Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-1 The system shall have
the capability to load
supermarket goods.
Functional NA NA Inspection
-Compliance with the following
requirements will be verified via
formal examination.
FRIN 1.0 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-2 The system shall have
the capability to weigh
goods no more than
three quarters of a ton.
Functional ≤ ¾ ton per
load.
> 1 pound but
≤ ¾ ton per
load.
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight limitations
during scale weighing operations.
Demonstration
-Compliance with the requirement
will be verified by observation of
weighing goods.
FRIN 1.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-3 The system shall have
the capability to lift
goods no more than half
a ton per load.
Functional ≤ ¾ ton per
load.
> 1 pound but
≤ ¾ ton per
load.
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight lifting
margins.
Demonstration
-Compliance with the requirement
will be verified by observation of
lifting goods.
FRIN 1.2 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-4 The system shall have
the capability to store
goods at room
temperature.
Functional ≤ ½ ton per
load.
½ ton per
load.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
measurements will be quantified
and analyzed.
FRIN 1.3 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-5 The system shall have
the capability to store
goods at refrigerated
temperature.
Functional Between 73°F &
75°F ± 2 °F.
74°F. Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
measurements will be quantified
and analyzed.
FRIN 1.4 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-6 The system shall have
the capability to store
goods at freezer
temperature.
Functional Between 37°F &
41°F.
38°F. Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
measurements will be quantified
and analyzed.
FRIN 1.5 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-7 The system shall have
the capability to protect
supermarket goods.
Functional Between 0°F &
2°F.
0°F. Inspection FRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the following
requirements will be verified via
formal examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
the protection of goods.
PRUIN-1-8 The system shall have
the capability to secure
goods from damage
during delivery.
Functional N/A N/A Inspection
-Compliance with the following
requirements will be verified via
formal examination the securing
mechanism.
Demonstration
-Compliance with the requirement
will be verified by observation of
secured goods during delivery.
FRIN 2.1 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-9 The system shall have
the capability to release
goods for unloading.
Functional 97% of goods
should not be
damaged during
delivery.
100% of
goods should
not be
damaged
during
delivery.
Inspection
-Compliance with the following
requirements will be verified via
formal examination of the release
mechanism.
Demonstration
-Compliance with the requirement
will be verified by observation of
secured goods being released.
FRIN 2.2 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-10 The system shall have
the capability to
preserve supermarket
goods.
Functional 100% of goods
should be
released during
unloading.
(T=O)
100% of
goods should
be released
during
unloading.
(T=O)
Inspection
-Compliance with the following
requirements will be verified via
formal examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
preservation of goods.
FRIN 3.0 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-11 The System shall have
the capability to control
the climate in the cargo
area.
Functional N/A. N/A. Inspection
-Compliance with the following
requirements will be verified via
formal examination of the climate
control system.
Demonstration
-Compliance with the requirement
will be verified by observation of
the climate control system during
operation.
FRIN 3.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-12 The system shall have
the capability to raise
temperature at a rate of
5o
F per minute to
support climate control.
Functional 100% of cargo
area shall be
climate
controlled at all
times.
(T=O)
100% of
cargo area
shall be
climate
controlled at
all SFIN
times.
(T=O)
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
FRIN 3.1.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-13 The system shall have
the capability to add
heat to the cargo area.
Functional Between 3°F &
5°F per minute.
5°F per
minute.
Demonstration
-Compliance with the requirement
will be verified by observation of
the climate control system’s ability
to add heat to the cargo area.
FRIN 3.1.1.1 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by exploiting engine heat for raising temperatures (FCD,
2014).
PRUIN-1-14 The system shall have
the capability to
maintain temperature in
room temperature band
with a tolerance of + 1o
F
to support climate
control.
Functional 100% of the
time heat
should be able
to be added to
the cargo area.
(T=O)
100% of the
time heat
should be
able to be
added to the
cargo area.
(T=O)
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
FRIN 3.1.2 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-15 The system shall have
the capability to
maintain temperature in
refrigerated temperature
band with a tolerance of
+ 1o
F to support climate
control.
Functional Between 73°F &
75°F ± 1°F.
74°F. Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
FRIN 3.1.3 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-16 The system shall have
the capability to
maintain temperature in
freezer temperature
band with a tolerance of
+ 1o
F to support climate
control.
Functional Between 37°F &
41°F ± 1° F.
38°F. Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
SFIN 3.1.4 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-17 The system shall have
the capability to lower
temperature at a rate of
5o
F per minute to
support climate control.
Functional Between 0°F &
2°F ± 1°F.
0°F. Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
FRIN 3.1.5 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by exploiting liquid nitrogen for lowering temperatures (FCD,
2014).
PRUIN-1-18 The system shall have
the capability to remove
heat from the cargo
area.
Functional Between 3°F &
5°F per minute.
5°F per
minute.
Inspection
-Compliance with the following
requirements will be verified via
formal examination of the climate
control system.
Demonstration
FRIN 3.1.5.1 Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by observation of
the climate control system’s ability
to remove heat to the cargo area.
PRUIN-1-19 The system shall have
the capability to deliver
supermarket goods.
Functional 100% of the
time heat
should be able
to be removed
to the cargo
area.
(T=O)
100% of the
time heat
should be
able to be
removed to
the cargo
area.
(T=O)
Inspection
-Compliance with the following
requirements will be verified via
formal examination.
FRIN 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-20 The system shall have
the capability to start for
operation.
Functional N/A. N/A. Inspection
-Compliance with the following
requirement will be verified via
formal examination of start of
operation.
Demonstration
-Compliance with the requirement
will be verified by observation of
turning on the LRAE-18.
FRIN 4.1 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-21 The system shall have
the capability to be
operated manually by
personnel.
Functional 100% of the
time the system
shall be able to
be started for
operation.
(T=O)
100% of the
time the
system shall
be able to be
started for
operation.
(T=O)
Inspection
-Compliance with the following
requirement will be verified via
formal examination of system
ability to be manually operated by
personnel.
Test
-Compliance with the requirement
will be verified by simulation testing
of manual operation of the vehicle
prior to allowing personnel to
operate vehicle for safety
intentions.
Demonstration
-Compliance with the requirement
will be verified by observation of
personnel manually operating the
LRAE-18.
FRIN 4.2 Satisfies the 6.3 systems attribute expressed in the CDD that
of individuals responsible for operating the LRAE-18 shall be
trained and have the proper licensure allowing them to
manually operate the vehicle (FCD, 2014).
PRUIN-1-22 The system shall have
the capability to
increase speed at a rate
of 10 MPH per second
to support operation.
Functional 100% of the
time the system
shall be able to
be manually
operated by
personnel.
(T=O)
100% of the
time the
system shall
be able to be
manually
operated by
personnel.
(T=O)
Inspection
-Compliance with the following
requirements will be verified via
formal examination speed
fluctuations.
Demonstration
FRIN 4.2.1 Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by observation of
speed escalation during operation.
PRUIN-1-23 The system shall have
the capability to
maintain speed to
support operation.
Functional Between 8 MPH
& 10 MPH per
second.
10 MPH per
second.
Inspection
-Compliance with the following
requirements will be verified via
formal examination speed
fluctuations.
Demonstration
-Compliance with the requirement
will be verified by observation of
speed sustainability during
operation.
FRIN 4.2.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-24 The system shall have
the capability to
decrease speed at a
rate of 10 MPH per
second to support
operation.
Functional Maintain current
speed ± 1 MPH
Maintain
current speed
± 0.5 MPH
Inspection
-Compliance with the following
requirements will be verified via
formal examination speed
fluctuations.
Demonstration
-Compliance with the requirement
will be verified by observation of
speed escalation during operation.
FRIN 4.2.3 Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-25 The system shall have
the capability to
conserve fuel.
Functional Between 8 MPH
& 10 MPH per
second.
10 MPH per
second.
Inspection
-Compliance with the following
requirements will be verified via
formal examination of energy
conserving operations within the
system.
Demonstration
-Compliance with the requirement
will be verified by observation of
the system ability to conserve fuel.
FRIN 4.2.4 Satisfies the 6.2 systems attribute expressed in the CDD that
the system shall have optimal operating conditions for
maximum energy spared during transportation of grocery
goods to supermarket chains. (FCD, 2014).
PRUIN-1-26 The system shall have
the capability to stop
from operation.
Functional 100% of the
time the system
shall be able to
be stopped from
operation.
(T=O)
100% of the
time the
system shall
be able to be
stopped from
operation.
(T=O)
Inspection
-Compliance with the following
requirements will be verified via
formal examination of stop of
operation.
Demonstration
-Compliance with the requirement
will be verified by observation of
turning off the LRAE-18.
FRIN 4.3 Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-27 The system shall have
the capability to unload
supermarket goods.
Functional 100% of the
time the system
shall be able to
100% of the
time the
system shall
Inspection
-Compliance with the following
requirements will be verified via
FRIN 5.0 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
be stopped from
operation.
(T=O)
be able to be
stopped from
operation.
(T=O)
formal examination of the
unloading of goods.
Demonstration
-Compliance with the requirement
will be verified by observation of
retrieving goods.
PRUIN-1-28 The system shall have
the capability to retrieve
goods.
Functional N/A N/A Inspection
-Compliance with the following
requirements will be verified via
formal examination of the retrieval
of goods.
Demonstration
-Compliance with the requirement
will be verified by observation of
recovering goods.
FRIN 5.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-29 The system shall have
the capability to lower
goods no more than half
a ton per load.
Functional 100% of the
time the system
shall be able to
retrieve goods.
(T=O)
100% of the
time the
system shall
be able to
retrieve
goods.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight lowering
margins.
Demonstration
-Compliance with the requirement
will be verified by observation of
lowering goods.
FRIN 5.2 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-30 The system shall have
the capability to track
supermarket goods.
Functional ≤ ½ ton per
load.
½ ton per
load.
Inspection
-Compliance with the following
requirements will be verified via
formal examination.
FRIN 6.0 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-31 The system shall have
the capability to identify
any goods.
Functional 100% of the
time the system
shall be able to
identify goods.
(T=O)
100% of the
time the
system shall
be able to
identify
goods.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of identification of
goods.
Demonstration
-Compliance with the requirement
will be verified by observation of
the system ability to identify goods.
FRIN 6.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-32 The system shall have
the capability to log
goods into the tracking
system.
Functional 100% of the
time the system
shall be able to
log goods into
100% of the
time the
system shall
be able to log
goods into the
Inspection
-Compliance with the requirement
will be verified via formal
examination of the tracking system.
FRIN 6.2 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
the tracking
system.
(T=O)
tracking
system.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by execution of
logging goods into the tracking
system.
PRUIN-1-33 The system shall have
the capability to log the
quantity of any goods.
Functional 100% of the
time the system
shall be able to
log the quantity
of goods into
the tracking
system.
(T=O)
100% of the
time the
system shall
be able to log
the quantity of
goods into the
tracking
system.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination tracking system.
Demonstration
-Compliance with the requirement
will be verified by observation of
successful accountability for
quantified amounts of logged
goods.
FRIN 6.2.1 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-34 The system shall have
the capability to log the
weight of any goods.
Functional 100% of the
time the system
shall be able to
log the weight
of goods into
the tracking
system.
(T=O)
100% of the
time the
system shall
be able to log
the weight of
goods into the
tracking
system.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination tracking system.
Demonstration
-Compliance with the requirement
will be verified by observation of
weight of goods being logged in the
tracking system.
FRIN 6.2.2 Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-35 The LRAE-18 shall have
a load management
system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the load
management system and
associated requirements.
DRIN 1.0 SDIN 1.0
SFIN 1.0
SFIN 2.0
SFIN 5.0
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-36 The load management
system shall have a
scale to weigh goods no
more than three quarter
of a ton.
Design ≤ ¾ ton per
load.
> 1 pound but
≤ ¾ ton per
load.
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight limitations
during scale weighing operations.
DRIN 1.1 SDIN 1.1
SFIN 1.1
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-37 The load management
system shall have an
elevator to lift goods no
more than half a ton per
load.
Design ≤ ½ ton per
load.
½ ton per
load.
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight lifting
margins.
DRIN 1.2.1 SDIN 1.2.1
SFIN 1.2
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-38 The load management
system shall have an
elevator to lower goods
no more than half a ton
per load.
Design ≤ ½ ton per
load.
½ ton per
load.
Inspection
-Compliance with the requirement
will be verified via formal
examination of weight lowering
margins.
DRIN 1.2.2 SDIN 1.2.2
SFIN 5.2
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-39 The load management
system shall have a
total of 9 bays, with 3
bays at the top level, 3
bays at the bottom level,
and 3 bays between the
top and bottom level.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of total bays per level.
DRIN 1.3 SDIN 1.3
SFIN 1.3 – 1.5
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-40 The load management
system shall have
latches for securing
goods.
Design 97% of goods
should not be
damaged during
delivery.
100% of
goods should
not be
damaged
during
delivery.
Inspection
-Compliance with the requirement
will be verified via formal
examination of latches for securing
goods.
DRIN 1.4.1 SDIN 1.4.1
SFIN 2.1
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-41 The load management
system shall have
latches for releasing
goods.
Design 100% of goods
should be
released during
unloading.
(T=O)
100% of
goods should
be released
during
unloading.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of latches for releasing
goods.
DRIN 1.4.2 SDIN 1.4.2
SFIN 2.2
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-42 The LRAE-18 shall have
a climate control
system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of climate control
system and associated
requirements.
DRIN 2.0 SDIN 2.0
SFIN 3.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-43 The climate control
system shall use liquid
nitrogen to remove heat
for lowering the
temperature in each bay
at a rate of 5o
F per
minute.
Design 100% of the
time heat
should be able
to be removed
from the cargo
area.
(T=O)
100% of the
time heat
should be
able to be
removed from
the cargo
area.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of liquid nitrogen used
for lowering temperatures.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
measurements will be quantified
and analyzed.
DRIN 2.1 SDIN 2.1
SFIN 3.1.5.1
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-44 The climate control
system shall use heat
from the electro-
mechanical engine to
add heat for raising the
temperature in each bay
at a rate of 5o
F per
minute.
Design 100% of the
time heat
should be able
to be added to
the cargo area.
(T=O)
100% of the
time heat
should be
able to be
added to the
cargo area.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of electro-mechanical
engine heat used for raising
temperatures.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
DRIN 2.2 SDIN 2.2
SFIN 3.1.1.1
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
measurements will be quantified
and analyzed.
PRUIN-1-45 The climate control
system shall have a
temperature regulating
module for maintaining
temperature in room
temperature band with a
tolerance of + 1o
F in
each of the 3 bays at
the top level.
Design Between 73°F &
75°F ± 1°F.
74°F. Inspection
-Compliance with the requirement
will be verified via formal
examination of the temperature
regulator used for maintaining
temperatures.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
DRIN 2.0.1 SDIN 2.0.1
SFIN 3.1.2 – 3.1.4
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-46 The climate control
system shall have a
temperature regulating
module for maintaining
temperature in
refrigerated temperature
band with a tolerance of
+ 1o
F in each of the 3
bays at the middle level.
Design Between 37°F &
41°F ± 1° F.
38°F. Inspection
-Compliance with the requirement
will be verified via formal
examination of the temperature
regulator used for maintaining
