The customer’s goal is to create revenue.
Projects are investments.
Projects are investments.
It can be a hotel, a web site,
the launching a new product in the market;
an airport, a new book or a local gym.
The client invested money to achieve a specific goal by:
• Solving a problem,
• Covering an existing need
• Improving the quality of life
It will also create jobs and potentially attract other investors.
a simple project...
a simple project...
with simple requirements
• Duration: 4 months
• Budget: $25,000
• Resources availability: 100%
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
01 02 03 04 05 06 07 08 09
Budgeted cost $25,000
(distributed per month)
Planned duration: 4months
time (months)
cost$
COSMOS PROJECT MANAGEMENT
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month)
COSMOS PROJECT MANAGEMENT
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
COSMOS PROJECT MANAGEMENT
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
You meet here, at this
fragile little point…
*spend some time to consider the project as completed. What would you(like to)
read on the closing report?
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
Reportingfour months anda week later...
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
Budgeted cost compared to
actual cost per month.
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
Budgeted cost compared to
actual cost per month.
The cost remained $25,000
and the are changes only to
monthly cost distribution.
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
Budgeted cost compared to
actual cost per month.
The cost remained $25,000
and the are changes only to
monthly cost distribution.
The customer can
start focusing on ROI!
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Budgeted cost compared to
actual cost per month.
The cost remained $25,000
and the are changes only to
monthly cost distribution.
Actual duration: 4 months
The customer can
start focusing on ROI!
The paradox:
People tend to take for granted the processes that lead
projects to achieve successfully all the initial requirements.
The paradox:
People tend to take for granted the processes that lead
projects to achieve successfully all the initial requirements.
After applying project management processes and take a
look back, you see nothing more than what it should have
been done.
COSMOS PROJECT MANAGEMENT
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
Reportingfour months anda week later...
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
2 more months required
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
2 more months required
Budgeted cost compared
to actual cost per month.
More money required
to finish the project.
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 4 months
2 more months required
Budgeted cost compared
to actual cost per month.
More money required
to finish the project.
Delivering with 2 months delay.
The customer pays more money
and the ROI will delay too.
01 02 03 04 05 06 07 08 09
COSMOS PROJECT MANAGEMENT
time (months)
cost$
Planned duration: 4months
Budgeted cost compared
to actual cost per month.
More money required
to finish the project.
Actual duration: 4 months
2 more months required
Delivering with 2 months delay.
The customer pays more money
and the ROI will delay too.
“Houston, we have a problem”.
To understand the importance of a project for the
customer, think as you are the customer.
The investment goes further than the project itself.
To understand the importance of a project for the
customer, think as you are the customer.
The investment goes further than the project itself.
Delays on achieving the project objectives, delay the
creation of new jobs and opportunities or the pay back
of the business loans.
COSMOS PROJECT MANAGEMENT
01 02 03 04 05 06 07 08 09
Planned duration: 4months
time (months)
cost$
Resources availability: 100%
Budgeted cost $25,000
(distributed per month) This is the day the customer
is looking forward to!
Reportingfour months anda week later...
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 3months and 2weeks
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 3months and 2weeks
Budgeted cost compared
to actual cost per month.
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 3months and 2weeks
Budgeted cost compared
to actual cost per month.
The project’s cost is $20,000
that means $5,000 under the
original budget!
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Actual duration: 3months and 2weeks
Budgeted cost compared
to actual cost per month.
The project’s cost is $20,000
that means $5,000 under the
original budget!
The customer has already
saved money starts
focusing on ROI earlier!
01 02 03 04 05 06 07 08 09
time (months)
cost$
Planned duration: 4months
Budgeted cost compared
to actual cost per month.
The project’s cost is $20,000
that means $5,000 under the
original budget!
Actual duration: 3months and 2weeks
The customer has already
saved money starts
focusing on ROI earlier!
Delivering early and under budget the project, is the
way to promote the benefits of project management.
Saving time and money, avoiding to waste resources
and energy.
Delivering early and under budget the project, is the
way to promote the benefits of project management.
Saving time and money, avoiding to waste resources
and energy.
Requires knowledge and experience, but most of all
dedication to the project objectives.
In early, under budget deliveries, everyone is happy:
the customer, the sponsors, the project team
and many other persons for whom this investment
will become an opportunity!
In Brief
In Brief
Projects are
investments.
In Brief
Projects are
investments.
On time delivery can
be CRUSIAL for the
investment.
In Brief
Projects are
investments.
Delays can cause
irreversible problems.
On time delivery can
be CRUSIAL for the
investment.
In Brief
to save time, cost and
resources is an asset.
Applying PM process
Projects are
investments.
Delays can cause
irreversible problems.
On time delivery can
be CRUSIAL for the
investment.
In Brief
to save time, cost and
resources is an asset.
Applying PM process
Projects are
investments.
Delays can cause
irreversible problems.
On time delivery can
be CRUSIAL for the
investment.
© All rights reserved - Denise Fotopoulou uk.linkedin.com/in/denisefotopoulou/

