SlideShare uma empresa Scribd logo
1 de 36
Baixar para ler offline
JULY 2013
DUNDEE PRECIOUS METALS
BUILDING A PREMIER,
INTERMEDIATE, LOW-COST
GOLD PRODUCER
Proudly celebrating 30 years as a
Toronto Stock Exchange
listed company
2
FORWARD-LOOKING
STATEMENTS
This presentation contains “forward-looking information” or "forward-looking statements" that involve a number of risks and
uncertainties. Forward-looking information and forward-looking statements include, but are not limited to, statements with respect to
the future prices of gold and other metals, the estimation of mineral reserves and resources, the realization of mineral estimates, the
timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the
development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional
capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims,
limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward-looking
statements can be identified by the use of words such as “plans”, “expects”, or “does not expect”, “is expected”, “budget”, “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates”, or “does not anticipate”, or “believes”, or variations of such words and phrases or state
that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking
statements are based on the opinions and estimates of management as of the date such statements are made, and they involve
known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the
Company to be materially different from any other future results, performance or achievements expressed or implied by the forward-
looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current
reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future
prices of gold; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated;
accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the
completion of development or construction activities, fluctuations in metal prices, as well as those risk factors discussed or referred to
in this news release under and in the Company’s annual information form under the heading "Risk Factors" and other documents filed
from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially
from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be
anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual
results and future events could differ materially from those anticipated in such statements. Accordingly, readers are cautioned not to
place undue reliance on forward-looking statements.
Dundee Precious Metals
Strong
Financial Position
Commodity and
Geographic
Diversification
High Quality Assets
with Proven Operating
Performance and Further
Potential
Experienced Management
Team and Board with
Strong Track Record
Pipeline of Value Adding
Organic Growth
INVESTMENT SUMMARY
3
MAINTAINING A SOLID FINANCIAL
POSITION
4Dundee Precious Metals
Share Price C$4.31
Shares Outstanding 139M
Market Capitalization $600M
Fully diluted shares
Additional cash on dilution
146M
C$25M
52 week low - high $3.69 - $9.93
Gross Revenue by Metals Sold
2011A 2012A 2016EGold
Copper
Silver
Zinc
Dundee Corporation 25%
Equinox Partners <10%
$285M
Cash and Credit
including:
$36M from early warrant exercise
$150M undrawn revolving credit
facility
~$100M in Cash
@ Mar. 31, 2013
$121M
Significant 2012 Operating
Cash Flow
$80.5M
Debt
@ Mar. 31, 2013
Total Debt : Total Capital
= 10%
48%
41%
6% 5%
Capital Structure @ July 2, 2013
Top Shareholders
DPM’S ASSETS LOCATED IN
POLITICALLY STABLE REGIONS
5Dundee Precious Metals
Head office
Operating assets
Developing asset
GOLD COMPOUND ANNUAL GROWTH
RATE OF 14%
6Dundee Precious Metals
Consolidated Gold Production (oz 000’s) Consolidated Copper Production (lbs 000,000)
Copper production has increased 105% over four yearsGold production has increased 70% over four years
DECREASING CASH COSTS AND
INCREASING EBITDA
7Dundee Precious Metals
Reduced cash cost per ounce of gold produced
78% over four years1
Consolidated Adjusted EBITDA increased
412% over four years2
($40)
$32
$45
$118
$125
2008 2009 2010 2011 2012
(1) Net of by-product credits
(2) Cdn $
8
Source: Scotia Capital (April 2, 2013), DPM 2013 Guidance
Note: All-in Sustaining Cash Cost = Total cash costs (net of by-products) + sustaining capital + corporate G&A
DPM: A LOW COST PRODUCER
Cash Cost/Tonne of Ore Processed (1) ($/T)
(1) This is a non-GAAP measure. See 2012 Annual Report for further details.
(2) All-in cost is comprised of cash delivered cost which includes mine cash costs, TC’s, RC’s and freight; net of by product credits, sustaining capital; and G&A costs
(allocated based on revenue of operation). All-in costs exclude Avala and Dunav and growth capital expenditures. See Appendix for reconciliation to cost of sales.
Dundee Precious Metals
$665 $714
$782
$838 $842 $875 $884
$1,005
$1,155 $1,178 $1,212
$1,325 $1,362
DPM Argonaut Alamos Allied
Nevada
Primero Timmins Teranga Centerra Alacer AuRico African
Barrick
Golden
Star
Semafo
2013E All-In Sustaining Cash Cost (US$/oz)
Average: $987
CORPORATE VISION AND STRATEGY
9Dundee Precious Metals
Building DPM into a premier, intermediate, low-cost
gold producer
Optimize value of existing operating assets
Grow the business beyond existing operating assets
Sustain low quartile operating costs Conceptual
Illustration of
Krumovgrad
Gold Project
3 blocks of
dust-
capturing
chambers
installed in
the new
baghouse at
Tsumeb
Exploration
at Kapan
Mine
Autoclave
fabricated for
the MPF to
be used for
Stage 2
Pyrite
Project at
Chelopech
• Increase mine production and extend LOMs
• Upgrade/expand smelter and establish long-term contracts
that provide a stable return
• Develop Krumovgrad gold project
• Establish deep pipeline of greenfield exploration
opportunities
• Complete acquisitions that offer accretive growth, diversity
and gold exposure, while maintaining a conservative
capital structure
Maintain a strong balance sheet with ample liquidity
Strategy
Vision
CHELOPECH MINE:
LOW COST, LONG LIFE PRODUCER
10Dundee Precious Metals
Chelopech Optimization
Grade Ounces
Resources M&I
(at Dec.31, 2012)
Au (oz) 4.0 g/t 3.8M
Cu (lbs) 1.3% 825M
Reserves
(at Dec 31, 2012)
Au (oz) 3.6 g/t 2.5M
Cu (lbs) 1.1% Cu 519M
Estimated Mine Life @ expanded rate 10+ years
Continue to implement
cost/margin improvements
Operating at full capacity of two
million tonnes of ore per annum
Capitalize on lower cost / higher
recovery staged flotation reactor
technology
Perform targeted exploration to
replace depletion and increase
mineral resources / reserves
Install new pyrite concentrate
flotation circuit
Complete feasibility study on the
pyrite gold treatment project
Staged Flotation
Reactor at
Chelopech
Operations
Dundee Precious Metals
400,000 T pyrite concentrate produced (E)
Metals Potential Grades Est. Incremental Production Result
Au 6-7 g/t 75,000 - 90,000 oz
Ag 10 - 15 g/t 130,000 - 190,000 oz
Cu 0.5% - 0.7% 4.5M - 6.0M lbs
Cash cost per oz of gold (net of by-product credits) $615
Estimated capital costs $202M
NPV (5% discount rate) after tax(1) $141M
IRR after tax(1) 24%
Item Capex
Stage 1: Concentrator upgrade $23M
Stage 2: POX Facility
Phase 1 - start production 2017 $93M
Phase 2 - start production 2019 $87M
(1) Assumes the following commodity prices after 2016: $1,250/oz Au, $25/oz Ag,
and $2.75/lb Cu
Project HighlightsProject Stages
CHELOPECH MINE:
PYRITE PROJECT TO INCREASE RECOVERIES TO 90%
2013 Catalysts
Complete Stage 1
Concentrator Upgrade
Q4 2013
Stage 2 POX
Facility Feasibility Study
Q3 2013
11
Dundee Precious Metals 12Dundee Precious Metals
Kapan Optimization
Complete final portion of drilling of
Shahumyan deposit to support
resource and potential expanded
operation
Complete studies to confirm optimal
mine plan based on new resource
Explore regional license to define
additional Mineral Resources
Continue operational improvements
and cost reductions
Product
Cu & Zn concentrates
containing Au & Ag
Deposit Type
Polymetallic vein deposit
(swarms)
Open Pit Resource Underway
Underground Resource Underway
KAPAN MINE:
POTENTIAL TO INCREASE SIZE AND EXTEND LIFE OF MINE
2012 Metals Production Grades
22,000 oz Au 1.56 g/t
2.5M lbs Cu 0.25%
15.4M lbs Zn 1.67%
450,000 oz Ag 32.20 g/t
Kapan Mine office
2013 Catalysts
Updated NI 43-101
Resource Estimate
Q3
2013
* Kapan operations were on care and maintenance as of November 2008; operations restarted April 2009.
Dundee Precious Metals
• One of the few smelters with
ability to process complex
concentrate
• Upgrades designed to meet
internationally accepted
environmental standards and
expand capacity to process
additional 3rd party
concentrate
• Lower per tonne operating
costs and more favourable
smelting terms are expected
to generate significantly higher
margins
Horne Smelter
Operated by Xstrata
Capacity: 825Kt of concentrate (total)
Note: Complex concentrate capacity limited
with little to no 3rd party capacity
Tsumeb Smelter
Operated by Dundee Precious Metals
Capacity: 240Kt-320Kt of complex concentrate
Operating Smelters
Closed Smelters
Other smelters that process various amounts of complex concentrates
La Oroya Smelter(1)
Operated by Doe Run
Kosaka Smelter
Shut down in Q1 2008San Luis de Potosi Smelter
Shut down in 2012
Note: Currently closed
Limited Global Smelting Capacity for Complex Concentrate
TSUMEB SMELTER:
A UNIQUE STRATEGIC ASSET
13
Dundee Precious Metals
DPM Ownership 100%
Location Namibia
Technology Ausmelt
