SlideShare uma empresa Scribd logo
1 de 9
Baixar para ler offline
What is being proposed?
The plans are to create a 5km,      created by widening the existing
two lane dual carriageway           road until Aller. The road then
between Penn Inn and the Torbay     swings west before proceeding
Ring Road at Kerswell Gardens.      in a southerly direction to bypass
                                    Kingskerswell, joining the
Starting just before the Penn Inn
                                    Torbay Ring Road west of
roundabout, a flyover would take
                                    Kerswell Gardens.
traffic onto a dual carriageway,
The Government’s
challenge to reduce costs
The scheme was forecast to cost     over a longer period. This will not
£121m, but as the Government        change or lessen the benefits of
spending review took effect last    the scheme – there will still be
year, all transport schemes under   gains from the very start, but it will
consideration were asked to look    mean that not all the work will be
for savings.                        done at the same time.
Engineers at Devon County Council   As a result, the immediate cost
and Torbay Council reviewed the     of the scheme has been reduced
proposals and concluded that        to £110m, although Devon and
the scheme could be rolled out in   Torbay will have to contribute
stages, to reduce the immediate     more through a variety of funding
cost and spread the spending        packages.
So what has changed?
At Penn Inn, the new bridge over     At Edginswell Junction, the dualling
the roundabout would be narrower.    that was planned for the road at
Losing this extra width will save    this point would also be built at
a significant sum, but it will not   a later date, also reducing the
materially change the way the        immediate cost of the scheme.
road operates.
                                       Finally, omitting the metre wide
The Aller Junction is being            hard strips has reduced the width
reconfigured to reduce its immediate of the road construction. This
cost. As there are alternative ways to change also means that the 50mph
access the new road, two new slip      speed limit will be extended from
roads and the Aller Link Road would Aller through to Edginswell.
be built at a later date.
New jobs, new local
opportunities
134,000 people live in Torbay, but   effect across the tourism and retail
these numbers swell dramatically     sectors. As a result, the new road
during the tourist seasons, making   could create an additional 7,960
the roads even more crowded.         jobs across Devon and Torbay.
Tourism is a key part of Torbay’s    Around 3,500 of these jobs would
economy, with nearly 17% of all      be in Torbay, with around 750 being
jobs in the tourist industry, so a   in the tourist sector.
good transport network is vital.
                                    With the increase in employment,
The scheme will create the right    this will bring another £125m per
environment for local businesses to year into Torbay’s economy, which
thrive, which will have a knock on  will transform the area.
Land Management
With such a large scale project,   Careful use has been made of
it has also been important to      the contours of the land, creating
ensure that the visual impact      artificial cuttings where necessary
of the road is minimised as far    to screen the new route from
as possible.                       houses and viewpoints.
Costs
2010   Cost of scheme                          £121m
       Department for Transport contribution   £108m


2011   Cost of current scheme                  £110m
       Department for Transport contribution   £76m
       Devon County Council contribution       £17m
       Torbay Council contribution             £17m
What happens next?
The scheme is in a development          the Secretary of State, construction
pool competing against 45 other         could start in 2012 and the road
schemes for a share of £630m.           could be in operation by
The total value of all the schemes is   December 2015.
around £900m so it’s clear that not
all of them will be successful.         However, we have lots to do in
                                        the meantime. We have reduced
A new final business case is            our costs significantly without
being produced at the moment,           compromising the effectiveness
which will be submitted by 9            of the scheme. There are clear
September 2011. A decision on the       economic, social and environmental
successful schemes is expected          benefits. So now the road needs
by Christmas. If the scheme was
                                        your support!
granted permission to proceed by
How to help
We need to show the Ministers          the road by writing to the Minister
making the decision that this is       responsible for making the decision
the best option. The case has to       and to our MPs. Their details are on
demonstrate that this is best for      the newsletter – ask staff for a copy.
the area, that it has the backing of The more detail you can give
the community and so the money       about the difference a new road
should be spent here, on this road.  will make, the more effective the
There will be some that disagree,    letter will be. MPs and Ministers get
and the same process applies.        thousands of letters each day, so
Writing to the Minister and MPs will it’s important to make it stand out
be very important in either case.    and make it personal.
You can help make the case for         Thank you very much for your help.
More information
For more information please visit our website:
www.southdevonlinkroad.co.uk
or email: sdlr@coastmarcoms.co.uk
or contact:
Paul Ewings at
Matford Offices
Devon County Council
County Hall
Topsham Road
Exeter
EX2 4QW

