30800                         Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices

                                               Access at: http://www.gpoaccess.gov/nara/               technologies used to generate electricity              Displays and other information about
                                               index.html.                                             from fossil fuels, including natural gas.              DOE’s proposed action and Summit’s
                                                                                                          Summit proposes to build its IGCC                   project will be available, and
                                                 Authority: Section 1605 of the American               plant adjacent to an oil field in Ector
                                               Recovery and Reinvestment Act, Public Law                                                                      representatives from DOE and Summit
                                               111–5.                                                  County, Texas. The plant would use                     will be present at the informal session
                                                                                                       coal as its feedstock. It would capture,               to discuss the proposed project, DOE’s
                                                 Dated: May 28, 2010.                                  in the form of CO2, about 90% of the                   CCPI program, and the EIS process.
                                               Arne Duncan,                                            carbon in the portion of its coal fuel
                                               Secretary of Education.                                                                                        ADDRESSES: Written comments on the
                                                                                                       supply used for power production. The
                                               [FR Doc. 2010–13308 Filed 6–1–10; 8:45 am]              plant would employ two gasifiers,                      scope of the EIS and requests to
                                                                                                       feeding a single, combined-cycle power                 participate in the public scoping
                                               BILLING CODE 4000–01–P
                                                                                                       island to generate about 400 MW (gross)                meeting should be addressed to: Mr.
                                                                                                       of electricity, with the co-production of              Mark L. McKoy, U.S. Department of
                                               DEPARTMENT OF ENERGY                                    sulfuric acid and urea (for fertilizer) or             Energy, National Energy Technology
                                                                                                       other chemicals. About 275 MW of                       Laboratory, 3610 Collins Ferry Road,
                                               Notice of Intent To Prepare an                          electricity would be put onto the power                P.O. Box 880, Morgantown, WV 26507–
                                               Environmental Impact Statement for                      grid, with the remaining power used for                0880. Individuals and organizations
                                               Texas Clean Energy Project, Ector                       commercial loads on the project site,                  who would like to provide oral or
                                               County, TX                                              such as urea production and CO2                        electronic comments, or request copies
                                                                                                       compression. During DOE                                of the Draft EIS, should contact Mr.
                                               AGENCY: Department of Energy.                                                                                  McKoy by telephone (304–285–4426),
                                               ACTION: Notice of Intent To Prepare            An       demonstration phase of the project, it
                                                                                                       would permanently sequester CO2 at a                   toll-free telephone (1–800–432–8330
                                               Environmental Impact Statement.                                                                                (ext. 4426), fax (304–285–4403), e-mail
                                                                                                       maximum rate of about 3 million tons
                                                                                                       per year by piping it to Permian Basin                 (Summit.EIS@netl.doe.gov), or formal
                                               SUMMARY: The U.S. Department of
                                                                                                       oil fields, where it would be used by                  mail submitted to the address given
                                               Energy (DOE or Department) announces
                                                                                                       field operators for enhanced oil recovery              above.
                                               its intent to prepare an Environmental
                                               Impact Statement (EIS) pursuant to the                  (EOR). Summit is owned jointly by the                  FOR FURTHER INFORMATION CONTACT: For
                                               National Environmental Policy Act                       Summit Power Group, Inc. and CW                        further information about this project,
                                               (NEPA), the Council on Environmental                    NextGen, Inc. (CWNI), a Clayton                        contact Mr. Mark L. McKoy, as
                                               Quality (CEQ) NEPA regulations (40                      Williams company. The project team                     described above. For general
                                               CFR parts 1500–1508), and DOE NEPA                      includes Summit Power Group, Inc.;                     information on the DOE NEPA process,
                                               implementing procedures (10 CFR part                    Blue Source, LLC; Siemens, AG; and                     please contact Ms. Carol M. Borgstrom,
                                               1021), to assess the potential                          CWNI; among others.                                    Director, Office of NEPA Policy and
                                               environmental impacts for the proposed                     DOE issues this Notice of Intent (NOI)              Compliance (GC–54), U.S. Department
                                               action of providing Federal funding for                 to inform interested parties of the                    of Energy, 1000 Independence Avenue,
                                               the proposed Texas Clean Energy                         pending EIS and to invite public                       SW., Washington, DC 20585–0103;
                                               Project (TCEP) near Odessa, Texas. The                  comments on the proposed action,                       telephone: 202–586–4600; fax: 202–
                                               project would comprise planning,                        including: (1) The proposed plans for                  586–7031; or leave a toll-free message at
                                               design, construction and operation by                   implementing the project, (2) the range                1–800–472–2756.
                                               Summit Texas Clean Energy, LLC                          of environmental issues and alternatives
                                                                                                       to be analyzed, and (3) the analysis                   SUPPLEMENTARY INFORMATION:
                                               (Summit) of a coal-fueled electric power
                                               and chemicals production plant                          methods to be used or considered                       Background
                                               integrated with carbon dioxide (CO2)                    during preparation of the EIS.
                                               capture and geologic sequestration. DOE                 DATES: DOE invites comments on the                        Since the early 1970s, DOE and its
                                               selected this project for an award of                   proposed scope and content of the EIS                  predecessor agencies have pursued
                                               financial assistance through a                          from all interested parties. Comments                  research and development programs
                                               competitive process under the Clean                     must be received by July 2, 2010, to                   that include large, technically complex
                                               Coal Power Initiative (CCPI) program                    ensure consideration. Late comments                    projects in pursuit of innovation in a
                                               (Round 3).                                              will be considered to the extent                       wide variety of coal technologies
                                                  The EIS (DOE/EIS–0444) will inform                   practicable. In addition to accepting                  through the proof-of-concept stage.
                                               DOE’s decision on whether to provide                    comments in writing (formal letters,                   However, helping a technology reach
                                               financial assistance under its CCPI                     faxes and e-mails) and by telephone                    the proof-of-concept stage does not
                                               program. DOE proposes to provide                        (See ADDRESSES below), DOE will                        ensure its continued development or
                                               Summit with approximately $350                          conduct a public scoping meeting in                    commercialization. Before a technology
                                               million in funding for this project,                    which government agencies, private-                    can be considered seriously for
                                               which would demonstrate the full                        sector organizations, and the general                  commercialization, it must be
                                               integration of CO2 capture and                          public are invited to present oral                     demonstrated at a sufficient scale to
                                               sequestration with a commercial,                        comments or suggestions with regard to                 prove its reliability and economically
                                               integrated gasification combined-cycle                  the alternatives and issues to be                      competitive performance. The financial
                                               (IGCC) poly-generation (electricity and                 considered in the EIS. The scoping                     risk associated with such large-scale
                                               chemicals) plant. DOE’s contribution of                 meeting will be held beginning at 7 p.m.               demonstration projects is often too high
                                               $350 million would constitute about 20                  on Thursday, June 17, 2010, in the                     for the private sector to assume in the
sroberts on DSKD5P82C1PROD with NOTICES




                                               percent of the estimated total                          Saulsbury Meeting Room of the                          absence of strong incentives.
                                               development and capital cost of the                     Electronics Technology Building at                        The CCPI program was established in
                                               project, which is estimated to be $1.73                 Odessa College, 201 West University                    2002 as a government and private sector
                                               billion (2009 dollars). TCEP would                      Blvd, Odessa, Texas 79764. The public                  partnership to implement the
                                               employ advanced clean coal                              is also invited to learn more about the                recommendation in President Bush’s
                                               technologies to reduce the levels of CO2                proposed project at an informal session                National Energy Policy to increase
                                               emissions below that of conventional                    at this location beginning at 4 p.m.                   investment in clean coal technology.


                                          VerDate Mar<15>2010   19:46 Jun 01, 2010   Jkt 220001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:FRFM02JNN1.SGM   02JNN1
Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices                                            30801