Product
Copper blister
bars
2012 concentrate throughput 159,356 tonnes
Emissions & dust capture upgrades $99M
Sulphuric acid capture plant (Q3 2014) $204M
Electric holding furnace (Q1 2016) ~$70M+
Asset Overview
TSUMEB SMELTER HAS POTENTIAL
TO POSITIVELY IMPACT EARNINGSComplexConSmelterCapacity(000’s)
14
KRUMOVGRAD GOLD PROJECT:
LOW CASH COST OPERATION
15Dundee Precious Metals
Proposed Mine Type Open Pit
Gold Recoveries 85%
Grade 3.4 g/t
Annual ore tonnage production 850,000 tpy
Annual Au production 74,000 ounces
Mine Life 9 years
Capital Costs to complete US$127M
Total cash cost per oz Au Eq $404
Conceptual
Illustration of
Krumovgrad
Gold Project
Secure final local approvals
required prior to proceeding with
ordering long lead items /
construction
Seek opportunities to increase
recoveries through use of SFR
technology
Update / finalize mine plan
Complete detailed engineering that
optimizes value of project
Evaluate other exploration
opportunities within existing
licenses and establish targeted drill
program
Based on Jan. 2012 DFS; Estimated recoveries, capital & operating costs in process of being updated.
Future Catalysts
Start Construction 2015
Start Production 2016
Dundee Precious Metals
• NI-43-101 resources include:
 Bigar Hill initial Inferred Resource of 26.4 MT @
1.6 g/t Au for 1.4Moz
 Korkan initial Inferred Resource of 20.1 MT @
1.5 g/t Au for 1.0 Moz
 Kraku Pester initial Indicated resource of 6.3 MT
@ 1.3 g/t Au for 0.27 Mozs and Inferred
Resource of 2.2 MT @ 1.0 g/t Au for 0.07 Moz
• Total Inferred Resource of 48.7 MT @ 1.5 g/t Au for
2.5 Moz
• NI-43-101 inferred resources include:
 Kiseljak Mineral Resource initial estimate 300
MT grading 0.27% Cu & 0.26 g/t Au for 1.8 Blbs
Cu and 2.5 Moz Au
• Bakrenjaca Au-Ag base metal epithermal system,
drilling intersected 11m @ 5.13 g/t Au, 346 g/t Ag and
1.19% Cu
DPM EXPLORATION UPDATE:
PARTIALLY-OWNED ENTITIES
Securities
Shares
(m)
% Held
Value
(C$M)
Avala Resources
Special Warrants
Warrants (strike at C$0.30)
Total
135.0
50.0
25.0
53% 8.1
-
-
8.1
Dunav Resources
Warrants (strike at C$0.42)
Total
56.0
27.5
46% 6.2
-
6.2
Total shares & securities ~ 14.3
Avala Resources Ltd. (TSX-V: AVZ) Equity Portfolio Overview as at July 2, 2013
Dunav Resources Ltd. (TSX-V: DNZ)
16
DPM VALUE PROPOSITION:
TRADING AT A SIGNIFICANT DISCOUNT TO OUR PEERS
17Dundee Precious Metals
as at July 2, 2013
Market Capitalization (FD) $630M
Debt $80.5M
Corporate Cash (1) ($140M)
Strategic Investments ($31M)
Enterprise Value $540M
2017 @ $1,400 Au; $3.20 Cu
Chelopech $220M
Kapan (excluding open pit expansion) $23
Krumovgrad $42
Tsumeb Smelter $100
G & A ($35)
Average EBITDA $350(2)
EV/EBITDA 1.5x
Estimated Capital expenditure to 2017 $640 - $750M
Estimated Cash Flow to 2017(3) $1.0B
(1) At Mar. 31, 2013;
AVZ and DNV are
assumed at $0; Fully
Diluted; includes cash on
dilution
(2) Assumes avg LOM
EBITDA for Chelopech,
Kapan (assuming Kapan
can be extended &
operated at current rates),
Krumovgrad and estimate
for NCS at 310,000 tpa
(3) Based on $1,400 Au
and $3.20 Cu.
Dundee Precious Metals
Strong
Financial Position
Commodity and
Geographic
Diversification
High Quality Assets
with Proven Operating
Performance and Further
Potential
Experienced Management
Team and Board with
Strong Track Record
Pipeline of Value Adding
Organic Growth
COMPELLING INVESTMENT
OPPORTUNITY
18
DUNDEE PRECIOUS METALS
MANAGEMENT TEAM
19Dundee Precious Metals
Rick Howes
President & Chief Executive Officer
David Rae
Senior Vice President,
Operations
Adrian Goldstone
Executive Vice President,
Sustainable
Business Development
Michael Dorfman
Senior Vice President,
Corporate Development
Hume Kyle
Executive Vice
President &
Chief Financial Officer
Lori Beak
Senior Vice President,
Investor &
Regulatory Affairs &
Corporate Secretary
Hans Nolte
Vice President & General
Manager, Namibia Custom
Smelters
Reuben Mills
Vice President, Safety &
Asset Risk Management
Rob Taylor
Vice President Projects
Jeremy Cooper
Vice President,
Commercial Affairs
Simon Meik
Vice President, Processing
Hratch Jabrayan
Vice President & General
Manager,
Kapan Mine
Nikolay Hristov
Vice President & General
Manager,
Chelopech Mine
Iliya Garkov
Vice President & General
Manager, Krumovgrad
Gold Project
Richard Gosse
Senior Vice
President,
Exploration
Jonathan Goodman
Executive Chairman
Paul Proulx
Senior Vice President,
Corporate Services
dundeeprecious.com
One Adelaide Street East
Suite 500
Toronto, Ontario M5C 2V9
T: 416 365-5191
Investor Relations
T: 416 365-2851
ssrubiski@dundeeprecious.com
TSX:
DPM – Common Shares
DPM.WT.A – 2015 Warrants
Proudly celebrating 30 years as
a Toronto Stock Exchange listed
company
21
APPENDICIES
ANALYST COVERAGE
22Dundee Precious Metals
BMO John Hayes
CIBC World Markets Leon Esterhuizen
Cormark Securities Mike Kozak
Dundee Securities Josh Wolfson
GMP Securities Oliver Turner
Paradigm Capital Don MacLean
RBC Capital Markets Sam Crittenden
Scotia Capital Leily Omoumi
Stifel, Nicolaus & Co. Michael Scoon
2013 GUIDANCE
23Dundee Precious Metals
Metals Contained in Concentrate Produced Chelopech Kapan Total
Gold (ounces) 125,000 – 143,000 25,000 – 30,000 150,000 – 173,000
Copper (million pounds) 43.0 – 46.0 2.5 – 3.0 45.5 – 49.0
Zinc (million pounds) - 12.0 – 14.5 12.0 – 14.5
Silver (ounces) 182,000 – 195,000 438,000 – 528,000 620,000 – 723,000
Sustaining Capital expenditures $14 - $17 million $8 - $12 million $22 - $29 million
Total growth capital expenditures $210 - $240 million
Construction of acid plant at Tsumeb
Pyrite Project at Chelopech
Krumovgrad development and construction work
Kapan Gold exploration and/or development work
Mine output at Chelopech (tonnes of ore) 1.9 – 2.05 million
Mine out put at Kapan (tonnes of ore) 550,000 – 600,000
Concentrate smelted at Tsumeb (tonnes) 185,000 – 200,000
Sustaining capital expenditures at Tsumeb $13 - $16 million
Q1 2013 SUMMARY
24Dundee Precious Metals
Q1 2013 Q1 2012
Adjusted Net Earnings $6.6 million $31.3 million
Adjusted basic EPS $0.05 $0.25
Gross profit (loss)
Chelopech $36.4 million $52.4 million
Kapan ($1.4 million) $1.8 million
Tsumeb Smelter ($10.7 million) ($5.8 million)
Total Gross profit $24.3 million $48.4 million
Chelopech Production
Gold (ounces) 39,313 35,582
Copper (lbs) 12,048,521 11,620,465
Silver (ounces) 61,058 59,050
Cash cost/T ore processed (incl. royalties) $41.16 $46.80
Cash cost/T ore processed (excl. royalties) $36.55 $41.97
Kapan Production
Gold (ounces) 5,159 6,328
Copper (lbs) 553,731 613,397
Zinc (lbs) 3,358,133 4,443,184
Silver (ounces) 94,346 128,476
Cash cost/T ore processed (incl. royalties) $75.83 $75.18
Cash cost/T ore processed (excl. royalties) $72.36 $66.29
COPPER HEDGE POSITION
25Dundee Precious Metals
Year of projected payable copper
production
Volume Hedged (lbs) * Average fixed price ($/lb)
2013 5,019,920 $3.94
2014 7,195,880 $3.73
Total 12,215,800 $3.81
• As at March 31, 2013, the Company had outstanding derivative contracts to mitigate a portion of its price exposure
related to its by-products. These are summarized below:
CHELOPECH MINE:
UPDATED MINERAL RESERVES AND RESOURCES
26Dundee Precious Metals
Chelopech Mineral Reserves – December 31, 2012
Category
Tonnes
(M)
Gold Copper Silver
Grade
(g/t)
Ounces
(M)
Grade
(%)
Pounds
(M)
Grade
(g/t) Ounces (M)
Proven 12.3 3.4 1.4 1.3 340 9.3 3.7
Probable 9.3 3.8 1.1 0.9 180 5.7 1.7
Total 21.6 3.6 2.5 1.1 519 7.7 5.4
Chelopech Mineral Resources – December 31, 2012
Category
Tonnes
(M)
Gold Copper Silver
Grade (g/t)
Ounces
(M)
Grade
(%)
Pounds
(M)
Grade
(g/t) Ounces (M)
Measured 15.1 4.0 2.0 1.5 490 10.3 5.0
Indicated 14.0 4.0 1.8 1.1 336 8.5 3.8
M&I 29.1 4.0 3.8 1.3 825 9.4 8.8
Inferred 9.3 2.9 0.9 0.9 182 10.6 3.2
1. The rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals.
2. All Mineral Resources and Mineral Reserves Estimates have been determined and reported in accordance with NI 43-101 and the classification adopted by the CIM.
3. Chelopech Mineral Reserves are based on a gold equivalent cut-off of 4 g/t (Au g/t + 2.06xCu%) and a cut-off of USD 10 profit/tonne using NSR analysis, as of December 31, 2012. This information has been
prepared by Gordon Fellows who is a QP as defined in NI 43-101 and not independent of the Company.
4. Chelopech Mineral Resources are based on a gold equivalent cut-off 3 g/t (Au g/t + 2.06xCu%) and a greater than USD 0 profit/tonne test using NSR analysis, as of December 31, 2012. This information has
been prepared by Petya Kuzmanova and reviewed and approved by Julian Barnes. Julian Barnes is a QP as defined in NI 43-101 and not independent of the Company.
5. Mineral Reserves and Mineral Resources for Chelopech are based on long term metals prices of USD 1,250/oz Au, USD 2.75/lb Cu, USD 25/oz Ag.
6. Measured and Indicated Mineral Resources are inclusive of Proven and Probable Mineral Reserves.
CHELOPECH MINE:
EXPLORATION RESULTS Q1 2013
27Dundee Precious Metals
Significant intercepts (cut-off grade 3g/tAuEq)
Hole ID Northing
(mRL)
Easting
(mRL)
Dip Az From
(m)
To (m) Interval
(m)
Grades
Cu (%) Au (g/t)
EXT19_260_13 29786 6042 -28.1 018.7 121.5 148.5 27.0 0.68 3.60
EXT19_260_14 29785 6042 -42.1 019.1 145.5 162.0 16.5 1.42 3.47
EXT19W_320_23 29778 5846 -25.9 43.7 25.5 49.5 24.0 1.06 3.90
129.0 138.0 9.0 0.93 2.36
EXT19W_320_24 29778 5846 -43.8 42.6 28.5 64.5 36.0 1.21 3.65
EXT19W_320_25 29777 5843 -8.8 336.2 120.0 153.0 33.0 0.26 4.51
