module 3: Project Management Processes
Project management processes include the project scheduling processes, project time management, project scope management,
and project integration management. These processes will be used by the project team to deliver the work defined in the project
schedule.
Module 4: Stakeholder Management
Project Stakeholder Management is about identifying the people, groups, or organizations that could impact or be impacted by the
project. PSM includes continuous communication with stakeholders to understand their needs and expectations, addressing issues
as they occur, and managing conflicting interests.
Module 5: Initiating the Project
This module discusses the processes involved in initiating the project that include identifying the project team, definition of project
scope, schedule, quality, cost, and risk to produce the Project Charter. A planning engineer not only must understand the content
of the charter, the constraints facing the project will have direct impact during project planning and scheduling activities that will
follow after this phase.
Module 6: Planning and Scheduling
Planning is the process of identifying all activities necessary to complete the project while scheduling is the process of determining
the sequential order of executing project activities, assigning planned duration, resources and determining the start and finish dates
of each activity. You will be guided using Primavera tool to develop a project schedule based upon construction industry case study.
Module 7: Cost Accounting
The result of planning and scheduling help in identifying all costs associated with the project that will eventually determine the
project budget. There are other cost related to the procurement of materials, contractual liabilities, inflation cost, penalties, that
will be discussed in this session.
Module 8: Risk Management
Managing threats facing project team in delivering the project works. This module discuss the processes associated with risk
management that include identifying risk, developing risk action plans, risk management plan.
Module 9: Managing and Controlling Project Schedule
A planning engineer’s job also include managing and controlling the project specifically controlling changes affecting the scope and
schedule of the project, managing the acceptance of project deliverables, managing risks, issues, and managing subcontractor.
Duration: 32 hoursCourse Outline
© Copyright AAPM® SYSENEG Academy of Project Management
© Copyright AAPM® SYSENEG Academy of Project Management
EXAMINATION
• Format:
60 multiple choice questions
• Duration: 90 min
Program fees include:
• Training services
• Course Study Notes
• Examination
• Certification
• AAPM® Membership x 2 years

Mais conteúdo relacionado

Mais de GAFM Academy of Project Management ® - ISO 29990 Certified International Board of Standards

Mais de GAFM Academy of Project Management ® - ISO 29990 Certified International Board of Standards (8)

GAFM Academy HOW TO START A PROJECT
GAFM Academy HOW TO START A PROJECTGAFM Academy HOW TO START A PROJECT
GAFM Academy HOW TO START A PROJECT
 
GAFM Academy HOW TO DIRECT AND MANAGE A PROJECT
GAFM Academy HOW TO DIRECT AND MANAGE A PROJECTGAFM Academy HOW TO DIRECT AND MANAGE A PROJECT
GAFM Academy HOW TO DIRECT AND MANAGE A PROJECT
 
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECTGAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
 
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
 
CPC Certified Project Consultant contact: sysenegacademy@gmail.com
CPC Certified Project Consultant   contact: sysenegacademy@gmail.comCPC Certified Project Consultant   contact: sysenegacademy@gmail.com
CPC Certified Project Consultant contact: sysenegacademy@gmail.com
 
GAFM Certifications > gafmacademy@gmail.com
GAFM Certifications > gafmacademy@gmail.com GAFM Certifications > gafmacademy@gmail.com
GAFM Certifications > gafmacademy@gmail.com
 
MPM Master Project Manager - contact sysenegacademy@gmail.com
MPM Master Project Manager - contact sysenegacademy@gmail.comMPM Master Project Manager - contact sysenegacademy@gmail.com
MPM Master Project Manager - contact sysenegacademy@gmail.com
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
 

Último

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 

Último (16)