                                               Through cooperative agreements with                     pipelines (with the construction of short              electricity that can be generated from a
                                               its private sector partners, the program                new connector pipelines) where the CO2                 quantity of coal. Both turbines would
                                               advances clean coal technologies to                     could be used in EOR operations. Most                  generate electricity for sale, with a part
                                               commercialization; these technologies                   likely, CO2 would be transported in an                 of the electricity diverted to service
                                               often involve combustion                                existing regional CO2 pipeline network.                other parts of the poly-generation plant
                                               improvements, control system advances,                  A short, approximately two-mile, new                   and on-site commercial loads. At full
                                               gasifier designs, pollution reductions                  CO2 pipeline could connect the power                   capacity, the plant would be expected to
                                               (including greenhouse gas reduction),                   plant site to the nearest existing trunk               use about 5,800 tons of low-sulfur coal
                                               efficiency increases, fuel processing                   pipeline.                                              per day (about 1.9 to 2.0 million tons
                                               techniques and other improvements.                                                                             per year). Coal would be delivered by
                                                                                                       Proposed Plant
                                                  Congress established criteria for                                                                           railroad trains from the Powder River
                                               projects receiving financial assistance                    Summit would construct an IGCC                      Basin and would be bought through
                                               under this program in Title IV of the                   poly-generation plant that is designed to              contracts on the open market.
                                               Energy Policy Act of 2005 (Pub. L. 109–                 capture approximately 90 percent of its                   The plant would minimize emissions
                                               58) (EPACT 2005). Under this statute,                   CO2, and sequester it through use in                   of sulfur oxides, nitrogen oxides,
                                               CCPI projects must ‘‘advance efficiency,                EOR operations. Summit, or another                     mercury, and particulates as compared
                                               environmental performance and cost                      entity, would operate the plant to                     to conventional coal-fueled power
                                               competitiveness well beyond the level                   demonstrate the commercial feasibility                 plants. In compliance with Texas House
                                               of technologies that are in commercial                  of a fully integrated, coal-fueled 400                 Bill 469, the project would be required
                                               service’’ (Pub. L. 109–58, Sec. 402(a)). In             MW-equivalent generating unit that                     to meet stringent emissions limits: 0.034
                                               February 2009, the American Recovery                    would produce 275 MW of electricity                    pounds of NOX per million BTUs, 0.04
                                               and Reinvestment Act of 2009 (Pub. L.                   for the power grid (with additional                    pounds of SOX per million BTUs, 95
                                               111–5, 123 Stat. 115 (Feb. 17, 2009))                   amounts for on-site commercial loads                   percent reduction in mercury emissions,
                                               (ARRA) appropriated $3.4 billion to                     and plant use) plus sulfuric acid, urea                and 0.015 pounds of particulates per
                                               DOE for ‘‘Fossil Energy Research and                    and perhaps other chemicals such as                    million BTUs. The project’s air permit
                                               Development;’’ the Department intends                   ammonia, methanol or substitute                        application with the Texas Commission
                                               to use a significant portion of these                   natural gas. Following the                             on Environmental Quality (TCEQ)
                                               funds to provide financial assistance to                demonstration phase, the project would                 includes even lower emissions limits
                                               CCPI projects.                                          continue long-term commercial                          than those required by HB 469.
                                                                                                       operations with continuing sales of                    Emissions of carbon monoxide and
                                               Purpose and Need for Agency Action                      power, urea, captured CO2 and other                    volatile organic compounds would be
                                                 The purpose and need for the DOE                      chemical products.                                     controlled.
                                               action are to advance the CCPI program                     The new plant would consist of two                     Steam from the gasification and
                                               by funding projects that have the best                  gasifiers, a gas processing and cleanup                syngas processing could be condensed,
                                               chance of achieving the program’s                       system, a syngas-fueled combustion                     treated, and recycled into the gasifier or
                                               objectives as established by Congress:                  turbine, a heat-recovery steam generator,              added to the plant’s cooling water
                                               the commercialization of clean coal                     a steam turbine, a sulfur recovery plant,              circuit. Slag from the gasifiers would be
                                               technologies that advance efficiency,                   a chemicals production plant, and                      sold for beneficial uses. Other solid
                                               environmental performance, and cost                     associated facilities. The system is                   materials generated by the various plant
                                                                                                       designed with duplicate, over-sized                    processes would be accumulated on site
                                               competitiveness well beyond the level
                                                                                                       gasifiers to ensure full-time availability             and made available for beneficial use,
                                               of technologies that are currently in
                                                                                                       of syngas production, with sufficient                  recycling or, if these options are not
                                               commercial service.
                                                                                                       supply for both the production of                      available, disposed of in accordance
                                               Summit’s Proposed Project                               electricity (more than 75 percent) and                 with applicable laws.
                                                                                                       chemicals (less than 25 percent).                         The chemical plant would use the
                                               Site of Proposed Project: Penwell, Texas                   The plant proposed by Summit would                  Haber process to convert syngas into
                                                  The proposed site is located on 600                  gasify coal to produce ‘‘synthesis gas’’               ammonia and the Bosch-Meiser process
                                               acres, approximately 15 miles southwest                 (or ‘‘syngas’’—mostly carbon monoxide                  to convert ammonia into urea for
                                               of the city of Odessa in Ector County,                  (CO), hydrogen gas (H2), CO2 and                       fertilizer. With equipment additions or
                                               Texas. The site is on flat land north of                steam), which would be processed to                    changes, other chemicals could be
                                               the town of Penwell and Interstate                      increase the H2 content (by converting                 produced.
                                               Highway I–20. The proposed power                        CO and H2O into H2 plus CO2) and                          Other notable equipment would
                                               plant property is arid, non-arable brush                cleaned of particulates and acid gases to              include coal storage facilities, a coal
                                               (mesquite-lotebush-juniper) and range                   produce a H2-rich, carbon-lean fuel. The               preparation plant and coal feed system,
                                               land. Surrounding areas are or were                     H2-rich fuel would power the gas                       air separators, stacks, mechanical draft
                                               used primarily for ranching to the north                combustion turbine, and CO2 emissions                  cooling tower (dry cooling is planned
                                               and east and oil production to the west                 would be minimal (only a fraction of                   for the power generation facilities and
                                               and south, with some scattered                          those of a natural gas power plant) as a               wet cooling for other portions of the
                                               industrial facilities (quarry, cement                   result of the hydrogen-rich, carbon-lean               plant), a unit for converting captured
                                               plant, etc.) within sight to the east and               fuel. Hot exhaust gas from the gas                     sulfur dioxide into sulfuric acid for sale
                                               south. There is an extensive junk yard                  combustion turbine would generate                      on the market, and a particulate
                                               of abandoned oil and gas equipment                      steam from water in the heat recovery                  filtration system. The height of the
sroberts on DSKD5P82C1PROD with NOTICES




                                               along the site’s southern border, on the                steam generator to drive the steam                     tallest proposed stack would be
                                               other side of a railroad. The site has                  turbine. Using a heat recovery steam                   approximately 140 feet above ground
                                               access to coal delivery via rail along the              generator and a steam turbine to capture               level. Additionally, the plant would
                                               southern border of the property, and it                 energy from the exhaust gases of the                   require the construction of a railroad
                                               connects to I–20 via Farm-to-Market                     combustion turbine is the essence of the               loop, coal unloading facilities, ash/slag
                                               Road 1601. There are numerous oil                       combined-cycle approach and increases                  handling facilities, access roads,
                                               fields within reach of existing CO2                     both efficiency and the total amount of                administration buildings, water and


                                          VerDate Mar<15>2010   19:08 Jun 01, 2010   Jkt 220001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:FRFM02JNN1.SGM   02JNN1
30802                         Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices

                                               waste water treatment facilities, and a                 sequester about 3 million tons of CO2                  facilities, including the capture and sale
                                               waste water disposal well. An                           per year by transporting it in pipelines               of CO2, would be expected to continue
                                               underpass may be constructed beneath                    to oil fields in the Permian Basin of west             for 30 to 50 years. Summit plans to start
                                               the adjoining railroad.                                 Texas for use in EOR operations. These                 construction during 2011 and
                                                                                                       fields are well characterized, and some                commercial operations (demonstration
                                               Proposed Linear Facilities
                                                                                                       already make extensive use of CO2 for                  phase) by late 2014. The schedule is
                                                  Linear facilities are the power                      EOR. As a consequence of EOR                           contingent upon Summit receiving the
                                               transmission lines and pipelines that                   operations, most of the captured CO2                   necessary permits (which would be
                                               convey electricity and materials to and                 (more than 99 percent) would be                        preceded by hearings, public comment
                                               from the plant. Electricity could be                    sequestered in deep underground                        opportunities and other events
                                               conveyed to regional 345 kV                             geologic formations that would be
                                               transmission lines via an approved                                                                             mandated by applicable regulations and
                                                                                                       monitored to verify the quantity and                   agency procedures) and financial
                                               ERCOT (Electric Reliability Council of                  permanence of CO2 storage. The use of
                                               Texas) grid extension but could also be                                                                        closing on all the necessary funding
                                                                                                       CO2 in this manner would continue the
                                               transmitted via local interconnects with                                                                       sources, including DOE’s financial
                                                                                                       existing uses of the subject fields,
                                               either of two 138 kV transmission lines,                namely enhanced oil production using                   assistance. DOE’s decision to provide
                                               one located approximately 0.7 miles to                  CO2.                                                   financial assistance for detailed design,
                                               the north and the other located 1.8 miles                  The EOR process involves the                        procurement of expensive equipment,
                                               to the south. Rights-of-ways (ROWs)                     repeated injection of CO2 to reduce the                construction, and operations will be
                                               would be approximately 200 ft wide. An                  oil’s viscosity and to move it through                 informed by the NEPA process.
                                               electrical substation would be                          the reservoir. During EOR operations,                  Connected and Cumulative Actions
                                               constructed to facilitate the connection                pore space left by the extracted oil is
                                               to the grid.                                            occupied by the injected CO2,                             Under the cooperative agreement
                                                  Process water would be obtained from                 sequestering it in the geologic                        between DOE and Summit, DOE would
                                               local wastewater treatment facilities                   formation. Reservoirs are not over-                    share in the cost of the power and
                                               (using effluent from the Gulf Coast                     pressurized from CO2 for EOR                           chemical plant, supporting facilities and
                                               Authority, the City of Odessa, and/or                   operations, because fluid volumes are                  site infrastructure (including that
                                               the City of Midland) or from a re-                      removed from the reservoirs in amounts                 required for sequestration monitoring,
                                               charging aquifer in the region. Other                   corresponding to those injected in the                 verification and accounting (MVA), and
                                               water supply options may be considered                  reservoirs.                                            the costs associated with implementing
                                               during the project planning. The water                                                                         and documenting the results of the
                                                                                                       Summit’s Technology Alternatives
                                               would be conveyed by one or more new
                                                                                                         Summit has proposed to use Siemens                   demonstration test plan during the
                                               pipelines constructed on a combination
                                                                                                       SFG–500 gasifiers and a Siemens F-class                demonstration phase). Under this
                                               of existing and new ROWs over
                                                                                                       combined-cycle power island. As plans                  agreement, DOE would not share in the
                                               distances ranging between about 10
                                               miles and 54 miles.                                     progress, Summit will make a final                     costs of normal plant operations during
                                                  Wastewater would be processed in a                   selection of air separation technology,                the demonstration phase. For activities
                                               new on-site wastewater treatment plant.                 water/gas shift reactor technology, acid               that would not occur if not for this
                                               The plant would be designed for zero                    gas removal system technology (for                     project, DOE will consider these as
                                               liquid discharge.                                       capturing both CO2 and acid gases, such                connected actions and will evaluate
                                                  Natural gas, which would be used to                  as H2S), sulfur recovery technology (e.g.,             them in the EIS.
                                               start the plant, would be obtained from                 Claus process), and urea production                       DOE will consider the cumulative
                                               an existing pipeline that traverses the                 technology (e.g., combination of the                   impacts of both the cost-shared
                                               proposed project site or from a gas line                Haber ammonia production process and                   activities and other activities, along
                                               located either to the north or to the                   Bosch-Meiser urea production process).                 with any other connected actions,
                                               south of the site. Natural gas also may                 Summit has proposed to use only                        including those of third parties.
                                               be used to fuel the power island                        commercially proven, fully warranted                   Cumulative impacts analysis will
                                               initially, while the remainder of the                   equipment to reduce risks and costs.                   include the analysis of pollutant
                                               plant is under construction.                            The technological advancement is in the                emissions (including greenhouse gas
                                                  The plant may deliver its CO2 to the                 integration of all these components. A                 emissions) and other incremental
                                               existing Central Basin CO2 pipeline,                    competitive process would be used to
                                                                                                                                                              impacts that, when added to past,
                                               which is less than two miles to the east                select vendors and manufacturers (other
                                                                                                                                                              present and reasonably foreseeable
                                               of the proposed plant site. In this                     than for the Siemens-supplied
                                                                                                                                                              future impacts, may have significant
                                               option, a short new pipeline would be                   equipment). A wide variety of chemicals
                                                                                                                                                              effects on the human environment. DOE
                                               constructed eastwards along new ROW.                    could be produced, depending on
                                                                                                                                                              will not consider impacts associated
                                               Alternatively, new pipelines could be                   chemical processing equipment
                                               constructed to either existing oil fields               installed. Current plans indicate market               with the purchase of commodities (such
                                               or to other existing pipelines. New                     viability for the production and sale of               as coal) on the open market, coal
                                               ROWs would require widths of 100 ft                     urea (for fertilizer), ammonia, methanol               mining, or the transportation of coal as
                                               for construction and approximately 50 ft                and substitute natural gas (SNG).                      a general industrial activity (as
                                               for pipeline operations. Sales and                                                                             distinguished from the delivery of coal
                                                                                                       Proposed Project Schedule                              to the project site, specifically), given
                                               conveyance options for CO2 are
sroberts on DSKD5P82C1PROD with NOTICES




