SlideShare uma empresa Scribd logo
1 de 66
ICEI2014
9TH INTERNATIONAL CONFERENCE ON ECOLOGICAL INFORMATICS
ECOLOGICAL INFORMATICS FOR ENVIRONMENTAL SUSTAINABILITY
20-24 OCTOBER 2014, NANJING, CHINA
An integrated SCADA / GIS approach to management of combined
sewerage systems – preparation for a blue green solutions – case
study Zagreb
Božidar Deduš (PRONING DHI, Zagreb, CROATIA)
Tomislav Šijak (Naval Architecture Institute, Zagreb, CROATIA)
Vesna Rogulja (PRONING DHI, Zagreb, CROATIA)
Proning DHI d.o.o.
CONTENT – CASE STUDY ZAGREB
TRADITIONAL APPROACH TO WWSS PLANNING AND OPERATION
 GIS / SCADA
BLUE GREEN APPROACH
CONSLUSIONS
Proning DHI d.o.o.
Proning DHI d.o.o.
ZAGREB -
CAPITAL OF
CROATIA, EU
• CROATIA - 5 Mio Inhabitants
• 55.000 km2
• 34.000 km2 Adriatic sea
• GDP/capita < 20.000 USD
• Zagreb 1 Mio Inhabitants
• 3000 km of wss
• 2000 km of sewage
• WWTP 1,2 (1,5) Mio PE
• River Sava dividing city in 2
• I PHASE- DATA COLECTING AND EVALUATION
– GIS
– Monitoring campaign
– Model building and calibrating
– Evaluation of existing situation
• II PHASE – MASTER PLAN
– Short term measures
– Long term measures
– RTC
– Water quality modeling
• III PHASE – DESIGNING GOK (MDC) SYSTEM
• IV PHASE –DETAIL DESIGNING AND CONSTRUCTION
Proning DHI d.o.o.
ZAGREB SEWER SYSTEM PROJECT
FROM MASTER PLAN TO OPERATION
(1995. – 2007.)
• V PHASE- OPERATION
– Major construction works finished
– WWTP in operation
– Further sewerage system rehabilitation plan slowered
– Climate changes effects
• VI PHASE – SCADA PROJECT
– Provision of monitoring equipment (rainfall runoff)
– Monitoring campaign
– SCADA project
• VII PHASE – BLUE GREEN APPROACH
– Water quality monitoring
– Preparation for BGD
Proning DHI d.o.o.
FROM OPERATION TO CLIMATE CHANGES
FROM TRADITIONAL TO BLUE GREEN SOLUTIONS
(2007. – 2014. +)
Kanal.shp
0
1 - 1904
1905 - 1924
1925 - 1944
1945 - 1964
1965 - 1984
1985 - 2004
Proning DHI d.o.o.
GIS
Kanal.shp
0 - 30
31 - 60
61 - 120
121 - 200
201 - 300
301 - 600
Kanal.shp
-
ACC
alkaten
beton
betonirani
betonska cijev
kamenština
PHD
PHD korugirana
PVC
salonit
I PHASE
• CATCHMENT AREA >300 Km2
• 2000 km PIPES
• 1.2 mil. PE
Proning DHI d.o.o.
nn Desetogodišnje serije oborinaDesetogodišnje serije oborina
MY-M/S
0.000
0.200
0.400
0.600
0.800
1.000
1.200
1985 1990
REGN, OBORINE
*** BOUNDARY DATA ***
BIJENIK
Desetogodišnje serije temperaturaDesetogodišnjeDesetogodišnje serije temperaturaserije temperaturann
-10.000
-5.000
-0.000
5.000
10.000
15.000
20.000
25.000
1985 1990
GRIC
TEMPERATURE
*** BOUNDARY DATA ***
Desetogodišnje serije evapotranspiracijeDesetogodišnje serije evapotranspiracijenn
MM
0.000
0.010
0.020
0.030
0.040
0.050
0.060
0.070
1985 1990
MAKSIMIR
EVAPOTRANSPIRACIJA
*** BOUNDARY DATA ***
Petogodišnje serije mjerenja protoka na GOK-u
M3/SEK
3.0
13.0
23.0
33.0
43.0
53.0
1989 1990 1991 1992 1993
PROTOCI NA GOKU
*** BOUNDARY DATA ***
HISTORICAL
DATA DHMZ-a
Proning DHI d.o.o.
REZULTATI KALIBRACIJE ZA KIŠNI DOGAĐAJ 29.07.1995. - MJERENI I SIMULIRANI NIVOI I PROTOCI NA TRI LOKACIJE
(CALIBRATION RESULTS FOR THE RAIN DATED 29. 07. 1995.
MEASURED AND SIMULATED FLOWS AND LEVELS ON THE THREE MONITORING SITES)
Proning DHI d.o.o.
Proning DHI d.o.o.
Flooding and pressure
EXISTING SITUATION
EVALUATION
0
10
20
30
40
50
60
1989
Sanitarni i indudtrijski dotok
FLOW COMPONENTS IN ZAGREB SS
BASED ON LONG TERM
SIMULATIONS
12%
9%
39%
40% Površinsko otjecanje
Potoci Bliznec i Vugrovec
Stanovnici
Industrija
Proning DHI d.o.o.
Proning DHI d.o.o.
II PHASE - ZAGREB SS MASTER PLAN
Proning DHI d.o.o.
SHORT TERM AND LONG TERM MEASURESExisting situation
To do nothing scenario
Short term measures result
Long term measures result
Flooding and pressure
Flooding and pressure
Flooding and pressure
Flooding and pressure
1-1-1989 20-2-1989 11-4-1989 31-5-1989 20-7-1989 8-9-1989 28-10-1989 17-12-1989
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
[m3/s] Time Series DISCHARGE WEIR (Rftnh489.prf) DISCHARGEWEIR
SAVICA -> ZAPSAV
1-1-1989 20-2-1989 11-4-1989 31-5-1989 20-7-1989 8-9-1989 28-10-1989 17-12-1989
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
65.0
70.0
[m3/s] Time Series DISCHARGE WEIR (Rftnh489.prf)
OVERFLOW SAVICA 1989.y. OVERFLOW RADNIČKA 1989.y.
Proning DHI d.o.o.1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.5
0.5
0.6
0.6
0.7
0.7
0.8
0.8
0.9
0.9
1.0
1.0
[m3/s] Time Series DISCHARGE WEIR (Rftbod95.prf) DISCHARGEWEIR
SAVICA -> ZAPSAV
1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
[m3/s] Time Series DISCHARGE WEIR (Rftbod95.prf) DISCHARGEWEIR
8648 -> GOK-PRE
1995. y 1995. y
Proning DHI d.o.o.
Kontrolirano pumpanje
Pokretni preljevi
Pokretna zapornica
Senzori razine vode
RTC SCHEME
RTC MODELING
Proning DHI d.o.o.
Tlačno tečenje < od 2 m ispod površine terena
Tlačno tečenje
RTC FOR DESIGN EVENT 28.8.1989.
Voda na površini terena
Kontrolirano tlačno tečenje
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
1 2
VOLUMEN m3/god
VOLUMEN m3/god
0
100000
200000
300000
400000
500000
1 2
kg BPK5/god
kg BPK5/god
RTC RESULTS
STATIČKI RTC
PRELJEV m3 kg BPK/god m3 kg BPK/god
ČRNOMEREC 1122338 11134 1058698 8220
SAVICA 291950 907 381373 990
RADNIČKA 13373395 390636 11872608 334088
SUMA 14787683 402677 13312679 343298
Proning DHI d.o.o.