temperatures.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
DRIN 2.0.2 SDIN 2.0.2
SFIN 3.1.2 – 3.1.4
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-47 The climate control
system shall have a
temperature regulating
module for maintaining
temperature in freezer
temperature band with a
tolerance of + 1o
F in
each of the 3 bays at
the bottom level.
Design Between 0°F &
2°F ± 1°F.
0°F. Inspection
-Compliance with the requirement
will be verified via formal
examination of the temperature
regulator used for maintaining
temperatures.
Analysis
- Compliance with the requirement
will be verified by cargo climate
operation, under controlled
conditions where temperature
fluctuation measurements will be
quantified and analyzed.
DRIN 2.0.3 SDIN 2.0.3
SFIN 3.1.2 – 3.1.4
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-48 The LRAE-18 shall have
a propulsion system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the propulsion
system and associated
requirements.
DRIN 3.0 SDIN 3.0
SFIN 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-49 The propulsion system
shall have a keying
module for interfacing
with the operator to start
the vehicle.
Design 100% of the
time the system
shall be able to
be started for
operation.
(T=O)
100% of the
time the
system shall
be able to be
started for
operation.
(T=O)
Inspection
-Compliance with the requirement
will be verified by visual
examination of the keying module.
Demonstration
-Compliance with the requirement
will be verified by observation
keying module interface with
operator to start the vehicle.
DRIN 3.0.1 SDIN 3.0.1
SFIN 4.1
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-50 The propulsion system
shall have a keying
module for interfacing
with the operator to stop
the vehicle.
Design 100% of the
time the system
shall be able to
be stopped from
operation.
(T=O)
100% of the
time the
system shall
be able to be
stopped from
operation.
(T=O)
Inspection
-Compliance with the requirement
will be verified by visual
examination of the keying module.
Demonstration
-Compliance with the requirement
will be verified by observation
keying module interface with
operator to stop the vehicle.
DRIN 3.0.2 SDIN 3.0.2
SFIN 4.3
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-51 The propulsion system
shall have a speed-
regulating module for
interfacing with the
operator to increase
vehicle speed.
Design Between 8 MPH
& 10 MPH per
second.
10 MPH per
second.
Inspection
-Compliance with the requirement
will be verified by visual
examination of the speed-
regulating module.
Demonstration
-Compliance with the requirement
will be verified by observation
speed-regulating module interface
with operator to increase speed of
the vehicle.
DRIN 3.0.3 SDIN 3.0.3
SFIN 4.2.1
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-52 The propulsion system
shall have a speed
regulating module for
interfacing with the
operator to maintain
vehicle speed.
Design Maintain current
speed ± 1 MPH
Maintain
current speed
± 0.5 MPH
Inspection
-Compliance with the requirement
will be verified by visual
examination of the speed-
regulating module.
Demonstration
-Compliance with the requirement
will be verified by observation
speed-regulating module interface
DRIN 3.0.4 SDIN 3.0.4
SFIN 4.2.2
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
with operator to maintain the speed
of the vehicle.
PRUIN-1-53 The propulsion system
shall have a speed
regulating module for
interfacing with the
operator to decrease
vehicle speed.
Design Between 8 MPH
& 10 MPH per
second.
10 MPH per
second.
Inspection
-Compliance with the requirement
will be verified by visual
examination of the speed-
regulating module.
Demonstration
-Compliance with the requirement
will be verified by observation
speed-regulating module interface
with operator to decrease speed of
the vehicle.
DRIN 3.0.5 SDIN 3.0.5
SFIN 4.2.3
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-54 The propulsion system
shall have a backup
liquid nitrogen engine.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the backup liquid
nitrogen engine.
Demonstration
-Compliance with the requirement
will be verified by observation of
the liquid nitrogen engine during
operation.
DRIN 3.1 SDIN 3.1
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-55 The liquid nitrogen
engine shall run off of
liquid nitrogen.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of liquid nitrogen
engine in operation.
Demonstration
-Compliance with the requirement
will be verified by observation of
the use of liquid nitrogen to operate
the backup liquid nitrogen engine.
DRIN 3.1.1 SDIN 3.1.1
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-56 The propulsion system
shall have a primary
electro-mechanical
engine.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the primary electro-
mechanical engine.
Demonstration
-Compliance with the requirement
will be verified by observation of
DRIN 3.2 SDIN 3.2
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
the electro-mechanical engine
during operation.
PRUIN-1-57 The electro-mechanical
engine shall have a
rechargeable battery.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the rechargeable
battery associated with the electro-
mechanical engine.
DRIN 3.2.1 SDIN 3.2.1
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-58 The rechargeable
battery shall store
energy input from solar
panels.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the rechargeable
battery storage capabilities.
Demonstration
-Compliance with the requirement
will be verified by observation of
the rechargeable battery ability to
store energy input from solar
panels.
DRIN 3.2.1.1 SDIN 3.2.1.1
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-59 The solar panels shall
absorb solar energy
from the sun.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the solar panels.
Demonstration
-Compliance with the requirement
will be verified by observation of
the solar panel ability intake solar
energy from the sun.
DRIN 3.2.1.1.1 SDIN 3.2.1.1.1
SFIN 4.2
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-60 The LRAE-18 shall have
a smart energy
consumption system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of smart energy
consumption system and
associated requirements.
DRIN 4.0 SDIN 4.0
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-61 The smart energy
consumption system
shall have an energy
waste reduction system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination to account quantities
of energy waste.
DRIN 4.1 SDIN 4.1
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-62 The energy waste
reduction system shall
have a GPS module for
interfacing with a global
positioning system
satellite.
Design 100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of GPS from the
interface design.
Test
DRIN 4.1.1 SDIN 4.1.1
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by simulation testing
proving optimal decision-making by
the interface system.
PRUIN-1-63 The energy waste
reduction system shall
have a traffic updating
module for interfacing
with the regional traffic
reporting system.
Design 100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of traffic reports from
the interface design.
Test
-Compliance with the requirement
will be verified by simulation testing
proving optimal decision-making by
the interface system.
DRIN 4.1.2 SDIN 4.1.2
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-64 The energy waste
reduction system shall
have an inventory
managing system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the inventory
management system accounting
for all the goods.
DRIN 4.1.3 SDIN 4.1.3
SFIN 6.0
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-65 The inventory managing
system shall a UPC
recognition module to
identify goods.
Design 100% of the
time the system
shall be able to
identify goods.
(T=O)
100% of the
time the
system shall
be able to
identify
goods.
(T=O)
Demonstration
-Compliance with the requirement
will be verified via detailed
inspection of module while the
vehicle is in operation
DRIN 4.1.3.1 SDIN 4.1.3.1
SFIN 6.1
SFIN 4.2.4
Satisfies the 5.3 capabilities expressed in the CDD that of
the system shall exploit smart energy consumption (FCD,
2014).
PRUIN-1-66 The inventory managing
system shall log the
quantity of identified
goods.
Design 100% of the
time the system
shall be able to
log quantity of
goods into the
tracking system.
(T=O)
100% of the
time the
system shall
be able to log
quantity of
goods into the
tracking
system.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the tracking system.
Demonstration
-Compliance with the requirement
will be verified by execution of
logging goods into the tracking
system.
DRIN 4.1.3 SDIN 4.1.3
SFIN 6.2.1
SFIN 4.2.4
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
PRUIN-1-67 The inventory managing
system shall log the
weight of identified
goods.
Design 100% of the
time the system
shall be able to
log weight of
goods into the
tracking system.
(T=O)
100% of the
time the
system shall
be able to log
weight of
goods into the
tracking
system.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the tracking system.
Demonstration
-Compliance with the requirement
will be verified by execution of
logging goods into the tracking
system.
DRIN 4.1.3 SDIN 4.1.3
SFIN 6.2.2
SFIN 4.2.4
Satisfies the 5.4 capabilities expressed in the CDD that of
the system shall have a user-friendly human interface design
(FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-68 The smart energy
consumption system
shall have an energy
reclaiming system.
Design N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of the energy reclaim
system and associated systems.
DRIN 4.2 SDIN 4.2
SFIN 4.2.4
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-69 The energy reclaiming
system shall have a
mechanical energy
reclaiming system that
reclaims kinetic energy
lost when traveling.
Design 100% of the
time the system
shall be able to
reclaim kinetic
energy lost
when traveling.
(T=O)
100% of the
time the
system shall
be able to
reclaim kinetic
energy lost
when
traveling.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the mechanical
energy reclaiming system.
Test
-Compliance with the requirement
will be verified by simulation testing
proving optimal reclaimed energy
during traveling.
Analysis
- Compliance with the requirement
will be verified by the mechanical
energy reclaiming system, under
controlled conditions where energy
gains are measured and will be
quantified and analyzed.
DRIN 4.2.1 SDIN 4.2.1
SFIN 4.2.4
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-70 The energy reclaiming
system shall have a
regenerative braking
system that reclaims
kinetic energy lost when
stopping.
Design 100% of the
time the system
shall be able to
reclaim kinetic
energy lost
when stopping.
(T=O)
100% of the
time the
system shall
be able to
reclaim kinetic
energy lost
when
stopping.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the regenerative
breaking system.
Test
-Compliance with the requirement
will be verified by simulation testing
proving optimal reclaimed energy
braking evolutions when traveling.
Analysis
- Compliance with the requirement
will be verified by the regenerative
breaking system, under controlled
conditions where energy gains are
measured and will be quantified
and analyzed.
DRIN 4.2.2 SDIN 4.2.2
SFIN 4.2.4
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable sources of energy for
major intake mechanisms (FCD, 2014).
PRUIN-1-71 When workers are lifting
heavy items, steel-toed
shoes shall be worn.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
SRIN 1 FRIN 1.2
DRIN 1.0
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-72 When workers are lifting
heavy items, pinch free
gloves shall be worn.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 2 FRIN 1.2
DRIN 1.0
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-73 Workers when lifting
heavy items shall use
proper lifting
techniques.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 3 FRIN 1.2
DRIN 1.0
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-74 Workers operating the
vehicle elevator shall
stand clear of the load.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 4 FRIN 1.2
DRIN 1.2
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-75 When workers are
securing latches, pinch
free gloves shall be
worn.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
SRIN 5 FRIN 2.1
DRIN 1.4
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
PRUIN-1-76 When workers are
releasing latches, pinch
free gloves shall be
worn.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 6 FRIN 2.1
DRIN 1.4
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-77 The vehicle operator
shall wear a seat belt
when the keying module
is engaged.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 7 FRIN 4.2
DRIN 3.0
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-78 The vehicle operator
shall obey all vehicle
operation policies.
Safety N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 8 FRIN 4.2
DRIN 3.0
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
PRUIN-1-79 The LRAE-18 shall
meet the standards of
the Occupational Safety
and Health
Administration.
Safety 100 % of the
standards are
meet.
T=O
100 % of the
standards are
meet.
T=O
Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce obeying rules and
regulations.
SRIN 9 FRIN in its entirety
DRIN in its entirety
Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the
CDD that workers associated with the LREA-18 shall be
properly trained and be aware of safety concerns (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-80 Workers packing the
crate with goods shall
place heavy goods in
separate crates from
light or fragile goods.
Packaging N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations on
packaging requirements.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce packaging goods
appropriately.
PRIN 1 FRIN 2.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-81 The packed crate
containing room
temperature goods shall
be stored in the room
temperature bay.
Packaging N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations on
storage requirements.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce storing goods
appropriately.
PRIN 2 FRIN 1.3
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-82 The packed crate
containing frozen goods
shall be stored in the
freezer bay.
Packaging N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations on
storage requirements.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce storing goods
appropriately.
PRIN 3 FRIN 1.5
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-83 The packed crate
containing refrigerated
goods shall be stored in
the refrigerated bay.
Packaging N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations on
storage requirements.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce storing goods
appropriately.
PRIN 4 FRIN 1.4
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-84 When loading crate
containing goods into
respective bay the crate
shall be secured with
latches to prevent
damage of goods.
Packaging N/A N/A Inspection
-Compliance with the requirement
will be verified via formal
examination of workforce fulfillment
with rules and regulations on
packaging requirements.
Demonstration
-Compliance with the requirement
will be verified by observation of
workforce packaging goods
appropriately.
PRIN 5 FRIN 2.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-85 The corporate inventory
management system
shall have all central
information protected.
Security 100% of the
time the system
shall be able
provided
security against
theft
(T=O)
100% of the
time the
system shall
be able
provided
security
against theft
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination security system
associated with the corporate
inventory management system.
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
PRIN 1 FRIN 6.0
DRIN 4.1.3
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-86 The load management
system shall have a
locking mechanism to
secure all goods held
within the cargo area.
Security 100% of the
time the system
shall be able
provided
security against
theft
(T=O)
100% of the
time the
system shall
be able
provided
security
against theft
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination security system
associated with the load
management system.
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
PRIN 2 FRIN 2.0
DRIN 1.4
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-87 The LRAE-18 system
shall have a security
alarm installed on the
vehicle that becomes
engaged when the
vehicle is locked.
Security 100% of the
time the system
shall be able
provided
security against
theft
(T=O)
100% of the
time the
system shall
be able
provided
security
against theft
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination security system
associated with the LRAE-18
system
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
PRIN 3 FRIN 2.0
DRIN 1.4
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-88 The corporate
dispatching system shall
Security 100% of the
time the system
shall be able
100% of the
time the
system shall
Inspection
-Compliance with the requirement
will be verified via formal
PRIN 4 FRIN 6.0
DRIN 4.1.4
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
have all have all central
information protected.
provided
security against
theft
(T=O)
be able
provided
security
against theft
(T=O)
examination security system
associated with corporate
dispatching system
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-89 Support facilities shall
have locking
mechanism to secure all
doors of the facility.
Security 100% of the
time the system
shall be able
provided
security against
theft
(T=O)
100% of the
time the
system shall
be able
provided
security
against theft
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination security system
associated with support facility
doors.
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
PRIN 5 FRIN 2.0
DRIN 1.4
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-90 Support facilities shall
have locking
mechanism to secure all
associated equipment
located at the facility.
Security 100% of the
time the system
shall be able
provided
security against
theft
(T=O)
100% of the
time the
system shall
be able
provided
security
against theft
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination security system
associated with the support facility
equipment.
Demonstration
-Compliance with the requirement
will be verified by observation
simulated theft trials.
PRIN 6 FRIN 2.0
DRIN 1.4
Satisfies the 6.4 capabilities expressed in the CDD that
system shall protect associated products from security risks
such as theft or vandalism (FCD, 2014).
PRUIN-1-91 Workers shall be trained
on the proper
techniques to lift heavy
goods.
Training N/A N/A Demonstration
-Compliance with the requirement
will be verified by written exam test
and observational tests of
individuals.
TRIN 1 DRIN 1.0
FRIN 1.2
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-92 Vehicle operators shall
be trained on the proper
regulations associated
operating the LRAE-18.
Training N/A N/A Demonstration
-Compliance with the requirement
will be verified by written exam test