                                               currently under consideration and                         The project proposed by Summit                       these impacts are generally well known
                                               negotiation.                                            includes the planning, design,                         and would occur regardless of DOE’s
                                                                                                       construction, initial start-up, and early              decision regarding financial assistance
                                               Proposed Use of CO2 for Enhanced Oil                    operation of the plant and associated                  for this project. No coal for this project
                                               Recovery and Sequestration                              facilities for a period of three years                 would come from ‘‘mountaintop
                                                 During DOE’s demonstration phase of                   under the DOE demonstration phase.                     removal’’ forms of mining, which are not
                                               plant operations, the project would                     Thereafter the plant and associated                    practiced in the Powder River Basin.


                                          VerDate Mar<15>2010   19:08 Jun 01, 2010   Jkt 220001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:FRFM02JNN1.SGM   02JNN1
Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices                                             30803

                                               Alternatives, Including the Proposed                    given to environmental factors. DOE                    FutureGen (reference: DOE/EIS–0394).
                                               Action                                                  will make the synopsis available to the                In particular, Summit sought a site
                                                  NEPA requires that agencies evaluate                 public by posting it on NETL’s Web site.               where CO2 sales options were readily
                                               the reasonable alternatives to their                       After DOE selects a project for an                  available and the market was strong and
                                               proposed action. The purpose and need                   award, the range of reasonable                         dependable so that there would be no
                                                                                                       alternatives becomes the project as                    reliance on pending legislation for CO2
                                               for agency action determines the range
                                                                                                       proposed by the applicant, any                         capture and sequestration and no need
                                               of reasonable alternatives. In this case,
                                                                                                       alternatives still under consideration by              for a long CO2 pipeline that might not
                                               the purpose and need for DOE’s
                                                                                                       the applicant or that are reasonable                   be built. The EIS will briefly describe
                                               proposed action—providing cost-shared
                                                                                                       within the confines of the project as                  Summit’s site selection process.
                                               funding for Summit’s project—is to
                                                                                                       proposed (e.g., the particular location of             However, DOE does not plan to analyze
                                               advance the CCPI program by funding
                                                                                                       the plant on the parcel of land proposed               in detail any alternative sites considered
                                               projects that have the best chance of
                                                                                                       for the project) and a ‘‘no action’’                   and dismissed by Summit because
                                               achieving the program’s objectives as
                                                                                                       alternative. Regarding a no action                     Summit is no longer considering these
                                               established by Congress: The
                                                                                                       alternative, DOE assumes for purposes                  other alternatives and because they were
                                               commercialization of clean coal                         of the EIS that, if it decides to withhold
                                               technologies that advance efficiency,                                                                          not part of the proposal that Summit
                                                                                                       financial assistance, the project would                offered and DOE accepted.
                                               environmental performance, and cost                     not proceed.
                                               competitiveness well beyond the level                      DOE currently plans to evaluate the                 Floodplains and Wetlands
                                               of technologies that are currently in                   project as proposed by Summit (with
                                               service.                                                                                                          The footprint of the proposed plant
                                                                                                       and without any mitigating conditions                  would not affect any wetlands or
                                                  DOE’s NEPA regulations include a                     that DOE may identify as reasonable and
                                               process for identifying and analyzing                                                                          floodplains. Wetland and floodplain
                                                                                                       appropriate); alternatives to Summit’s                 impacts, if any, from construction of
                                               reasonable alternatives in the context of               proposal that it is still considering (e.g.,
                                               providing financial assistance through a                                                                       pipelines and transmission lines would
                                                                                                       water sources, sales options for CO2,                  be identified during the preparation of
                                               competitive selection of projects                       and the ROWs for linear facilities); and
                                               proposed by entities outside the federal                                                                       the EIS and described in the EIS. In the
                                                                                                       the no action alternative. DOE and                     event that the EIS identifies wetlands
                                               government. The range of reasonable                     Summit will consider other reasonable
                                               alternatives in competitions for grants,                                                                       and floodplains that would be affected
                                                                                                       alternatives suggested during the                      by the proposed project, including its
                                               loans, loan guarantees, and other                       scoping period.
                                               financial support is defined initially by                                                                      linear facilities and connected actions,
                                                                                                          Under the no action alternative, DOE
                                               the range of responsive proposals                                                                              DOE will prepare a floodplain and
                                                                                                       would not provide funding to Summit.
                                               received by DOE. Unlike projects                                                                               wetland assessment in accordance with
                                                                                                       In the absence of financial assistance
                                               undertaken by DOE itself, the                                                                                  its regulations at 10 CFR part 1022 and
                                                                                                       from DOE, Summit could reasonably
                                               Department cannot mandate what                                                                                 include the assessment in the EIS.
                                                                                                       pursue two options. It could build the
                                               outside entities propose, where they                    project without DOE funding; the                       Preliminary Identification of
                                               propose their project, or how they                      impacts of this option would be                        Environmental Issues
                                               propose to do it, beyond expressing                     essentially the same as those of DOE’s
                                               basic requirements in the funding                                                                                 DOE intends to address the issues
                                                                                                       proposed action, except any DOE-
                                               opportunity announcement; and these                     required mitigations would not be                      listed below when considering the
                                               express requirements must be limited to                 imposed. Or, Summit could choose not                   potential impacts resulting from the
                                               those that further the program’s                        to pursue its project, and there would be              construction and operation of Summit’s
                                               objectives. DOE’s decision is then                      no impacts from the project. This latter               proposed project and any connected
                                               limited to selecting among the                          option would not contribute to the goal                actions. This list is neither intended to
                                               applications that meet the program’s                    of the CCPI program, which is to                       be inclusive nor a predetermined set of
                                               goals.                                                  accelerate commercial deployment of                    potential impacts. DOE invites
                                                  Recognizing that the range of                        advanced coal technologies that provide                comments on whether this is the correct
                                               reasonable alternatives in the context of               the United States with clean, reliable,                list of important issues that should be
                                               financial assistance and contracting is                 and affordable energy. However, as                     considered in the EIS. The
                                               determined by the number and nature of                  required by NEPA, DOE analyzes this                    environmental issues include:
                                               the proposals received, section 216 of                  option as the no action alternative for                   • Air quality impacts: Potential for air
                                               DOE’s NEPA regulations requires the                     the purpose of making a meaningful                     emissions during construction and
                                               Department to prepare an                                comparison between the impacts of DOE                  operation of the power plant and
                                               ‘‘environmental critique’’ that assesses                providing financial assistance and                     appurtenant facilities to impact local
                                               the environmental impacts and issues                    withholding that assistance.                           sensitive receptors, local environmental
                                               relating to each of the proposals that the                 Alternatives considered by Summit in                conditions, and special-use areas,
                                               DOE selecting official considers for an                 developing its proposed project will be                including contributions to smog and
                                               award. See 10 CFR 1021.216. This                        discussed in the EIS. Summit                           haze, impacts from dust and any
                                               official considers these impacts and                    considered a number of sites (six in                   significant vapor plumes, and
                                               issues, along with other aspects of the                 Texas alone) and determined that the                   consequences of greenhouse gas
                                               proposals (such as technical merit and                  only reasonable site for continued                     emissions;
                                               financial ability) and the program’s                    consideration is the one at Penwell.                      • Water resource impacts: Potential
sroberts on DSKD5P82C1PROD with NOTICES




                                               objectives, in making awards. DOE                       Summit’s consideration included                        impacts from water utilization and
                                               prepared a critique of the proposals that               market opportunities and conditions,                   evaporation;
                                               were deemed suitable for selection in                   local infrastructure, physical suitability                • Infrastructure and land use impacts:
                                               this round of awards for the CCPI                       of the sites, and environmental                        Potential environmental and
                                               program. DOE will prepare an                            concerns. Two of the sites had already                 socioeconomic impacts associated with
                                               ‘‘environmental synopsis,’’ based on the                been environmentally reviewed and                      the project, including delivery of feed
                                               critique, to document consideration                     cleared for a very similar project,                    materials and distribution of products