EXT151_165_04 29305 5463 -60.6 134.2 40.5 54.0 13.5 0.71 2.67
G103_225_03 29178 5706 -58.4 346.4 85.5 126.0 40.5 0.79 2.07
1) Significant intercepts are located within the Chelopech Mine Concession and proximal to the mine workings.
2) Gold Equivalent calculation is based on the following formula: (Au g/t + 2.05xCu%).
3) Minimum downhole width reported is 1.5 metres with a maximum internal dilution of 4.5 metres.
4) True widths are approximately 90% of the intersection width.
5) Drill holes with prefix G indicate grade control drilling which is performed using BQ diamond drill core. All other holes are drilled with NQ
diamond core.
6) Coordinates are in mine-grid.
7) No factors of material effect have hindered the accuracy and reliability of the data presented above.
8) No upper cuts applied.
9) For detailed information on drilling, sampling and analytical methodologies refer to the NI 43-101 “Preliminary Economic Assessment Report
for the Chelopech Pyrite Recovery Project” (the “PEA Technical Report”) filed on SEDAR at www.sedar.com on September 10, 2012.
CHELOPECH MINE:
CASH COST RECONCILIATION
28Dundee Precious Metals
US$ thousands, unless otherwise indicated
Q1 2013
Actual
Year 2012
Actual
Year 2011
Actual
Year 2010
Actual
Year 2009
Actual
Year 2008
Actual
Cost of Sales:
31,991 98,298 88,838 $72,707 74,499 67,245
Less amortization & other
(7,948) (19,542) (15,499) (14,425) (14,242) (11,966)
Plus other charges, including freight
23,832 86,228 65,125 41,234 38,317 26,006
Less by-product credits
(41,434) (163,940) (147,812) (87,320) (64,198) (59,376)
Cash cost of sales after by-product credits
6,441 1,044 (9,348) 12,196 34,376 21,909
Gold oz (payable metal)
34,732 116,644 83,796 58,065 93,081 70,878
Cash cost of sales/oz gold,
(net of by-product credits)
$1851 $92 $(112)3 $2104 $3695 $3096
5Based on US$2.34/lb copper 6
Based on US$3.16/lb copper4
Based on US$3.42/lb copper
3
Based on US$4.27/lb copper2
Based on US$3.95/lb copper
1
Based on US$3.64/lb copper
CHELOPECH MINE:
CASH COST PER TONNE OF ORE RECONCILIATION
29Dundee Precious Metals
1. Gold, copper and zinc are accounted for as co-products. Total cash costs are net of by-product silver revenue.
2. For other periods please refer to past MD&As available on the corporate web site.
US$ thousands, unless otherwise indicated
For the periods indicated
Q1
2013
Year 2012
Actual
Year 2011
Actual
Year 2010
Actual
Year 2009
Actual
Year 2008
Actual
Ore processed (mt) 513,360 1,819,687 1,353,733 1,000,781 980,928 900,563
Cost of sales 31,991 98,298 $ 88,838 $ 72,707 75,647 67,423
Add (deduct):
Depreciation, amortization & other non-cash costs (7,948) (19,542) (15,499) (14,425) (15,390) (11,966)
Change in concentrate inventory (2,911) 4,535 862 (2,018) (419) (178)
Total cash cost of production 21,132 83,291 $ 74,201 $ 56,264 59,838 55,279
Cash cost per tonne of ore processed, including
royalties $41.16 $ 45.77 $ 54.81 $ 56.22 $ 61.00 $ 61.38
Cash cost per tonne of ore processed, excluding
royalties $36.55 $ 41.16 $ 49.99 $ 51.54 $ 55.23 $ 57.87
KAPAN MINE:
MINERAL RESOURCE ESTIMATE
30Dundee Precious Metals
Cut off
(AuEq - g/t)
Tonnage
(Mt)
Gold Equiv.
(g/t)
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Zinc
(%)
0.50 335.8 1.19 0.11 0.48 8.39 0.41
0.75 226.5 1.47 0.13 0.61 10.32 0.49
1.00 147.1 1.80 0.15 0.79 12.62 0.57
1.25 98.3 2.14 0.17 0.99 14.99 0.65
1.50 69.8 2.45 0.18 1.19 17.00 0.72
1.75 49.2 2.80 0.19 1.43 19.14 0.78
2.00 36.3 3.13 0.19 1.68 20.87 0.83
Shahumyan Deposit – September 2008
Inferred Mineral Resource – Ordinary Kriging Estimate
10mE x 10mN x 10mRL Block Size – 5m Capped Input Composite Data
AuEq US$ price assumptions: Cu $2.50/lb, Au $850/oz, Ag $16/oz and Zn $1.00/lb
KAPAN MINE:
EXPLORATION RESULTS Q1 2013
31Dundee Precious Metals
Surface significant intercepts (SHDDR holes, cut-off grade 0.5 g/t AuEq) and underground significant intercepts (E
holes, cut-off grade 1.0g/t AuEq)
Hole ID
Northing
(mRL)
Easting
(mRL)
RL Dip Azi From
(m)
To
(m)
Interval
(m) & AuEQ
Au
(g/t)
Ag
(g/t)
Cu
(%)
Zn
(%)
E712DE014 4343208 8623975 713 -23.1 358.4 79.0 81.0 2m @ 20.17 11.55 358.5 0.06 2.47
E712DE028 4343208 8623974 712 -54.9 352.2 367.0 369.0 2m @ 13.09 8.72 69.5 1.79 0.07
E712DW007 4343184 8623803 713 -20.0 6.9 423.0 425.2 2.2m @ 17.74 8.20 184.6 2.45 3.33
E712DW009 4343184 8623803 712 -40.7 6.2 48.0 54.0 6m @ 11.71 3.72 54.4 2.18 6.05
SHDDR0516 4344044 8623467 975 -59.8 2.7 49.0 54.0 5m @ 3.68 2.30 22.2 0.04 1.58
SHDDR0517 4343950 8623467 963 -59.4 1.5 48.0 59.0 11m @ 2.49 0.96 34.8 0.30 0.64
SHDDR0517 4343950 8623467 963 -59.4 1.5 76.0 94.5 18.5m @ 1.93 0.36 17.5 0.36 1.14
SHRCR0111 4343334 8623777 904 -60.6 0.6 54.0 63.0 9m @ 3.56 1.36 22.0 0.31 2.29
SHRCR0115 4343370 8623867 895 -60.5 0.4 69.0 82.0 13m @ 5.93 5.59 9.3 0.01 0.24
SHRCR0117 4343245 8623880 882 -60.4 1.1 20.0 35.0 15m @ 2.43 0.91 21.8 0.15 1.51
SHDDR0539 4343234 8623596 906 -60.3 1.4 134.0 150.0 16m @ 2.72 1.03 25.8 0.25 1.40
SHDDR0539 4343234 8623596 906 -60.3 1.4 269.0 283.0 14m @ 4.42 2.45 49.5 0.26 1.01
1) In situ gold equivalent (AuEq) grade based on the following long-term metal prices: $1,250 per ounce for gold, $25 per ounce for silver, $3.00 per pound for copper and $1.00 per pound for
zinc.
2) Holes with the prefix SHDDR and SHRCR are surface HQ diamond and RC open pit drilling, respectively, while E holes are underground BQ drilling.
3) Significant intercepts for surface holes are located within the Central and Southern Zones while underground drilling is located within the Central Zone of the Shahumyan Deposit.
4) True widths are approximately 90% of the intersection width.
5) Minimum width reported is 2 metres and a maximum internal dilution of 4 metres.
6) All survey coordinates are transformed to AUSPOS.
7) No factors of material effect have hindered the accuracy and reliability of the data presented above.
8) No upper cuts have been applied.
KAPAN MINE:
CASH COST RECONCILIATION
32Dundee Precious Metals
US$ thousands, unless otherwise indicated
Q1 2013
Actual
Year 2012
Actual
Year 2011
Actual
Year 2010
Actual
Year 2009
Actual
Year 2008
Actual
Cost of Sales:
9,502 50,547 47,276 33,637 21,072 36,319
Less amortization & other
(1,617) (9,989) (9,140) (7,056) (6,996) (5,400)
Plus other charges, including freight
1,672 6,218 11,893 8,912 5,142 4,976
Less by-product credits
(5,780) (32,075) (47,588) (28,562) (13,591) (13,520)
Cash cost of sales after by-product credits
3,777 14,701 3,028 6,931 5,627 22,375
Gold oz (payable metal)
3,541 18,204 26,230 22,287 11,233 11,388
Cash cost of sales/oz gold,
(net of by-product credits)
$1,0671 $8082 $1153 $3114 $5015 $1,9656
5Based on US$2.34/lb copper 6
Based on US$3.16/lb copper4
Based on US$3.42/lb copper
3
Based on US$4.27/lb copper2
Based on US$3.95/lb copper
1
Based on US$3.64/lb copper
KAPAN MINE:
CASH COST PER TONNE OF ORE RECONCILIATION
33Dundee Precious Metals
1. Gold, copper and zinc are accounted for as co-products. Total cash costs are net of by-product silver revenue.
2. For other periods please refer to past MD&As available on the corporate web site.
US$ thousands, unless otherwise indicated
For the periods indicated
Q1
2013
Year 2012
Actual
Year 2011
Actual
Year 2010
Actual
Year 2009
Actual
Year 2008
Actual
Ore processed (mt) 119,663 509,419 581,852 428,865 218,235 269,033
Cost of sales 9,502 50,547 $ 47,276 $ 33,637 $ 21,197 $ 36,319
Add (deduct):
Depreciation, amortization & other non-cash
costs
(1,617) (10,883) (9,140) (7,056) (4,047) (3,668)
Care and maintenance costs - - - - (3,074) (1,732)
Change in concentrate inventory 1,189 (718) 416 3,572 1,696 (1,485)
Total cash cost of production 9,074 38,946 $ 38,552 $ 30,153 $ 15,772 $ 29,434
Cash cost per tonne of ore processed
(royalties not applicable in 2009) $75.83 $ 76.45 $ 66.26 $ 70.31 $ 72.27 $ 109.40
Cash cost per tonne of ore processed,
excluding royalties $72.36 $ 69.10 $ 62.57 $ 66.33 $ 72.27 $ 109.40
KRUMOVGRAD GOLD PROJECT
34Dundee Precious Metals
KRUMOVGRAD GOLD PROJECT
35Dundee Precious Metals
Krumovgrad Mineral Reserves – December 31, 2011
Category
Tonnes
(M)
Gold Silver
Grade
(g/t)
Ounces
(M)
Grade
(g/t) Ounces (M)
Proven 2.94 4.70 0.44 2.54 0.24
Probable 4.30 2.44 0.34 1.52 0.21
Total 7.24 3.36 0.78 1.92 0.45
Krumovgrad Mineral Resources – December 31, 2011
Category
Tonnes
(M)
Gold Silver
Grade (g/t)
Ounces
(M)
Grade
(g/t) Ounces (M)
Measured 3.30 4.90 0.52 3.00 0.28
Indicated 4.69 2.50 0.38 2.00 0.24
M&I 7.99 3.50 0.90 2.00 0.51
Inferred 0.40 1.20 0.02 1.00 0.01
1. Rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals.
2. All Mineral Resource Estimates have been determined and reported in accordance with NI 43-101 and the classification adopted by the CIM.
3. Krumovgrad Mineral Reserves and Resources are based on the Krumovgrad 2012 Technical Report using a variable economic cut-off grade and 0.5 g/t Au respectively.
4. All Mineral Reserves and Resources are based on long term metals prices of $1,250 Au, $3/lb Cu, $25/oz Ag and $1/lb Zn.
5. Measured and Indicated Mineral Resources are inclusive of Proven and Probable Reserves.
dundeeprecious.com
One Adelaide Street East
Suite 500
Toronto, Ontario M5C 2V9
T: 416 365-5191
Investor Relations
T: 416 365-2851
ssrubiski@dundeeprecious.com
TSX:
DPM – common shares
DPM.WT.A – 2015 Warrants
Proudly celebrating 30 years as
a Toronto Stock Exchange listed
company