and observational tests of
individuals.
TRIN 2 DRIN 3.0
FRIN 4.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-93 In-house management
shall be trained on the
protocols and
regulations associated
with the managing of
the LRAE-18.
Training N/A N/A Demonstration
-Compliance with the requirement
will be verified by written exam test
and observational tests of
individuals.
TRIN 3 DRIN 4.1.3
FRIN 6.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
PRUIN-1-94 In-house workers shall
be trained on the
protocols and
regulations associated
with oversight of LRAE-
18 operation.
Training N/A N/A Demonstration
-Compliance with the requirement
will be verified by written exam test
and observational tests of
individuals.
TRIN 4 DRIN 4.1.3
FRIN 6.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-95 Support facility
mechanics shall be
trained on the
maintenance associated
with the LRAE-18.
Training N/A N/A Demonstration
-Compliance with the requirement
will be verified by written exam test
and observational tests of
individuals.
TRIN 5 DRIN 1.0
FRIN 4.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-96 The LRAE-18 system
shall utilize safe energy
with non-negative
environmental or health
implications.
Environmental 100 %
utilization of
safe energy.
T=O
100 %
utilization of
safe energy.
T=O
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
energy measurements will be
quantified and analyzed.
ERIN 1 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.2.1 capabilities expressed in the CDD that the
system shall utilize safe energy (FCD, 2014).
PRUIN-1-97 The LRAE-18 system
shall not contribute to
the proliferation of
carbon dioxide release.
Environmental 0 % carbon
dioxide release.
T=O
0 % carbon
dioxide
release.
T=O
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
carbon dioxide measurements will
be quantified and analyzed.
ERIN 2 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.2.2 capabilities expressed in the CDD that the
system shall not contribute to the proliferation of carbon
dioxide release (FCD, 2014).
PRUIN-1-98 The LRAE-18 system
shall not contribute to
the proliferation of air
polluting fume.
Environmental 0 % of air
polluting fumes.
T=O
0 % of air
polluting
fumes.
T=O
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
polluting fume measurements will
be quantified and analyzed.
ERIN 3 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.2.3 capabilities expressed in the CDD that the
system shall not contribute to the proliferation of fumes
(FCD, 2014).
PRUIN-1-99 The LRAE-18 system
shall not contribute to
noise generated from
movement process.
Environmental >50 % reduction
in noise.
90%
reduction in
noise.
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
noise measurements will be
quantified and analyzed.
ERIN 4 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.2.3 capabilities expressed in the CDD that the
system shall not contribute to the generation of noise (FCD,
2014).
PRUIN-1-100 The LRAE-18 system
shall utilize renewable
sources of energy that
increase value and
reduce or eliminate
waste generation.
Environmental 100 %
utilization of
renewable
sources of
energy that
increase value
and reduce or
eliminate waste
generation.
T=O
100 %
utilization of
renewable
sources of
energy that
increase
value and
reduce or
eliminate
waste
generation.
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
ERIN 5 FRIN 4.0
DIN 3.0 & 4.0
Satisfies the 5.1 capabilities expressed in the CDD that the
system shall exploit renewable energy (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
T=O
PRUIN-1-101 The LRAE-18 system
shall utilize free or
cheap renewable
energy sources.
Environmental 90 % utilization
of free or cheap
renewable
energy sources.
100 %
utilization of
free or cheap
renewable
energy
sources.
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
ERIN 6 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 capabilities expressed in the CDD that the
system shall exploit renewable energy (FCD, 2014).
PRUIN-1-102 The LRAE-18 system
shall meet standards of
the Environmental
Protection Agency to
eliminate associated air
pollution fines and
penalties.
Environmental 100 % of the
standards are
meet.
T=O
100 % of the
standards are
meet.
T=O
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
pollutant measurements will be
quantified and analyzed.
ERIN 7 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.5.3 capabilities expressed in the CDD that the
system shall meet all standards of the EPA (FCD, 2014).
PRUIN-1-103 The LRAE-18 system
shall meet standards of
the Department of
Transportation.
Environmental 100 % of the
standards are
meet.
T=O
100 % of the
standards are
meet.
T=O
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
ERIN 8 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.5.4 capabilities expressed in the CDD that the
system shall meet all standards of the DOT (FCD, 2014).
PRUIN-1-104 The LRAE-18 system
shall meet the
standards of the Food
and Drug
Administration.
Environmental 100 % of the
standards are
meet.
T=O
100 % of the
standards are
meet.
T=O
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
ERIN 9 FRIN 3.0
DRIN 2.0
Satisfies the 5.5.9 capabilities expressed in the CDD that the
system shall meet all standards of the FDA (FCD, 2014).
PRUIN-1-105 The LRAE-18 system
shall meet the
incentives from pollution
prevention programs.
Environmental 90 % of all
incentives from
pollution
prevention
programs are
met.
100 % of all
incentives
from pollution
prevention
programs are
met.
Analysis
-Compliance with the requirement
will be verified by system operation
under controlled conditions where
pollutant measurements will be
quantified and analyzed.
ERIN 10 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.5.5 capabilities expressed in the CDD that the
system shall meet incentives from pollution prevention
programs (FCD, 2014).
PRUIN-1-106 The LRAE-18 system
shall have the ability to
utilize renewable
sources of energy for
major energy
consumption
Environmental >99.9 %
renewable
sources of
energy
utilization.
100 %
renewable
sources of
energy
utilization.
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
ERIN 11 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 capabilities expressed in the CDD that the
system shall exploit renewable energy (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
components such as
mobility and air
conditioning.
-Compliance with the requirement
will be verified by observation of
simulated trials.
PRUIN-1-107 The temperature
sensors shall send
signals to the
temperature-regulating
module.
Internal
Interface
100% of the
time the system
shall send
signals
(T=O)
100% of the
time the
system shall
send signals
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 1 FRIN 3.0
DRIN 2.0
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-108 The temperature-
regulating module shall
send signals to the
valve actuator when an
undesirable temperature
is present.
Internal
Interface
100% of the
time the system
shall send
signals
(T=O)
100% of the
time the
system shall
send signals
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 2 FRIN 3.0
DRIN 2.0
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-109 The valve actuator shall
be able to use liquid
nitrogen for cooling the
cargo bay.
Internal
Interface
100% of the
time the system
shall be able to
use liquid
nitrogen for
cooling,
(T=O)
100% of the
time the
system shall
be able to use
liquid nitrogen
for cooling,
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 3 FRIN 3.0
DRIN 2.0
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-110 The valve actuator shall
be able to use heat from
Internal
Interface
100% of the
time the system
100% of the
time the
Inspection IIRIN 4 FRIN 3.0
DRIN 2.0
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
the electro-mechanical
engine for heating the
cargo bay.
shall be able to
use heat from
the electro-
mechanical
engine for
heating.
(T=O)
system shall
be able to use
heat from the
electro-
mechanical
engine for
heating.
(T=O)
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-111 The heat exchanger
shall allow the
movement of
undesirable air to leave
the cargo bay.
Internal
Interface
100% of the
time the system
shall allow
movement of
air.
(T=O)
100% of the
time the
system shall
allow
movement of
air.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 5 FRIN 3.0
DRIN 2.0
Satisfies the 5.5 capabilities expressed in the CDD that of
the system shall reduce total life cycle cost by at least 10%
by the integration of new technology (FCD, 2014).
PRUIN-1-112 The keying module shall
be used to start or stop
the LRAE-18 system.
Internal
Interface
100 % of the
time the key
should start or
stop the system.
(T=O)
100 % of the
time the key
should start or
stop the
system.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 6 FRIN 4.0
DRIN 3.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-113 The bank of batteries
shall output direct
current to the power
inverter.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
IIRIN 7 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by observation of
simulated trials.
PRUIN-1-114 The power inverter shall
convert the direct
current into alternating
current.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 8 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-115 The rotating magnets on
the drive shaft shall
repel the motor-
generator winding coils
during.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 9 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-116 The repelling forces
shall create energy and
rotate the drive shaft.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 10 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-117 The drive shaft shall
rotate the wheels.
Internal
Interface
100 % of the
time.
(T=O)
100 % of the
time the
Inspection IIRIN 11 FRIN 4.0
DRIN 3.0 & 4.0
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
system shall
comply.
(T=O)
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-118 The wheels shall rotate
the drive shaft.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 12 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-119 The heating element
shall heat the liquid
nitrogen to its boiling
point.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 13 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-120 The nitrogen vapor
pressure shall energize
the liquid nitrogen
engine.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
IIRIN 14 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
PRUIN-1-121 The liquid nitrogen
engine shall rotate the
drive shaft and wheels.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 15 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-122 Solar panels shall
capture solar energy
and transfer to bank of
batteries for storage.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 16 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-123 Power grids shall send
electrical energy to
support facilities that
can recharge the
vehicles bank of
batteries.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
IIRIN 17 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
-Compliance with the requirement
will be verified by observation of
simulated trials.
PRUIN-1-124 The regenerative
braking system shall
convert kinetic energy
into usable energy by
using the electro-
mechanical motor-
generator, which
outputs alternating
current.
Internal
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
IIRIN 18 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that
of the system shall exploit renewable/alternative sources of
energy for major intake mechanisms (FCD, 2014).
PRUIN-1-125 Workers shall weigh
goods using a scale.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
EIRIN 1 FRIN 4.0
DRIN 3.0 & 4.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-126 The UPC recognition
module shall obtain bar
coded information from
the bill of goods.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 2 FRIN 6.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-127 The bill of goods shall
contain the identity and
quantity of goods.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
EIRIN 3 FRIN 6.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-128 The crate shall be used
for packaging of goods
for delivery.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 4 FRIN 1.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-129 The vehicle inventory
management module
shall compute the
External
Interface
100 % of the
time the system
shall comply.
100 % of the
time the
Inspection EIRIN 5 FRIN 6.0
DRIN 1.0
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
identity and quantity of
goods being transferred.
(T=O) system shall
comply.
(T=O)
-Compliance with the requirement
will be verified via formal
examination.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
Satisfies the 1.4 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
operators (FCD, 2014).
PRUIN-1-130 Workers to life or lower
goods shall operate the
vehicle elevator.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 6 FRIN 1.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-131 Worker shall move
crated goods.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 7 FRIN 1.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-132 Workers shall secure or
lease the latches used
for protecting goods
during transfer.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 8 FRIN 1.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
support facility workers shall be properly trained on the
mechanisms associated with the LRAE-18 (FCD, 2014).
PRUIN-1-133 The corporate inventory
management system
shall regulate the
database.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 9 FRIN 6.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-134 Corporate inventory
management shall
regulate the goods
database.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 10 FRIN 6.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-135 Vehicle operators shall
use the friendly
interface to inventory
goods, GPS, and
climate controls.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 11 FRIN 4.0
DRIN 4.1
Satisfies the 1.4 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
operators (FCD, 2014).
PRUIN-1-136 Corporate inventory
management shall
regulate the goods
database.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 12 FRIN 6.0
DRIN 1.0
Satisfies the 6.6 capabilities expressed in the CDD that
workers shall be properly trained on the mechanisms
associated with the LRAE-18 (FCD, 2014).
PRUIN-1-137 The regional traffic
reporting system shall
send traffic data to the
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
Inspection
-Compliance with the requirement
will be verified via formal
examination.
EIRIN 13 FRIN 4.0
DRIN 4.1
Satisfies the 1.3 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
world GPS satellite
system.
(T=O)
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
operator that computes smart energy consumption (FCD,
2014).
PRUIN-1-138 The world GPS satellite
system shall send traffic
data to the vehicle GPS
module.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN 14 FRIN 4.0
DRIN 4.1
Satisfies the 1.3 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
operator that computes smart energy consumption (FCD,
2014).
PRUIN-1-139 The vehicle GPS
module shall send traffic
information to the
energy waste reduction
system, vehicle
inventory management
module, and vehicle
dispatching module.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
EIRIN15 FRIN 4.0
DRIN 4.1
Satisfies the 1.3 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
operator that computes smart energy consumption (FCD,
2014).
PRUIN-1-140 The energy waster
reduction system shall
compute the optimal
delivery designation.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination.
Test
-Compliance with the requirement
will be verified by simulation
testing.
EIRIN 16 FRIN 4.0
DRIN 4.1
Satisfies the 1.3 capabilities expressed in the CDD that the
system will have a friendly interface design for the vehicle
operator that computes smart energy consumption (FCD,
2014).
Project Requirement
Unique
Identification
Number
RequirementStatement Requirement
Type
Development
Threshold
Development
Objective
Verification RequirementType
Unique
Identification
Number
RequirementTraceability
Demonstration
-Compliance with the requirement
will be verified by observation of
simulated trials.
PRUIN-1-141 The vehicle dispatch
module shall interface
with the corporate
dispatch system.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the dispatch
module.
Demonstration
-Compliance with the requirement
will be verified by execution of
proper communication between
interfaces.
EIRIN 17 FRIN 6.0
FRIN 4.2.4
Satisfies the 6.5 & 6.6 system attribute expressed in the
CDD that of the system shall have all stakeholders linked to
the product (FCD, 2014).
PRUIN-1-142 The inventory-managing
module shall interface
with the corporate
inventory management
system to account for
goods.
External
Interface
100 % of the
time the system
shall comply.
(T=O)
100 % of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the inventory-
managing module.
Demonstration
-Compliance with the requirement
will be verified by execution of
proper communication between
interfaces.
EIRIN 18 FRIN 6.0
FRIN 4.2.4
Satisfies the 6.5 & 6.6 system attribute expressed in the
CDD that of the system shall have all stakeholders linked to
the product (FCD, 2014).
PRUIN-1-143 The battery shall be
safely disposed of in a
battery-recycling center.
Disposal 100% of the
time the system
shall comply.
(T=O)
100% of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the disposal
method.
DIRIN 1 DRIN 4.0
Satisfies the 5.3 AND 5.3.1 system attribute expressed in the
CDD that of the system shall utilize renewable sources of
energy that reduce or eliminate waste generation.(FCD,
2014)
PRUIN-1-144 Tires shall be safely
disposed of in a tire
recycling facility.
Disposal 100% of the
time the system
shall comply.
(T=O)
100% of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the disposal
method.
DIRIN 2 DRIN 4.0
Satisfies the 5.3 AND 5.3.1 system attribute expressed in the
CDD that of the system shall utilize renewable sources of
energy that reduce or eliminate waste generation.(FCD,
2014)
PRUIN-1-145 Metal used for structure
shall be safely disposed
of or sold for scrap
Disposal 100% of the
time the system
shall comply.
(T=O)
100% of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the disposal
method.
DIRIN 3 DRIN 4.0
Satisfies the 5.3 AND 5.3.1 system attribute expressed in the
CDD that of the system shall utilize renewable sources of
energy that reduce or eliminate waste generation.(FCD,
2014)
PRUIN-1-146 Nitrogen used to power
the cooling system shall
be properly disposed of
Disposal 100% of the
time the system
shall comply.
(T=O)
100% of the
time the
system shall
comply.
(T=O)
Inspection
-Compliance with the requirement
will be verified via formal
examination of the disposal
method.
DIRIN 4 DRIN 4.0
Satisfies the 5.3 AND 5.3.1 system attribute expressed in the
CDD that of the system shall utilize renewable sources of
energy that reduce or eliminate waste generation.(FCD,
2014)