                                          VerDate Mar<15>2010   19:08 Jun 01, 2010   Jkt 220001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:FRFM02JNN1.SGM   02JNN1
30804                         Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices

                                               (e.g., power transmission lines,                        EIS. The public scoping period will end                DEPARTMENT OF ENERGY
                                               pipelines);                                             on July 2, 2010. Interested government
                                                  • Visual impacts associated with                     agencies, private-sector organizations                 Biomass Research and Development
                                               facility structures: View shed impacts,                 and individuals are encouraged to                      Technical Advisory Committee
                                               impacts to scenic views (e.g., impacts                  submit comments or suggestions
                                                                                                                                                              AGENCY: Department of Energy, Office of
                                               caused by the plant structures, water                   concerning the content of the EIS, issues
                                                                                                                                                              Energy Efficiency and Renewable
                                               vapor plumes, flares, power                             and impacts that should be addressed,
                                                                                                                                                              Energy.
                                               transmission lines, pipelines), internal                and alternatives that should be
                                               and external perception of the                          considered. Scoping comments should                    ACTION: Notice of open meeting.
                                               community or locality;                                  clearly describe specific issues or topics
                                                                                                                                                              SUMMARY: This notice announces an
                                                  • Solid waste impacts: Pollution                     that the EIS should address. Written, e-
                                                                                                                                                              open meeting of the Biomass Research
                                               prevention and waste management                         mailed, faxed, or telephoned comments
                                                                                                                                                              and Development Technical Advisory
                                               issues (generation, treatment, transport,               should be received by July 2, 2010 (see
                                                                                                                                                              Committee under Section 9008(d) of the
                                               storage, disposal or use), including the                ADDRESSES).
                                                                                                                                                              Food, Conservation, and Energy Act of
                                               handling of slag, water treatment sludge,                  DOE will conduct a public scoping
                                                                                                                                                              2008. The Federal Advisory Committee
                                               sulfur by-products, and hazardous                       meeting beginning at 7 p.m. on
                                                                                                                                                              Act (Pub. L. 92–463, 86 Stat. 770)
                                               materials;                                              Thursday, June 17, 2010 in the
                                                  • Ecological impacts: Potential on-site                                                                     requires that agencies publish these
                                                                                                       Saulsbury Meeting Room of the
                                               and off-site impacts to vegetation,                                                                            notices in the Federal Register to allow
                                                                                                       Electronics Technology Building at
                                               terrestrial wildlife, aquatic wildlife,                                                                        for public participation. This notice
                                                                                                       Odessa College, 201 West University
                                               threatened or endangered species, and                                                                          announces the meeting of the Biomass
                                                                                                       Blvd., Odessa, Texas 79764. The public
                                               ecologically sensitive habitats;                                                                               Research and Development Technical
                                                                                                       is also invited to learn more about the
                                                  • Traffic issues: Potential impacts                                                                         Advisory Committee.
                                                                                                       proposed project at an informal session
                                               from the construction and operation of                  at this location beginning at 4 p.m.                   DATES:
                                               the facilities, including changes in local              Anyone who wishes to speak at this                        June 23, 2010; 10:30 a.m. to 3:15 p.m.
                                               traffic patterns, deterioration of roads,               public scoping meeting should contact                     June 24, 2010; 10:30 a.m. to 3 p.m.
                                               traffic hazards, and traffic controls;                  Mr. Mark L. McKoy, either by phone,                    ADDRESSES: Hyatt Arlington, 1325
                                                  • Historic and cultural resource                     fax, e-mail, or letter (see ADDRESSES).                Wilson Boulevard, Arlington, Virginia
                                               issues: Potential impacts, primarily                       Those who do not arrange in advance                 22209, (703) 525–1234.
                                               related to linear facilities and connected              to speak may register at the meeting                   FOR FURTHER INFORMATION CONTACT:
                                               actions;                                                (preferably at the beginning of the                    Laura McCann, Designated Federal
                                                  • Fate and stability of sequestered                  meeting) and may speak after previously                Officer for the Committee, Office of
                                               CO2 (and other captured gases) during                   scheduled speakers. Speakers will be                   Energy Efficiency and Renewable
                                               and after EOR usage;                                    given approximately five minutes to                    Energy, U.S. Department of Energy,
                                                  • Health and safety issues associated                present their comments. Those speakers                 1000 Independence Avenue, SW.,
                                               with CO2 capture, transport, and usage                  who want more than five minutes                        Washington, DC 20585; (202) 586–7766;
                                               in EOR;                                                 should indicate the length of time                     e-mail: laura.mccann@ee.doe.gov or T.J.
                                                  • Marketability of products                          desired in their request. Depending on                 Heibel at (410) 997–7778 ext. 223; e-
                                               (including by-products) and market                      the number of speakers, DOE may need                   mail: theibel@bcs-hq.com.
                                               access to feedstocks;                                   to limit all speakers to five minutes                  SUPPLEMENTARY INFORMATION:
                                                  • Socio-economic impacts, including                  initially and provide second
                                               the creation of jobs and the impacts of                                                                           Purpose of Meeting: To provide
                                                                                                       opportunities as time permits. Speakers                advice and guidance that promotes
                                               State and local tax incentives;                         may also provide written materials to
                                                  • Disproportionate impacts on                                                                               research and development leading to the
                                                                                                       supplement their presentations. Oral                   production of biobased fuels and
                                               minority and low-income populations;                    and written comments will be given
                                                  • Noise and light impacts: Potential                                                                        biobased products.
                                                                                                       equal consideration. Federal, State and                   Tentative Agenda: Agenda will
                                               impacts from construction,                              local elected officials and tribal leaders
                                               transportation of materials, and facility                                                                      include the following:
                                                                                                       may be given priority in the order of                     • Update on USDA Biomass R&D
                                               operations;                                             those making oral comments.
                                                  • Connected actions: Potential                                                                              Activities.
                                                                                                          DOE will begin the formal meeting
                                               development of support facilities or                                                                              • Update on DOE Biomass R&D
                                                                                                       with an overview of Summit’s proposed
                                               supporting infrastructure;                                                                                     Activities.
                                                                                                       Texas Clean Energy Project. The
                                                  • Cumulative effects that result from                                                                          • Presentation on DOE/USDA Joint
                                                                                                       meeting will not be conducted as an
                                               the incremental impacts of the proposed                                                                        Solicitation Process.
                                                                                                       evidentiary hearing, and speakers will
                                               project when added to other past,                                                                                 • Presentation on DOE and USDA
                                                                                                       not be cross-examined. However,
                                               present, and reasonably foreseeable                                                                            loan guarantee programs.
                                                                                                       speakers may be asked questions to help
                                               future projects;                                                                                                  • Presentation on SC/NIFA joint
                                                                                                       ensure that DOE fully understands the
                                                  • Compliance with regulatory                         comments or suggestions. A presiding
                                                                                                                                                              solicitation (genetics).
                                               requirements and environmental                                                                                    • Update on Biomass R&D Board
                                                                                                       officer will establish the order of
                                               permitting;                                                                                                    Activities.
                                                                                                       speakers and provide any additional
                                                  • Environmental monitoring plans                     procedures necessary to conduct the
                                                                                                                                                                 Public Participation: In keeping with
                                               associated with the power plant and                                                                            procedures, members of the public are
sroberts on DSKD5P82C1PROD with NOTICES




                                                                                                       meeting.
                                               with the CO2 sequestration sites.                                                                              welcome to observe the business of the
                                                                                                         Issued in Washington, DC, this 27th day of           Biomass Research and Development
                                               Public Scoping Process                                  May, 2010.                                             Technical Advisory Committee. To
                                                 To ensure identification of all issues                James J. Markowsky,                                    attend the meeting and/or to make oral
                                               related to DOE’s proposed action and                    Assistant Secretary, Office of Fossil Energy.          statements regarding any of the items on
                                               Summit’s proposed project, DOE seeks                    [FR Doc. 2010–13215 Filed 6–1–10; 8:45 am]             the agenda, you should contact Laura
                                               public input to define the scope of the                 BILLING CODE 6450–01–P                                 McCann at 202–586–7766; E-mail:


                                          VerDate Mar<15>2010   19:08 Jun 01, 2010   Jkt 220001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:FRFM02JNN1.SGM   02JNN1

Mais conteúdo relacionado

Mais procurados

דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתTashtiot media
 
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALIMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALJoe Miller
 
Environmental benefitspeakenergyefficiency
Environmental benefitspeakenergyefficiencyEnvironmental benefitspeakenergyefficiency
Environmental benefitspeakenergyefficiencyPaul Kuhlman
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issuesgtapang
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalRahul Walawalkar
 
The Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeThe Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeLarry Smarr
 
Renewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of EnglandRenewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of Englandcrifcambs
 
credit-suisse Energy and Materials Report 2005 Credit Suisse
credit-suisse Energy and Materials Report 2005 Credit Suissecredit-suisse Energy and Materials Report 2005 Credit Suisse
credit-suisse Energy and Materials Report 2005 Credit SuisseQuarterlyEarningsReports2
 
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse GroupQuarterlyEarningsReports2
 
Renewable Energy : The United Kingdom Approach
Renewable Energy : The United Kingdom ApproachRenewable Energy : The United Kingdom Approach
Renewable Energy : The United Kingdom ApproachGavin Harper
 
Indonesia Emergency Response
Indonesia Emergency ResponseIndonesia Emergency Response
Indonesia Emergency Responsebenisuryadi
 
Defining an Australian Carbon Budget
Defining an Australian Carbon BudgetDefining an Australian Carbon Budget
Defining an Australian Carbon BudgetThe Climate Institute
 