Mais conteúdo relacionado

Mais procurados

Dgc 13 05_09_agm
Dgc 13 05_09_agmDgc 13 05_09_agm
Dgc 13 05_09_agmDetourGold
 
Dundee cibc investor_conference
Dundee cibc investor_conferenceDundee cibc investor_conference
Dundee cibc investor_conferenceCompany Spotlight
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDetourGold
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, torontoCompany Spotlight
 
Bmo capital annual global metals and mining conference
Bmo capital annual global metals and mining conferenceBmo capital annual global metals and mining conference
Bmo capital annual global metals and mining conferenceCompany Spotlight
 
Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014Company Spotlight
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceDetourGold
 
Dundee Precious Metals - Denver Gold Forum
Dundee Precious Metals - Denver Gold ForumDundee Precious Metals - Denver Gold Forum
Dundee Precious Metals - Denver Gold ForumCompany Spotlight
 
Alamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalAlamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalalamosgoldinc
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalalamosgoldinc
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyalGold
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012PetroMagdalena
 
John Tumazos Very Independent Research Conference
John Tumazos Very Independent Research ConferenceJohn Tumazos Very Independent Research Conference
John Tumazos Very Independent Research ConferenceTeranga Gold
 

Mais procurados (14)

Seabridge may13pres
Seabridge may13presSeabridge may13pres
Seabridge may13pres
 
Dgc 13 05_09_agm
Dgc 13 05_09_agmDgc 13 05_09_agm
Dgc 13 05_09_agm
 
Dundee cibc investor_conference
Dundee cibc investor_conferenceDundee cibc investor_conference
Dundee cibc investor_conference
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto
 
Bmo capital annual global metals and mining conference
Bmo capital annual global metals and mining conferenceBmo capital annual global metals and mining conference
Bmo capital annual global metals and mining conference
 
Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014Seabridge - Corporate Presentation August 2014
Seabridge - Corporate Presentation August 2014
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials Conference
 
Dundee Precious Metals - Denver Gold Forum
Dundee Precious Metals - Denver Gold ForumDundee Precious Metals - Denver Gold Forum
Dundee Precious Metals - Denver Gold Forum
 
Alamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalAlamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 final
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 final
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 Presentation
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012
 
John Tumazos Very Independent Research Conference
John Tumazos Very Independent Research ConferenceJohn Tumazos Very Independent Research Conference
John Tumazos Very Independent Research Conference
 

Destaque

02 10-2007 - apresentação - mz real estate conference
02 10-2007 - apresentação - mz real estate conference02 10-2007 - apresentação - mz real estate conference
02 10-2007 - apresentação - mz real estate conferenceSiteriCR2
 
United Maps - Unternehmensprofil und Technologie
United Maps - Unternehmensprofil und TechnologieUnited Maps - Unternehmensprofil und Technologie
United Maps - Unternehmensprofil und TechnologieStefan Knecht
 
Remembering | 2013 In Pictures
Remembering | 2013 In PicturesRemembering | 2013 In Pictures
Remembering | 2013 In PicturesBoyd Bailey
 
Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3Sp10tyvex
 
Knowing your Catholic customer
Knowing your Catholic customerKnowing your Catholic customer
Knowing your Catholic customeraquinasnmore
 
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...Banco Popular
 
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04Sukarya
 
Cr2 apresentacao 2 q10 - 17-08-2010 - eng
Cr2   apresentacao 2 q10 - 17-08-2010 - engCr2   apresentacao 2 q10 - 17-08-2010 - eng
Cr2 apresentacao 2 q10 - 17-08-2010 - engSiteriCR2
 
2008 Budget Discussions Jan 9 08
2008  Budget  Discussions  Jan 9 08 2008  Budget  Discussions  Jan 9 08
2008 Budget Discussions Jan 9 08 jgabateman
 
Highlights 2009 For Website
Highlights 2009 For WebsiteHighlights 2009 For Website
Highlights 2009 For Websiteepeecook
 
CR2 presentation - 4Q12 e 2012
CR2   presentation - 4Q12 e 2012CR2   presentation - 4Q12 e 2012
CR2 presentation - 4Q12 e 2012CR2
 
Announcements 16 September 2012
Announcements 16 September 2012Announcements 16 September 2012
Announcements 16 September 2012stbarnabastoronto
 
Delivering Quality Global Immersion in Graduate Business Program Practicum
Delivering Quality Global Immersion in Graduate Business Program PracticumDelivering Quality Global Immersion in Graduate Business Program Practicum
Delivering Quality Global Immersion in Graduate Business Program PracticumDavinder Kaur
 
Sáng kiến kinh nghiệm hình học không gian12 truonghocso.com
Sáng kiến kinh nghiệm hình học không gian12   truonghocso.comSáng kiến kinh nghiệm hình học không gian12   truonghocso.com
Sáng kiến kinh nghiệm hình học không gian12 truonghocso.comThế Giới Tinh Hoa
 