Mais conteúdo relacionado

Mais procurados

Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansPractical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansLiving Online
 
Healthy Buildings Guide To Reopen Retail Stores
Healthy Buildings Guide To Reopen Retail StoresHealthy Buildings Guide To Reopen Retail Stores
Healthy Buildings Guide To Reopen Retail StoresSharadShekar2
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master planPrinka Choudhary
 
Equipment validation
Equipment validationEquipment validation
Equipment validationGaurav Kr
 
In Apc Training Presentation
In  Apc Training PresentationIn  Apc Training Presentation
In Apc Training Presentationahmad bassiouny
 
Cip sip-ctd solution-ivt_presentation
Cip sip-ctd solution-ivt_presentationCip sip-ctd solution-ivt_presentation
Cip sip-ctd solution-ivt_presentationAraik Ambartsumyan
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 
Recovery from a process saturation condition benefits of using delta v pid_plus
Recovery from a process saturation condition benefits of using delta v pid_plusRecovery from a process saturation condition benefits of using delta v pid_plus
Recovery from a process saturation condition benefits of using delta v pid_plusEmerson Exchange
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationMayur Unde
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instrumentsSanathoiba Singha
 
Process Control
Process ControlProcess Control
Process ControlShirleyy
 

Mais procurados (19)

Autoclave validation maliba
Autoclave validation malibaAutoclave validation maliba
Autoclave validation maliba
 
Auditing of hvac by parag
Auditing of hvac by paragAuditing of hvac by parag
Auditing of hvac by parag
 
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and TechniciansPractical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and Technicians
 
Healthy Buildings Guide To Reopen Retail Stores
Healthy Buildings Guide To Reopen Retail StoresHealthy Buildings Guide To Reopen Retail Stores
Healthy Buildings Guide To Reopen Retail Stores
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
Polymer APC
Polymer APCPolymer APC
Polymer APC
 
HVAC
HVACHVAC
HVAC
 
Doc1 copy
Doc1   copyDoc1   copy
Doc1 copy
 
Process validation of tablets
Process validation of tabletsProcess validation of tablets
Process validation of tablets
 
Equipment validation
Equipment validationEquipment validation
Equipment validation
 
In Apc Training Presentation
In  Apc Training PresentationIn  Apc Training Presentation
In Apc Training Presentation
 