• Average number of overflow events for static
system is 23 per year
• Wit RTC average number of overflow events is
reduced to 8 per year
• 80% overflow volume reduction for non flooding
events
Proning DHI d.o.o.
WATER QUALITY MODELING
WQ MODEL WITH MONITORING LOCATION
Flow meter
Water sampling
Rain gauge
Proning DHI d.o.o.
1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
12.0
12.5
[mg/l] Time Series CONCENTRATION IN NODES, BOD DIS, (Ft95.trf) CONCENTRATION IN NODES, BOD DIS,
673+410
688+065
714+886
17-8-1998 6-10-1998 25-11-1998 14-1-1999 5-3-1999 24-4-1999 13-6-1999
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
500.0
CONCENTRATION [m] GOK4 BOD
1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
[mg/l] Time Series CONCENTRATION IN NODES, NH4, (Ft95.trf) CONCENTRATION IN NODES, NH4,
673+410
688+065
714+886
17-8-1998 6-10-1998 25-11-1998 14-1-1999 5-3-1999 24-4-1999 13-6-1999
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
CONCENTRATION [m] GOK4 NH4
SAVA - BOD5
GOK4 -BOD5
SAVA - NH4
GOK4 - NH4
TIME SERIES
Proning DHI d.o.o.
MouseTRAP CALIBRATION RESULTS
29-8-1998 8-9-1998 18-9-1998 28-9-1998 8-10-1998
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
200.0
[mg/l] Time Series CONCENTRATION IN NODES, BOD, (Lnh4bod.trf) CONCENTRATION IN NODES, BOD,
2508
CONCENTRATION, - GOK4 24H BOD
CONCENTRATION, - GOK4 BOD
20-7-1998 30-7-1998 9-8-1998 19-8-1998 29-8-1998 8-9-1998 18-9-1998
2.0
4.0
6.0
8.0
10.0
12.0
14.0
[mg/l] Time Series CONCENTRATION IN NODES, NH4, (Lnh4bod.trf) CONCENTRATION IN NODES, NH4,
2508
CONCENTRATION, - GOK 24H NH4
CONCENTRATION, - GOK4 NH4
Location GOK4
BOD
NH4
+
simulirano
mjereno jednom
mjesečno 6/24h
mjereno jednom
dnevno
Proning DHI d.o.o.
1 5 - 4 - 1 9 9 3 4 - 6 - 1 9 9 3 2 4 - 7 - 1 9 9 3 1 2 - 9 - 1 9 9 3
0 .0
2 .0
4 .0
6 .0
8 .0
1 0 .0
1 2 .0
[m g /l]
T im e Se rie s C O NC ENT R AT IO N IN NO D ES, BO D D IS, (Sa va -9 3 .trf)
CO NCENTRA TIO N IN NO DES , B O D DIS ,
7 1 4 + 8 8 6
CO NCENTRA TIO N, - JA N B O D DIS
6 9 1 + 8 7 5
CO NCENTRA TIO N, - PET B O D DIS
6 7 3 + 4 1 0
CO NCENTRA TIO N, - O B O B O D DIS
1 5 - 4 - 1 9 9 3 5 - 5 - 1 9 9 3 2 5 - 5 - 1 9 9 3 1 4 - 6 - 1 9 9 3 4 - 7 - 1 9 9 3 2 4 - 7 - 1 9 9 3 1 3 - 8 - 1 9 9 3 2 - 9 - 1 9 9 3 2 2 - 9 - 1 9 9 3
0 .0
2 .0
4 .0
6 .0
8 .0
1 0 .0
1 2 .0
[m g /l]
T im e Se rie s C O NC ENT R AT IO N IN NO D ES, D O , (Sa va -9 3 .trf)
C O N C EN TR A TIO N IN N O D ES , D O ,
7 1 4 + 8 8 6
C O N C EN TR A TIO N , - JA N K O M IR 0 2
6 9 1 + 8 7 5
C O N C EN TR A TIO N , - PETR O S EV O 2
6 7 3 + 4 1 0
C O N C EN TR A TIO N , - O B O R O V O O 2
SAVA RIVER CALIBRATIN RESULT (April - October ’93)
simulirano
mjereno
Jankomir
Petruševac
Oborovo
Proning DHI d.o.o.
1 - 1 - 1 9 9 0 2 0 - 7 - 1 9 9 0 5 - 2 - 1 9 9 1 2 4 - 8 - 1 9 9 1 1 1 - 3 - 1 9 9 2 2 7 - 9 - 1 9 9 2
0 .0
2 .0
4 .0
6 .0
8 .0
1 0 .0
1 2 .0
[m g /l]
T im e Se rie s C O NC ENT R AT IO N IN NO D ES, D O , (Ve r9 0 -9 2 .trf)
CO NCENTRA TIO N IN NO DES , DO ,
7 1 4 + 8 8 6
CO NCENTRA TIO N, - JA NK O M IR 0 2
6 9 1 + 8 7 5
CO NCENTRA TIO N, - PETRO S EV O 2
6 7 3 + 4 1 0
CO NCENTRA TIO N, - O B O RO V O O 2
1 - 1 - 1 9 9 0 2 0 - 7 - 1 9 9 0 5 - 2 - 1 9 9 1 2 4 - 8 - 1 9 9 1 1 1 - 3 - 1 9 9 2 2 7 - 9 - 1 9 9 2
0 .0
2 .0
4 .0
6 .0
8 .0
1 0 .0
1 2 .0
1 4 .0
[m g /l]
T im e Se rie s C O NC ENT R AT IO N IN NO D ES, BO D D IS, (Ve r9 0 -9 2 .trf)
CO NCENTRA TIO N IN NO DES , B O D DIS ,
7 1 4 + 8 8 6
CO NCENTRA TIO N, - JA N B O D DIS
6 9 1 + 8 7 5
CO NCENTRA TIO N, - PET B O D DIS
6 7 3 + 4 1 0
CO NCENTRA TIO N, - O B O B O D DIS
RIVER SAVA VERIFICATION RESULT 1990-92
simulirano
mjereno
Jankomir
Petruševac
Oborovo
+
Proning DHI d.o.o.
Broj događaja u 1989. Volumen preljevanja (m3) BPK (kg /god) NH4 (kg /god)
Preljev Črnomerec 18.0 1122338.0 11134.2 810.3
Preljev Savica 12.0 291950.0 907.7 66.9
Preljev Radnička 38.0 13401774.5 390636.5 29794.5
0.0
5000000.0
10000000.0
15000000.0
Preljev Črnomerec Preljev Savica Preljev Radnička
VOLUMEN PRELJEVANJA
Volumen preljevanja (m3)
0.0
100000.0
200000.0
300000.0
400000.0
Preljev Črnomerec Preljev Savica Preljev Radnička
BPK - NH4
BPK (kg /god) NH4 (kg /god)
OVERFLOWING
89. god
Proning DHI d.o.o.
Broj događaja u 1995. Volumen preljevanja (m3) BPK (kg /god) NH4 (kg /god)
Preljev Črnomerec 13.0 188021.4 3320.7 33.8
Preljev Savica 7.0 16921.7 137.3 10.0
Preljev Radnička 42.0 9005043.8 362880.9 24991.4
0.0
2000000.0
4000000.0
6000000.0
8000000.0
10000000.0
Preljev Črnomerec Preljev Savica Preljev Radnička
VOLUMEN PRELJEVANJA
Volumen preljevanja (m3)
0.0
50000.0
100000.0
150000.0
200000.0
250000.0
300000.0
350000.0
400000.0
Preljev Črnomerec Preljev Savica Preljev Radnička
VOLUMEN PRELJEVANJA
BPK (kg /god) NH4 (kg /god)
OVERFLOWING 95. god
Proning DHI d.o.o.
1-1-1989 11-4-1989 20-7-1989 28-10-1989
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
[mg/l] Time Series of CONCENTRATION IN NODES, DO, CONCENTRATION IN NODES, DO,
673+410
3| 673+410
4| 673+410
EXAMPLE OF SIMULATION RESULTS
Proning DHI d.o.o.
NW, PW, FW -1989.
DO, existing/short term/long term
NW, PW, FW-89BOD, existing/short term/long term
1-1-1989 11-4-1989 20-7-1989 28-10-1989
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
[mg/l] Time Series CONCENTRATION IN NODES, BOD DIS,