Investor Presentation - November 2011
Investor Presentation - November 2011Investor Presentation - November 2011
Investor Presentation - November 2011Multiplus
 
Pedoman pijah ikan cangkringan
Pedoman pijah ikan cangkringanPedoman pijah ikan cangkringan
Pedoman pijah ikan cangkringanWarta Wirausaha
 
Sukarya Delhi Half Marathon 2011 Poster
Sukarya Delhi Half Marathon 2011 PosterSukarya Delhi Half Marathon 2011 Poster
Sukarya Delhi Half Marathon 2011 PosterSukarya
 

Destaque (20)

Teletrade cursos forex
Teletrade cursos forexTeletrade cursos forex
Teletrade cursos forex
 
02 10-2007 - apresentação - mz real estate conference
02 10-2007 - apresentação - mz real estate conference02 10-2007 - apresentação - mz real estate conference
02 10-2007 - apresentação - mz real estate conference
 
United Maps - Unternehmensprofil und Technologie
United Maps - Unternehmensprofil und TechnologieUnited Maps - Unternehmensprofil und Technologie
United Maps - Unternehmensprofil und Technologie
 
Remembering | 2013 In Pictures
Remembering | 2013 In PicturesRemembering | 2013 In Pictures
Remembering | 2013 In Pictures
 
Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3
 
Knowing your Catholic customer
Knowing your Catholic customerKnowing your Catholic customer
Knowing your Catholic customer
 
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...
Ángel Ron entrega los diez programas formativos de la tercera convocatoria de...
 
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04
Run for Sukarya in the Airtel Delhi Half Marathon 2012 -04
 
Cr2 apresentacao 2 q10 - 17-08-2010 - eng
Cr2   apresentacao 2 q10 - 17-08-2010 - engCr2   apresentacao 2 q10 - 17-08-2010 - eng
Cr2 apresentacao 2 q10 - 17-08-2010 - eng
 
2008 Budget Discussions Jan 9 08
2008  Budget  Discussions  Jan 9 08 2008  Budget  Discussions  Jan 9 08
2008 Budget Discussions Jan 9 08
 
Highlights 2009 For Website
Highlights 2009 For WebsiteHighlights 2009 For Website
Highlights 2009 For Website
 
CR2 presentation - 4Q12 e 2012
CR2   presentation - 4Q12 e 2012CR2   presentation - 4Q12 e 2012
CR2 presentation - 4Q12 e 2012
 
Announcements 16 September 2012
Announcements 16 September 2012Announcements 16 September 2012
Announcements 16 September 2012
 
Delivering Quality Global Immersion in Graduate Business Program Practicum
Delivering Quality Global Immersion in Graduate Business Program PracticumDelivering Quality Global Immersion in Graduate Business Program Practicum
Delivering Quality Global Immersion in Graduate Business Program Practicum
 
Fotoregistro
FotoregistroFotoregistro
Fotoregistro
 
Zonasi
ZonasiZonasi
Zonasi
 
Sáng kiến kinh nghiệm hình học không gian12 truonghocso.com
Sáng kiến kinh nghiệm hình học không gian12   truonghocso.comSáng kiến kinh nghiệm hình học không gian12   truonghocso.com
Sáng kiến kinh nghiệm hình học không gian12 truonghocso.com
 
Investor Presentation - November 2011
Investor Presentation - November 2011Investor Presentation - November 2011
Investor Presentation - November 2011
 
Pedoman pijah ikan cangkringan
Pedoman pijah ikan cangkringanPedoman pijah ikan cangkringan
Pedoman pijah ikan cangkringan
 
Sukarya Delhi Half Marathon 2011 Poster
Sukarya Delhi Half Marathon 2011 PosterSukarya Delhi Half Marathon 2011 Poster
Sukarya Delhi Half Marathon 2011 Poster
 

Semelhante a Investor Presentation July 2013

Dundee Precious Metals Investor Presentation August 2013
Dundee Precious Metals  Investor Presentation August 2013Dundee Precious Metals  Investor Presentation August 2013
Dundee Precious Metals Investor Presentation August 2013Company Spotlight
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013Company Spotlight
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, torontoCompany Spotlight
 
Corporate presentation february2015-master
Corporate presentation february2015-masterCorporate presentation february2015-master
Corporate presentation february2015-masterAdam Martin
 
Claude Resources Inc. - CRJ - February 2015 Corporate Presentation
Claude Resources Inc. - CRJ - February 2015 Corporate PresentationClaude Resources Inc. - CRJ - February 2015 Corporate Presentation
Claude Resources Inc. - CRJ - February 2015 Corporate PresentationClaude Resources Inc.
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentationDetourGold
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold ForumDetourGold
 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc.
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoDetourGold
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDetourGold
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' MeetingCompany Spotlight
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' MeetingCompany Spotlight
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' MeetingCompany Spotlight
 

Semelhante a Investor Presentation July 2013 (17)

Dundee Precious Metals Investor Presentation August 2013
Dundee Precious Metals  Investor Presentation August 2013Dundee Precious Metals  Investor Presentation August 2013
Dundee Precious Metals Investor Presentation August 2013
 
Investor Presentation May 2013
Investor Presentation May 2013Investor Presentation May 2013
Investor Presentation May 2013
 
2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto2014 prospectors and developers association of canada conference, toronto
2014 prospectors and developers association of canada conference, toronto
 
Corporate presentation february2015-master
Corporate presentation february2015-masterCorporate presentation february2015-master
Corporate presentation february2015-master
 
Corp pres
Corp presCorp pres
Corp pres
 
Seabridge gold presentation
Seabridge gold presentationSeabridge gold presentation
Seabridge gold presentation
 
Corp pres oct2013
Corp pres oct2013Corp pres oct2013
Corp pres oct2013
 
Claude Resources Inc. - CRJ - February 2015 Corporate Presentation
Claude Resources Inc. - CRJ - February 2015 Corporate PresentationClaude Resources Inc. - CRJ - February 2015 Corporate Presentation
Claude Resources Inc. - CRJ - February 2015 Corporate Presentation
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentation
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold Forum
 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
 
Seabridge presentation13
Seabridge presentation13Seabridge presentation13
Seabridge presentation13
 
BoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, TorontoBoAML Canada Mining Conference, Toronto
BoAML Canada Mining Conference, Toronto
 
Dgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conferenceDgc 13 09_12-13_bo_aml conference
Dgc 13 09_12-13_bo_aml conference
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting
 
2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting2013 Annual Shareholders' Meeting
2013 Annual Shareholders' Meeting
 

Mais de Company Spotlight

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsCompany Spotlight
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 

Mais de Company Spotlight (20)

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 

Último

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 

Último (20)