Cip sip-ctd solution-ivt_presentation
Cip sip-ctd solution-ivt_presentationCip sip-ctd solution-ivt_presentation
Cip sip-ctd solution-ivt_presentation
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Acc shams
Acc shamsAcc shams
Acc shams
 
Recovery from a process saturation condition benefits of using delta v pid_plus
Recovery from a process saturation condition benefits of using delta v pid_plusRecovery from a process saturation condition benefits of using delta v pid_plus
Recovery from a process saturation condition benefits of using delta v pid_plus
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC Qualification
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instruments
 
Process Control
Process ControlProcess Control
Process Control
 
Is 13849. 1993
Is 13849. 1993Is 13849. 1993
Is 13849. 1993
 

Destaque (15)

10 steps to
10 steps to10 steps to
10 steps to
 
Sample
SampleSample
Sample
 
joint venture
 joint venture joint venture
joint venture
 
Web 2.0
Web 2.0Web 2.0
Web 2.0
 
Universitas Indonesia, kelompok 2
Universitas Indonesia, kelompok 2Universitas Indonesia, kelompok 2
Universitas Indonesia, kelompok 2
 
Photo
PhotoPhoto
Photo
 
C10k and beyond - Uri Shamay, Akamai
C10k and beyond - Uri Shamay, AkamaiC10k and beyond - Uri Shamay, Akamai
C10k and beyond - Uri Shamay, Akamai
 
FAMILIA Paulette Rodriguez Gallegos
FAMILIA Paulette Rodriguez GallegosFAMILIA Paulette Rodriguez Gallegos
FAMILIA Paulette Rodriguez Gallegos
 
Literatura ridnogo kraju
Literatura ridnogo krajuLiteratura ridnogo kraju
Literatura ridnogo kraju
 
friends
friendsfriends
friends
 
Printable 2014-calendars-rubybows
Printable 2014-calendars-rubybowsPrintable 2014-calendars-rubybows
Printable 2014-calendars-rubybows
 
Your new approach to health
Your new approach to healthYour new approach to health
Your new approach to health
 
Super Bowl Food: Tortilla chips
Super Bowl Food: Tortilla chipsSuper Bowl Food: Tortilla chips
Super Bowl Food: Tortilla chips
 
Articles en mathematics_5
Articles en mathematics_5Articles en mathematics_5
Articles en mathematics_5
 
Quantities How to buy something
Quantities How to buy somethingQuantities How to buy something
Quantities How to buy something
 

Semelhante a Requirements Management Matrix done-1

casestudyextractbigpharmav1
casestudyextractbigpharmav1casestudyextractbigpharmav1
casestudyextractbigpharmav1Sam Edwards
 
Sterile process validation
Sterile process validationSterile process validation
Sterile process validationSagar Savale
 
Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical EquipmentsDhawal_Raghuvanshi
 
Pharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingPharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingEric Ferguson
 
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control PerformanceUtilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control PerformanceEmerson Exchange
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoCrown Cork & Seal
 
Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR KUNDLAJAYALAKSHMI
 
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx  microbiology for pharm dGOOD MANUFACTURING PRAC.pptx  microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx microbiology for pharm dtehseenmalik450
 
Qualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarQualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarhimaja donthula
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...Journal For Research
 
Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Jim Cahill
 
Optimized proportional integral derivative (pid) controller for the exhaust t...
Optimized proportional integral derivative (pid) controller for the exhaust t...Optimized proportional integral derivative (pid) controller for the exhaust t...
Optimized proportional integral derivative (pid) controller for the exhaust t...Ali Marzoughi
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...Palash Das
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturingDr. Samia
 
Sterile area
Sterile areaSterile area
Sterile areavijjya22
 

Semelhante a Requirements Management Matrix done-1 (20)

casestudyextractbigpharmav1
casestudyextractbigpharmav1casestudyextractbigpharmav1
casestudyextractbigpharmav1
 
Sterile process validation
Sterile process validationSterile process validation
Sterile process validation
 
Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical Equipments
 
Pharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth TestingPharmaceutical Engineering Downflow Booth Testing
Pharmaceutical Engineering Downflow Booth Testing
 
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control PerformanceUtilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
 
Qualification of gc equipment
Qualification of gc equipmentQualification of gc equipment
Qualification of gc equipment
 
Validación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De ProcesoValidación De Sistemas De Gases De Proceso
Validación De Sistemas De Gases De Proceso
 
Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR Qualification of analytical instrument of FTIR
Qualification of analytical instrument of FTIR
 
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx  microbiology for pharm dGOOD MANUFACTURING PRAC.pptx  microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
 
Qualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarQualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumar
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Pyromon Pro brochure
Pyromon Pro brochurePyromon Pro brochure
Pyromon Pro brochure
 
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...
MODEL BASED ANALYSIS OF TEMPERATURE PROCESS UNDER VARIOUS CONTROL STRATEGIES ...
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvac
 
Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2
 
Optimized proportional integral derivative (pid) controller for the exhaust t...
Optimized proportional integral derivative (pid) controller for the exhaust t...Optimized proportional integral derivative (pid) controller for the exhaust t...
Optimized proportional integral derivative (pid) controller for the exhaust t...
 
EU GMP Revise.pdf
EU GMP Revise.pdfEU GMP Revise.pdf
EU GMP Revise.pdf
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...
 
Sterile products manufacturing
Sterile products manufacturingSterile products manufacturing
Sterile products manufacturing
 