A Global Perspective on Climate Policy
A Global Perspective on Climate PolicyA Global Perspective on Climate Policy
A Global Perspective on Climate PolicyThe Climate Institute
 
Expanding biogas markets
Expanding biogas marketsExpanding biogas markets
Expanding biogas marketsNNFCC
 
M.Sc thesis Presentation
M.Sc thesis PresentationM.Sc thesis Presentation
M.Sc thesis Presentationubongsimon
 
NNFCC market review bioenergy issue one april 2012
NNFCC market review bioenergy issue one april 2012NNFCC market review bioenergy issue one april 2012
NNFCC market review bioenergy issue one april 2012NNFCC
 
Renewable Energy Technologies for Poverty Alleviation: South Africa
Renewable Energy Technologies for Poverty Alleviation: South Africa  Renewable Energy Technologies for Poverty Alleviation: South Africa
Renewable Energy Technologies for Poverty Alleviation: South Africa QZ1
 
energy future holindings 040108ConfCallDeck_FINAL
energy future holindings  040108ConfCallDeck_FINALenergy future holindings  040108ConfCallDeck_FINAL
energy future holindings 040108ConfCallDeck_FINALfinance29
 

Mais procurados (19)

דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראלית
 
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALIMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
 
Environmental benefitspeakenergyefficiency
Environmental benefitspeakenergyefficiencyEnvironmental benefitspeakenergyefficiency
Environmental benefitspeakenergyefficiency
 
No to BNPP Revival Power Issues
No to BNPP Revival Power IssuesNo to BNPP Revival Power Issues
No to BNPP Revival Power Issues
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar Final
 
The Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeThe Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate Change
 
Renewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of EnglandRenewable and low carbon energy capacity study for the East of England
Renewable and low carbon energy capacity study for the East of England
 
credit-suisse Energy and Materials Report 2005 Credit Suisse
credit-suisse Energy and Materials Report 2005 Credit Suissecredit-suisse Energy and Materials Report 2005 Credit Suisse
credit-suisse Energy and Materials Report 2005 Credit Suisse
 
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group
.credit-suisse MIB AG Energy and Materials Report 2001 Credit Suisse Group
 
Renewable Energy : The United Kingdom Approach
Renewable Energy : The United Kingdom ApproachRenewable Energy : The United Kingdom Approach
Renewable Energy : The United Kingdom Approach
 
Indonesia Emergency Response
Indonesia Emergency ResponseIndonesia Emergency Response
Indonesia Emergency Response
 
Defining an Australian Carbon Budget
Defining an Australian Carbon BudgetDefining an Australian Carbon Budget
Defining an Australian Carbon Budget
 
MAPD 2010 - Strategic energy & climate planning
MAPD 2010 - Strategic energy & climate planningMAPD 2010 - Strategic energy & climate planning
MAPD 2010 - Strategic energy & climate planning
 
A Global Perspective on Climate Policy
A Global Perspective on Climate PolicyA Global Perspective on Climate Policy
A Global Perspective on Climate Policy
 
Expanding biogas markets
Expanding biogas marketsExpanding biogas markets
Expanding biogas markets
 
M.Sc thesis Presentation
M.Sc thesis PresentationM.Sc thesis Presentation
M.Sc thesis Presentation
 
NNFCC market review bioenergy issue one april 2012
NNFCC market review bioenergy issue one april 2012NNFCC market review bioenergy issue one april 2012
NNFCC market review bioenergy issue one april 2012
 
Renewable Energy Technologies for Poverty Alleviation: South Africa
Renewable Energy Technologies for Poverty Alleviation: South Africa  Renewable Energy Technologies for Poverty Alleviation: South Africa
Renewable Energy Technologies for Poverty Alleviation: South Africa
 
energy future holindings 040108ConfCallDeck_FINAL
energy future holindings  040108ConfCallDeck_FINALenergy future holindings  040108ConfCallDeck_FINAL
energy future holindings 040108ConfCallDeck_FINAL
 

Destaque (9)

March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
NOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC ProjectNOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC Project
 
NOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy ProjectNOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy Project
 
Dec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons LearnedDec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons Learned
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
NOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy ProjectNOA DEIS (EPA) - Mesaba Energy Project
NOA DEIS (EPA) - Mesaba Energy Project
 
NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
Sept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons LearnedSept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons Learned
 
NOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon CaptureNOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon Capture
 

Semelhante a NOI - Texas Clean Energy

Letter from Edison Electric Institute 1.3.03 (b)
Letter from Edison Electric Institute 1.3.03 (b)Letter from Edison Electric Institute 1.3.03 (b)
Letter from Edison Electric Institute 1.3.03 (b)Obama White House
 
Session3 RE_ situation_in_egypt
Session3 RE_ situation_in_egyptSession3 RE_ situation_in_egypt
Session3 RE_ situation_in_egyptRCREEE
 
Letter to Edison Electric Institute 8.30.02
Letter to Edison Electric Institute 8.30.02Letter to Edison Electric Institute 8.30.02
Letter to Edison Electric Institute 8.30.02Obama White House
 
Letter from Edison Electric Institute 1.3.03 (a)
Letter from Edison Electric Institute 1.3.03 (a)Letter from Edison Electric Institute 1.3.03 (a)
Letter from Edison Electric Institute 1.3.03 (a)Obama White House
 
Lyubovsky argus methanol forum sept 2018
Lyubovsky argus methanol forum sept 2018Lyubovsky argus methanol forum sept 2018
Lyubovsky argus methanol forum sept 2018Maxim Lyubovsky
 
Viterbo Offshore Wind Energy In Brazil
Viterbo   Offshore Wind Energy In BrazilViterbo   Offshore Wind Energy In Brazil
Viterbo Offshore Wind Energy In BrazilJean Viterbo
 
Mep1623 power plant cost 1
Mep1623 power plant cost 1Mep1623 power plant cost 1
Mep1623 power plant cost 1Subzero Bill
 
Climate Change Mitigation &amp; Adaptation
Climate Change  Mitigation &amp; AdaptationClimate Change  Mitigation &amp; Adaptation
Climate Change Mitigation &amp; AdaptationLaurence Mills
 
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...Larry Smarr
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010myatom
 
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Global CCS Institute
 

Semelhante a NOI - Texas Clean Energy (20)

Letter from Edison Electric Institute 1.3.03 (b)
Letter from Edison Electric Institute 1.3.03 (b)Letter from Edison Electric Institute 1.3.03 (b)
Letter from Edison Electric Institute 1.3.03 (b)
 
NOI - Abengoa Biorefinery
NOI - Abengoa BiorefineryNOI - Abengoa Biorefinery
NOI - Abengoa Biorefinery
 
Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project
 
Draft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC ProjectDraft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC Project
 
SERA Email 1.21.03
SERA Email 1.21.03SERA Email 1.21.03
SERA Email 1.21.03
 
Session3 RE_ situation_in_egypt
Session3 RE_ situation_in_egyptSession3 RE_ situation_in_egypt
Session3 RE_ situation_in_egypt
 
NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)
 
Letter to Edison Electric Institute 8.30.02
Letter to Edison Electric Institute 8.30.02Letter to Edison Electric Institute 8.30.02
Letter to Edison Electric Institute 8.30.02
 
Letter from Edison Electric Institute 1.3.03 (a)
Letter from Edison Electric Institute 1.3.03 (a)Letter from Edison Electric Institute 1.3.03 (a)
Letter from Edison Electric Institute 1.3.03 (a)
 
Lyubovsky argus methanol forum sept 2018
Lyubovsky argus methanol forum sept 2018Lyubovsky argus methanol forum sept 2018
Lyubovsky argus methanol forum sept 2018
 
Viterbo Offshore Wind Energy In Brazil
Viterbo   Offshore Wind Energy In BrazilViterbo   Offshore Wind Energy In Brazil
Viterbo Offshore Wind Energy In Brazil
 
Viterbo energex norway 2006
Viterbo energex norway 2006Viterbo energex norway 2006
Viterbo energex norway 2006
 
Mep1623 power plant cost 1
Mep1623 power plant cost 1Mep1623 power plant cost 1
Mep1623 power plant cost 1
 
行政學1
行政學1行政學1
行政學1
 
行政學1
行政學1行政學1
行政學1
 
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
 
Climate Change Mitigation &amp; Adaptation
Climate Change  Mitigation &amp; AdaptationClimate Change  Mitigation &amp; Adaptation
Climate Change Mitigation &amp; Adaptation
 
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...
Project GreenLight: Optimizing Cyberinfrastructure for a Carbon Constrained W...
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
 
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
 

Mais de DOE Office of NEPA Policy & Compliance

Mais de DOE Office of NEPA Policy & Compliance (18)

June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - MercuryNOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - Mercury
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
NOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa BiorefineryNOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa Biorefinery
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
Amended NOI - Abengoa Biorefinery
Amended NOI - Abengoa BiorefineryAmended NOI - Abengoa Biorefinery
Amended NOI - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 
NOI - Champlain Hudson Power
NOI - Champlain Hudson PowerNOI - Champlain Hudson Power
NOI - Champlain Hudson Power
 
NOI - Energia Sierra Juarez
NOI - Energia Sierra JuarezNOI - Energia Sierra Juarez
NOI - Energia Sierra Juarez
 
NOI - Hooper Springs EIS
NOI - Hooper Springs EISNOI - Hooper Springs EIS
NOI - Hooper Springs EIS
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 
Notice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC ProjectNotice of Intent for Kemper County Miss. IGCC Project
Notice of Intent for Kemper County Miss. IGCC Project
 
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
NOI - Transmission Lines on Forest Service Lands (CO, UT, NE)
 