Mais conteúdo relacionado

Semelhante a Investments - Project management benefits

Planning for Value
Planning for ValuePlanning for Value
Planning for Valueallan kelly
 
ch09 project communication, tracking.ppt
ch09 project communication, tracking.pptch09 project communication, tracking.ppt
ch09 project communication, tracking.pptShivaniArgulwarBachu
 
Outsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamOutsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamJonathan Bingham
 
Outsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamOutsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamBKA Content
 
What Would your Life Be With No DEBT??
What Would your Life Be With No DEBT??What Would your Life Be With No DEBT??
What Would your Life Be With No DEBT??Jaime Rojas
 
Part v taking your project management to the next level
Part v taking your project management to the next levelPart v taking your project management to the next level
Part v taking your project management to the next levelJess Sarabia
 
Planning for Value: how much? when?
Planning for Value: how much? when?Planning for Value: how much? when?
Planning for Value: how much? when?allan kelly
 
YouTube Content Handling Proposal PowerPoint Presentation Slides
YouTube Content Handling Proposal PowerPoint Presentation SlidesYouTube Content Handling Proposal PowerPoint Presentation Slides
YouTube Content Handling Proposal PowerPoint Presentation SlidesSlideTeam
 
Prototyping Your Business
Prototyping Your BusinessPrototyping Your Business
Prototyping Your BusinessDan Mall
 
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation Area
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation AreaVoiceBoxer's Presentation at DIHAD 2015 -- Innovation Area
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation AreaVoiceBoxer
 
United First Financial And How It Works.
United First Financial And How It Works.United First Financial And How It Works.
United First Financial And How It Works.VanessaLammers
 
Bullpen Power Point 2017
Bullpen Power Point 2017Bullpen Power Point 2017
Bullpen Power Point 2017Pat Casey
 
Project Charter V 2.0Project CharterProject .docx
Project Charter V 2.0Project CharterProject .docxProject Charter V 2.0Project CharterProject .docx
Project Charter V 2.0Project CharterProject .docxstilliegeorgiana
 
Payoff Your Mortgage Early
Payoff Your Mortgage EarlyPayoff Your Mortgage Early
Payoff Your Mortgage Earlysuzannekwong
 
2016_LSBDC_Conference_presentation Financial
2016_LSBDC_Conference_presentation Financial2016_LSBDC_Conference_presentation Financial
2016_LSBDC_Conference_presentation FinancialJustin Downs
 
Webinar: Earned value management pure common sense
Webinar: Earned value management pure common senseWebinar: Earned value management pure common sense
Webinar: Earned value management pure common senseAli Zeeshan
 

Semelhante a Investments - Project management benefits (20)

Planning for Value
Planning for ValuePlanning for Value
Planning for Value
 
ch09 project communication, tracking.ppt
ch09 project communication, tracking.pptch09 project communication, tracking.ppt
ch09 project communication, tracking.ppt
 
Outsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamOutsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing Team
 
Outsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing TeamOutsourcing Your Content vs. Hiring an In-House Writing Team
Outsourcing Your Content vs. Hiring an In-House Writing Team
 
What Would your Life Be With No DEBT??
What Would your Life Be With No DEBT??What Would your Life Be With No DEBT??
What Would your Life Be With No DEBT??
 
