SlideShare uma empresa Scribd logo
1 de 12
© 2015 Contech Engineered Solutions LLC
Raising the Bar North of the Border:
The Ins and Outs of Canada’s New
Evaluation Process for Oil-Grit Separators
Presented by:
Derek Berg
StormCon Austin
August, 5th 2015
1
© 2015 Contech Engineered Solutions LLC
 Stakeholder driven protocol development and regulatory
overview
 CETV protocol specifics
 CETV protocol in practice, testing a full scale CDS®
 Discussion
Presentation Overview
2
© 2015 Contech Engineered Solutions LLC
 BMP evaluation has come a long way but remains imperfect
 Equipment, methods and best practices continue to be refined
 Merits of lab vs. field still debated
 Resource constraints straining existing programs
 Consistent implementation is essential
BMP Evaluation
3
© 2015 Contech Engineered Solutions LLC
 Canadian regulatory framework requires predominantly local
decision making and vetting of MTDs
 Historically no Canadian specific protocols or evaluation
programs for MTDs
 Local decision makers often lack resources and/or expertise to
complete evaluations
 Some regions relying on programs such as NJCAT/NJDEP but
data from those programs not always well suited for direct
adoption
Drivers for a CETV Protocol
4
© 2015 Contech Engineered Solutions LLC
 In 2013 Toronto and Region Conservation Authority (TRCA)
convened a diverse stakeholder group to gauge interest and
establish goals for a national protocol
 Group agreed to use 2013 NJDEP protocol as a foundation for
the process
 Changes needed to make resulting data applicable to diverse
local regulations
 Stakeholders wanted a protocol that yielded a flexible data set
 After initial stakeholder meeting TRCA took lead on drafting
protocol with several rounds of stakeholder review
CETV Development
5
© 2015 Contech Engineered Solutions LLC
 Mandatory performance trials at 7 operating rates ranging from
40 l/min/m2 to 1400 l/min/m2 of sedimentation area
o Additional tests optional
o All testing using modified mass balance with target influent of 200mg/l
 PSD analysis on source sediment as well as sediment
captured during each test run
 Scour test component with system filled to 50% sediment
capacity
o Uses 1-1000um PSD for scour
o 5 target loading rates between 200-2600 l/min/m2 of sedimentation area
o Duplicate effluent and PSD samples collected at each operating rate
 Voluntary light liquid re-entrainment test
o A scour test for floatables
o Low density polyethylene beads used to simulate oils
CETV Protocol Specifics
6
© 2015 Contech Engineered Solutions LLC
 All testing, reporting and data submission must be completed
by 3rd party facility
 SSC method specified for all solids analysis
 Specifies NJDEP 1-1000um PSD
o D50 ~65 microns
o ~20% of material less than 8 microns
CETV Protocol Specifics
7
© 2015 Contech Engineered Solutions LLC
CETV Process Overview
8
Application
Test at 3rd
Party Facility
Submission
of Results
Establish
Performance
Claim
Review by
Verification
Entity
CETV
Verification
Environment Canada
Globe Performance Solutions
Manufacturer/3rd Party Lab
Toronto and Region Conservation Authority
Regional/Local Regulatory Authority
Stakeholders:
© 2015 Contech Engineered Solutions LLC
2014: CDS-4 tested at Alden Research Labs in Holden, MA
CETV in Practice
9
© 2015 Contech Engineered Solutions LLC
 Initial PSD tolerances and sampling requirements made
sediment compliance difficult
o + or – 3% tolerances changed to + or – 6%
 Mass balance approach results in lengthy run times at low
operating rates
o Min 11.3kg sediment per trial
o CDS trial at 40 l/min/m2 was 21.4 hours
o Test run in 3 chunks over 3 days
 PSD sampling before each test run adds appreciable cost and
increases likelihood of non compliance
Lessons Learned
10
© 2015 Contech Engineered Solutions LLC
 Protocol is robust and has been proven feasible to implement
 Protocol and process require substantial financial investment
 Protocol implementation could be improved with tweaks to test
requirements
 CDS in early stages of CETV verification process
 Process creates a substantial amount of data but there is little
guidance for using data at local level
o Ideally policy or guidance on use of results should be created to aid
local users and drive consistency
 Consistent implementation of verification process and local
regulatory policy will be critical to success of program
Discussion
11
© 2015 Contech Engineered Solutions LLC
Questions
Derek Berg
dberg@conteches.com
207-885-6174
Thank You!!
12