673+410
3| 673+410
5| 673+410
CONCENTRATION IN NODES, NH4,
Proning DHI d.o.o.
NW, PW, FW-89Amonia NH4 , existing/short term/long term
1-1-1989 11-4-1989 20-7-1989 28-10-1989
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
[mg/l] Time Series of CONCENTRATION IN NODES, NH4, CONCENTRATION IN NODES, NH4,
673+410
3| 673+410
5| 673+410
Proning DHI d.o.o.
BOD LOAD DISTRIBUTION
kg BPK / god – SHORT TERM
41.27%
58.72%
0.01% SAVA (kritična)
Kanalizacija - ispusti
Preljevi (89)
kg BPK /god – LONG TERM
83%
14%
3% SAVA (kritična)
Kanalizacija - ispusti
Preljevi (89)
kg BPK5/god - SADAŠNJE STANJE
42%
58%
Sava
Kanalizacija
Proning DHI d.o.o.
EXISTING SITUATION
Proning DHI d.o.o.
Bliznec
Ravnice
Kozari Bok
Dubrava
Sjeverna Čulinečka
Sesvete
Strug
Žitnjak
Južna Čulinečka
WWTP
PHASE III – DESIGNING GOK SYSTEM
• main channel 9590 m long
• catchment area 220 km2
• DWF 3-4 m3/s
• RWF 70 m3/s
Proning DHI d.o.o.
86%
14%
Preljevanje [m3/god]
Mješoviti dotok na CUPu kišnom
razdoblju [m3/god]
ODNOS PRELIVENOG I PROČIŠĆENOG VOLUMENA U KIŠNOM RAZDOBLJU
ODNOS PRELIVENOG I UKUPNO PROČIŠĆENOG VOLUMENA
5%
95%
Preljevanje [m3/god]
Ukupni dotok na CUP[m3/god]
LONG TERM SIMULATION RESULTS - 01.01.1995. do 31.12.1995.
Proning DHI d.o.o.
1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995
105.2
105.4
105.6
105.8
106.0
106.2
106.4
106.6
106.8
107.0
107.2
107.4
107.6
107.8
108.0
108.2
108.4
108.6
108.8
109.0
[m] Time Series WATER LEVEL NODES (V31-NOVI-C.PRF) WATER LEVEL NODES
RADNICK
Kota krune preljeva 108.5 mnm
WATER LEVEL ON CSO RADNIČKA BASED ON I YEAR SIMULATION ( 1.1.1995 DO
31.12.1995.)
Proning DHI d.o.o.
Preljev Radnička, Qs= 3,7 m3/s, 2Qs=7,2 m3/s. L=60m,
Qp=58 m3/s
Proning DHI d.o.o.
CSO RADNIČKA
Proning DHI
d.o.o.
CSO RADNIČKA PHISICAL MODEL
Testing parameters:
• water levels in channels
• overflow coefficient
• velocities upstream and downstream
of the overflow structure
• dynamic pressures
• sediment transport
• floating sediment transport
Proning DHI d.o.o.
Proning DHI d.o.o.
PHASE IV – DETAIL DESIGNING AND CONSTRUCTION
Proning DHI d.o.o.
CONSTRUCTION OF
CSO RADNIČKA
Proning DHI d.o.o.
Proning DHI d.o.o.
Proning DHI d.o.o.
Proning DHI d.o.o.
Proning DHI d.o.o.
ZAGREB WWTP
1,2 mil. PE (1,5)
URBANIZATION EFFECTS
Proning DHI d.o.o.
URBANIZATION EFFECTS
Proning DHI d.o.o.
URBANIZATION EFFECTS
Proning DHI d.o.o.
URBANIZATION EFFECTS
Proning DHI d.o.o.
FROM TRADITIONAL TO BLUE GREEN SOLUTIONS
-Traditional solutions could not compensate for the climate change
impact due to various reasons partly due to uncontrolled
urbanisation
-Frequent urban floodings caused substantial damages to the urban
infrastrucure, properties and human lives
- EU directives to be followed push desicion makers to undertake
improvements on the sewerage systems
Proning DHI d.o.o.
SCADA / GIS SYSTEM
-rainfall runoff monitoring
-Establishment of the SCADA system
- Qulity monitoring
-- Further enlargment of the SCADA system with WQ parameters
-- Blue Green designing
-- Water and energy savings
Proning DHI d.o.o.
GIS AND SCADA GIS – sewerage dimensions
Proning DHI d.o.o.
GIS AND SCADA GIS – sewerage age
Proning DHI d.o.o.
GIS AND SCADA GIS – low slope inclination sewage
Proning DHI d.o.o.
GIS AND SCADA
Proning DHI d.o.o.
• SCADA – basic concept
GIS AND SCADA
Proning DHI d.o.o.
• SCADA – basic concept
GIS AND SCADA
Proning DHI d.o.o.
• SCADA – basic concept
GIS AND SCADA
SCADA – phase I
• 24 monitoring - canal
• 4 pumping stations
• 2 CSO
• 20 ombrographs,
• 11 limnigraphs
TOTAL 60 monitors
Proning DHI d.o.o.
GIS AND SCADA
SCADA – final phase
• 81 monitoring canal,
• 49 pumping stations,
• 9 CSO,
• 20 ombrographs,
• 11 limnigraphs
TOTAL 170 monitors
Proning DHI d.o.o.
Proning DHI d.o.o.
SCADA MONITORS:
RAIN. VELOCITY, DEPTH (LEVEL)
PH, TEMPERATURE, DISSOLVED OXYGEN, ETC
GIS AND SCADA
Proning DHI d.o.o.
• SCADA ZAGREB SCHEME OF
COMUNICATION NETWORK
GIS AND SCADA
Proning DHI d.o.o.
• SCADA – remote monitoring
stations
BUT ... ALL THIS DID NOT PREVENT SEVEREURBAN FLOODINGS, DAMAGES OF
URBAN INFRASTRUCTURE ETC.
Proning DHI d.o.o.
BLUE GREEN
SOLUTION
(PROF. MAKSIMOVIC)
Blue green urban concept
Proning DHI d.o.o.
BLUE GREEN
SOLUTION
(PROF. MAKSIMOVIC)
Blue green urban concept
Proning DHI d.o.o.
BLUE GREEN
SOLUTION
(PROF. MAKSIMOVIC)
Blue green urban concept
Proning DHI d.o.o.
BLUE GREEN
SOLUTION
(PROF. MAKSIMOVIC)
Blue green urban concept – example:
Zagreb campus
Proning DHI d.o.o.
CONCLUSIONS – LESSONS LEARNED
STRUCTURAL MEASURES, BEING TRADITIONAL APROACH ARE IN URBAN AREAS
EXPENSIVE AND CAN NOT ACCOMODATE FOR EFFECTS OF CLIMATE CHANGES
NON-STRUCTURAL MEASURES ARE HELPING IMPROVING OVERALL
PERFORMANCE OF THE SS
GIS / SCADA FURTHER IMPROVES SS MANAGEMENT
BLUE GREEN CONCEPT FURTHER IMPROVES WATER / ENERGY CYCLE IN CITIES
BALANCING INPUTS AND OUTPUTS, ENABLING SUISTAINABLE FUTURE
COMBINATION OF STRUCTURAL AND NON-STRUCTURAL MEASURES
SUPPORTED BY BLUE GREEN CONCEPT WILL ALOW THE MOST BALANCED
MULTICRITERIAL SOLUTIONS
BY IMPLEMENTING COMBINATION OF STRUCTURAL , NON-STRUCTURAL AND
BLUE-GREEN MEASURES ONE CAN ACHIEVE HIGHER URBAN STANDARD, HIGHER
SECURITY AND LOWER O/M COSTS
Proning DHI d.o.o.
THANK YOU FOR YOUR
ATTENTION
Bozidar Dedus
deda@proning-dhi.hr
Proning DHI d.o.o.