Worth Account Presentation Client
Worth Account Presentation ClientWorth Account Presentation Client
Worth Account Presentation Client
 
Part v taking your project management to the next level
Part v taking your project management to the next levelPart v taking your project management to the next level
Part v taking your project management to the next level
 
KMSFeedback Example DEC 2015
KMSFeedback Example DEC 2015KMSFeedback Example DEC 2015
KMSFeedback Example DEC 2015
 
Selling PPC Services With Data
Selling PPC Services With DataSelling PPC Services With Data
Selling PPC Services With Data
 
Planning for Value: how much? when?
Planning for Value: how much? when?Planning for Value: how much? when?
Planning for Value: how much? when?
 
YouTube Content Handling Proposal PowerPoint Presentation Slides
YouTube Content Handling Proposal PowerPoint Presentation SlidesYouTube Content Handling Proposal PowerPoint Presentation Slides
YouTube Content Handling Proposal PowerPoint Presentation Slides
 
Prototyping Your Business
Prototyping Your BusinessPrototyping Your Business
Prototyping Your Business
 
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation Area
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation AreaVoiceBoxer's Presentation at DIHAD 2015 -- Innovation Area
VoiceBoxer's Presentation at DIHAD 2015 -- Innovation Area
 
United First Financial And How It Works.
United First Financial And How It Works.United First Financial And How It Works.
United First Financial And How It Works.
 
Bullpen Power Point 2017
Bullpen Power Point 2017Bullpen Power Point 2017
Bullpen Power Point 2017
 
Project Charter V 2.0Project CharterProject .docx
Project Charter V 2.0Project CharterProject .docxProject Charter V 2.0Project CharterProject .docx
Project Charter V 2.0Project CharterProject .docx
 
Budgeting
BudgetingBudgeting
Budgeting
 
Payoff Your Mortgage Early
Payoff Your Mortgage EarlyPayoff Your Mortgage Early
Payoff Your Mortgage Early
 
2016_LSBDC_Conference_presentation Financial
2016_LSBDC_Conference_presentation Financial2016_LSBDC_Conference_presentation Financial
2016_LSBDC_Conference_presentation Financial
 
Webinar: Earned value management pure common sense
Webinar: Earned value management pure common senseWebinar: Earned value management pure common sense
Webinar: Earned value management pure common sense
 

Mais de Denise Fotopoulou

Soft Skills in Project Management
Soft Skills in Project ManagementSoft Skills in Project Management
Soft Skills in Project ManagementDenise Fotopoulou
 
Project management practitioner or software user?
Project management practitioner or software user?Project management practitioner or software user?
Project management practitioner or software user?Denise Fotopoulou
 
Project Management - Keep it simple
Project Management - Keep it simpleProject Management - Keep it simple
Project Management - Keep it simpleDenise Fotopoulou
 

Mais de Denise Fotopoulou (6)

Project environment
Project environmentProject environment
Project environment
 
Earned Value fundamentals
Earned Value fundamentalsEarned Value fundamentals
Earned Value fundamentals
 
Soft Skills in Project Management
Soft Skills in Project ManagementSoft Skills in Project Management
Soft Skills in Project Management
 
People & Projects
People & ProjectsPeople & Projects
People & Projects
 
Project management practitioner or software user?
Project management practitioner or software user?Project management practitioner or software user?
Project management practitioner or software user?
 
Project Management - Keep it simple
Project Management - Keep it simpleProject Management - Keep it simple
Project Management - Keep it simple
 

Último

8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 

Último (20)