Mais conteúdo relacionado

Mais procurados

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015Arun Jothilingam
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...All4 Inc.
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Mike Beck
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Mike Beck
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Society of Petroleum Engineers
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channelsmirzaqadeer
 
Green Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationGreen Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationWisconsin Clean Cities
 

Mais procurados (9)

General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015General_ENTRION_Presentation_December2015
General_ENTRION_Presentation_December2015
 
Mark Van Domelen
Mark Van DomelenMark Van Domelen
Mark Van Domelen
 
Los Angeles County's Sustainable Roadway Improvement Program
Los Angeles County's Sustainable Roadway Improvement ProgramLos Angeles County's Sustainable Roadway Improvement Program
Los Angeles County's Sustainable Roadway Improvement Program
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013
 
Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...Automation of the Drilling System: What has been done, what is being done, an...
Automation of the Drilling System: What has been done, what is being done, an...
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channels
 
Green Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department PresentationGreen Vehicles Workshop - Port Washington Police Department Presentation
Green Vehicles Workshop - Port Washington Police Department Presentation
 

Semelhante a Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators

Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Semantic Web Company
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysIEA_RETD
 
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyHydroTerra Pty Ltd
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBailey LeRoux
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and ComplianceAll4 Inc.
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmDNVGLEnergy
 
CCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysCCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysOECD Environment
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by DesignBir Gujral PhD, MBA
 
1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdfrafael442748
 
"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele GalatolaCerame-Unie
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Kevin Perry
 
Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!TechWell
 
Q & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismQ & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismUNFCCC
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...International Hydropower Association
 

Semelhante a Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators (20)

Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
Eelco Kruizinga: A Matchmaking Assistant to support developing countries in b...
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
 
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
EEP Mekong: 6th Call for Proposals Meeting in Vientiane, 22 June 2016
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
 
Challenges for EPD implementation
Challenges for EPD implementationChallenges for EPD implementation
Challenges for EPD implementation
 
Bridging the Gap in Flow Measurement
Bridging the Gap in Flow MeasurementBridging the Gap in Flow Measurement
Bridging the Gap in Flow Measurement
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
 
Code Blue Implementation
Code Blue ImplementationCode Blue Implementation
Code Blue Implementation
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Environmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and HowEnvironmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and How
 
CCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeawaysCCXG Workshop, February 2021, Key takeaways
CCXG Workshop, February 2021, Key takeaways
 
Joint Training & Certification Program
Joint Training & Certification ProgramJoint Training & Certification Program
Joint Training & Certification Program
 
White paper on Quality by Design
White paper on Quality by DesignWhite paper on Quality by Design
White paper on Quality by Design
 
1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf1._BWMS_commissioning_post_webinar_doc.pdf
1._BWMS_commissioning_post_webinar_doc.pdf
 
"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola"Building the Single Market for Green Products" | Michele Galatola
"Building the Single Market for Green Products" | Michele Galatola
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
 
Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!Reduce Release Cycle Time: Nine Months to a Week - Nice!
Reduce Release Cycle Time: Nine Months to a Week - Nice!
 
Q & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanismQ & A session on the Kyoto Protocol's clean development mechanism
Q & A session on the Kyoto Protocol's clean development mechanism
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
 
NEERI_N_N_Rao.ppt
NEERI_N_N_Rao.pptNEERI_N_N_Rao.ppt
NEERI_N_N_Rao.ppt
 

Mais de Contech Engineered Solutions

Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...Contech Engineered Solutions
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Contech Engineered Solutions
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sContech Engineered Solutions
 

Mais de Contech Engineered Solutions (18)

Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 
2018 Contech Calendar
2018 Contech Calendar2018 Contech Calendar
2018 Contech Calendar
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
2017 Contech Calendar
2017 Contech Calendar2017 Contech Calendar
2017 Contech Calendar
 
2016 Contech Calendar
2016 Contech Calendar2016 Contech Calendar
2016 Contech Calendar
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
 
How Rainwater Harvesting Works
How Rainwater Harvesting WorksHow Rainwater Harvesting Works
How Rainwater Harvesting Works
 
2015 Contech Calendar
2015 Contech Calendar2015 Contech Calendar
2015 Contech Calendar
 
Maximizing Phosphorus Load Reduction
Maximizing Phosphorus Load ReductionMaximizing Phosphorus Load Reduction
Maximizing Phosphorus Load Reduction
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Rainwater Harvesting Answer Book
Rainwater Harvesting Answer BookRainwater Harvesting Answer Book
Rainwater Harvesting Answer Book
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 