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 

Investor Presentation July 2013

  • 1. JULY 2013 DUNDEE PRECIOUS METALS BUILDING A PREMIER, INTERMEDIATE, LOW-COST GOLD PRODUCER Proudly celebrating 30 years as a Toronto Stock Exchange listed company
  • 2. 2 FORWARD-LOOKING STATEMENTS This presentation contains “forward-looking information” or "forward-looking statements" that involve a number of risks and uncertainties. Forward-looking information and forward-looking statements include, but are not limited to, statements with respect to the future prices of gold and other metals, the estimation of mineral reserves and resources, the realization of mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward- looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, fluctuations in metal prices, as well as those risk factors discussed or referred to in this news release under and in the Company’s annual information form under the heading "Risk Factors" and other documents filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.
  • 3. Dundee Precious Metals Strong Financial Position Commodity and Geographic Diversification High Quality Assets with Proven Operating Performance and Further Potential Experienced Management Team and Board with Strong Track Record Pipeline of Value Adding Organic Growth INVESTMENT SUMMARY 3
  • 4. MAINTAINING A SOLID FINANCIAL POSITION 4Dundee Precious Metals Share Price C$4.31 Shares Outstanding 139M Market Capitalization $600M Fully diluted shares Additional cash on dilution 146M C$25M 52 week low - high $3.69 - $9.93 Gross Revenue by Metals Sold 2011A 2012A 2016EGold Copper Silver Zinc Dundee Corporation 25% Equinox Partners <10% $285M Cash and Credit including: $36M from early warrant exercise $150M undrawn revolving credit facility ~$100M in Cash @ Mar. 31, 2013 $121M Significant 2012 Operating Cash Flow $80.5M Debt @ Mar. 31, 2013 Total Debt : Total Capital = 10% 48% 41% 6% 5% Capital Structure @ July 2, 2013 Top Shareholders
  • 5. DPM’S ASSETS LOCATED IN POLITICALLY STABLE REGIONS 5Dundee Precious Metals Head office Operating assets Developing asset
  • 6. GOLD COMPOUND ANNUAL GROWTH RATE OF 14% 6Dundee Precious Metals Consolidated Gold Production (oz 000’s) Consolidated Copper Production (lbs 000,000) Copper production has increased 105% over four yearsGold production has increased 70% over four years
  • 7. DECREASING CASH COSTS AND INCREASING EBITDA 7Dundee Precious Metals Reduced cash cost per ounce of gold produced 78% over four years1 Consolidated Adjusted EBITDA increased 412% over four years2 ($40) $32 $45 $118 $125 2008 2009 2010 2011 2012 (1) Net of by-product credits (2) Cdn $
  • 8. 8 Source: Scotia Capital (April 2, 2013), DPM 2013 Guidance Note: All-in Sustaining Cash Cost = Total cash costs (net of by-products) + sustaining capital + corporate G&A DPM: A LOW COST PRODUCER Cash Cost/Tonne of Ore Processed (1) ($/T) (1) This is a non-GAAP measure. See 2012 Annual Report for further details. (2) All-in cost is comprised of cash delivered cost which includes mine cash costs, TC’s, RC’s and freight; net of by product credits, sustaining capital; and G&A costs (allocated based on revenue of operation). All-in costs exclude Avala and Dunav and growth capital expenditures. See Appendix for reconciliation to cost of sales. Dundee Precious Metals $665 $714 $782 $838 $842 $875 $884 $1,005 $1,155 $1,178 $1,212 $1,325 $1,362 DPM Argonaut Alamos Allied Nevada Primero Timmins Teranga Centerra Alacer AuRico African Barrick Golden Star Semafo 2013E All-In Sustaining Cash Cost (US$/oz) Average: $987
  • 9. CORPORATE VISION AND STRATEGY 9Dundee Precious Metals Building DPM into a premier, intermediate, low-cost gold producer Optimize value of existing operating assets Grow the business beyond existing operating assets Sustain low quartile operating costs Conceptual Illustration of Krumovgrad Gold Project 3 blocks of dust- capturing chambers installed in the new baghouse at Tsumeb Exploration at Kapan Mine Autoclave fabricated for the MPF to be used for Stage 2 Pyrite Project at Chelopech • Increase mine production and extend LOMs • Upgrade/expand smelter and establish long-term contracts that provide a stable return • Develop Krumovgrad gold project • Establish deep pipeline of greenfield exploration opportunities • Complete acquisitions that offer accretive growth, diversity and gold exposure, while maintaining a conservative capital structure Maintain a strong balance sheet with ample liquidity Strategy Vision
  • 10. CHELOPECH MINE: LOW COST, LONG LIFE PRODUCER 10Dundee Precious Metals Chelopech Optimization Grade Ounces Resources M&I (at Dec.31, 2012) Au (oz) 4.0 g/t 3.8M Cu (lbs) 1.3% 825M Reserves (at Dec 31, 2012) Au (oz) 3.6 g/t 2.5M Cu (lbs) 1.1% Cu 519M Estimated Mine Life @ expanded rate 10+ years Continue to implement cost/margin improvements Operating at full capacity of two million tonnes of ore per annum Capitalize on lower cost / higher recovery staged flotation reactor technology Perform targeted exploration to replace depletion and increase mineral resources / reserves Install new pyrite concentrate flotation circuit Complete feasibility study on the pyrite gold treatment project Staged Flotation Reactor at Chelopech Operations
  • 11. Dundee Precious Metals 400,000 T pyrite concentrate produced (E) Metals Potential Grades Est. Incremental Production Result Au 6-7 g/t 75,000 - 90,000 oz Ag 10 - 15 g/t 130,000 - 190,000 oz Cu 0.5% - 0.7% 4.5M - 6.0M lbs Cash cost per oz of gold (net of by-product credits) $615 Estimated capital costs $202M NPV (5% discount rate) after tax(1) $141M IRR after tax(1) 24% Item Capex Stage 1: Concentrator upgrade $23M Stage 2: POX Facility Phase 1 - start production 2017 $93M Phase 2 - start production 2019 $87M (1) Assumes the following commodity prices after 2016: $1,250/oz Au, $25/oz Ag, and $2.75/lb Cu Project HighlightsProject Stages CHELOPECH MINE: PYRITE PROJECT TO INCREASE RECOVERIES TO 90% 2013 Catalysts Complete Stage 1 Concentrator Upgrade Q4 2013 Stage 2 POX Facility Feasibility Study Q3 2013 11
  • 12. Dundee Precious Metals 12Dundee Precious Metals Kapan Optimization Complete final portion of drilling of Shahumyan deposit to support resource and potential expanded operation Complete studies to confirm optimal mine plan based on new resource Explore regional license to define additional Mineral Resources Continue operational improvements and cost reductions Product Cu & Zn concentrates containing Au & Ag Deposit Type Polymetallic vein deposit (swarms) Open Pit Resource Underway Underground Resource Underway KAPAN MINE: POTENTIAL TO INCREASE SIZE AND EXTEND LIFE OF MINE 2012 Metals Production Grades 22,000 oz Au 1.56 g/t 2.5M lbs Cu 0.25% 15.4M lbs Zn 1.67% 450,000 oz Ag 32.20 g/t Kapan Mine office 2013 Catalysts Updated NI 43-101 Resource Estimate Q3 2013 * Kapan operations were on care and maintenance as of November 2008; operations restarted April 2009.
  • 13. Dundee Precious Metals • One of the few smelters with ability to process complex concentrate • Upgrades designed to meet internationally accepted environmental standards and expand capacity to process additional 3rd party concentrate • Lower per tonne operating costs and more favourable smelting terms are expected to generate significantly higher margins Horne Smelter Operated by Xstrata Capacity: 825Kt of concentrate (total) Note: Complex concentrate capacity limited with little to no 3rd party capacity Tsumeb Smelter Operated by Dundee Precious Metals Capacity: 240Kt-320Kt of complex concentrate Operating Smelters Closed Smelters Other smelters that process various amounts of complex concentrates La Oroya Smelter(1) Operated by Doe Run Kosaka Smelter Shut down in Q1 2008San Luis de Potosi Smelter Shut down in 2012 Note: Currently closed Limited Global Smelting Capacity for Complex Concentrate TSUMEB SMELTER: A UNIQUE STRATEGIC ASSET 13
  • 14. Dundee Precious Metals DPM Ownership 100% Location Namibia Technology Ausmelt Product Copper blister bars 2012 concentrate throughput 159,356 tonnes Emissions & dust capture upgrades $99M Sulphuric acid capture plant (Q3 2014) $204M Electric holding furnace (Q1 2016) ~$70M+ Asset Overview TSUMEB SMELTER HAS POTENTIAL TO POSITIVELY IMPACT EARNINGSComplexConSmelterCapacity(000’s) 14
  • 15. KRUMOVGRAD GOLD PROJECT: LOW CASH COST OPERATION 15Dundee Precious Metals Proposed Mine Type Open Pit Gold Recoveries 85% Grade 3.4 g/t Annual ore tonnage production 850,000 tpy Annual Au production 74,000 ounces Mine Life 9 years Capital Costs to complete US$127M Total cash cost per oz Au Eq $404 Conceptual Illustration of Krumovgrad Gold Project Secure final local approvals required prior to proceeding with ordering long lead items / construction Seek opportunities to increase recoveries through use of SFR technology Update / finalize mine plan Complete detailed engineering that optimizes value of project Evaluate other exploration opportunities within existing licenses and establish targeted drill program Based on Jan. 2012 DFS; Estimated recoveries, capital & operating costs in process of being updated. Future Catalysts Start Construction 2015 Start Production 2016
