The given presentation gives what is needed to be done for Solar power projects under REC mechanism, India. REC mechanism in India, is the renewable energy certificate mechanism.
2. REC Mechanism
Renewable Energy Certificate (REC) mechanism is a market based instrument to promote
renewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimed
at addressing the mismatch between availability of RE resources in state and the requirement of
the obligated entities to meet the renewable purchase obligation (RPO).
Sale of Electricity
Revenue
Sale of REC Certificate
Revenue for a RE generator under REC scheme includes revenue from the sale of electricity
component of RE generation and the revenue from the sale of environmental attributes in the
form of RECs.
3. Financials REC
Per MW Optimistic Conservative Radically Pessimistic
Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores
Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units
Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit
Tariff Escallation 5% 3% 3%
Max possible tariff Rs 8 Rs 7 Rs 6
Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unit
Price of REC after 5 years RS 6/unit Rs 4.0/unit Zero
Exim financing 50% of Cost No No
Interest rate (Exim) 10% NA NA
Interest rate (domestic) 12.50% 13% 14%
Tenor for Exim 15 years NA NA
Tenor for domestic 12 years 12 years 12 years
Accelerated depreciation Yes YES Yes
Equity IRR 90% 40% 16%
4. Execution Plan
0 1 2 3 4 5 6
MOU
Reg for
project 30 days
Accreditation 42 days
Registration 42 days
Issuance
Open Access Documentation with Electricity Dept
Comissioning Setting up of the project
5. Process of Accreditation
Verification prior
2 to accreditation
ELIGIBLE 1 3b
Entity Application to
accreditation STATE AGENCY Intimation to
accreditation
SLDC - RVPN
Confirmation to
3a accreditation
Intimation to
accreditation 3c
NLDC – Central agency
6. Accreditation
0 7 14 21 28 35 42
Submission
Check 5 days
Re Submit 7 days
Processiong 30 Days
Certificate
7. Accreditation
Format 1.1
Sec A Owner Details
Sec B Operator Details
Sec C RE Generating Station Details
Sec D Connectivity Details with Concerned Licensee (STU/Discom)
Sec E Metering Details
Sec F Statutory Clearance Details
Sec G General Details
Sec H Details of Fee & Charges
Section I : Declaration
Format 1.2 CERTIFICATE OF ACCREDIATION
8. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
9. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
10. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
11. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
12. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
13. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
14. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
15. Accreditation
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Sec G
Sec H
Section I : Declaration
Format 1.2
16. Process of Registration
ELIGIBLE
Entity SLDC - RVPN
STATE AGENCY
3c Intimation of
3a Intimation of 3b Registration
Registration
Confirmation to
Registration
1
Application for NLDC –
Registration Central agency
3d POWER
2
Verification for Intimation of EXCHANGE
registration Registration
17. Registration
0 7 14 21 28 35 42
Submission
Check 2
incomplete 7 work day
Processing 15 days
Certificate
Fees Submit 15 days
18. Registration
Format 2.1 Application for Registration of RE Generating as Eligible Entity
Sec A Owner Details
Sec B RE Generating Station Details
Sec C Copy of Certificate of Accreditation from State Agency
Sec D Commissioning Schedule
Sec E Details of Fee & Charges
Sec F Declaration
Section I : Declaration
Format 2.2 CERTIFICATE OF REGISTRATION
19. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
20. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
21. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
22. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
23. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
24. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
25. Registration
Format 2.1
Sec A
Sec B
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
27. Open Access
0 10 20 30 40 50 60
MOU
Submission
incomplete 10 day
Processing 30 days
System Study 30 days
System stren ???
28. Open Access
Form I APPLICATION FOR SCHEDULING
Form II CONCURENCE FROM SLDC
Form III REQUEST/CONCURRENCE FROM RLDC
Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING)
Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION
Form VI ACCEPTANCE FOR SCHEDULING
Form VII DETAILS OF PAYMENT
Form VIII REGISTRATION FORM
30. Process of Issuance
Intimation to
Issuance
STATE AGENCY 5b 2 Verification prior
to Issuance
3
Regular Injection
Report NLDC – Central agency
SLDC - RVPN
Intimation of Meter Reading Issuance of
REC
1 5a
4c 4b Application for
Issuance
Distribution
Licensee
4a
ELIGIBLE Entity
31. Issuance
0 7 14 21 28 35 42
Submit
Check 2
Incomplete 5 days
Processiong 15 days
Certificate
32. Issuance
Format 3.1
Sec A Energy Injection Report
Sec B Registration Certificate (To ascertain validity)
Sec C Details of Fee & Charges
Sec D Compliance Auditor Report (if applicable)
Format 3.2 CERTIFICATE OF ISSUANCE
33. Issuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
34. Issuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
35. Issuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
36. Issuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
37. Issuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
39. Application
Execution time
I Company Details
Forms
II Proposed Power Project
III Details of Proposed Power Project
IV Electrical Details
V Financial Details
VI Any Other relevant information
VII Declaration
VIII Documents enclosed – As applicable
40. Application
Execution time
I Company Details
Forms
II Proposed Power Project
III Details of Proposed Power Project
IV Electrical Details
V Financial Details
VI Any Other relevant information
VII Declaration
VIII Documents enclosed – As applicable
41. Services Offered
Conceptualization Execution Project Monitoring
Feasibility Study Land Identification Monitoring
Rebates and Incentives Design Maintenance
Quality Procure
Funding Install
Testing and Certification
Providing Engineering Excellence in every Step
42. Scope of Work
Incorporating Renewable Incentives and Policy changes to get maximum out
Business Model
of the Business Model
Forming JV for FI’s and facilitating tie ups with Indian Companies.
Investor
Overcoming legal hurdles to ease Investments in India
Consulting about best technology for Solar projects, based on the location
Technical
and the cost.
Pre Bid and Post Bid Consultancy for lucrative but competitive for Solar
Proposals
tenders in India
Finance Arranging Funds and Optimizing it to get maximum returns on Equity
Making strategic tie-ups for Foreign companies looking for Solar Business
Tie ups
Opportunity in India
43. Thank You
for your time…
Contact us:-
Shop no 7, Murlipura Road
Jaipur, Rajasthan
Mob no :- +91 – 8829 003 003
Email :- DeeSolarIndia@gmail.com