Último

Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfgarthraymundo123
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...Envirotac Inc.
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddMadisonHenderson5
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Open Access Research Paper
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAaimanhadi215
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptxEllen Book
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Sareena Khatun
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxafzalulhoda98
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlMonica Sydney
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 

Último (20)

Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfdddddddddddddddddddddddddddddddddddd
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 

Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators

  • 1. © 2015 Contech Engineered Solutions LLC Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluation Process for Oil-Grit Separators Presented by: Derek Berg StormCon Austin August, 5th 2015 1
  • 2. © 2015 Contech Engineered Solutions LLC  Stakeholder driven protocol development and regulatory overview  CETV protocol specifics  CETV protocol in practice, testing a full scale CDS®  Discussion Presentation Overview 2
  • 3. © 2015 Contech Engineered Solutions LLC  BMP evaluation has come a long way but remains imperfect  Equipment, methods and best practices continue to be refined  Merits of lab vs. field still debated  Resource constraints straining existing programs  Consistent implementation is essential BMP Evaluation 3
  • 4. © 2015 Contech Engineered Solutions LLC  Canadian regulatory framework requires predominantly local decision making and vetting of MTDs  Historically no Canadian specific protocols or evaluation programs for MTDs  Local decision makers often lack resources and/or expertise to complete evaluations  Some regions relying on programs such as NJCAT/NJDEP but data from those programs not always well suited for direct adoption Drivers for a CETV Protocol 4
  • 5. © 2015 Contech Engineered Solutions LLC  In 2013 Toronto and Region Conservation Authority (TRCA) convened a diverse stakeholder group to gauge interest and establish goals for a national protocol  Group agreed to use 2013 NJDEP protocol as a foundation for the process  Changes needed to make resulting data applicable to diverse local regulations  Stakeholders wanted a protocol that yielded a flexible data set  After initial stakeholder meeting TRCA took lead on drafting protocol with several rounds of stakeholder review CETV Development 5
  • 6. © 2015 Contech Engineered Solutions LLC  Mandatory performance trials at 7 operating rates ranging from 40 l/min/m2 to 1400 l/min/m2 of sedimentation area o Additional tests optional o All testing using modified mass balance with target influent of 200mg/l  PSD analysis on source sediment as well as sediment captured during each test run  Scour test component with system filled to 50% sediment capacity o Uses 1-1000um PSD for scour o 5 target loading rates between 200-2600 l/min/m2 of sedimentation area o Duplicate effluent and PSD samples collected at each operating rate  Voluntary light liquid re-entrainment test o A scour test for floatables o Low density polyethylene beads used to simulate oils CETV Protocol Specifics 6
  • 7. © 2015 Contech Engineered Solutions LLC  All testing, reporting and data submission must be completed by 3rd party facility  SSC method specified for all solids analysis  Specifies NJDEP 1-1000um PSD o D50 ~65 microns o ~20% of material less than 8 microns CETV Protocol Specifics 7
  • 8. © 2015 Contech Engineered Solutions LLC CETV Process Overview 8 Application Test at 3rd Party Facility Submission of Results Establish Performance Claim Review by Verification Entity CETV Verification Environment Canada Globe Performance Solutions Manufacturer/3rd Party Lab Toronto and Region Conservation Authority Regional/Local Regulatory Authority Stakeholders:
  • 9. © 2015 Contech Engineered Solutions LLC 2014: CDS-4 tested at Alden Research Labs in Holden, MA CETV in Practice 9
  • 10. © 2015 Contech Engineered Solutions LLC  Initial PSD tolerances and sampling requirements made sediment compliance difficult o + or – 3% tolerances changed to + or – 6%  Mass balance approach results in lengthy run times at low operating rates o Min 11.3kg sediment per trial o CDS trial at 40 l/min/m2 was 21.4 hours o Test run in 3 chunks over 3 days  PSD sampling before each test run adds appreciable cost and increases likelihood of non compliance Lessons Learned 10
  • 11. © 2015 Contech Engineered Solutions LLC  Protocol is robust and has been proven feasible to implement  Protocol and process require substantial financial investment  Protocol implementation could be improved with tweaks to test requirements  CDS in early stages of CETV verification process  Process creates a substantial amount of data but there is little guidance for using data at local level o Ideally policy or guidance on use of results should be created to aid local users and drive consistency  Consistent implementation of verification process and local regulatory policy will be critical to success of program Discussion 11
  • 12. © 2015 Contech Engineered Solutions LLC Questions Derek Berg dberg@conteches.com 207-885-6174 Thank You!! 12