NOI - Texas Clean Energy

  • 1. 30800 Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices Access at: http://www.gpoaccess.gov/nara/ technologies used to generate electricity Displays and other information about index.html. from fossil fuels, including natural gas. DOE’s proposed action and Summit’s Summit proposes to build its IGCC project will be available, and Authority: Section 1605 of the American plant adjacent to an oil field in Ector Recovery and Reinvestment Act, Public Law representatives from DOE and Summit 111–5. County, Texas. The plant would use will be present at the informal session coal as its feedstock. It would capture, to discuss the proposed project, DOE’s Dated: May 28, 2010. in the form of CO2, about 90% of the CCPI program, and the EIS process. Arne Duncan, carbon in the portion of its coal fuel Secretary of Education. ADDRESSES: Written comments on the supply used for power production. The [FR Doc. 2010–13308 Filed 6–1–10; 8:45 am] plant would employ two gasifiers, scope of the EIS and requests to feeding a single, combined-cycle power participate in the public scoping BILLING CODE 4000–01–P island to generate about 400 MW (gross) meeting should be addressed to: Mr. of electricity, with the co-production of Mark L. McKoy, U.S. Department of DEPARTMENT OF ENERGY sulfuric acid and urea (for fertilizer) or Energy, National Energy Technology other chemicals. About 275 MW of Laboratory, 3610 Collins Ferry Road, Notice of Intent To Prepare an electricity would be put onto the power P.O. Box 880, Morgantown, WV 26507– Environmental Impact Statement for grid, with the remaining power used for 0880. Individuals and organizations Texas Clean Energy Project, Ector commercial loads on the project site, who would like to provide oral or County, TX such as urea production and CO2 electronic comments, or request copies compression. During DOE of the Draft EIS, should contact Mr. AGENCY: Department of Energy. McKoy by telephone (304–285–4426), ACTION: Notice of Intent To Prepare An demonstration phase of the project, it would permanently sequester CO2 at a toll-free telephone (1–800–432–8330 Environmental Impact Statement. (ext. 4426), fax (304–285–4403), e-mail maximum rate of about 3 million tons per year by piping it to Permian Basin (Summit.EIS@netl.doe.gov), or formal SUMMARY: The U.S. Department of oil fields, where it would be used by mail submitted to the address given Energy (DOE or Department) announces field operators for enhanced oil recovery above. its intent to prepare an Environmental Impact Statement (EIS) pursuant to the (EOR). Summit is owned jointly by the FOR FURTHER INFORMATION CONTACT: For National Environmental Policy Act Summit Power Group, Inc. and CW further information about this project, (NEPA), the Council on Environmental NextGen, Inc. (CWNI), a Clayton contact Mr. Mark L. McKoy, as Quality (CEQ) NEPA regulations (40 Williams company. The project team described above. For general CFR parts 1500–1508), and DOE NEPA includes Summit Power Group, Inc.; information on the DOE NEPA process, implementing procedures (10 CFR part Blue Source, LLC; Siemens, AG; and please contact Ms. Carol M. Borgstrom, 1021), to assess the potential CWNI; among others. Director, Office of NEPA Policy and environmental impacts for the proposed DOE issues this Notice of Intent (NOI) Compliance (GC–54), U.S. Department action of providing Federal funding for to inform interested parties of the of Energy, 1000 Independence Avenue, the proposed Texas Clean Energy pending EIS and to invite public SW., Washington, DC 20585–0103; Project (TCEP) near Odessa, Texas. The comments on the proposed action, telephone: 202–586–4600; fax: 202– project would comprise planning, including: (1) The proposed plans for 586–7031; or leave a toll-free message at design, construction and operation by implementing the project, (2) the range 1–800–472–2756. Summit Texas Clean Energy, LLC of environmental issues and alternatives to be analyzed, and (3) the analysis SUPPLEMENTARY INFORMATION: (Summit) of a coal-fueled electric power and chemicals production plant methods to be used or considered Background integrated with carbon dioxide (CO2) during preparation of the EIS. capture and geologic sequestration. DOE DATES: DOE invites comments on the Since the early 1970s, DOE and its selected this project for an award of proposed scope and content of the EIS predecessor agencies have pursued financial assistance through a from all interested parties. Comments research and development programs competitive process under the Clean must be received by July 2, 2010, to that include large, technically complex Coal Power Initiative (CCPI) program ensure consideration. Late comments projects in pursuit of innovation in a (Round 3). will be considered to the extent wide variety of coal technologies The EIS (DOE/EIS–0444) will inform practicable. In addition to accepting through the proof-of-concept stage. DOE’s decision on whether to provide comments in writing (formal letters, However, helping a technology reach financial assistance under its CCPI faxes and e-mails) and by telephone the proof-of-concept stage does not program. DOE proposes to provide (See ADDRESSES below), DOE will ensure its continued development or Summit with approximately $350 conduct a public scoping meeting in commercialization. Before a technology million in funding for this project, which government agencies, private- can be considered seriously for which would demonstrate the full sector organizations, and the general commercialization, it must be integration of CO2 capture and public are invited to present oral demonstrated at a sufficient scale to sequestration with a commercial, comments or suggestions with regard to prove its reliability and economically integrated gasification combined-cycle the alternatives and issues to be competitive performance. The financial (IGCC) poly-generation (electricity and considered in the EIS. The scoping risk associated with such large-scale chemicals) plant. DOE’s contribution of meeting will be held beginning at 7 p.m. demonstration projects is often too high $350 million would constitute about 20 on Thursday, June 17, 2010, in the for the private sector to assume in the sroberts on DSKD5P82C1PROD with NOTICES percent of the estimated total Saulsbury Meeting Room of the absence of strong incentives. development and capital cost of the Electronics Technology Building at The CCPI program was established in project, which is estimated to be $1.73 Odessa College, 201 West University 2002 as a government and private sector billion (2009 dollars). TCEP would Blvd, Odessa, Texas 79764. The public partnership to implement the employ advanced clean coal is also invited to learn more about the recommendation in President Bush’s technologies to reduce the levels of CO2 proposed project at an informal session National Energy Policy to increase emissions below that of conventional at this location beginning at 4 p.m. investment in clean coal technology. VerDate Mar<15>2010 19:46 Jun 01, 2010 Jkt 220001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:FRFM02JNN1.SGM 02JNN1
  • 2. Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices 30801 Through cooperative agreements with pipelines (with the construction of short electricity that can be generated from a its private sector partners, the program new connector pipelines) where the CO2 quantity of coal. Both turbines would advances clean coal technologies to could be used in EOR operations. Most generate electricity for sale, with a part commercialization; these technologies likely, CO2 would be transported in an of the electricity diverted to service often involve combustion existing regional CO2 pipeline network. other parts of the poly-generation plant improvements, control system advances, A short, approximately two-mile, new and on-site commercial loads. At full gasifier designs, pollution reductions CO2 pipeline could connect the power capacity, the plant would be expected to (including greenhouse gas reduction), plant site to the nearest existing trunk use about 5,800 tons of low-sulfur coal efficiency increases, fuel processing pipeline. per day (about 1.9 to 2.0 million tons techniques and other improvements. per year). Coal would be delivered by Proposed Plant Congress established criteria for railroad trains from the Powder River projects receiving financial assistance Summit would construct an IGCC Basin and would be bought through under this program in Title IV of the poly-generation plant that is designed to contracts on the open market. Energy Policy Act of 2005 (Pub. L. 109– capture approximately 90 percent of its The plant would minimize emissions 58) (EPACT 2005). Under this statute, CO2, and sequester it through use in of sulfur oxides, nitrogen oxides, CCPI projects must ‘‘advance efficiency, EOR operations. Summit, or another mercury, and particulates as compared environmental performance and cost entity, would operate the plant to to conventional coal-fueled power competitiveness well beyond the level demonstrate the commercial feasibility plants. In compliance with Texas House of technologies that are in commercial of a fully integrated, coal-fueled 400 Bill 469, the project would be required service’’ (Pub. L. 109–58, Sec. 402(a)). In MW-equivalent generating unit that to meet stringent emissions limits: 0.034 February 2009, the American Recovery would produce 275 MW of electricity pounds of NOX per million BTUs, 0.04 and Reinvestment Act of 2009 (Pub. L. for the power grid (with additional pounds of SOX per million BTUs, 95 111–5, 123 Stat. 115 (Feb. 17, 2009)) amounts for on-site commercial loads percent reduction in mercury emissions, (ARRA) appropriated $3.4 billion to and plant use) plus sulfuric acid, urea and 0.015 pounds of particulates per DOE for ‘‘Fossil Energy Research and and perhaps other chemicals such as million BTUs. The project’s air permit Development;’’ the Department intends ammonia, methanol or substitute application with the Texas Commission to use a significant portion of these natural gas. Following the on Environmental Quality (TCEQ) funds to provide financial assistance to demonstration phase, the project would includes even lower emissions limits CCPI projects. continue long-term commercial than those required by HB 469. operations with continuing sales of Emissions of carbon monoxide and Purpose and Need for Agency Action power, urea, captured CO2 and other volatile organic compounds would be The purpose and need for the DOE chemical products. controlled. action are to advance the CCPI program The new plant would consist of two Steam from the gasification and by funding projects that have the best gasifiers, a gas processing and cleanup syngas processing could be condensed, chance of achieving the program’s system, a syngas-fueled combustion treated, and recycled into the gasifier or objectives as established by Congress: turbine, a heat-recovery steam generator, added to the plant’s cooling water the commercialization of clean coal a steam turbine, a sulfur recovery plant, circuit. Slag from the gasifiers would be technologies that advance efficiency, a chemicals production plant, and sold for beneficial uses. Other solid environmental performance, and cost associated facilities. The system is materials generated by the various plant designed with duplicate, over-sized processes would be accumulated on site competitiveness well beyond the level gasifiers to ensure full-time availability and made available for beneficial use, of technologies that are currently in of syngas production, with sufficient recycling or, if these options are not commercial service. supply for both the production of available, disposed of in accordance Summit’s Proposed Project electricity (more than 75 percent) and with applicable laws. chemicals (less than 25 percent). The chemical plant would use the Site of Proposed Project: Penwell, Texas The plant proposed by Summit would Haber process to convert syngas into The proposed site is located on 600 gasify coal to produce ‘‘synthesis gas’’ ammonia and