Mais conteúdo relacionado

Semelhante a Dedus scada gis case study zagreb

CO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmesCO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmesGlobal CCS Institute
 
FIWARE Global Summit - Smart City / Community Services and Infrastructures
FIWARE Global Summit - Smart City / Community Services and InfrastructuresFIWARE Global Summit - Smart City / Community Services and Infrastructures
FIWARE Global Summit - Smart City / Community Services and InfrastructuresFIWARE
 
P&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptxP&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptxAastharaj16
 
EnviroInsite training workshop - Overview of EnviroInsite Features
EnviroInsite training workshop - Overview of EnviroInsite FeaturesEnviroInsite training workshop - Overview of EnviroInsite Features
EnviroInsite training workshop - Overview of EnviroInsite FeaturesBruce Jacobs
 
The significance of Surface Logging For The Formation Evaluation Advance Surf...
The significance of Surface Logging For The Formation Evaluation Advance Surf...The significance of Surface Logging For The Formation Evaluation Advance Surf...
The significance of Surface Logging For The Formation Evaluation Advance Surf...Evangelos Siskos
 
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...Yuma Koizumi
 
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes Tomer - Monitoring Choices Affect our Discernment of Watershed Processes
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes Soil and Water Conservation Society
 
EnviroInsite training workshop - Developing a conceptual model
EnviroInsite training workshop - Developing a conceptual modelEnviroInsite training workshop - Developing a conceptual model
EnviroInsite training workshop - Developing a conceptual modelBruce Jacobs
 
Environmental impacts from Aquaculture in Bolinao, Philippines
Environmental impacts from Aquaculture in Bolinao, PhilippinesEnvironmental impacts from Aquaculture in Bolinao, Philippines
Environmental impacts from Aquaculture in Bolinao, PhilippinesPatrick White
 
Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary
 Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary
Download-manuals-ground water-dataprocessinmg-provisionaldatadictionaryhydrologywebsite1
 
Air modelling presentation final2
Air modelling presentation final2Air modelling presentation final2
Air modelling presentation final2Bishal Bhari
 
Inventory of ghg uk overview
Inventory of ghg uk overviewInventory of ghg uk overview
Inventory of ghg uk overviewREMEDIAnetwork
 

Semelhante a Dedus scada gis case study zagreb (20)

CO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmesCO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmes
 
FIWARE Global Summit - Smart City / Community Services and Infrastructures
FIWARE Global Summit - Smart City / Community Services and InfrastructuresFIWARE Global Summit - Smart City / Community Services and Infrastructures
FIWARE Global Summit - Smart City / Community Services and Infrastructures
 
P&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptxP&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptx
 
EnviroInsite training workshop - Overview of EnviroInsite Features
EnviroInsite training workshop - Overview of EnviroInsite FeaturesEnviroInsite training workshop - Overview of EnviroInsite Features
EnviroInsite training workshop - Overview of EnviroInsite Features
 
6 g wadi network for see-zlatanović&dimkić
6 g wadi network for see-zlatanović&dimkić6 g wadi network for see-zlatanović&dimkić
6 g wadi network for see-zlatanović&dimkić
 
AGU_2014 Poster_v3
AGU_2014 Poster_v3AGU_2014 Poster_v3
AGU_2014 Poster_v3
 
The significance of Surface Logging For The Formation Evaluation Advance Surf...
The significance of Surface Logging For The Formation Evaluation Advance Surf...The significance of Surface Logging For The Formation Evaluation Advance Surf...
The significance of Surface Logging For The Formation Evaluation Advance Surf...
 
Bjs green belt ppt
Bjs green belt pptBjs green belt ppt
Bjs green belt ppt
 
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...
Theory and Methods for Unsupervised Anomaly Detection in Sounds Based on Deep...
 