Sterile area
Sterile areaSterile area
Sterile area
 

Requirements Management Matrix done-1

  • 1. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-1 The system shall have the capability to load supermarket goods. Functional NA NA Inspection -Compliance with the following requirements will be verified via formal examination. FRIN 1.0 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-2 The system shall have the capability to weigh goods no more than three quarters of a ton. Functional ≤ ¾ ton per load. > 1 pound but ≤ ¾ ton per load. Inspection -Compliance with the requirement will be verified via formal examination of weight limitations during scale weighing operations. Demonstration -Compliance with the requirement will be verified by observation of weighing goods. FRIN 1.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-3 The system shall have the capability to lift goods no more than half a ton per load. Functional ≤ ¾ ton per load. > 1 pound but ≤ ¾ ton per load. Inspection -Compliance with the requirement will be verified via formal examination of weight lifting margins. Demonstration -Compliance with the requirement will be verified by observation of lifting goods. FRIN 1.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-4 The system shall have the capability to store goods at room temperature. Functional ≤ ½ ton per load. ½ ton per load. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature measurements will be quantified and analyzed. FRIN 1.3 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-5 The system shall have the capability to store goods at refrigerated temperature. Functional Between 73°F & 75°F ± 2 °F. 74°F. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature measurements will be quantified and analyzed. FRIN 1.4 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-6 The system shall have the capability to store goods at freezer temperature. Functional Between 37°F & 41°F. 38°F. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature measurements will be quantified and analyzed. FRIN 1.5 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-7 The system shall have the capability to protect supermarket goods. Functional Between 0°F & 2°F. 0°F. Inspection FRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014).
  • 2. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the following requirements will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of the protection of goods. PRUIN-1-8 The system shall have the capability to secure goods from damage during delivery. Functional N/A N/A Inspection -Compliance with the following requirements will be verified via formal examination the securing mechanism. Demonstration -Compliance with the requirement will be verified by observation of secured goods during delivery. FRIN 2.1 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-9 The system shall have the capability to release goods for unloading. Functional 97% of goods should not be damaged during delivery. 100% of goods should not be damaged during delivery. Inspection -Compliance with the following requirements will be verified via formal examination of the release mechanism. Demonstration -Compliance with the requirement will be verified by observation of secured goods being released. FRIN 2.2 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-10 The system shall have the capability to preserve supermarket goods. Functional 100% of goods should be released during unloading. (T=O) 100% of goods should be released during unloading. (T=O) Inspection -Compliance with the following requirements will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of preservation of goods. FRIN 3.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-11 The System shall have the capability to control the climate in the cargo area. Functional N/A. N/A. Inspection -Compliance with the following requirements will be verified via formal examination of the climate control system. Demonstration -Compliance with the requirement will be verified by observation of the climate control system during operation. FRIN 3.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014).
  • 3. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-12 The system shall have the capability to raise temperature at a rate of 5o F per minute to support climate control. Functional 100% of cargo area shall be climate controlled at all times. (T=O) 100% of cargo area shall be climate controlled at all SFIN times. (T=O) Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. FRIN 3.1.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-13 The system shall have the capability to add heat to the cargo area. Functional Between 3°F & 5°F per minute. 5°F per minute. Demonstration -Compliance with the requirement will be verified by observation of the climate control system’s ability to add heat to the cargo area. FRIN 3.1.1.1 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by exploiting engine heat for raising temperatures (FCD, 2014). PRUIN-1-14 The system shall have the capability to maintain temperature in room temperature band with a tolerance of + 1o F to support climate control. Functional 100% of the time heat should be able to be added to the cargo area. (T=O) 100% of the time heat should be able to be added to the cargo area. (T=O) Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. FRIN 3.1.2 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-15 The system shall have the capability to maintain temperature in refrigerated temperature band with a tolerance of + 1o F to support climate control. Functional Between 73°F & 75°F ± 1°F. 74°F. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. FRIN 3.1.3 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-16 The system shall have the capability to maintain temperature in freezer temperature band with a tolerance of + 1o F to support climate control. Functional Between 37°F & 41°F ± 1° F. 38°F. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. SFIN 3.1.4 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-17 The system shall have the capability to lower temperature at a rate of 5o F per minute to support climate control. Functional Between 0°F & 2°F ± 1°F. 0°F. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. FRIN 3.1.5 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by exploiting liquid nitrogen for lowering temperatures (FCD, 2014). PRUIN-1-18 The system shall have the capability to remove heat from the cargo area. Functional Between 3°F & 5°F per minute. 5°F per minute. Inspection -Compliance with the following requirements will be verified via formal examination of the climate control system. Demonstration FRIN 3.1.5.1 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014).
  • 4. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by observation of the climate control system’s ability to remove heat to the cargo area. PRUIN-1-19 The system shall have the capability to deliver supermarket goods. Functional 100% of the time heat should be able to be removed to the cargo area. (T=O) 100% of the time heat should be able to be removed to the cargo area. (T=O) Inspection -Compliance with the following requirements will be verified via formal examination. FRIN 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-20 The system shall have the capability to start for operation. Functional N/A. N/A. Inspection -Compliance with the following requirement will be verified via formal examination of start of operation. Demonstration -Compliance with the requirement will be verified by observation of turning on the LRAE-18. FRIN 4.1 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-21 The system shall have the capability to be operated manually by personnel. Functional 100% of the time the system shall be able to be started for operation. (T=O) 100% of the time the system shall be able to be started for operation. (T=O) Inspection -Compliance with the following requirement will be verified via formal examination of system ability to be manually operated by personnel. Test -Compliance with the requirement will be verified by simulation testing of manual operation of the vehicle prior to allowing personnel to operate vehicle for safety intentions. Demonstration -Compliance with the requirement will be verified by observation of personnel manually operating the LRAE-18. FRIN 4.2 Satisfies the 6.3 systems attribute expressed in the CDD that of individuals responsible for operating the LRAE-18 shall be trained and have the proper licensure allowing them to manually operate the vehicle (FCD, 2014). PRUIN-1-22 The system shall have the capability to increase speed at a rate of 10 MPH per second to support operation. Functional 100% of the time the system shall be able to be manually operated by personnel. (T=O) 100% of the time the system shall be able to be manually operated by personnel. (T=O) Inspection -Compliance with the following requirements will be verified via formal examination speed fluctuations. Demonstration FRIN 4.2.1 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014).
  • 5. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by observation of speed escalation during operation. PRUIN-1-23 The system shall have the capability to maintain speed to support operation. Functional Between 8 MPH & 10 MPH per second. 10 MPH per second. Inspection -Compliance with the following requirements will be verified via formal examination speed fluctuations. Demonstration -Compliance with the requirement will be verified by observation of speed sustainability during operation. FRIN 4.2.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-24 The system shall have the capability to decrease speed at a rate of 10 MPH per second to support operation. Functional Maintain current speed ± 1 MPH Maintain current speed ± 0.5 MPH Inspection -Compliance with the following requirements will be verified via formal examination speed fluctuations. Demonstration -Compliance with the requirement will be verified by observation of speed escalation during operation. FRIN 4.2.3 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-25 The system shall have the capability to conserve fuel. Functional Between 8 MPH & 10 MPH per second. 10 MPH per second. Inspection -Compliance with the following requirements will be verified via formal examination of energy conserving operations within the system. Demonstration -Compliance with the requirement will be verified by observation of the system ability to conserve fuel. FRIN 4.2.4 Satisfies the 6.2 systems attribute expressed in the CDD that the system shall have optimal operating conditions for maximum energy spared during transportation of grocery goods to supermarket chains. (FCD, 2014). PRUIN-1-26 The system shall have the capability to stop from operation. Functional 100% of the time the system shall be able to be stopped from operation. (T=O) 100% of the time the system shall be able to be stopped from operation. (T=O) Inspection -Compliance with the following requirements will be verified via formal examination of stop of operation. Demonstration -Compliance with the requirement will be verified by observation of turning off the LRAE-18. FRIN 4.3 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-27 The system shall have the capability to unload supermarket goods. Functional 100% of the time the system shall be able to 100% of the time the system shall Inspection -Compliance with the following requirements will be verified via FRIN 5.0 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014).
  • 6. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability be stopped from operation. (T=O) be able to be stopped from operation. (T=O) formal examination of the unloading of goods. Demonstration -Compliance with the requirement will be verified by observation of retrieving goods. PRUIN-1-28 The system shall have the capability to retrieve goods. Functional N/A N/A Inspection -Compliance with the following requirements will be verified via formal examination of the retrieval of goods. Demonstration -Compliance with the requirement will be verified by observation of recovering goods. FRIN 5.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-29 The system shall have the capability to lower goods no more than half a ton per load. Functional 100% of the time the system shall be able to retrieve goods. (T=O) 100% of the time the system shall be able to retrieve goods. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of weight lowering margins. Demonstration -Compliance with the requirement will be verified by observation of lowering goods. FRIN 5.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-30 The system shall have the capability to track supermarket goods. Functional ≤ ½ ton per load. ½ ton per load. Inspection -Compliance with the following requirements will be verified via formal examination. FRIN 6.0 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-31 The system shall have the capability to identify any goods. Functional 100% of the time the system shall be able to identify goods. (T=O) 100% of the time the system shall be able to identify goods. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of identification of goods. Demonstration -Compliance with the requirement will be verified by observation of the system ability to identify goods. FRIN 6.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-32 The system shall have the capability to log goods into the tracking system. Functional 100% of the time the system shall be able to log goods into 100% of the time the system shall be able to log goods into the Inspection -Compliance with the requirement will be verified via formal examination of the tracking system. FRIN 6.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014).
  • 7. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability the tracking system. (T=O) tracking system. (T=O) Demonstration -Compliance with the requirement will be verified by execution of logging goods into the tracking system. PRUIN-1-33 The system shall have the capability to log the quantity of any goods. Functional 100% of the time the system shall be able to log the quantity of goods into the tracking system. (T=O) 100% of the time the system shall be able to log the quantity of goods into the tracking system. (T=O) Inspection -Compliance with the requirement will be verified via formal examination tracking system. Demonstration -Compliance with the requirement will be verified by observation of successful accountability for quantified amounts of logged goods. FRIN 6.2.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-34 The system shall have the capability to log the weight of any goods. Functional 100% of the time the system shall be able to log the weight of goods into the tracking system. (T=O) 100% of the time the system shall be able to log the weight of goods into the tracking system. (T=O) Inspection -Compliance with the requirement will be verified via formal examination tracking system. Demonstration -Compliance with the requirement will be verified by observation of weight of goods being logged in the tracking system. FRIN 6.2.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-35 The LRAE-18 shall have a load management system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the load management system and associated requirements. DRIN 1.0 SDIN 1.0 SFIN 1.0 SFIN 2.0 SFIN 5.0 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-36 The load management system shall have a scale to weigh goods no more than three quarter of a ton. Design ≤ ¾ ton per load. > 1 pound but ≤ ¾ ton per load. Inspection -Compliance with the requirement will be verified via formal examination of weight limitations during scale weighing operations. DRIN 1.1 SDIN 1.1 SFIN 1.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-37 The load management system shall have an elevator to lift goods no more than half a ton per load. Design ≤ ½ ton per load. ½ ton per load. Inspection -Compliance with the requirement will be verified via formal examination of weight lifting margins. DRIN 1.2.1 SDIN 1.2.1 SFIN 1.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-38 The load management system shall have an elevator to lower goods no more than half a ton per load. Design ≤ ½ ton per load. ½ ton per load. Inspection -Compliance with the requirement will be verified via formal examination of weight lowering margins. DRIN 1.2.2 SDIN 1.2.2 SFIN 5.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014).
  • 8. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-39 The load management system shall have a total of 9 bays, with 3 bays at the top level, 3 bays at the bottom level, and 3 bays between the top and bottom level. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of total bays per level. DRIN 1.3 SDIN 1.3 SFIN 1.3 – 1.5 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-40 The load management system shall have latches for securing goods. Design 97% of goods should not be damaged during delivery. 100% of goods should not be damaged during delivery. Inspection -Compliance with the requirement will be verified via formal examination of latches for securing goods. DRIN 1.4.1 SDIN 1.4.1 SFIN 2.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-41 The load management system shall have latches for releasing goods. Design 100% of goods should be released during unloading. (T=O) 100% of goods should be released during unloading. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of latches for releasing goods. DRIN 1.4.2 SDIN 1.4.2 SFIN 2.2 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-42 The LRAE-18 shall have a climate control system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of climate control system and associated requirements. DRIN 2.0 SDIN 2.0 SFIN 3.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-43 The climate control system shall use liquid nitrogen to remove heat for lowering the temperature in each bay at a rate of 5o F per minute. Design 100% of the time heat should be able to be removed from the cargo area. (T=O) 100% of the time heat should be able to be removed from the cargo area. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of liquid nitrogen used for lowering temperatures. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature measurements will be quantified and analyzed. DRIN 2.1 SDIN 2.1 SFIN 3.1.5.1 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-44 The climate control system shall use heat from the electro- mechanical engine to add heat for raising the temperature in each bay at a rate of 5o F per minute. Design 100% of the time heat should be able to be added to the cargo area. (T=O) 100% of the time heat should be able to be added to the cargo area. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of electro-mechanical engine heat used for raising temperatures. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature DRIN 2.2 SDIN 2.2 SFIN 3.1.1.1 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014).