the Bosch-Meiser process acres, approximately 15 miles southwest (or ‘‘syngas’’—mostly carbon monoxide to convert ammonia into urea for of the city of Odessa in Ector County, (CO), hydrogen gas (H2), CO2 and fertilizer. With equipment additions or Texas. The site is on flat land north of steam), which would be processed to changes, other chemicals could be the town of Penwell and Interstate increase the H2 content (by converting produced. Highway I–20. The proposed power CO and H2O into H2 plus CO2) and Other notable equipment would plant property is arid, non-arable brush cleaned of particulates and acid gases to include coal storage facilities, a coal (mesquite-lotebush-juniper) and range produce a H2-rich, carbon-lean fuel. The preparation plant and coal feed system, land. Surrounding areas are or were H2-rich fuel would power the gas air separators, stacks, mechanical draft used primarily for ranching to the north combustion turbine, and CO2 emissions cooling tower (dry cooling is planned and east and oil production to the west would be minimal (only a fraction of for the power generation facilities and and south, with some scattered those of a natural gas power plant) as a wet cooling for other portions of the industrial facilities (quarry, cement result of the hydrogen-rich, carbon-lean plant), a unit for converting captured plant, etc.) within sight to the east and fuel. Hot exhaust gas from the gas sulfur dioxide into sulfuric acid for sale south. There is an extensive junk yard combustion turbine would generate on the market, and a particulate of abandoned oil and gas equipment steam from water in the heat recovery filtration system. The height of the sroberts on DSKD5P82C1PROD with NOTICES along the site’s southern border, on the steam generator to drive the steam tallest proposed stack would be other side of a railroad. The site has turbine. Using a heat recovery steam approximately 140 feet above ground access to coal delivery via rail along the generator and a steam turbine to capture level. Additionally, the plant would southern border of the property, and it energy from the exhaust gases of the require the construction of a railroad connects to I–20 via Farm-to-Market combustion turbine is the essence of the loop, coal unloading facilities, ash/slag Road 1601. There are numerous oil combined-cycle approach and increases handling facilities, access roads, fields within reach of existing CO2 both efficiency and the total amount of administration buildings, water and VerDate Mar<15>2010 19:08 Jun 01, 2010 Jkt 220001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:FRFM02JNN1.SGM 02JNN1
  • 3. 30802 Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices waste water treatment facilities, and a sequester about 3 million tons of CO2 facilities, including the capture and sale waste water disposal well. An per year by transporting it in pipelines of CO2, would be expected to continue underpass may be constructed beneath to oil fields in the Permian Basin of west for 30 to 50 years. Summit plans to start the adjoining railroad. Texas for use in EOR operations. These construction during 2011 and fields are well characterized, and some commercial operations (demonstration Proposed Linear Facilities already make extensive use of CO2 for phase) by late 2014. The schedule is Linear facilities are the power EOR. As a consequence of EOR contingent upon Summit receiving the transmission lines and pipelines that operations, most of the captured CO2 necessary permits (which would be convey electricity and materials to and (more than 99 percent) would be preceded by hearings, public comment from the plant. Electricity could be sequestered in deep underground opportunities and other events conveyed to regional 345 kV geologic formations that would be transmission lines via an approved mandated by applicable regulations and monitored to verify the quantity and agency procedures) and financial ERCOT (Electric Reliability Council of permanence of CO2 storage. The use of Texas) grid extension but could also be closing on all the necessary funding CO2 in this manner would continue the transmitted via local interconnects with sources, including DOE’s financial existing uses of the subject fields, either of two 138 kV transmission lines, namely enhanced oil production using assistance. DOE’s decision to provide one located approximately 0.7 miles to CO2. financial assistance for detailed design, the north and the other located 1.8 miles The EOR process involves the procurement of expensive equipment, to the south. Rights-of-ways (ROWs) repeated injection of CO2 to reduce the construction, and operations will be would be approximately 200 ft wide. An oil’s viscosity and to move it through informed by the NEPA process. electrical substation would be the reservoir. During EOR operations, Connected and Cumulative Actions constructed to facilitate the connection pore space left by the extracted oil is to the grid. occupied by the injected CO2, Under the cooperative agreement Process water would be obtained from sequestering it in the geologic between DOE and Summit, DOE would local wastewater treatment facilities formation. Reservoirs are not over- share in the cost of the power and (using effluent from the Gulf Coast pressurized from CO2 for EOR chemical plant, supporting facilities and Authority, the City of Odessa, and/or operations, because fluid volumes are site infrastructure (including that the City of Midland) or from a re- removed from the reservoirs in amounts required for sequestration monitoring, charging aquifer in the region. Other corresponding to those injected in the verification and accounting (MVA), and water supply options may be considered reservoirs. the costs associated with implementing during the project planning. The water and documenting the results of the Summit’s Technology Alternatives would be conveyed by one or more new Summit has proposed to use Siemens demonstration test plan during the pipelines constructed on a combination SFG–500 gasifiers and a Siemens F-class demonstration phase). Under this of existing and new ROWs over combined-cycle power island. As plans agreement, DOE would not share in the distances ranging between about 10 miles and 54 miles. progress, Summit will make a final costs of normal plant operations during Wastewater would be processed in a selection of air separation technology, the demonstration phase. For activities new on-site wastewater treatment plant. water/gas shift reactor technology, acid that would not occur if not for this The plant would be designed for zero gas removal system technology (for project, DOE will consider these as liquid discharge. capturing both CO2 and acid gases, such connected actions and will evaluate Natural gas, which would be used to as H2S), sulfur recovery technology (e.g., them in the EIS. start the plant, would be obtained from Claus process), and urea production DOE will consider the cumulative an existing pipeline that traverses the technology (e.g., combination of the impacts of both the cost-shared proposed project site or from a gas line Haber ammonia production process and activities and other activities, along located either to the north or to the Bosch-Meiser urea production process). with any other connected actions, south of the site. Natural gas also may Summit has proposed to use only including those of third parties. be used to fuel the power island commercially proven, fully warranted Cumulative impacts analysis will initially, while the remainder of the equipment to reduce risks and costs. include the analysis of pollutant plant is under construction. The technological advancement is in the emissions (including greenhouse gas The plant may deliver its CO2 to the integration of all these components. A emissions) and other incremental existing Central Basin CO2 pipeline, competitive process would be used to impacts that, when added to past, which is less than two miles to the east select vendors and manufacturers (other present and reasonably foreseeable of the proposed plant site. In this than for the Siemens-supplied future impacts, may have significant option, a short new pipeline would be equipment). A wide variety of chemicals effects on the human environment. DOE constructed eastwards along new ROW. could be produced, depending on will not consider impacts associated Alternatively, new pipelines could be chemical processing equipment constructed to either existing oil fields installed. Current plans indicate market with the purchase of commodities (such or to other existing pipelines. New viability for the production and sale of as coal) on the open market, coal ROWs would require widths of 100 ft urea (for fertilizer), ammonia, methanol mining, or the transportation of coal as for construction and approximately 50 ft and substitute natural gas (SNG). a general industrial activity (as for pipeline operations. Sales and distinguished from the delivery of coal Proposed Project Schedule to the project site, specifically), given conveyance options for CO2 are sroberts on DSKD5P82C1PROD with NOTICES currently under consideration and The project proposed by Summit these impacts are generally well known negotiation. includes the planning, design, and would occur regardless of DOE’s construction, initial start-up, and early decision regarding financial assistance Proposed Use of CO2 for Enhanced Oil operation of the plant and associated for this project. No coal for this project Recovery and Sequestration facilities for a period of three years would come from ‘‘mountaintop During DOE’s demonstration phase of under the DOE demonstration phase. removal’’ forms of mining, which are not plant operations, the project would Thereafter the plant and associated practiced in the Powder River Basin. VerDate Mar<15>2010 19:08 Jun 01, 2010 Jkt 220001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:FRFM02JNN1.SGM 02JNN1
  • 4. Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices 30803 Alternatives, Including the Proposed given to environmental factors. DOE FutureGen (reference: DOE/EIS–0394). Action will make the synopsis available to the In particular, Summit sought a site NEPA requires that agencies evaluate public by posting it on NETL’s Web site. where CO2 sales options were readily the reasonable alternatives to their After DOE selects a project for an available and the market was strong and proposed action. The purpose and need award, the range of reasonable dependable so that there would be no alternatives becomes the project as reliance on pending legislation for CO2 for agency action determines the range proposed by the applicant, any capture and sequestration and no need of reasonable alternatives. In this case, alternatives still under consideration by for a long CO2 pipeline that might not the purpose and need for DOE’s the applicant or that are reasonable be built. The EIS will briefly describe proposed action—providing cost-shared within the confines of the project as Summit’s site selection process. funding for Summit’s project—is to proposed (e.g., the particular location of However, DOE does not plan to analyze advance the CCPI program by funding the plant on the parcel of land proposed in detail any alternative sites considered projects that have the best chance of for the project) and a ‘‘no action’’ and dismissed by Summit because achieving the program’s objectives as alternative. Regarding a no action Summit is no longer considering these established by Congress: The alternative, DOE assumes for purposes other alternatives and because they were commercialization of clean coal of the EIS that, if it decides to withhold technologies that advance efficiency, not part of the proposal that Summit financial assistance, the project would offered and DOE accepted. environmental performance, and cost not proceed. competitiveness well beyond the level DOE currently plans to evaluate the Floodplains and Wetlands of technologies that are currently in project as proposed by Summit (with service. The footprint of the proposed plant and without any mitigating conditions