8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 

Investments - Project management benefits

  • 2. The customer’s goal is to create revenue. Projects are investments.
  • 3. Projects are investments. It can be a hotel, a web site, the launching a new product in the market; an airport, a new book or a local gym.
  • 4. The client invested money to achieve a specific goal by: • Solving a problem, • Covering an existing need • Improving the quality of life It will also create jobs and potentially attract other investors.
  • 6. a simple project... with simple requirements • Duration: 4 months • Budget: $25,000 • Resources availability: 100%
  • 7. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months
  • 8. 01 02 03 04 05 06 07 08 09 Budgeted cost $25,000 (distributed per month) Planned duration: 4months time (months) cost$
  • 9. COSMOS PROJECT MANAGEMENT 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month)
  • 10. COSMOS PROJECT MANAGEMENT 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to!
  • 11. COSMOS PROJECT MANAGEMENT 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to!
  • 12. 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to!
  • 13. 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to! You meet here, at this fragile little point…
  • 14.
  • 15. *spend some time to consider the project as completed. What would you(like to) read on the closing report?
  • 16. 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to! Reportingfour months anda week later...
  • 17. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months
  • 18. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months Budgeted cost compared to actual cost per month.
  • 19. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months Budgeted cost compared to actual cost per month. The cost remained $25,000 and the are changes only to monthly cost distribution.
  • 20. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months Budgeted cost compared to actual cost per month. The cost remained $25,000 and the are changes only to monthly cost distribution. The customer can start focusing on ROI!
  • 21. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Budgeted cost compared to actual cost per month. The cost remained $25,000 and the are changes only to monthly cost distribution. Actual duration: 4 months The customer can start focusing on ROI!
  • 22. The paradox: People tend to take for granted the processes that lead projects to achieve successfully all the initial requirements.
  • 23. The paradox: People tend to take for granted the processes that lead projects to achieve successfully all the initial requirements. After applying project management processes and take a look back, you see nothing more than what it should have been done.
  • 24. COSMOS PROJECT MANAGEMENT 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to! Reportingfour months anda week later...
  • 25. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months 2 more months required
  • 26. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months 2 more months required Budgeted cost compared to actual cost per month. More money required to finish the project.
  • 27. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 4 months 2 more months required Budgeted cost compared to actual cost per month. More money required to finish the project. Delivering with 2 months delay. The customer pays more money and the ROI will delay too.
  • 28. 01 02 03 04 05 06 07 08 09 COSMOS PROJECT MANAGEMENT time (months) cost$ Planned duration: 4months Budgeted cost compared to actual cost per month. More money required to finish the project. Actual duration: 4 months 2 more months required Delivering with 2 months delay. The customer pays more money and the ROI will delay too.
  • 29. “Houston, we have a problem”.
  • 30. To understand the importance of a project for the customer, think as you are the customer. The investment goes further than the project itself.
  • 31. To understand the importance of a project for the customer, think as you are the customer. The investment goes further than the project itself. Delays on achieving the project objectives, delay the creation of new jobs and opportunities or the pay back of the business loans.
  • 32. COSMOS PROJECT MANAGEMENT 01 02 03 04 05 06 07 08 09 Planned duration: 4months time (months) cost$ Resources availability: 100% Budgeted cost $25,000 (distributed per month) This is the day the customer is looking forward to! Reportingfour months anda week later...
  • 33. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 3months and 2weeks
  • 34. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 3months and 2weeks Budgeted cost compared to actual cost per month.
  • 35. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 3months and 2weeks Budgeted cost compared to actual cost per month. The project’s cost is $20,000 that means $5,000 under the original budget!
  • 36. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Actual duration: 3months and 2weeks Budgeted cost compared to actual cost per month. The project’s cost is $20,000 that means $5,000 under the original budget! The customer has already saved money starts focusing on ROI earlier!
  • 37. 01 02 03 04 05 06 07 08 09 time (months) cost$ Planned duration: 4months Budgeted cost compared to actual cost per month. The project’s cost is $20,000 that means $5,000 under the original budget! Actual duration: 3months and 2weeks The customer has already saved money starts focusing on ROI earlier!
  • 38. Delivering early and under budget the project, is the way to promote the benefits of project management. Saving time and money, avoiding to waste resources and energy.
  • 39. Delivering early and under budget the project, is the way to promote the benefits of project management. Saving time and money, avoiding to waste resources and energy. Requires knowledge and experience, but most of all dedication to the project objectives.
  • 40. In early, under budget deliveries, everyone is happy: the customer, the sponsors, the project team and many other persons for whom this investment will become an opportunity!
  • 43. In Brief Projects are investments. On time delivery can be CRUSIAL for the investment.
  • 44. In Brief Projects are investments. Delays can cause irreversible problems. On time delivery can be CRUSIAL for the investment.
  • 45. In Brief to save time, cost and resources is an asset. Applying PM process Projects are investments. Delays can cause irreversible problems. On time delivery can be CRUSIAL for the investment.