  • 16. Dundee Precious Metals • NI-43-101 resources include:  Bigar Hill initial Inferred Resource of 26.4 MT @ 1.6 g/t Au for 1.4Moz  Korkan initial Inferred Resource of 20.1 MT @ 1.5 g/t Au for 1.0 Moz  Kraku Pester initial Indicated resource of 6.3 MT @ 1.3 g/t Au for 0.27 Mozs and Inferred Resource of 2.2 MT @ 1.0 g/t Au for 0.07 Moz • Total Inferred Resource of 48.7 MT @ 1.5 g/t Au for 2.5 Moz • NI-43-101 inferred resources include:  Kiseljak Mineral Resource initial estimate 300 MT grading 0.27% Cu & 0.26 g/t Au for 1.8 Blbs Cu and 2.5 Moz Au • Bakrenjaca Au-Ag base metal epithermal system, drilling intersected 11m @ 5.13 g/t Au, 346 g/t Ag and 1.19% Cu DPM EXPLORATION UPDATE: PARTIALLY-OWNED ENTITIES Securities Shares (m) % Held Value (C$M) Avala Resources Special Warrants Warrants (strike at C$0.30) Total 135.0 50.0 25.0 53% 8.1 - - 8.1 Dunav Resources Warrants (strike at C$0.42) Total 56.0 27.5 46% 6.2 - 6.2 Total shares & securities ~ 14.3 Avala Resources Ltd. (TSX-V: AVZ) Equity Portfolio Overview as at July 2, 2013 Dunav Resources Ltd. (TSX-V: DNZ) 16
  • 17. DPM VALUE PROPOSITION: TRADING AT A SIGNIFICANT DISCOUNT TO OUR PEERS 17Dundee Precious Metals as at July 2, 2013 Market Capitalization (FD) $630M Debt $80.5M Corporate Cash (1) ($140M) Strategic Investments ($31M) Enterprise Value $540M 2017 @ $1,400 Au; $3.20 Cu Chelopech $220M Kapan (excluding open pit expansion) $23 Krumovgrad $42 Tsumeb Smelter $100 G & A ($35) Average EBITDA $350(2) EV/EBITDA 1.5x Estimated Capital expenditure to 2017 $640 - $750M Estimated Cash Flow to 2017(3) $1.0B (1) At Mar. 31, 2013; AVZ and DNV are assumed at $0; Fully Diluted; includes cash on dilution (2) Assumes avg LOM EBITDA for Chelopech, Kapan (assuming Kapan can be extended & operated at current rates), Krumovgrad and estimate for NCS at 310,000 tpa (3) Based on $1,400 Au and $3.20 Cu.
  • 18. Dundee Precious Metals Strong Financial Position Commodity and Geographic Diversification High Quality Assets with Proven Operating Performance and Further Potential Experienced Management Team and Board with Strong Track Record Pipeline of Value Adding Organic Growth COMPELLING INVESTMENT OPPORTUNITY 18
  • 19. DUNDEE PRECIOUS METALS MANAGEMENT TEAM 19Dundee Precious Metals Rick Howes President & Chief Executive Officer David Rae Senior Vice President, Operations Adrian Goldstone Executive Vice President, Sustainable Business Development Michael Dorfman Senior Vice President, Corporate Development Hume Kyle Executive Vice President & Chief Financial Officer Lori Beak Senior Vice President, Investor & Regulatory Affairs & Corporate Secretary Hans Nolte Vice President & General Manager, Namibia Custom Smelters Reuben Mills Vice President, Safety & Asset Risk Management Rob Taylor Vice President Projects Jeremy Cooper Vice President, Commercial Affairs Simon Meik Vice President, Processing Hratch Jabrayan Vice President & General Manager, Kapan Mine Nikolay Hristov Vice President & General Manager, Chelopech Mine Iliya Garkov Vice President & General Manager, Krumovgrad Gold Project Richard Gosse Senior Vice President, Exploration Jonathan Goodman Executive Chairman Paul Proulx Senior Vice President, Corporate Services
  • 20. dundeeprecious.com One Adelaide Street East Suite 500 Toronto, Ontario M5C 2V9 T: 416 365-5191 Investor Relations T: 416 365-2851 ssrubiski@dundeeprecious.com TSX: DPM – Common Shares DPM.WT.A – 2015 Warrants Proudly celebrating 30 years as a Toronto Stock Exchange listed company
  • 22. ANALYST COVERAGE 22Dundee Precious Metals BMO John Hayes CIBC World Markets Leon Esterhuizen Cormark Securities Mike Kozak Dundee Securities Josh Wolfson GMP Securities Oliver Turner Paradigm Capital Don MacLean RBC Capital Markets Sam Crittenden Scotia Capital Leily Omoumi Stifel, Nicolaus & Co. Michael Scoon
  • 23. 2013 GUIDANCE 23Dundee Precious Metals Metals Contained in Concentrate Produced Chelopech Kapan Total Gold (ounces) 125,000 – 143,000 25,000 – 30,000 150,000 – 173,000 Copper (million pounds) 43.0 – 46.0 2.5 – 3.0 45.5 – 49.0 Zinc (million pounds) - 12.0 – 14.5 12.0 – 14.5 Silver (ounces) 182,000 – 195,000 438,000 – 528,000 620,000 – 723,000 Sustaining Capital expenditures $14 - $17 million $8 - $12 million $22 - $29 million Total growth capital expenditures $210 - $240 million Construction of acid plant at Tsumeb Pyrite Project at Chelopech Krumovgrad development and construction work Kapan Gold exploration and/or development work Mine output at Chelopech (tonnes of ore) 1.9 – 2.05 million Mine out put at Kapan (tonnes of ore) 550,000 – 600,000 Concentrate smelted at Tsumeb (tonnes) 185,000 – 200,000 Sustaining capital expenditures at Tsumeb $13 - $16 million
  • 24. Q1 2013 SUMMARY 24Dundee Precious Metals Q1 2013 Q1 2012 Adjusted Net Earnings $6.6 million $31.3 million Adjusted basic EPS $0.05 $0.25 Gross profit (loss) Chelopech $36.4 million $52.4 million Kapan ($1.4 million) $1.8 million Tsumeb Smelter ($10.7 million) ($5.8 million) Total Gross profit $24.3 million $48.4 million Chelopech Production Gold (ounces) 39,313 35,582 Copper (lbs) 12,048,521 11,620,465 Silver (ounces) 61,058 59,050 Cash cost/T ore processed (incl. royalties) $41.16 $46.80 Cash cost/T ore processed (excl. royalties) $36.55 $41.97 Kapan Production Gold (ounces) 5,159 6,328 Copper (lbs) 553,731 613,397 Zinc (lbs) 3,358,133 4,443,184 Silver (ounces) 94,346 128,476 Cash cost/T ore processed (incl. royalties) $75.83 $75.18 Cash cost/T ore processed (excl. royalties) $72.36 $66.29
  • 25. COPPER HEDGE POSITION 25Dundee Precious Metals Year of projected payable copper production Volume Hedged (lbs) * Average fixed price ($/lb) 2013 5,019,920 $3.94 2014 7,195,880 $3.73 Total 12,215,800 $3.81 • As at March 31, 2013, the Company had outstanding derivative contracts to mitigate a portion of its price exposure related to its by-products. These are summarized below:
  • 26. CHELOPECH MINE: UPDATED MINERAL RESERVES AND RESOURCES 26Dundee Precious Metals Chelopech Mineral Reserves – December 31, 2012 Category Tonnes (M) Gold Copper Silver Grade (g/t) Ounces (M) Grade (%) Pounds (M) Grade (g/t) Ounces (M) Proven 12.3 3.4 1.4 1.3 340 9.3 3.7 Probable 9.3 3.8 1.1 0.9 180 5.7 1.7 Total 21.6 3.6 2.5 1.1 519 7.7 5.4 Chelopech Mineral Resources – December 31, 2012 Category Tonnes (M) Gold Copper Silver Grade (g/t) Ounces (M) Grade (%) Pounds (M) Grade (g/t) Ounces (M) Measured 15.1 4.0 2.0 1.5 490 10.3 5.0 Indicated 14.0 4.0 1.8 1.1 336 8.5 3.8 M&I 29.1 4.0 3.8 1.3 825 9.4 8.8 Inferred 9.3 2.9 0.9 0.9 182 10.6 3.2 1. The rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals. 2. All Mineral Resources and Mineral Reserves Estimates have been determined and reported in accordance with NI 43-101 and the classification adopted by the CIM. 3. Chelopech Mineral Reserves are based on a gold equivalent cut-off of 4 g/t (Au g/t + 2.06xCu%) and a cut-off of USD 10 profit/tonne using NSR analysis, as of December 31, 2012. This information has been prepared by Gordon Fellows who is a QP as defined in NI 43-101 and not independent of the Company. 4. Chelopech Mineral Resources are based on a gold equivalent cut-off 3 g/t (Au g/t + 2.06xCu%) and a greater than USD 0 profit/tonne test using NSR analysis, as of December 31, 2012. This information has been prepared by Petya Kuzmanova and reviewed and approved by Julian Barnes. Julian Barnes is a QP as defined in NI 43-101 and not independent of the Company. 5. Mineral Reserves and Mineral Resources for Chelopech are based on long term metals prices of USD 1,250/oz Au, USD 2.75/lb Cu, USD 25/oz Ag. 6. Measured and Indicated Mineral Resources are inclusive of Proven and Probable Mineral Reserves.
  • 27. CHELOPECH MINE: EXPLORATION RESULTS Q1 2013 27Dundee Precious Metals Significant intercepts (cut-off grade 3g/tAuEq) Hole ID Northing (mRL) Easting (mRL) Dip Az From (m) To (m) Interval (m) Grades Cu (%) Au (g/t) EXT19_260_13 29786 6042 -28.1 018.7 121.5 148.5 27.0 0.68 3.60 EXT19_260_14 29785 6042 -42.1 019.1 145.5 162.0 16.5 1.42 3.47 EXT19W_320_23 29778 5846 -25.9 43.7 25.5 49.5 24.0 1.06 3.90 129.0 138.0 9.0 0.93 2.36 EXT19W_320_24 29778 5846 -43.8 42.6 28.5 64.5 36.0 1.21 3.65 EXT19W_320_25 29777 5843 -8.8 336.2 120.0 153.0 33.0 0.26 4.51 EXT151_165_04 29305 5463 -60.6 134.2 40.5 54.0 13.5 0.71 2.67 G103_225_03 29178 5706 -58.4 346.4 85.5 126.0 40.5 0.79 2.07 1) Significant intercepts are located within the Chelopech Mine Concession and proximal to the mine workings. 2) Gold Equivalent calculation is based on the following formula: (Au g/t + 2.05xCu%). 3) Minimum downhole width reported is 1.5 metres with a maximum internal dilution of 4.5 metres. 4) True widths are approximately 90% of the intersection width. 5) Drill holes with prefix G indicate grade control drilling which is performed using BQ diamond drill core. All other holes are drilled with NQ diamond core. 6) Coordinates are in mine-grid. 7) No factors of material effect have hindered the accuracy and reliability of the data presented above. 8) No upper cuts applied. 9) For detailed information on drilling, sampling and analytical methodologies refer to the NI 43-101 “Preliminary Economic Assessment Report for the Chelopech Pyrite Recovery Project” (the “PEA Technical Report”) filed on SEDAR at www.sedar.com on September 10, 2012.