  • 9. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability measurements will be quantified and analyzed. PRUIN-1-45 The climate control system shall have a temperature regulating module for maintaining temperature in room temperature band with a tolerance of + 1o F in each of the 3 bays at the top level. Design Between 73°F & 75°F ± 1°F. 74°F. Inspection -Compliance with the requirement will be verified via formal examination of the temperature regulator used for maintaining temperatures. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. DRIN 2.0.1 SDIN 2.0.1 SFIN 3.1.2 – 3.1.4 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-46 The climate control system shall have a temperature regulating module for maintaining temperature in refrigerated temperature band with a tolerance of + 1o F in each of the 3 bays at the middle level. Design Between 37°F & 41°F ± 1° F. 38°F. Inspection -Compliance with the requirement will be verified via formal examination of the temperature regulator used for maintaining temperatures. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. DRIN 2.0.2 SDIN 2.0.2 SFIN 3.1.2 – 3.1.4 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-47 The climate control system shall have a temperature regulating module for maintaining temperature in freezer temperature band with a tolerance of + 1o F in each of the 3 bays at the bottom level. Design Between 0°F & 2°F ± 1°F. 0°F. Inspection -Compliance with the requirement will be verified via formal examination of the temperature regulator used for maintaining temperatures. Analysis - Compliance with the requirement will be verified by cargo climate operation, under controlled conditions where temperature fluctuation measurements will be quantified and analyzed. DRIN 2.0.3 SDIN 2.0.3 SFIN 3.1.2 – 3.1.4 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-48 The LRAE-18 shall have a propulsion system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the propulsion system and associated requirements. DRIN 3.0 SDIN 3.0 SFIN 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014).
  • 10. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-49 The propulsion system shall have a keying module for interfacing with the operator to start the vehicle. Design 100% of the time the system shall be able to be started for operation. (T=O) 100% of the time the system shall be able to be started for operation. (T=O) Inspection -Compliance with the requirement will be verified by visual examination of the keying module. Demonstration -Compliance with the requirement will be verified by observation keying module interface with operator to start the vehicle. DRIN 3.0.1 SDIN 3.0.1 SFIN 4.1 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-50 The propulsion system shall have a keying module for interfacing with the operator to stop the vehicle. Design 100% of the time the system shall be able to be stopped from operation. (T=O) 100% of the time the system shall be able to be stopped from operation. (T=O) Inspection -Compliance with the requirement will be verified by visual examination of the keying module. Demonstration -Compliance with the requirement will be verified by observation keying module interface with operator to stop the vehicle. DRIN 3.0.2 SDIN 3.0.2 SFIN 4.3 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-51 The propulsion system shall have a speed- regulating module for interfacing with the operator to increase vehicle speed. Design Between 8 MPH & 10 MPH per second. 10 MPH per second. Inspection -Compliance with the requirement will be verified by visual examination of the speed- regulating module. Demonstration -Compliance with the requirement will be verified by observation speed-regulating module interface with operator to increase speed of the vehicle. DRIN 3.0.3 SDIN 3.0.3 SFIN 4.2.1 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-52 The propulsion system shall have a speed regulating module for interfacing with the operator to maintain vehicle speed. Design Maintain current speed ± 1 MPH Maintain current speed ± 0.5 MPH Inspection -Compliance with the requirement will be verified by visual examination of the speed- regulating module. Demonstration -Compliance with the requirement will be verified by observation speed-regulating module interface DRIN 3.0.4 SDIN 3.0.4 SFIN 4.2.2 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014).
  • 11. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability with operator to maintain the speed of the vehicle. PRUIN-1-53 The propulsion system shall have a speed regulating module for interfacing with the operator to decrease vehicle speed. Design Between 8 MPH & 10 MPH per second. 10 MPH per second. Inspection -Compliance with the requirement will be verified by visual examination of the speed- regulating module. Demonstration -Compliance with the requirement will be verified by observation speed-regulating module interface with operator to decrease speed of the vehicle. DRIN 3.0.5 SDIN 3.0.5 SFIN 4.2.3 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-54 The propulsion system shall have a backup liquid nitrogen engine. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the backup liquid nitrogen engine. Demonstration -Compliance with the requirement will be verified by observation of the liquid nitrogen engine during operation. DRIN 3.1 SDIN 3.1 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-55 The liquid nitrogen engine shall run off of liquid nitrogen. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of liquid nitrogen engine in operation. Demonstration -Compliance with the requirement will be verified by observation of the use of liquid nitrogen to operate the backup liquid nitrogen engine. DRIN 3.1.1 SDIN 3.1.1 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-56 The propulsion system shall have a primary electro-mechanical engine. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the primary electro- mechanical engine. Demonstration -Compliance with the requirement will be verified by observation of DRIN 3.2 SDIN 3.2 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014).
  • 12. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability the electro-mechanical engine during operation. PRUIN-1-57 The electro-mechanical engine shall have a rechargeable battery. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the rechargeable battery associated with the electro- mechanical engine. DRIN 3.2.1 SDIN 3.2.1 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-58 The rechargeable battery shall store energy input from solar panels. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the rechargeable battery storage capabilities. Demonstration -Compliance with the requirement will be verified by observation of the rechargeable battery ability to store energy input from solar panels. DRIN 3.2.1.1 SDIN 3.2.1.1 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-59 The solar panels shall absorb solar energy from the sun. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the solar panels. Demonstration -Compliance with the requirement will be verified by observation of the solar panel ability intake solar energy from the sun. DRIN 3.2.1.1.1 SDIN 3.2.1.1.1 SFIN 4.2 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-60 The LRAE-18 shall have a smart energy consumption system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of smart energy consumption system and associated requirements. DRIN 4.0 SDIN 4.0 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-61 The smart energy consumption system shall have an energy waste reduction system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination to account quantities of energy waste. DRIN 4.1 SDIN 4.1 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-62 The energy waste reduction system shall have a GPS module for interfacing with a global positioning system satellite. Design 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of GPS from the interface design. Test DRIN 4.1.1 SDIN 4.1.1 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014).
  • 13. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by simulation testing proving optimal decision-making by the interface system. PRUIN-1-63 The energy waste reduction system shall have a traffic updating module for interfacing with the regional traffic reporting system. Design 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of traffic reports from the interface design. Test -Compliance with the requirement will be verified by simulation testing proving optimal decision-making by the interface system. DRIN 4.1.2 SDIN 4.1.2 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-64 The energy waste reduction system shall have an inventory managing system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the inventory management system accounting for all the goods. DRIN 4.1.3 SDIN 4.1.3 SFIN 6.0 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-65 The inventory managing system shall a UPC recognition module to identify goods. Design 100% of the time the system shall be able to identify goods. (T=O) 100% of the time the system shall be able to identify goods. (T=O) Demonstration -Compliance with the requirement will be verified via detailed inspection of module while the vehicle is in operation DRIN 4.1.3.1 SDIN 4.1.3.1 SFIN 6.1 SFIN 4.2.4 Satisfies the 5.3 capabilities expressed in the CDD that of the system shall exploit smart energy consumption (FCD, 2014). PRUIN-1-66 The inventory managing system shall log the quantity of identified goods. Design 100% of the time the system shall be able to log quantity of goods into the tracking system. (T=O) 100% of the time the system shall be able to log quantity of goods into the tracking system. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the tracking system. Demonstration -Compliance with the requirement will be verified by execution of logging goods into the tracking system. DRIN 4.1.3 SDIN 4.1.3 SFIN 6.2.1 SFIN 4.2.4 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014). PRUIN-1-67 The inventory managing system shall log the weight of identified goods. Design 100% of the time the system shall be able to log weight of goods into the tracking system. (T=O) 100% of the time the system shall be able to log weight of goods into the tracking system. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the tracking system. Demonstration -Compliance with the requirement will be verified by execution of logging goods into the tracking system. DRIN 4.1.3 SDIN 4.1.3 SFIN 6.2.2 SFIN 4.2.4 Satisfies the 5.4 capabilities expressed in the CDD that of the system shall have a user-friendly human interface design (FCD, 2014).
  • 14. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-68 The smart energy consumption system shall have an energy reclaiming system. Design N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of the energy reclaim system and associated systems. DRIN 4.2 SDIN 4.2 SFIN 4.2.4 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-69 The energy reclaiming system shall have a mechanical energy reclaiming system that reclaims kinetic energy lost when traveling. Design 100% of the time the system shall be able to reclaim kinetic energy lost when traveling. (T=O) 100% of the time the system shall be able to reclaim kinetic energy lost when traveling. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the mechanical energy reclaiming system. Test -Compliance with the requirement will be verified by simulation testing proving optimal reclaimed energy during traveling. Analysis - Compliance with the requirement will be verified by the mechanical energy reclaiming system, under controlled conditions where energy gains are measured and will be quantified and analyzed. DRIN 4.2.1 SDIN 4.2.1 SFIN 4.2.4 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-70 The energy reclaiming system shall have a regenerative braking system that reclaims kinetic energy lost when stopping. Design 100% of the time the system shall be able to reclaim kinetic energy lost when stopping. (T=O) 100% of the time the system shall be able to reclaim kinetic energy lost when stopping. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the regenerative breaking system. Test -Compliance with the requirement will be verified by simulation testing proving optimal reclaimed energy braking evolutions when traveling. Analysis - Compliance with the requirement will be verified by the regenerative breaking system, under controlled conditions where energy gains are measured and will be quantified and analyzed. DRIN 4.2.2 SDIN 4.2.2 SFIN 4.2.4 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-71 When workers are lifting heavy items, steel-toed shoes shall be worn. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. SRIN 1 FRIN 1.2 DRIN 1.0 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be
  • 15. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-72 When workers are lifting heavy items, pinch free gloves shall be worn. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 2 FRIN 1.2 DRIN 1.0 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-73 Workers when lifting heavy items shall use proper lifting techniques. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 3 FRIN 1.2 DRIN 1.0 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-74 Workers operating the vehicle elevator shall stand clear of the load. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 4 FRIN 1.2 DRIN 1.2 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-75 When workers are securing latches, pinch free gloves shall be worn. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration SRIN 5 FRIN 2.1 DRIN 1.4 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014).
  • 16. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. PRUIN-1-76 When workers are releasing latches, pinch free gloves shall be worn. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 6 FRIN 2.1 DRIN 1.4 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-77 The vehicle operator shall wear a seat belt when the keying module is engaged. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 7 FRIN 4.2 DRIN 3.0 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-78 The vehicle operator shall obey all vehicle operation policies. Safety N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 8 FRIN 4.2 DRIN 3.0 Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014). PRUIN-1-79 The LRAE-18 shall meet the standards of the Occupational Safety and Health Administration. Safety 100 % of the standards are meet. T=O 100 % of the standards are meet. T=O Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations. Demonstration -Compliance with the requirement will be verified by observation of workforce obeying rules and regulations. SRIN 9 FRIN in its entirety DRIN in its entirety Satisfies the 6.3, 6.4, & 6.6 capabilities expressed in the CDD that workers associated with the LREA-18 shall be properly trained and be aware of safety concerns (FCD, 2014).
  • 17. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-80 Workers packing the crate with goods shall place heavy goods in separate crates from light or fragile goods. Packaging N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations on packaging requirements. Demonstration -Compliance with the requirement will be verified by observation of workforce packaging goods appropriately. PRIN 1 FRIN 2.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-81 The packed crate containing room temperature goods shall be stored in the room temperature bay. Packaging N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations on storage requirements. Demonstration -Compliance with the requirement will be verified by observation of workforce storing goods appropriately. PRIN 2 FRIN 1.3 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-82 The packed crate containing frozen goods shall be stored in the freezer bay. Packaging N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations on storage requirements. Demonstration -Compliance with the requirement will be verified by observation of workforce storing goods appropriately. PRIN 3 FRIN 1.5 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-83 The packed crate containing refrigerated goods shall be stored in the refrigerated bay. Packaging N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations on storage requirements. Demonstration -Compliance with the requirement will be verified by observation of workforce storing goods appropriately. PRIN 4 FRIN 1.4 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014).
  • 18. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-84 When loading crate containing goods into respective bay the crate shall be secured with latches to prevent damage of goods. Packaging N/A N/A Inspection -Compliance with the requirement will be verified via formal examination of workforce fulfillment with rules and regulations on packaging requirements. Demonstration -Compliance with the requirement will be verified by observation of workforce packaging goods appropriately. PRIN 5 FRIN 2.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-85 The corporate inventory management system shall have all central information protected. Security 100% of the time the system shall be able provided security against theft (T=O) 100% of the time the system shall be able provided security against theft (T=O) Inspection -Compliance with the requirement will be verified via formal examination security system associated with the corporate inventory management system. Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. PRIN 1 FRIN 6.0 DRIN 4.1.3 Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-86 The load management system shall have a locking mechanism to secure all goods held within the cargo area. Security 100% of the time the system shall be able provided security against theft (T=O) 100% of the time the system shall be able provided security against theft (T=O) Inspection -Compliance with the requirement will be verified via formal examination security system associated with the load management system. Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. PRIN 2 FRIN 2.0 DRIN 1.4 Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-87 The LRAE-18 system shall have a security alarm installed on the vehicle that becomes engaged when the vehicle is locked. Security 100% of the time the system shall be able provided security against theft (T=O) 100% of the time the system shall be able provided security against theft (T=O) Inspection -Compliance with the requirement will be verified via formal examination security system associated with the LRAE-18 system Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. PRIN 3 FRIN 2.0 DRIN 1.4 Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-88 The corporate dispatching system shall Security 100% of the time the system shall be able 100% of the time the system shall Inspection -Compliance with the requirement will be verified via formal PRIN 4 FRIN 6.0 DRIN 4.1.4
  • 19. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability have all have all central information protected. provided security against theft (T=O) be able provided security against theft (T=O) examination security system associated with corporate dispatching system Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-89 Support facilities shall have locking mechanism to secure all doors of the facility. Security 100% of the time the system shall be able provided security against theft (T=O) 100% of the time the system shall be able provided security against theft (T=O) Inspection -Compliance with the requirement will be verified via formal examination security system associated with support facility doors. Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. PRIN 5 FRIN 2.0 DRIN 1.4 Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-90 Support facilities shall have locking mechanism to secure all associated equipment located at the facility. Security 100% of the time the system shall be able provided security against theft (T=O) 100% of the time the system shall be able provided security against theft (T=O) Inspection -Compliance with the requirement will be verified via formal examination security system associated with the support facility equipment. Demonstration -Compliance with the requirement will be verified by observation simulated theft trials. PRIN 6 FRIN 2.0 DRIN 1.4 Satisfies the 6.4 capabilities expressed in the CDD that system shall protect associated products from security risks such as theft or vandalism (FCD, 2014). PRUIN-1-91 Workers shall be trained on the proper techniques to lift heavy goods. Training N/A N/A Demonstration -Compliance with the requirement will be verified by written exam test and observational tests of individuals. TRIN 1 DRIN 1.0 FRIN 1.2 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-92 Vehicle operators shall be trained on the proper regulations associated operating the LRAE-18. Training N/A N/A Demonstration -Compliance with the requirement will be verified by written exam test and observational tests of individuals. TRIN 2 DRIN 3.0 FRIN 4.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-93 In-house management shall be trained on the protocols and regulations associated with the managing of the LRAE-18. Training N/A N/A Demonstration -Compliance with the requirement will be verified by written exam test and observational tests of individuals. TRIN 3 DRIN 4.1.3 FRIN 6.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014).