Robert Healy IAC 2010
Robert Healy IAC 2010Robert Healy IAC 2010
Robert Healy IAC 2010
 
Hermesquispecuadros
HermesquispecuadrosHermesquispecuadros
Hermesquispecuadros
 
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes Tomer - Monitoring Choices Affect our Discernment of Watershed Processes
Tomer - Monitoring Choices Affect our Discernment of Watershed Processes
 
Ijetcas14 589
Ijetcas14 589Ijetcas14 589
Ijetcas14 589
 
EnviroInsite training workshop - Developing a conceptual model
EnviroInsite training workshop - Developing a conceptual modelEnviroInsite training workshop - Developing a conceptual model
EnviroInsite training workshop - Developing a conceptual model
 
Environmental impacts from Aquaculture in Bolinao, Philippines
Environmental impacts from Aquaculture in Bolinao, PhilippinesEnvironmental impacts from Aquaculture in Bolinao, Philippines
Environmental impacts from Aquaculture in Bolinao, Philippines
 
Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary
 Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary
Download-manuals-ground water-dataprocessinmg-provisionaldatadictionary
 
Air modelling presentation final2
Air modelling presentation final2Air modelling presentation final2
Air modelling presentation final2
 
Pres eucome 2016_v3
Pres eucome 2016_v3Pres eucome 2016_v3
Pres eucome 2016_v3
 
Inventory of ghg uk overview
Inventory of ghg uk overviewInventory of ghg uk overview
Inventory of ghg uk overview
 
Introduction to bioinformatics
Introduction to bioinformaticsIntroduction to bioinformatics
Introduction to bioinformatics
 

Mais de Deda4Proning

4 savjetovanje o savi pilot sava v3 bd
4 savjetovanje o savi pilot sava v3 bd4 savjetovanje o savi pilot sava v3 bd
4 savjetovanje o savi pilot sava v3 bdDeda4Proning
 
Bgd hrvatska, zagreb 17122013 bd v4
Bgd hrvatska, zagreb 17122013 bd v4Bgd hrvatska, zagreb 17122013 bd v4
Bgd hrvatska, zagreb 17122013 bd v4Deda4Proning
 
Nadogradnja postojećih upov a 2011 - uvodni dio
Nadogradnja postojećih upov a 2011 - uvodni dioNadogradnja postojećih upov a 2011 - uvodni dio
Nadogradnja postojećih upov a 2011 - uvodni dioDeda4Proning
 
Zaključci bd razvitak zgk 2008
Zaključci bd razvitak zgk 2008Zaključci bd razvitak zgk 2008
Zaključci bd razvitak zgk 2008Deda4Proning
 
Sanacija vodovoda zagreb integralna projektna zadaća 2005
Sanacija vodovoda zagreb   integralna projektna zadaća 2005Sanacija vodovoda zagreb   integralna projektna zadaća 2005
Sanacija vodovoda zagreb integralna projektna zadaća 2005Deda4Proning
 
Hydraulic study of the neretva river
Hydraulic study of the neretva riverHydraulic study of the neretva river
Hydraulic study of the neretva riverDeda4Proning
 
Deduš razvitak zg 2008 final
Deduš razvitak zg 2008 finalDeduš razvitak zg 2008 final
Deduš razvitak zg 2008 finalDeda4Proning
 

Mais de Deda4Proning (11)

4 savjetovanje o savi pilot sava v3 bd
4 savjetovanje o savi pilot sava v3 bd4 savjetovanje o savi pilot sava v3 bd
4 savjetovanje o savi pilot sava v3 bd
 
Bgd hrvatska, zagreb 17122013 bd v4
Bgd hrvatska, zagreb 17122013 bd v4Bgd hrvatska, zagreb 17122013 bd v4
Bgd hrvatska, zagreb 17122013 bd v4
 
Nadogradnja postojećih upov a 2011 - uvodni dio
Nadogradnja postojećih upov a 2011 - uvodni dioNadogradnja postojećih upov a 2011 - uvodni dio
Nadogradnja postojećih upov a 2011 - uvodni dio
 
Zaključci bd razvitak zgk 2008
Zaključci bd razvitak zgk 2008Zaključci bd razvitak zgk 2008
Zaključci bd razvitak zgk 2008
 
Sanacija vodovoda zagreb integralna projektna zadaća 2005
Sanacija vodovoda zagreb   integralna projektna zadaća 2005Sanacija vodovoda zagreb   integralna projektna zadaća 2005
Sanacija vodovoda zagreb integralna projektna zadaća 2005
 
Stmoritz
StmoritzStmoritz
Stmoritz
 
Neretva v07de
Neretva  v07deNeretva  v07de
Neretva v07de
 
Urbana hidroinfo
Urbana hidroinfoUrbana hidroinfo
Urbana hidroinfo
 
Hydraulic study of the neretva river
Hydraulic study of the neretva riverHydraulic study of the neretva river
Hydraulic study of the neretva river
 
Dobra 2006
Dobra 2006Dobra 2006
Dobra 2006
 
Deduš razvitak zg 2008 final
Deduš razvitak zg 2008 finalDeduš razvitak zg 2008 final
Deduš razvitak zg 2008 final
 

Último

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 

Último (20)