Mais conteúdo relacionado

Mais procurados

An overview of Zambia’s mining sector
An overview of Zambia’s mining sectorAn overview of Zambia’s mining sector
An overview of Zambia’s mining sectorBusiness Finland
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andygoogle
 
$300 million still up for grabs
$300 million still up for grabs$300 million still up for grabs
$300 million still up for grabsRebecca Enright
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewDevan Gopal
 
M3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-BrochureM3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-BrochurePadraig Smyth
 
Mattishall Community Project 2
Mattishall Community Project 2Mattishall Community Project 2
Mattishall Community Project 2Wendy Norfolk
 
Presentation 13th October 09 Mattishall Community Project
Presentation 13th October 09   Mattishall Community ProjectPresentation 13th October 09   Mattishall Community Project
Presentation 13th October 09 Mattishall Community ProjectNorfolkRCC
 

Mais procurados (8)

An overview of Zambia’s mining sector
An overview of Zambia’s mining sectorAn overview of Zambia’s mining sector
An overview of Zambia’s mining sector
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andy
 
$300 million still up for grabs
$300 million still up for grabs$300 million still up for grabs
$300 million still up for grabs
 
MMV Case Study - LinkedIn
MMV Case Study - LinkedInMMV Case Study - LinkedIn
MMV Case Study - LinkedIn
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overview
 
M3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-BrochureM3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-Brochure
 
Mattishall Community Project 2
Mattishall Community Project 2Mattishall Community Project 2
Mattishall Community Project 2
 
Presentation 13th October 09 Mattishall Community Project
Presentation 13th October 09   Mattishall Community ProjectPresentation 13th October 09   Mattishall Community Project
Presentation 13th October 09 Mattishall Community Project
 

Semelhante a Exhibition boards 2

South Devon Link Road presentation
South Devon Link Road presentationSouth Devon Link Road presentation
South Devon Link Road presentationDevonCountyCouncil
 
Gt create presentation
Gt create presentationGt create presentation
Gt create presentationDuncan Dibble
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINALCandice Spiroski
 
City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016Samantha Beneke
 
Key lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemesKey lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemesSwitch2 Energy Limited
 
Delivering our transport future now
Delivering our transport future nowDelivering our transport future now
Delivering our transport future nowJumpingJaq
 
Stevenage Revision
Stevenage RevisionStevenage Revision
Stevenage Revisionmissm
 
Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Claus Otto Nielsen
 
D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014D2N2lep
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable futuredjhutch
 
405235 State Of Estate Vis5
405235 State Of Estate Vis5405235 State Of Estate Vis5
405235 State Of Estate Vis5highgate10
 
Ceca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growthCeca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growthPlace North West
 
Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...Project Controls Expo
 
David Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon AmbitionsDavid Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon Ambitionsicarb
 
Broadband Summit 1
Broadband Summit 1Broadband Summit 1
Broadband Summit 1Jesse Norman
 

Semelhante a Exhibition boards 2 (20)

South Devon Link Road presentation
South Devon Link Road presentationSouth Devon Link Road presentation
South Devon Link Road presentation
 
Gt create presentation
Gt create presentationGt create presentation
Gt create presentation
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016
 
Key lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemesKey lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemes
 
Delivering our transport future now
Delivering our transport future nowDelivering our transport future now
Delivering our transport future now
 
Stevenage Revision
Stevenage RevisionStevenage Revision
Stevenage Revision
 
Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2
 
Eu sulphur directive_dfds
Eu sulphur directive_dfdsEu sulphur directive_dfds
Eu sulphur directive_dfds
 
Global District Energy Awards 2013 Overview
Global District Energy Awards 2013 OverviewGlobal District Energy Awards 2013 Overview
Global District Energy Awards 2013 Overview
 
D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future
 
405235 State Of Estate Vis5
405235 State Of Estate Vis5405235 State Of Estate Vis5
405235 State Of Estate Vis5
 
Ceca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growthCeca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growth
 
Sustainable Transport
Sustainable TransportSustainable Transport
Sustainable Transport
 
Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...
 
David Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon AmbitionsDavid Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon Ambitions
 
West of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletterWest of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletter
 
CSPR
CSPRCSPR
CSPR
 
Broadband Summit 1
Broadband Summit 1Broadband Summit 1
Broadband Summit 1
 

Último

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 

Último (20)

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 

Exhibition boards 2

  • 1. What is being proposed? The plans are to create a 5km, created by widening the existing two lane dual carriageway road until Aller. The road then between Penn Inn and the Torbay swings west before proceeding Ring Road at Kerswell Gardens. in a southerly direction to bypass Kingskerswell, joining the Starting just before the Penn Inn Torbay Ring Road west of roundabout, a flyover would take Kerswell Gardens. traffic onto a dual carriageway,
  • 2. The Government’s challenge to reduce costs The scheme was forecast to cost over a longer period. This will not £121m, but as the Government change or lessen the benefits of spending review took effect last the scheme – there will still be year, all transport schemes under gains from the very start, but it will consideration were asked to look mean that not all the work will be for savings. done at the same time. Engineers at Devon County Council As a result, the immediate cost and Torbay Council reviewed the of the scheme has been reduced proposals and concluded that to £110m, although Devon and the scheme could be rolled out in Torbay will have to contribute stages, to reduce the immediate more through a variety of funding cost and spread the spending packages.
  • 3. So what has changed? At Penn Inn, the new bridge over At Edginswell Junction, the dualling the roundabout would be narrower. that was planned for the road at Losing this extra width will save this point would also be built at a significant sum, but it will not a later date, also reducing the materially change the way the immediate cost of the scheme. road operates. Finally, omitting the metre wide The Aller Junction is being hard strips has reduced the width reconfigured to reduce its immediate of the road construction. This cost. As there are alternative ways to change also means that the 50mph access the new road, two new slip speed limit will be extended from roads and the Aller Link Road would Aller through to Edginswell. be built at a later date.
  • 4. New jobs, new local opportunities 134,000 people live in Torbay, but effect across the tourism and retail these numbers swell dramatically sectors. As a result, the new road during the tourist seasons, making could create an additional 7,960 the roads even more crowded. jobs across Devon and Torbay. Tourism is a key part of Torbay’s Around 3,500 of these jobs would economy, with nearly 17% of all be in Torbay, with around 750 being jobs in the tourist industry, so a in the tourist sector. good transport network is vital. With the increase in employment, The scheme will create the right this will bring another £125m per environment for local businesses to year into Torbay’s economy, which thrive, which will have a knock on will transform the area.
  • 5. Land Management With such a large scale project, Careful use has been made of it has also been important to the contours of the land, creating ensure that the visual impact artificial cuttings where necessary of the road is minimised as far to screen the new route from as possible. houses and viewpoints.
  • 6. Costs 2010 Cost of scheme £121m Department for Transport contribution £108m 2011 Cost of current scheme £110m Department for Transport contribution £76m Devon County Council contribution £17m Torbay Council contribution £17m
  • 7. What happens next? The scheme is in a development the Secretary of State, construction pool competing against 45 other could start in 2012 and the road schemes for a share of £630m. could be in operation by The total value of all the schemes is December 2015. around £900m so it’s clear that not all of them will be successful. However, we have lots to do in the meantime. We have reduced A new final business case is our costs significantly without being produced at the moment, compromising the effectiveness which will be submitted by 9 of the scheme. There are clear September 2011. A decision on the economic, social and environmental successful schemes is expected benefits. So now the road needs by Christmas. If the scheme was your support! granted permission to proceed by
  • 8. How to help We need to show the Ministers the road by writing to the Minister making the decision that this is responsible for making the decision the best option. The case has to and to our MPs. Their details are on demonstrate that this is best for the newsletter – ask staff for a copy. the area, that it has the backing of The more detail you can give the community and so the money about the difference a new road should be spent here, on this road. will make, the more effective the There will be some that disagree, letter will be. MPs and Ministers get and the same process applies. thousands of letters each day, so Writing to the Minister and MPs will it’s important to make it stand out be very important in either case. and make it personal. You can help make the case for Thank you very much for your help.
  • 9. More information For more information please visit our website: www.southdevonlinkroad.co.uk or email: sdlr@coastmarcoms.co.uk or contact: Paul Ewings at Matford Offices Devon County Council County Hall Topsham Road Exeter EX2 4QW