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 

Certified Planning Engineer , contact : gafmacademy@gmail.com

  • 1. Engineers need to make sure that their engineering projects are planned out perfectly in order to ensure that everything is produced quickly and inexpensively. The planning engineer determines the best possible method and sequence of engineering a particular project, whether it be a civil engineering project or a new type of machinery. During the developmental part of the engineering project, the planning engineer determines which techniques will be appropriate; determines the logistics of moving equipment and materials from location to location; draws up plans or communicates with technical illustrators to draw up plans; and estimates the price of the project. This engineer oversees all stages of the project and makes recommendations when last minute changes must be made to the project. They must also make sure that all safety standards are followed. During the manufacturing process, the planning engineer is responsible for determining the most efficient and effective methods of manufacturing the product. Planning engineers must be able to foresee the labor, technical, equipment and material demands that will be placed on the project. Planning engineers can be under a great deal of stress since there are often penalties within the contract for not completing the project on time. This certification program is a professional credential for individual to be recognized as a Certified Planning Engineer, and those seeking a rewarding career and compensation package as a Certified Planning Engineer. American Academy of Project Management AAPM® The American Academy of Project Management International Board of Standards (IBS) issues the CPE® Certified Planning Engineer to qualified applicants who have met our requirements of: Education, Training, Experience, Industry Knowledge, Ethics, and Continuing Education. Target Participant Individual who is currently holding an engineer position in oil and gas, manufacturing, construction, engineering consultancy services, utilities, telecommunications, and any other engineering based industry. Project Engineers, Construction Engineers, Mechanical Engineers, Process Engineers & Operators, Chemical Engineers, Pipeline and Piping Engineers, Materials, Coating & Corrosion Engineers, Electrical Engineers, Civil & Structural Engineers, Instrumentation & Control Engineers, Rotating Equipment Engineers, Maintenance and Asset Integrity Engineers, Subsea Engineers and Welding Engineers. © Copyright AAPM® SYSENEG Academy of Project Management International Board of Standards AAPM ® Board of Standards has been Accredited by the TÜV Technischer Überwachungs-Verein Österreich, a 140 years old EU/Austrian Technical Inspection Association) which works to validate the quality of products and services of all kinds to protect the public and for safety. Our AAPM and Board of Standards Makes History and Becomes First EU/US Based Certification Body to Achieve Training Accreditation as an: ISO 29990 Certified for Non Formal Training .
  • 2. Module 1: Role of a Planning Engineer Describe the roles and responsibilities of a Planning Engineer during the various phases of project planning and schedule development, management and control. Module 2: Project Management Life Cycle Planning Engineer need to know the five phases of a project management life cycle which includes Initiation phase, Planning phase, Execution phase, Monitoring and Control phase, and Closeout phase. Module 3: Project Management Processes Project management processes include the project scheduling processes, project time management, project scope management, and project integration management. These processes will be used by the project team to deliver the work defined in the project schedule. Module 4: Stakeholder Management Project Stakeholder Management is about identifying the people, groups, or organizations that could impact or be impacted by the project. PSM includes continuous communication with stakeholders to understand their needs and expectations, addressing issues as they occur, and managing conflicting interests. Module 5: Initiating the Project This module discusses the processes involved in initiating the project that include identifying the project team, definition of project scope, schedule, quality, cost, and risk to produce the Project Charter. A planning engineer not only must understand the content of the charter, the constraints facing the project will have direct impact during project planning and scheduling activities that will follow after this phase. Module 6: Planning and Scheduling Planning is the process of identifying all activities necessary to complete the project while scheduling is the process of determining the sequential order of executing project activities, assigning planned duration, resources and determining the start and finish dates of each activity. You will be guided using Primavera tool to develop a project schedule based upon construction industry case study. Module 7: Cost Accounting The result of planning and scheduling help in identifying all costs associated with the project that will eventually determine the project budget. There are other cost related to the procurement of materials, contractual liabilities, inflation cost, penalties, that will be discussed in this session. Module 8: Risk Management Managing threats facing project team in delivering the project works. This module discuss the processes associated with risk management that include identifying risk, developing risk action plans, risk management plan. Module 9: Managing and Controlling Project Schedule A planning engineer’s job also include managing and controlling the project specifically controlling changes affecting the scope and schedule of the project, managing the acceptance of project deliverables, managing risks, issues, and managing subcontractor. Duration: 32 hoursCourse Outline © Copyright AAPM® SYSENEG Academy of Project Management
  • 3. © Copyright AAPM® SYSENEG Academy of Project Management EXAMINATION • Format: 60 multiple choice questions • Duration: 90 min Program fees include: • Training services • Course Study Notes • Examination • Certification • AAPM® Membership x 2 years