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 

Dedus scada gis case study zagreb

  • 1. ICEI2014 9TH INTERNATIONAL CONFERENCE ON ECOLOGICAL INFORMATICS ECOLOGICAL INFORMATICS FOR ENVIRONMENTAL SUSTAINABILITY 20-24 OCTOBER 2014, NANJING, CHINA An integrated SCADA / GIS approach to management of combined sewerage systems – preparation for a blue green solutions – case study Zagreb Božidar Deduš (PRONING DHI, Zagreb, CROATIA) Tomislav Šijak (Naval Architecture Institute, Zagreb, CROATIA) Vesna Rogulja (PRONING DHI, Zagreb, CROATIA) Proning DHI d.o.o.
  • 2. CONTENT – CASE STUDY ZAGREB TRADITIONAL APPROACH TO WWSS PLANNING AND OPERATION  GIS / SCADA BLUE GREEN APPROACH CONSLUSIONS Proning DHI d.o.o.
  • 3. Proning DHI d.o.o. ZAGREB - CAPITAL OF CROATIA, EU • CROATIA - 5 Mio Inhabitants • 55.000 km2 • 34.000 km2 Adriatic sea • GDP/capita < 20.000 USD • Zagreb 1 Mio Inhabitants • 3000 km of wss • 2000 km of sewage • WWTP 1,2 (1,5) Mio PE • River Sava dividing city in 2
  • 4. • I PHASE- DATA COLECTING AND EVALUATION – GIS – Monitoring campaign – Model building and calibrating – Evaluation of existing situation • II PHASE – MASTER PLAN – Short term measures – Long term measures – RTC – Water quality modeling • III PHASE – DESIGNING GOK (MDC) SYSTEM • IV PHASE –DETAIL DESIGNING AND CONSTRUCTION Proning DHI d.o.o. ZAGREB SEWER SYSTEM PROJECT FROM MASTER PLAN TO OPERATION (1995. – 2007.)
  • 5. • V PHASE- OPERATION – Major construction works finished – WWTP in operation – Further sewerage system rehabilitation plan slowered – Climate changes effects • VI PHASE – SCADA PROJECT – Provision of monitoring equipment (rainfall runoff) – Monitoring campaign – SCADA project • VII PHASE – BLUE GREEN APPROACH – Water quality monitoring – Preparation for BGD Proning DHI d.o.o. FROM OPERATION TO CLIMATE CHANGES FROM TRADITIONAL TO BLUE GREEN SOLUTIONS (2007. – 2014. +)
  • 6. Kanal.shp 0 1 - 1904 1905 - 1924 1925 - 1944 1945 - 1964 1965 - 1984 1985 - 2004 Proning DHI d.o.o. GIS Kanal.shp 0 - 30 31 - 60 61 - 120 121 - 200 201 - 300 301 - 600 Kanal.shp - ACC alkaten beton betonirani betonska cijev kamenština PHD PHD korugirana PVC salonit I PHASE • CATCHMENT AREA >300 Km2 • 2000 km PIPES • 1.2 mil. PE
  • 8. nn Desetogodišnje serije oborinaDesetogodišnje serije oborina MY-M/S 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1985 1990 REGN, OBORINE *** BOUNDARY DATA *** BIJENIK Desetogodišnje serije temperaturaDesetogodišnjeDesetogodišnje serije temperaturaserije temperaturann -10.000 -5.000 -0.000 5.000 10.000 15.000 20.000 25.000 1985 1990 GRIC TEMPERATURE *** BOUNDARY DATA *** Desetogodišnje serije evapotranspiracijeDesetogodišnje serije evapotranspiracijenn MM 0.000 0.010 0.020 0.030 0.040 0.050 0.060 0.070 1985 1990 MAKSIMIR EVAPOTRANSPIRACIJA *** BOUNDARY DATA *** Petogodišnje serije mjerenja protoka na GOK-u M3/SEK 3.0 13.0 23.0 33.0 43.0 53.0 1989 1990 1991 1992 1993 PROTOCI NA GOKU *** BOUNDARY DATA *** HISTORICAL DATA DHMZ-a Proning DHI d.o.o.
  • 9. REZULTATI KALIBRACIJE ZA KIŠNI DOGAĐAJ 29.07.1995. - MJERENI I SIMULIRANI NIVOI I PROTOCI NA TRI LOKACIJE (CALIBRATION RESULTS FOR THE RAIN DATED 29. 07. 1995. MEASURED AND SIMULATED FLOWS AND LEVELS ON THE THREE MONITORING SITES) Proning DHI d.o.o.
  • 10. Proning DHI d.o.o. Flooding and pressure EXISTING SITUATION EVALUATION
  • 11. 0 10 20 30 40 50 60 1989 Sanitarni i indudtrijski dotok FLOW COMPONENTS IN ZAGREB SS BASED ON LONG TERM SIMULATIONS 12% 9% 39% 40% Površinsko otjecanje Potoci Bliznec i Vugrovec Stanovnici Industrija Proning DHI d.o.o.
  • 12. Proning DHI d.o.o. II PHASE - ZAGREB SS MASTER PLAN
  • 13. Proning DHI d.o.o. SHORT TERM AND LONG TERM MEASURESExisting situation To do nothing scenario Short term measures result Long term measures result Flooding and pressure Flooding and pressure Flooding and pressure Flooding and pressure
  • 14. 1-1-1989 20-2-1989 11-4-1989 31-5-1989 20-7-1989 8-9-1989 28-10-1989 17-12-1989 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 [m3/s] Time Series DISCHARGE WEIR (Rftnh489.prf) DISCHARGEWEIR SAVICA -> ZAPSAV 1-1-1989 20-2-1989 11-4-1989 31-5-1989 20-7-1989 8-9-1989 28-10-1989 17-12-1989 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 70.0 [m3/s] Time Series DISCHARGE WEIR (Rftnh489.prf) OVERFLOW SAVICA 1989.y. OVERFLOW RADNIČKA 1989.y. Proning DHI d.o.o.1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.9 0.9 1.0 1.0 [m3/s] Time Series DISCHARGE WEIR (Rftbod95.prf) DISCHARGEWEIR SAVICA -> ZAPSAV 1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 42.0 44.0 46.0 48.0 [m3/s] Time Series DISCHARGE WEIR (Rftbod95.prf) DISCHARGEWEIR 8648 -> GOK-PRE 1995. y 1995. y
  • 15. Proning DHI d.o.o. Kontrolirano pumpanje Pokretni preljevi Pokretna zapornica Senzori razine vode RTC SCHEME RTC MODELING
  • 16. Proning DHI d.o.o. Tlačno tečenje < od 2 m ispod površine terena Tlačno tečenje RTC FOR DESIGN EVENT 28.8.1989. Voda na površini terena Kontrolirano tlačno tečenje
  • 17. 0 2000000 4000000 6000000 8000000 10000000 12000000 14000000 16000000 1 2 VOLUMEN m3/god VOLUMEN m3/god 0 100000 200000 300000 400000 500000 1 2 kg BPK5/god kg BPK5/god RTC RESULTS STATIČKI RTC PRELJEV m3 kg BPK/god m3 kg BPK/god ČRNOMEREC 1122338 11134 1058698 8220 SAVICA 291950 907 381373 990 RADNIČKA 13373395 390636 11872608 334088 SUMA 14787683 402677 13312679 343298 Proning DHI d.o.o. • Average number of overflow events for static system is 23 per year • Wit RTC average number of overflow events is reduced to 8 per year • 80% overflow volume reduction for non flooding events