would not affect any wetlands or DOE’s NEPA regulations include a that DOE may identify as reasonable and process for identifying and analyzing floodplains. Wetland and floodplain appropriate); alternatives to Summit’s impacts, if any, from construction of reasonable alternatives in the context of proposal that it is still considering (e.g., providing financial assistance through a pipelines and transmission lines would water sources, sales options for CO2, be identified during the preparation of competitive selection of projects and the ROWs for linear facilities); and proposed by entities outside the federal the EIS and described in the EIS. In the the no action alternative. DOE and event that the EIS identifies wetlands government. The range of reasonable Summit will consider other reasonable alternatives in competitions for grants, and floodplains that would be affected alternatives suggested during the by the proposed project, including its loans, loan guarantees, and other scoping period. financial support is defined initially by linear facilities and connected actions, Under the no action alternative, DOE the range of responsive proposals DOE will prepare a floodplain and would not provide funding to Summit. received by DOE. Unlike projects wetland assessment in accordance with In the absence of financial assistance undertaken by DOE itself, the its regulations at 10 CFR part 1022 and from DOE, Summit could reasonably Department cannot mandate what include the assessment in the EIS. pursue two options. It could build the outside entities propose, where they project without DOE funding; the Preliminary Identification of propose their project, or how they impacts of this option would be Environmental Issues propose to do it, beyond expressing essentially the same as those of DOE’s basic requirements in the funding DOE intends to address the issues proposed action, except any DOE- opportunity announcement; and these required mitigations would not be listed below when considering the express requirements must be limited to imposed. Or, Summit could choose not potential impacts resulting from the those that further the program’s to pursue its project, and there would be construction and operation of Summit’s objectives. DOE’s decision is then no impacts from the project. This latter proposed project and any connected limited to selecting among the option would not contribute to the goal actions. This list is neither intended to applications that meet the program’s of the CCPI program, which is to be inclusive nor a predetermined set of goals. accelerate commercial deployment of potential impacts. DOE invites Recognizing that the range of advanced coal technologies that provide comments on whether this is the correct reasonable alternatives in the context of the United States with clean, reliable, list of important issues that should be financial assistance and contracting is and affordable energy. However, as considered in the EIS. The determined by the number and nature of required by NEPA, DOE analyzes this environmental issues include: the proposals received, section 216 of option as the no action alternative for • Air quality impacts: Potential for air DOE’s NEPA regulations requires the the purpose of making a meaningful emissions during construction and Department to prepare an comparison between the impacts of DOE operation of the power plant and ‘‘environmental critique’’ that assesses providing financial assistance and appurtenant facilities to impact local the environmental impacts and issues withholding that assistance. sensitive receptors, local environmental relating to each of the proposals that the Alternatives considered by Summit in conditions, and special-use areas, DOE selecting official considers for an developing its proposed project will be including contributions to smog and award. See 10 CFR 1021.216. This discussed in the EIS. Summit haze, impacts from dust and any official considers these impacts and considered a number of sites (six in significant vapor plumes, and issues, along with other aspects of the Texas alone) and determined that the consequences of greenhouse gas proposals (such as technical merit and only reasonable site for continued emissions; financial ability) and the program’s consideration is the one at Penwell. • Water resource impacts: Potential sroberts on DSKD5P82C1PROD with NOTICES objectives, in making awards. DOE Summit’s consideration included impacts from water utilization and prepared a critique of the proposals that market opportunities and conditions, evaporation; were deemed suitable for selection in local infrastructure, physical suitability • Infrastructure and land use impacts: this round of awards for the CCPI of the sites, and environmental Potential environmental and program. DOE will prepare an concerns. Two of the sites had already socioeconomic impacts associated with ‘‘environmental synopsis,’’ based on the been environmentally reviewed and the project, including delivery of feed critique, to document consideration cleared for a very similar project, materials and distribution of products VerDate Mar<15>2010 19:08 Jun 01, 2010 Jkt 220001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:FRFM02JNN1.SGM 02JNN1
  • 5. 30804 Federal Register / Vol. 75, No. 105 / Wednesday, June 2, 2010 / Notices (e.g., power transmission lines, EIS. The public scoping period will end DEPARTMENT OF ENERGY pipelines); on July 2, 2010. Interested government • Visual impacts associated with agencies, private-sector organizations Biomass Research and Development facility structures: View shed impacts, and individuals are encouraged to Technical Advisory Committee impacts to scenic views (e.g., impacts submit comments or suggestions AGENCY: Department of Energy, Office of caused by the plant structures, water concerning the content of the EIS, issues Energy Efficiency and Renewable vapor plumes, flares, power and impacts that should be addressed, Energy. transmission lines, pipelines), internal and alternatives that should be and external perception of the considered. Scoping comments should ACTION: Notice of open meeting. community or locality; clearly describe specific issues or topics SUMMARY: This notice announces an • Solid waste impacts: Pollution that the EIS should address. Written, e- open meeting of the Biomass Research prevention and waste management mailed, faxed, or telephoned comments and Development Technical Advisory issues (generation, treatment, transport, should be received by July 2, 2010 (see Committee under Section 9008(d) of the storage, disposal or use), including the ADDRESSES). Food, Conservation, and Energy Act of handling of slag, water treatment sludge, DOE will conduct a public scoping 2008. The Federal Advisory Committee sulfur by-products, and hazardous meeting beginning at 7 p.m. on Act (Pub. L. 92–463, 86 Stat. 770) materials; Thursday, June 17, 2010 in the • Ecological impacts: Potential on-site requires that agencies publish these Saulsbury Meeting Room of the and off-site impacts to vegetation, notices in the Federal Register to allow Electronics Technology Building at terrestrial wildlife, aquatic wildlife, for public participation. This notice Odessa College, 201 West University threatened or endangered species, and announces the meeting of the Biomass Blvd., Odessa, Texas 79764. The public ecologically sensitive habitats; Research and Development Technical is also invited to learn more about the • Traffic issues: Potential impacts Advisory Committee. proposed project at an informal session from the construction and operation of at this location beginning at 4 p.m. DATES: the facilities, including changes in local Anyone who wishes to speak at this June 23, 2010; 10:30 a.m. to 3:15 p.m. traffic patterns, deterioration of roads, public scoping meeting should contact June 24, 2010; 10:30 a.m. to 3 p.m. traffic hazards, and traffic controls; Mr. Mark L. McKoy, either by phone, ADDRESSES: Hyatt Arlington, 1325 • Historic and cultural resource fax, e-mail, or letter (see ADDRESSES). Wilson Boulevard, Arlington, Virginia issues: Potential impacts, primarily Those who do not arrange in advance 22209, (703) 525–1234. related to linear facilities and connected to speak may register at the meeting FOR FURTHER INFORMATION CONTACT: actions; (preferably at the beginning of the Laura McCann, Designated Federal • Fate and stability of sequestered meeting) and may speak after previously Officer for the Committee, Office of CO2 (and other captured gases) during scheduled speakers. Speakers will be Energy Efficiency and Renewable and after EOR usage; given approximately five minutes to Energy, U.S. Department of Energy, • Health and safety issues associated present their comments. Those speakers 1000 Independence Avenue, SW., with CO2 capture, transport, and usage who want more than five minutes Washington, DC 20585; (202) 586–7766; in EOR; should indicate the length of time e-mail: laura.mccann@ee.doe.gov or T.J. • Marketability of products desired in their request. Depending on Heibel at (410) 997–7778 ext. 223; e- (including by-products) and market the number of speakers, DOE may need mail: theibel@bcs-hq.com. access to feedstocks; to limit all speakers to five minutes SUPPLEMENTARY INFORMATION: • Socio-economic impacts, including initially and provide second the creation of jobs and the impacts of Purpose of Meeting: To provide opportunities as time permits. Speakers advice and guidance that promotes State and local tax incentives; may also provide written materials to • Disproportionate impacts on research and development leading to the supplement their presentations. Oral production of biobased fuels and minority and low-income populations; and written comments will be given • Noise and light impacts: Potential biobased products. equal consideration. Federal, State and Tentative Agenda: Agenda will impacts from construction, local elected officials and tribal leaders transportation of materials, and facility include the following: may be given priority in the order of • Update on USDA Biomass R&D operations; those making oral comments. • Connected actions: Potential Activities. DOE will begin the formal meeting development of support facilities or • Update on DOE Biomass R&D with an overview of Summit’s proposed supporting infrastructure; Activities. Texas Clean Energy Project. The • Cumulative effects that result from • Presentation on DOE/USDA Joint meeting will not be conducted as an the incremental impacts of the proposed Solicitation Process. evidentiary hearing, and speakers will project when added to other past, • Presentation on DOE and USDA not be cross-examined. However, present, and reasonably foreseeable loan guarantee programs. speakers may be asked questions to help future projects; • Presentation on SC/NIFA joint ensure that DOE fully understands the • Compliance with regulatory comments or suggestions. A presiding solicitation (genetics). requirements and environmental • Update on Biomass R&D Board officer will establish the order of permitting; Activities. speakers and provide any additional • Environmental monitoring plans procedures necessary to conduct the Public Participation: In keeping with associated with the power plant and procedures, members of the public are sroberts on DSKD5P82C1PROD with NOTICES meeting. with the CO2 sequestration sites. welcome to observe the business of the Issued in Washington, DC, this 27th day of Biomass Research and Development Public Scoping Process May, 2010. Technical Advisory Committee. To To ensure identification of all issues James J. Markowsky, attend the meeting and/or to make oral related to DOE’s proposed action and Assistant Secretary, Office of Fossil Energy. statements regarding any of the items on Summit’s proposed project, DOE seeks [FR Doc. 2010–13215 Filed 6–1–10; 8:45 am] the agenda, you should contact Laura public input to define the scope of the BILLING CODE 6450–01–P McCann at 202–586–7766; E-mail: VerDate Mar<15>2010 19:08 Jun 01, 2010 Jkt 220001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:FRFM02JNN1.SGM 02JNN1