  • 20. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability PRUIN-1-94 In-house workers shall be trained on the protocols and regulations associated with oversight of LRAE- 18 operation. Training N/A N/A Demonstration -Compliance with the requirement will be verified by written exam test and observational tests of individuals. TRIN 4 DRIN 4.1.3 FRIN 6.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-95 Support facility mechanics shall be trained on the maintenance associated with the LRAE-18. Training N/A N/A Demonstration -Compliance with the requirement will be verified by written exam test and observational tests of individuals. TRIN 5 DRIN 1.0 FRIN 4.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-96 The LRAE-18 system shall utilize safe energy with non-negative environmental or health implications. Environmental 100 % utilization of safe energy. T=O 100 % utilization of safe energy. T=O Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where energy measurements will be quantified and analyzed. ERIN 1 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.2.1 capabilities expressed in the CDD that the system shall utilize safe energy (FCD, 2014). PRUIN-1-97 The LRAE-18 system shall not contribute to the proliferation of carbon dioxide release. Environmental 0 % carbon dioxide release. T=O 0 % carbon dioxide release. T=O Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where carbon dioxide measurements will be quantified and analyzed. ERIN 2 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.2.2 capabilities expressed in the CDD that the system shall not contribute to the proliferation of carbon dioxide release (FCD, 2014). PRUIN-1-98 The LRAE-18 system shall not contribute to the proliferation of air polluting fume. Environmental 0 % of air polluting fumes. T=O 0 % of air polluting fumes. T=O Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where polluting fume measurements will be quantified and analyzed. ERIN 3 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.2.3 capabilities expressed in the CDD that the system shall not contribute to the proliferation of fumes (FCD, 2014). PRUIN-1-99 The LRAE-18 system shall not contribute to noise generated from movement process. Environmental >50 % reduction in noise. 90% reduction in noise. Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where noise measurements will be quantified and analyzed. ERIN 4 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.2.3 capabilities expressed in the CDD that the system shall not contribute to the generation of noise (FCD, 2014). PRUIN-1-100 The LRAE-18 system shall utilize renewable sources of energy that increase value and reduce or eliminate waste generation. Environmental 100 % utilization of renewable sources of energy that increase value and reduce or eliminate waste generation. T=O 100 % utilization of renewable sources of energy that increase value and reduce or eliminate waste generation. Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. ERIN 5 FRIN 4.0 DIN 3.0 & 4.0 Satisfies the 5.1 capabilities expressed in the CDD that the system shall exploit renewable energy (FCD, 2014).
  • 21. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability T=O PRUIN-1-101 The LRAE-18 system shall utilize free or cheap renewable energy sources. Environmental 90 % utilization of free or cheap renewable energy sources. 100 % utilization of free or cheap renewable energy sources. Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. ERIN 6 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 capabilities expressed in the CDD that the system shall exploit renewable energy (FCD, 2014). PRUIN-1-102 The LRAE-18 system shall meet standards of the Environmental Protection Agency to eliminate associated air pollution fines and penalties. Environmental 100 % of the standards are meet. T=O 100 % of the standards are meet. T=O Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where pollutant measurements will be quantified and analyzed. ERIN 7 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.5.3 capabilities expressed in the CDD that the system shall meet all standards of the EPA (FCD, 2014). PRUIN-1-103 The LRAE-18 system shall meet standards of the Department of Transportation. Environmental 100 % of the standards are meet. T=O 100 % of the standards are meet. T=O Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. ERIN 8 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.5.4 capabilities expressed in the CDD that the system shall meet all standards of the DOT (FCD, 2014). PRUIN-1-104 The LRAE-18 system shall meet the standards of the Food and Drug Administration. Environmental 100 % of the standards are meet. T=O 100 % of the standards are meet. T=O Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. ERIN 9 FRIN 3.0 DRIN 2.0 Satisfies the 5.5.9 capabilities expressed in the CDD that the system shall meet all standards of the FDA (FCD, 2014). PRUIN-1-105 The LRAE-18 system shall meet the incentives from pollution prevention programs. Environmental 90 % of all incentives from pollution prevention programs are met. 100 % of all incentives from pollution prevention programs are met. Analysis -Compliance with the requirement will be verified by system operation under controlled conditions where pollutant measurements will be quantified and analyzed. ERIN 10 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.5.5 capabilities expressed in the CDD that the system shall meet incentives from pollution prevention programs (FCD, 2014). PRUIN-1-106 The LRAE-18 system shall have the ability to utilize renewable sources of energy for major energy consumption Environmental >99.9 % renewable sources of energy utilization. 100 % renewable sources of energy utilization. Inspection -Compliance with the requirement will be verified via formal examination. Demonstration ERIN 11 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 capabilities expressed in the CDD that the system shall exploit renewable energy (FCD, 2014).
  • 22. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability components such as mobility and air conditioning. -Compliance with the requirement will be verified by observation of simulated trials. PRUIN-1-107 The temperature sensors shall send signals to the temperature-regulating module. Internal Interface 100% of the time the system shall send signals (T=O) 100% of the time the system shall send signals (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 1 FRIN 3.0 DRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-108 The temperature- regulating module shall send signals to the valve actuator when an undesirable temperature is present. Internal Interface 100% of the time the system shall send signals (T=O) 100% of the time the system shall send signals (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 2 FRIN 3.0 DRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-109 The valve actuator shall be able to use liquid nitrogen for cooling the cargo bay. Internal Interface 100% of the time the system shall be able to use liquid nitrogen for cooling, (T=O) 100% of the time the system shall be able to use liquid nitrogen for cooling, (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 3 FRIN 3.0 DRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-110 The valve actuator shall be able to use heat from Internal Interface 100% of the time the system 100% of the time the Inspection IIRIN 4 FRIN 3.0 DRIN 2.0
  • 23. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability the electro-mechanical engine for heating the cargo bay. shall be able to use heat from the electro- mechanical engine for heating. (T=O) system shall be able to use heat from the electro- mechanical engine for heating. (T=O) -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-111 The heat exchanger shall allow the movement of undesirable air to leave the cargo bay. Internal Interface 100% of the time the system shall allow movement of air. (T=O) 100% of the time the system shall allow movement of air. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 5 FRIN 3.0 DRIN 2.0 Satisfies the 5.5 capabilities expressed in the CDD that of the system shall reduce total life cycle cost by at least 10% by the integration of new technology (FCD, 2014). PRUIN-1-112 The keying module shall be used to start or stop the LRAE-18 system. Internal Interface 100 % of the time the key should start or stop the system. (T=O) 100 % of the time the key should start or stop the system. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 6 FRIN 4.0 DRIN 3.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-113 The bank of batteries shall output direct current to the power inverter. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration IIRIN 7 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014).
  • 24. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by observation of simulated trials. PRUIN-1-114 The power inverter shall convert the direct current into alternating current. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 8 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-115 The rotating magnets on the drive shaft shall repel the motor- generator winding coils during. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 9 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-116 The repelling forces shall create energy and rotate the drive shaft. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 10 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-117 The drive shaft shall rotate the wheels. Internal Interface 100 % of the time. (T=O) 100 % of the time the Inspection IIRIN 11 FRIN 4.0 DRIN 3.0 & 4.0
  • 25. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability system shall comply. (T=O) -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-118 The wheels shall rotate the drive shaft. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 12 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-119 The heating element shall heat the liquid nitrogen to its boiling point. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 13 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-120 The nitrogen vapor pressure shall energize the liquid nitrogen engine. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test IIRIN 14 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014).
  • 26. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. PRUIN-1-121 The liquid nitrogen engine shall rotate the drive shaft and wheels. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 15 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-122 Solar panels shall capture solar energy and transfer to bank of batteries for storage. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 16 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-123 Power grids shall send electrical energy to support facilities that can recharge the vehicles bank of batteries. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration IIRIN 17 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014).
  • 27. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability -Compliance with the requirement will be verified by observation of simulated trials. PRUIN-1-124 The regenerative braking system shall convert kinetic energy into usable energy by using the electro- mechanical motor- generator, which outputs alternating current. Internal Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. IIRIN 18 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 5.1 & 5.2 capabilities expressed in the CDD that of the system shall exploit renewable/alternative sources of energy for major intake mechanisms (FCD, 2014). PRUIN-1-125 Workers shall weigh goods using a scale. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. EIRIN 1 FRIN 4.0 DRIN 3.0 & 4.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-126 The UPC recognition module shall obtain bar coded information from the bill of goods. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 2 FRIN 6.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-127 The bill of goods shall contain the identity and quantity of goods. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. EIRIN 3 FRIN 6.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-128 The crate shall be used for packaging of goods for delivery. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 4 FRIN 1.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-129 The vehicle inventory management module shall compute the External Interface 100 % of the time the system shall comply. 100 % of the time the Inspection EIRIN 5 FRIN 6.0 DRIN 1.0
  • 28. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability identity and quantity of goods being transferred. (T=O) system shall comply. (T=O) -Compliance with the requirement will be verified via formal examination. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. Satisfies the 1.4 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle operators (FCD, 2014). PRUIN-1-130 Workers to life or lower goods shall operate the vehicle elevator. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 6 FRIN 1.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-131 Worker shall move crated goods. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 7 FRIN 1.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-132 Workers shall secure or lease the latches used for protecting goods during transfer. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 8 FRIN 1.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that support facility workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-133 The corporate inventory management system shall regulate the database. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 9 FRIN 6.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-134 Corporate inventory management shall regulate the goods database. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 10 FRIN 6.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-135 Vehicle operators shall use the friendly interface to inventory goods, GPS, and climate controls. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 11 FRIN 4.0 DRIN 4.1 Satisfies the 1.4 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle operators (FCD, 2014). PRUIN-1-136 Corporate inventory management shall regulate the goods database. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 12 FRIN 6.0 DRIN 1.0 Satisfies the 6.6 capabilities expressed in the CDD that workers shall be properly trained on the mechanisms associated with the LRAE-18 (FCD, 2014). PRUIN-1-137 The regional traffic reporting system shall send traffic data to the External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. Inspection -Compliance with the requirement will be verified via formal examination. EIRIN 13 FRIN 4.0 DRIN 4.1 Satisfies the 1.3 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle
  • 29. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability world GPS satellite system. (T=O) Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. operator that computes smart energy consumption (FCD, 2014). PRUIN-1-138 The world GPS satellite system shall send traffic data to the vehicle GPS module. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN 14 FRIN 4.0 DRIN 4.1 Satisfies the 1.3 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle operator that computes smart energy consumption (FCD, 2014). PRUIN-1-139 The vehicle GPS module shall send traffic information to the energy waste reduction system, vehicle inventory management module, and vehicle dispatching module. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. Demonstration -Compliance with the requirement will be verified by observation of simulated trials. EIRIN15 FRIN 4.0 DRIN 4.1 Satisfies the 1.3 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle operator that computes smart energy consumption (FCD, 2014). PRUIN-1-140 The energy waster reduction system shall compute the optimal delivery designation. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination. Test -Compliance with the requirement will be verified by simulation testing. EIRIN 16 FRIN 4.0 DRIN 4.1 Satisfies the 1.3 capabilities expressed in the CDD that the system will have a friendly interface design for the vehicle operator that computes smart energy consumption (FCD, 2014).
  • 30. Project Requirement Unique Identification Number RequirementStatement Requirement Type Development Threshold Development Objective Verification RequirementType Unique Identification Number RequirementTraceability Demonstration -Compliance with the requirement will be verified by observation of simulated trials. PRUIN-1-141 The vehicle dispatch module shall interface with the corporate dispatch system. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the dispatch module. Demonstration -Compliance with the requirement will be verified by execution of proper communication between interfaces. EIRIN 17 FRIN 6.0 FRIN 4.2.4 Satisfies the 6.5 & 6.6 system attribute expressed in the CDD that of the system shall have all stakeholders linked to the product (FCD, 2014). PRUIN-1-142 The inventory-managing module shall interface with the corporate inventory management system to account for goods. External Interface 100 % of the time the system shall comply. (T=O) 100 % of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the inventory- managing module. Demonstration -Compliance with the requirement will be verified by execution of proper communication between interfaces. EIRIN 18 FRIN 6.0 FRIN 4.2.4 Satisfies the 6.5 & 6.6 system attribute expressed in the CDD that of the system shall have all stakeholders linked to the product (FCD, 2014). PRUIN-1-143 The battery shall be safely disposed of in a battery-recycling center. Disposal 100% of the time the system shall comply. (T=O) 100% of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the disposal method. DIRIN 1 DRIN 4.0 Satisfies the 5.3 AND 5.3.1 system attribute expressed in the CDD that of the system shall utilize renewable sources of energy that reduce or eliminate waste generation.(FCD, 2014) PRUIN-1-144 Tires shall be safely disposed of in a tire recycling facility. Disposal 100% of the time the system shall comply. (T=O) 100% of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the disposal method. DIRIN 2 DRIN 4.0 Satisfies the 5.3 AND 5.3.1 system attribute expressed in the CDD that of the system shall utilize renewable sources of energy that reduce or eliminate waste generation.(FCD, 2014) PRUIN-1-145 Metal used for structure shall be safely disposed of or sold for scrap Disposal 100% of the time the system shall comply. (T=O) 100% of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the disposal method. DIRIN 3 DRIN 4.0 Satisfies the 5.3 AND 5.3.1 system attribute expressed in the CDD that of the system shall utilize renewable sources of energy that reduce or eliminate waste generation.(FCD, 2014) PRUIN-1-146 Nitrogen used to power the cooling system shall be properly disposed of Disposal 100% of the time the system shall comply. (T=O) 100% of the time the system shall comply. (T=O) Inspection -Compliance with the requirement will be verified via formal examination of the disposal method. DIRIN 4 DRIN 4.0 Satisfies the 5.3 AND 5.3.1 system attribute expressed in the CDD that of the system shall utilize renewable sources of energy that reduce or eliminate waste generation.(FCD, 2014)