  • 18. Proning DHI d.o.o. WATER QUALITY MODELING
  • 19. WQ MODEL WITH MONITORING LOCATION Flow meter Water sampling Rain gauge Proning DHI d.o.o.
  • 20. 1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0 12.5 [mg/l] Time Series CONCENTRATION IN NODES, BOD DIS, (Ft95.trf) CONCENTRATION IN NODES, BOD DIS, 673+410 688+065 714+886 17-8-1998 6-10-1998 25-11-1998 14-1-1999 5-3-1999 24-4-1999 13-6-1999 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 CONCENTRATION [m] GOK4 BOD 1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 [mg/l] Time Series CONCENTRATION IN NODES, NH4, (Ft95.trf) CONCENTRATION IN NODES, NH4, 673+410 688+065 714+886 17-8-1998 6-10-1998 25-11-1998 14-1-1999 5-3-1999 24-4-1999 13-6-1999 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 CONCENTRATION [m] GOK4 NH4 SAVA - BOD5 GOK4 -BOD5 SAVA - NH4 GOK4 - NH4 TIME SERIES Proning DHI d.o.o.
  • 21. MouseTRAP CALIBRATION RESULTS 29-8-1998 8-9-1998 18-9-1998 28-9-1998 8-10-1998 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 [mg/l] Time Series CONCENTRATION IN NODES, BOD, (Lnh4bod.trf) CONCENTRATION IN NODES, BOD, 2508 CONCENTRATION, - GOK4 24H BOD CONCENTRATION, - GOK4 BOD 20-7-1998 30-7-1998 9-8-1998 19-8-1998 29-8-1998 8-9-1998 18-9-1998 2.0 4.0 6.0 8.0 10.0 12.0 14.0 [mg/l] Time Series CONCENTRATION IN NODES, NH4, (Lnh4bod.trf) CONCENTRATION IN NODES, NH4, 2508 CONCENTRATION, - GOK 24H NH4 CONCENTRATION, - GOK4 NH4 Location GOK4 BOD NH4 + simulirano mjereno jednom mjesečno 6/24h mjereno jednom dnevno Proning DHI d.o.o.
  • 22. 1 5 - 4 - 1 9 9 3 4 - 6 - 1 9 9 3 2 4 - 7 - 1 9 9 3 1 2 - 9 - 1 9 9 3 0 .0 2 .0 4 .0 6 .0 8 .0 1 0 .0 1 2 .0 [m g /l] T im e Se rie s C O NC ENT R AT IO N IN NO D ES, BO D D IS, (Sa va -9 3 .trf) CO NCENTRA TIO N IN NO DES , B O D DIS , 7 1 4 + 8 8 6 CO NCENTRA TIO N, - JA N B O D DIS 6 9 1 + 8 7 5 CO NCENTRA TIO N, - PET B O D DIS 6 7 3 + 4 1 0 CO NCENTRA TIO N, - O B O B O D DIS 1 5 - 4 - 1 9 9 3 5 - 5 - 1 9 9 3 2 5 - 5 - 1 9 9 3 1 4 - 6 - 1 9 9 3 4 - 7 - 1 9 9 3 2 4 - 7 - 1 9 9 3 1 3 - 8 - 1 9 9 3 2 - 9 - 1 9 9 3 2 2 - 9 - 1 9 9 3 0 .0 2 .0 4 .0 6 .0 8 .0 1 0 .0 1 2 .0 [m g /l] T im e Se rie s C O NC ENT R AT IO N IN NO D ES, D O , (Sa va -9 3 .trf) C O N C EN TR A TIO N IN N O D ES , D O , 7 1 4 + 8 8 6 C O N C EN TR A TIO N , - JA N K O M IR 0 2 6 9 1 + 8 7 5 C O N C EN TR A TIO N , - PETR O S EV O 2 6 7 3 + 4 1 0 C O N C EN TR A TIO N , - O B O R O V O O 2 SAVA RIVER CALIBRATIN RESULT (April - October ’93) simulirano mjereno Jankomir Petruševac Oborovo Proning DHI d.o.o.
  • 23. 1 - 1 - 1 9 9 0 2 0 - 7 - 1 9 9 0 5 - 2 - 1 9 9 1 2 4 - 8 - 1 9 9 1 1 1 - 3 - 1 9 9 2 2 7 - 9 - 1 9 9 2 0 .0 2 .0 4 .0 6 .0 8 .0 1 0 .0 1 2 .0 [m g /l] T im e Se rie s C O NC ENT R AT IO N IN NO D ES, D O , (Ve r9 0 -9 2 .trf) CO NCENTRA TIO N IN NO DES , DO , 7 1 4 + 8 8 6 CO NCENTRA TIO N, - JA NK O M IR 0 2 6 9 1 + 8 7 5 CO NCENTRA TIO N, - PETRO S EV O 2 6 7 3 + 4 1 0 CO NCENTRA TIO N, - O B O RO V O O 2 1 - 1 - 1 9 9 0 2 0 - 7 - 1 9 9 0 5 - 2 - 1 9 9 1 2 4 - 8 - 1 9 9 1 1 1 - 3 - 1 9 9 2 2 7 - 9 - 1 9 9 2 0 .0 2 .0 4 .0 6 .0 8 .0 1 0 .0 1 2 .0 1 4 .0 [m g /l] T im e Se rie s C O NC ENT R AT IO N IN NO D ES, BO D D IS, (Ve r9 0 -9 2 .trf) CO NCENTRA TIO N IN NO DES , B O D DIS , 7 1 4 + 8 8 6 CO NCENTRA TIO N, - JA N B O D DIS 6 9 1 + 8 7 5 CO NCENTRA TIO N, - PET B O D DIS 6 7 3 + 4 1 0 CO NCENTRA TIO N, - O B O B O D DIS RIVER SAVA VERIFICATION RESULT 1990-92 simulirano mjereno Jankomir Petruševac Oborovo + Proning DHI d.o.o.
  • 24. Broj događaja u 1989. Volumen preljevanja (m3) BPK (kg /god) NH4 (kg /god) Preljev Črnomerec 18.0 1122338.0 11134.2 810.3 Preljev Savica 12.0 291950.0 907.7 66.9 Preljev Radnička 38.0 13401774.5 390636.5 29794.5 0.0 5000000.0 10000000.0 15000000.0 Preljev Črnomerec Preljev Savica Preljev Radnička VOLUMEN PRELJEVANJA Volumen preljevanja (m3) 0.0 100000.0 200000.0 300000.0 400000.0 Preljev Črnomerec Preljev Savica Preljev Radnička BPK - NH4 BPK (kg /god) NH4 (kg /god) OVERFLOWING 89. god Proning DHI d.o.o.
  • 25. Broj događaja u 1995. Volumen preljevanja (m3) BPK (kg /god) NH4 (kg /god) Preljev Črnomerec 13.0 188021.4 3320.7 33.8 Preljev Savica 7.0 16921.7 137.3 10.0 Preljev Radnička 42.0 9005043.8 362880.9 24991.4 0.0 2000000.0 4000000.0 6000000.0 8000000.0 10000000.0 Preljev Črnomerec Preljev Savica Preljev Radnička VOLUMEN PRELJEVANJA Volumen preljevanja (m3) 0.0 50000.0 100000.0 150000.0 200000.0 250000.0 300000.0 350000.0 400000.0 Preljev Črnomerec Preljev Savica Preljev Radnička VOLUMEN PRELJEVANJA BPK (kg /god) NH4 (kg /god) OVERFLOWING 95. god Proning DHI d.o.o.
  • 26. 1-1-1989 11-4-1989 20-7-1989 28-10-1989 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 [mg/l] Time Series of CONCENTRATION IN NODES, DO, CONCENTRATION IN NODES, DO, 673+410 3| 673+410 4| 673+410 EXAMPLE OF SIMULATION RESULTS Proning DHI d.o.o. NW, PW, FW -1989. DO, existing/short term/long term