  • 28. CHELOPECH MINE: CASH COST RECONCILIATION 28Dundee Precious Metals US$ thousands, unless otherwise indicated Q1 2013 Actual Year 2012 Actual Year 2011 Actual Year 2010 Actual Year 2009 Actual Year 2008 Actual Cost of Sales: 31,991 98,298 88,838 $72,707 74,499 67,245 Less amortization & other (7,948) (19,542) (15,499) (14,425) (14,242) (11,966) Plus other charges, including freight 23,832 86,228 65,125 41,234 38,317 26,006 Less by-product credits (41,434) (163,940) (147,812) (87,320) (64,198) (59,376) Cash cost of sales after by-product credits 6,441 1,044 (9,348) 12,196 34,376 21,909 Gold oz (payable metal) 34,732 116,644 83,796 58,065 93,081 70,878 Cash cost of sales/oz gold, (net of by-product credits) $1851 $92 $(112)3 $2104 $3695 $3096 5Based on US$2.34/lb copper 6 Based on US$3.16/lb copper4 Based on US$3.42/lb copper 3 Based on US$4.27/lb copper2 Based on US$3.95/lb copper 1 Based on US$3.64/lb copper
  • 29. CHELOPECH MINE: CASH COST PER TONNE OF ORE RECONCILIATION 29Dundee Precious Metals 1. Gold, copper and zinc are accounted for as co-products. Total cash costs are net of by-product silver revenue. 2. For other periods please refer to past MD&As available on the corporate web site. US$ thousands, unless otherwise indicated For the periods indicated Q1 2013 Year 2012 Actual Year 2011 Actual Year 2010 Actual Year 2009 Actual Year 2008 Actual Ore processed (mt) 513,360 1,819,687 1,353,733 1,000,781 980,928 900,563 Cost of sales 31,991 98,298 $ 88,838 $ 72,707 75,647 67,423 Add (deduct): Depreciation, amortization & other non-cash costs (7,948) (19,542) (15,499) (14,425) (15,390) (11,966) Change in concentrate inventory (2,911) 4,535 862 (2,018) (419) (178) Total cash cost of production 21,132 83,291 $ 74,201 $ 56,264 59,838 55,279 Cash cost per tonne of ore processed, including royalties $41.16 $ 45.77 $ 54.81 $ 56.22 $ 61.00 $ 61.38 Cash cost per tonne of ore processed, excluding royalties $36.55 $ 41.16 $ 49.99 $ 51.54 $ 55.23 $ 57.87
  • 30. KAPAN MINE: MINERAL RESOURCE ESTIMATE 30Dundee Precious Metals Cut off (AuEq - g/t) Tonnage (Mt) Gold Equiv. (g/t) Copper (%) Gold (g/t) Silver (g/t) Zinc (%) 0.50 335.8 1.19 0.11 0.48 8.39 0.41 0.75 226.5 1.47 0.13 0.61 10.32 0.49 1.00 147.1 1.80 0.15 0.79 12.62 0.57 1.25 98.3 2.14 0.17 0.99 14.99 0.65 1.50 69.8 2.45 0.18 1.19 17.00 0.72 1.75 49.2 2.80 0.19 1.43 19.14 0.78 2.00 36.3 3.13 0.19 1.68 20.87 0.83 Shahumyan Deposit – September 2008 Inferred Mineral Resource – Ordinary Kriging Estimate 10mE x 10mN x 10mRL Block Size – 5m Capped Input Composite Data AuEq US$ price assumptions: Cu $2.50/lb, Au $850/oz, Ag $16/oz and Zn $1.00/lb
  • 31. KAPAN MINE: EXPLORATION RESULTS Q1 2013 31Dundee Precious Metals Surface significant intercepts (SHDDR holes, cut-off grade 0.5 g/t AuEq) and underground significant intercepts (E holes, cut-off grade 1.0g/t AuEq) Hole ID Northing (mRL) Easting (mRL) RL Dip Azi From (m) To (m) Interval (m) & AuEQ Au (g/t) Ag (g/t) Cu (%) Zn (%) E712DE014 4343208 8623975 713 -23.1 358.4 79.0 81.0 2m @ 20.17 11.55 358.5 0.06 2.47 E712DE028 4343208 8623974 712 -54.9 352.2 367.0 369.0 2m @ 13.09 8.72 69.5 1.79 0.07 E712DW007 4343184 8623803 713 -20.0 6.9 423.0 425.2 2.2m @ 17.74 8.20 184.6 2.45 3.33 E712DW009 4343184 8623803 712 -40.7 6.2 48.0 54.0 6m @ 11.71 3.72 54.4 2.18 6.05 SHDDR0516 4344044 8623467 975 -59.8 2.7 49.0 54.0 5m @ 3.68 2.30 22.2 0.04 1.58 SHDDR0517 4343950 8623467 963 -59.4 1.5 48.0 59.0 11m @ 2.49 0.96 34.8 0.30 0.64 SHDDR0517 4343950 8623467 963 -59.4 1.5 76.0 94.5 18.5m @ 1.93 0.36 17.5 0.36 1.14 SHRCR0111 4343334 8623777 904 -60.6 0.6 54.0 63.0 9m @ 3.56 1.36 22.0 0.31 2.29 SHRCR0115 4343370 8623867 895 -60.5 0.4 69.0 82.0 13m @ 5.93 5.59 9.3 0.01 0.24 SHRCR0117 4343245 8623880 882 -60.4 1.1 20.0 35.0 15m @ 2.43 0.91 21.8 0.15 1.51 SHDDR0539 4343234 8623596 906 -60.3 1.4 134.0 150.0 16m @ 2.72 1.03 25.8 0.25 1.40 SHDDR0539 4343234 8623596 906 -60.3 1.4 269.0 283.0 14m @ 4.42 2.45 49.5 0.26 1.01 1) In situ gold equivalent (AuEq) grade based on the following long-term metal prices: $1,250 per ounce for gold, $25 per ounce for silver, $3.00 per pound for copper and $1.00 per pound for zinc. 2) Holes with the prefix SHDDR and SHRCR are surface HQ diamond and RC open pit drilling, respectively, while E holes are underground BQ drilling. 3) Significant intercepts for surface holes are located within the Central and Southern Zones while underground drilling is located within the Central Zone of the Shahumyan Deposit. 4) True widths are approximately 90% of the intersection width. 5) Minimum width reported is 2 metres and a maximum internal dilution of 4 metres. 6) All survey coordinates are transformed to AUSPOS. 7) No factors of material effect have hindered the accuracy and reliability of the data presented above. 8) No upper cuts have been applied.
  • 32. KAPAN MINE: CASH COST RECONCILIATION 32Dundee Precious Metals US$ thousands, unless otherwise indicated Q1 2013 Actual Year 2012 Actual Year 2011 Actual Year 2010 Actual Year 2009 Actual Year 2008 Actual Cost of Sales: 9,502 50,547 47,276 33,637 21,072 36,319 Less amortization & other (1,617) (9,989) (9,140) (7,056) (6,996) (5,400) Plus other charges, including freight 1,672 6,218 11,893 8,912 5,142 4,976 Less by-product credits (5,780) (32,075) (47,588) (28,562) (13,591) (13,520) Cash cost of sales after by-product credits 3,777 14,701 3,028 6,931 5,627 22,375 Gold oz (payable metal) 3,541 18,204 26,230 22,287 11,233 11,388 Cash cost of sales/oz gold, (net of by-product credits) $1,0671 $8082 $1153 $3114 $5015 $1,9656 5Based on US$2.34/lb copper 6 Based on US$3.16/lb copper4 Based on US$3.42/lb copper 3 Based on US$4.27/lb copper2 Based on US$3.95/lb copper 1 Based on US$3.64/lb copper
  • 33. KAPAN MINE: CASH COST PER TONNE OF ORE RECONCILIATION 33Dundee Precious Metals 1. Gold, copper and zinc are accounted for as co-products. Total cash costs are net of by-product silver revenue. 2. For other periods please refer to past MD&As available on the corporate web site. US$ thousands, unless otherwise indicated For the periods indicated Q1 2013 Year 2012 Actual Year 2011 Actual Year 2010 Actual Year 2009 Actual Year 2008 Actual Ore processed (mt) 119,663 509,419 581,852 428,865 218,235 269,033 Cost of sales 9,502 50,547 $ 47,276 $ 33,637 $ 21,197 $ 36,319 Add (deduct): Depreciation, amortization & other non-cash costs (1,617) (10,883) (9,140) (7,056) (4,047) (3,668) Care and maintenance costs - - - - (3,074) (1,732) Change in concentrate inventory 1,189 (718) 416 3,572 1,696 (1,485) Total cash cost of production 9,074 38,946 $ 38,552 $ 30,153 $ 15,772 $ 29,434 Cash cost per tonne of ore processed (royalties not applicable in 2009) $75.83 $ 76.45 $ 66.26 $ 70.31 $ 72.27 $ 109.40 Cash cost per tonne of ore processed, excluding royalties $72.36 $ 69.10 $ 62.57 $ 66.33 $ 72.27 $ 109.40
  • 35. KRUMOVGRAD GOLD PROJECT 35Dundee Precious Metals Krumovgrad Mineral Reserves – December 31, 2011 Category Tonnes (M) Gold Silver Grade (g/t) Ounces (M) Grade (g/t) Ounces (M) Proven 2.94 4.70 0.44 2.54 0.24 Probable 4.30 2.44 0.34 1.52 0.21 Total 7.24 3.36 0.78 1.92 0.45 Krumovgrad Mineral Resources – December 31, 2011 Category Tonnes (M) Gold Silver Grade (g/t) Ounces (M) Grade (g/t) Ounces (M) Measured 3.30 4.90 0.52 3.00 0.28 Indicated 4.69 2.50 0.38 2.00 0.24 M&I 7.99 3.50 0.90 2.00 0.51 Inferred 0.40 1.20 0.02 1.00 0.01 1. Rounding of tonnage and grade figures has resulted in some columns showing relatively minor discrepancies in sum totals. 2. All Mineral Resource Estimates have been determined and reported in accordance with NI 43-101 and the classification adopted by the CIM. 3. Krumovgrad Mineral Reserves and Resources are based on the Krumovgrad 2012 Technical Report using a variable economic cut-off grade and 0.5 g/t Au respectively. 4. All Mineral Reserves and Resources are based on long term metals prices of $1,250 Au, $3/lb Cu, $25/oz Ag and $1/lb Zn. 5. Measured and Indicated Mineral Resources are inclusive of Proven and Probable Reserves.
  • 36. dundeeprecious.com One Adelaide Street East Suite 500 Toronto, Ontario M5C 2V9 T: 416 365-5191 Investor Relations T: 416 365-2851 ssrubiski@dundeeprecious.com TSX: DPM – common shares DPM.WT.A – 2015 Warrants Proudly celebrating 30 years as a Toronto Stock Exchange listed company