  • 27. NW, PW, FW-89BOD, existing/short term/long term 1-1-1989 11-4-1989 20-7-1989 28-10-1989 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 [mg/l] Time Series CONCENTRATION IN NODES, BOD DIS, 673+410 3| 673+410 5| 673+410 CONCENTRATION IN NODES, NH4, Proning DHI d.o.o.
  • 28. NW, PW, FW-89Amonia NH4 , existing/short term/long term 1-1-1989 11-4-1989 20-7-1989 28-10-1989 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 [mg/l] Time Series of CONCENTRATION IN NODES, NH4, CONCENTRATION IN NODES, NH4, 673+410 3| 673+410 5| 673+410 Proning DHI d.o.o.
  • 29. BOD LOAD DISTRIBUTION kg BPK / god – SHORT TERM 41.27% 58.72% 0.01% SAVA (kritična) Kanalizacija - ispusti Preljevi (89) kg BPK /god – LONG TERM 83% 14% 3% SAVA (kritična) Kanalizacija - ispusti Preljevi (89) kg BPK5/god - SADAŠNJE STANJE 42% 58% Sava Kanalizacija Proning DHI d.o.o. EXISTING SITUATION
  • 30. Proning DHI d.o.o. Bliznec Ravnice Kozari Bok Dubrava Sjeverna Čulinečka Sesvete Strug Žitnjak Južna Čulinečka WWTP PHASE III – DESIGNING GOK SYSTEM • main channel 9590 m long • catchment area 220 km2 • DWF 3-4 m3/s • RWF 70 m3/s
  • 31. Proning DHI d.o.o. 86% 14% Preljevanje [m3/god] Mješoviti dotok na CUPu kišnom razdoblju [m3/god] ODNOS PRELIVENOG I PROČIŠĆENOG VOLUMENA U KIŠNOM RAZDOBLJU ODNOS PRELIVENOG I UKUPNO PROČIŠĆENOG VOLUMENA 5% 95% Preljevanje [m3/god] Ukupni dotok na CUP[m3/god] LONG TERM SIMULATION RESULTS - 01.01.1995. do 31.12.1995.
  • 32. Proning DHI d.o.o. 1-1-1995 20-2-1995 11-4-1995 31-5-1995 20-7-1995 8-9-1995 28-10-1995 17-12-1995 105.2 105.4 105.6 105.8 106.0 106.2 106.4 106.6 106.8 107.0 107.2 107.4 107.6 107.8 108.0 108.2 108.4 108.6 108.8 109.0 [m] Time Series WATER LEVEL NODES (V31-NOVI-C.PRF) WATER LEVEL NODES RADNICK Kota krune preljeva 108.5 mnm WATER LEVEL ON CSO RADNIČKA BASED ON I YEAR SIMULATION ( 1.1.1995 DO 31.12.1995.)
  • 33. Proning DHI d.o.o. Preljev Radnička, Qs= 3,7 m3/s, 2Qs=7,2 m3/s. L=60m, Qp=58 m3/s Proning DHI d.o.o. CSO RADNIČKA
  • 34. Proning DHI d.o.o. CSO RADNIČKA PHISICAL MODEL Testing parameters: • water levels in channels • overflow coefficient • velocities upstream and downstream of the overflow structure • dynamic pressures • sediment transport • floating sediment transport
  • 36. Proning DHI d.o.o. PHASE IV – DETAIL DESIGNING AND CONSTRUCTION
  • 42. Proning DHI d.o.o. ZAGREB WWTP 1,2 mil. PE (1,5)
  • 47. FROM TRADITIONAL TO BLUE GREEN SOLUTIONS -Traditional solutions could not compensate for the climate change impact due to various reasons partly due to uncontrolled urbanisation -Frequent urban floodings caused substantial damages to the urban infrastrucure, properties and human lives - EU directives to be followed push desicion makers to undertake improvements on the sewerage systems Proning DHI d.o.o.
  • 48. SCADA / GIS SYSTEM -rainfall runoff monitoring -Establishment of the SCADA system - Qulity monitoring -- Further enlargment of the SCADA system with WQ parameters -- Blue Green designing -- Water and energy savings Proning DHI d.o.o.
  • 49. GIS AND SCADA GIS – sewerage dimensions Proning DHI d.o.o.
  • 50. GIS AND SCADA GIS – sewerage age Proning DHI d.o.o.
  • 51. GIS AND SCADA GIS – low slope inclination sewage Proning DHI d.o.o.
  • 52. GIS AND SCADA Proning DHI d.o.o. • SCADA – basic concept
  • 53. GIS AND SCADA Proning DHI d.o.o. • SCADA – basic concept
  • 54. GIS AND SCADA Proning DHI d.o.o. • SCADA – basic concept
  • 55. GIS AND SCADA SCADA – phase I • 24 monitoring - canal • 4 pumping stations • 2 CSO • 20 ombrographs, • 11 limnigraphs TOTAL 60 monitors Proning DHI d.o.o.
  • 56. GIS AND SCADA SCADA – final phase • 81 monitoring canal, • 49 pumping stations, • 9 CSO, • 20 ombrographs, • 11 limnigraphs TOTAL 170 monitors Proning DHI d.o.o.
  • 57. Proning DHI d.o.o. SCADA MONITORS: RAIN. VELOCITY, DEPTH (LEVEL) PH, TEMPERATURE, DISSOLVED OXYGEN, ETC
  • 58. GIS AND SCADA Proning DHI d.o.o. • SCADA ZAGREB SCHEME OF COMUNICATION NETWORK
  • 59. GIS AND SCADA Proning DHI d.o.o. • SCADA – remote monitoring stations
  • 60. BUT ... ALL THIS DID NOT PREVENT SEVEREURBAN FLOODINGS, DAMAGES OF URBAN INFRASTRUCTURE ETC. Proning DHI d.o.o.
  • 61. BLUE GREEN SOLUTION (PROF. MAKSIMOVIC) Blue green urban concept Proning DHI d.o.o.
  • 62. BLUE GREEN SOLUTION (PROF. MAKSIMOVIC) Blue green urban concept Proning DHI d.o.o.
  • 63. BLUE GREEN SOLUTION (PROF. MAKSIMOVIC) Blue green urban concept Proning DHI d.o.o.
  • 64. BLUE GREEN SOLUTION (PROF. MAKSIMOVIC) Blue green urban concept – example: Zagreb campus Proning DHI d.o.o.
  • 65. CONCLUSIONS – LESSONS LEARNED STRUCTURAL MEASURES, BEING TRADITIONAL APROACH ARE IN URBAN AREAS EXPENSIVE AND CAN NOT ACCOMODATE FOR EFFECTS OF CLIMATE CHANGES NON-STRUCTURAL MEASURES ARE HELPING IMPROVING OVERALL PERFORMANCE OF THE SS GIS / SCADA FURTHER IMPROVES SS MANAGEMENT BLUE GREEN CONCEPT FURTHER IMPROVES WATER / ENERGY CYCLE IN CITIES BALANCING INPUTS AND OUTPUTS, ENABLING SUISTAINABLE FUTURE COMBINATION OF STRUCTURAL AND NON-STRUCTURAL MEASURES SUPPORTED BY BLUE GREEN CONCEPT WILL ALOW THE MOST BALANCED MULTICRITERIAL SOLUTIONS BY IMPLEMENTING COMBINATION OF STRUCTURAL , NON-STRUCTURAL AND BLUE-GREEN MEASURES ONE CAN ACHIEVE HIGHER URBAN STANDARD, HIGHER SECURITY AND LOWER O/M COSTS Proning DHI d.o.o.
  • 66. THANK YOU FOR YOUR ATTENTION Bozidar Dedus deda@proning-dhi.hr Proning DHI d.o.o.